National Horticulture Board Ministry of Agriculture 8: Farmers Welfare Government of , Plot No.85, Sector 18, Institutional Area, Gurugram - 122 015 (Haryana) Ph. 0124-2342992, Fax: 2342991, 2341225 - Website: www.nhb.gov.in NHB/CC/9thPPAC/2019-20/ .. September, 06, 2019 } 3°)0 Office Melno•.anduin

Subject: P•.oceedings of the 9th aneeting of the P•.e- P•.oject App•.aisal Coananittee(5th PPACfo•.IPAScheane 2019-20) to conside •.the p•.oposals unde.. va•.ious scheanes of the. Boa•.d held on 03.09.2019 at NHB,HQ,Guwug•.aan - Rega •.ding.

I am directed to enclose herewith a copy of the Proceedings of the 9th Meeting of the Pre-Project Appraisal Committee (New Project-2019-20) held on 03.09.2019 at NHB, Head Quarters, Gurugram under the Chairmanship of Dy. Managing Di ector, NHB.

Ob(1)ql.tol~

(D.. Pal) Deputy Director

Distribution:

1) All Divisional Heads jJoint Directors, NHB, Gurugram. 2) Account Officer, NHB, Gurugram.

Copy for information to :

1) PS to MD, NHB, Gurugram 2) PA to DMD, NHB, Gurugram National Horticulture Board Department of Agriculture, Cooperation and Farmers' Welfare Ministry of Agriculture and Farmers' Welfare

NHB, Gurugram, Dated 06th September, 2019 Minutes of the 9th Pre-Project Appraisal Committee (PPAC) meeting (New Project-2019- Subject 20) to consider the proposals under various schemes of the Board.

Date & Time 03.09.2019 Venue NHB, Gurugram

The Meeting was chaired by Shri Brajendra Singh, DMD, NHB. The following members attended the meeting.

Name of Officer/Representative with Designation attended the meeting S.No Composition 1. Deputy Managing Shri Brajendra Singh, Dy. Managing Director Director, NHB-Member 2. Divisional Heads of the 1. Shri D.P. Singh, Divisional Head (Fruits) Division- Member 2. Shri Pushpendra Arya, Divisional Head (Flowers) 3. Shri Lal Singh, Divisional Head (Vegetables) 4. Shri R.S. Meena, Divisional Head (Mushroom/Spices & Aromatic plants)

IN ATIENDANCE

• Shri K.N. Tripathi, Deputy Director, NHB • Shri U.s. Bhardwaj, Deputy Director, NHB • Shri O.K. Pal, Deputy Director, NHB • Shri Udaiveer Singh, Deputy Director, NHB • Shri. H.C. Rohilla, Account & Finance Officer, NHB • Shri A.K. Mishra, Sr. Horticulture Officer, NHB • Shri Ashok Kumar, Horticulture Officer, NHB • Shri. P.K. Bera, Horticulture Officer, NHB • Shri Ratan Lal Fulwariya, Horticulture Officer, NHB

1. At the outset, Deputy Managing Director welcomed the members of the PPAC and advised all members to meticulous follow the Pre-IPA/IPA guideline 2019-20. 2. It was informed to all dealing officers that examination of proposals mu'st be done with due diligence and concerned dealing officers will be accountable for any failure on their part as laid down in Internal Note dated 14.03.2019 issued under the signature of Shri Pushpendra Arya, JD (Personnel) under instruction from MD. 3. Chairman also reminded that all divisional heads must ensure that application is processed in timely manner and agenda should be submitted with signature of all dealing officers i.e. concerned HO/SHO/DD and Division Head with clear recommendation. 4. All Divisional Head confirmed that query for the proposals placed before PPAC have already been issued to applicants in advance. Representative of IT Division also informed that applicants will be able to see online checklist & agenda through their login 10. 5. Divisional Heads were asked to ensure speedy compliance of documents/clarifications in respect of deferred cases and place such cases before PPACwithin timeline given in guidelines. 6. It was observed that several irrelevant queries such as seeking information of English Version of land documents papers submitted by applicant. This may be avoided in future. 7. It was decided that a copy of the relevant agenda note & checklist shall be provided to each visiting farmers at NHB, Head Office and State Office along with a copy of Do's and Don't. Details of projects of PPAC meeting of IPA Scheme 2019-20 during Current Financial year

Sr. Date of Total New projects Deferred cases Total No. meeting projects approved Approved Deferred Rejected Withdrawn Approved Deferred Rejected Withdrawn discussed case 1 03.07.2019 13 01 08 04 - - - - - 01 2 19.07.2019 33 01 26 06 - - - - - 01 3 09.08.2019 54 02 49 02 - 01 - - - 03 4 20.08.2019 51 05 39 02 03 02 - - - 07 5 03.09.2019 65 08 55 01 - - 01 - - 08 Total 216 17 177 15 03 03 01 . . 20 ". - MINUTES FOR PPAC (Date of Meeting : 03/0912019) I - " - I Pre-IPA Project 2019-20-PIPA- - Istate: I Code: 27BMHBOOO023 I~ IType of IDate of Meeting: 1103/09/2019 Case: IFresh I~

1 Agenda Item No Volume-Ol (I) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Name of Scheme Production and Post Harvest Management of Horticulture Crops SHRI SANTOSH SHAMRAO KOLAVALE & 5 Name of Project OTHER-l Village-Sonalwadi Tal- Sangola Dist-Solapur 6 Project Location (Maharashtra ) 7 Gender(Male/Female) MALE Constitution of Applicant: 8 Group of Farmer growers I Consumers PromoteI'I Applicant Social Category 9 GEN (General/SCP ITSPIMinority(M/C/S/P IBI J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability ~ 13 Date of Receipt Online Application 02/08/2019 14 Date of Receipt of Hard Copy of Application 1310812019 15 As per Online Application: :('a t ('gOl'Y Crop Nmnl~ An~a/(:apacit) {ioit IFRUITSlpOMEGRANA~ Activity/ Crop/ Area/ Capacity Approved by PPAC: Category (:rop Name Area/('apadty Unit IFRUITS IpOMEGRANATEls.so IAcrel 16 Project Cost (Rs. in lakh) 27.61 17 Promoter's share (Rs. in lakh) 6.90 18 Loan Amount (Rs. in lakh) 20.71 19 Applicable Scheme New-After 31/03/2014 20 Approved Decision of PPAC : Approved with specific The proposal discussed & approved by the mention of amount/ Rejected with reasons/ Committee for issuance of Pre-In Principal Deferred with reasons Approval (Pre-IPA) based on the information given in Agenda Note/checklist. 21 Addl. remarks 22 (i)Presently at head office No Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers Yes (iii)Through phone by PPAC No -' - - - I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project IMaharashtra- II~O19-20-PIPA- Iistate: Code: 27BMHBOOO029 I Pune ,., I~ IType of !Date of Meeting : 1103/09/2019 IFresh I Case: II~

1 Agenda Item No Volume-01 (02) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project SOU. VIDYA SIDDHARAM SAGARE 6 Gat No. 117/21A/2IB At Post Malkavathe, Project Location Taluka South Solapur, District Solapur 7 Gender(Male/Female) FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoterl Applicant 9 Social Category GEN (General/SCP ITSP IMinority(MlC/S/P IBI J))10 BC 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 10108/2019 14 Date of Receipt of Hard Copy of Application 15 As per Online Application: ('fOp Ca!{'~ory An'a/(,apacily Lnil Activityl Cropl Areal Capacity Name ~UITS IGRAPESI5.00 ~~

16 Project Cost (Rs. in lakh) 28.92 17 Promoter's share (Rs. in lakh) 7.23 18 Loan Amount (Rs. in lakh) 21.69 New-After 31/03/2014 19 Applicable Scheme . 20 Rejected The Committee discussed the proposal in detail in the light of NHB Scheme Decision ofPPAC : Approved with specific guidelines and rejected as the applicant mention of amountl Rejected with reasonsl has requested to withdraw her Pre-IPA Deferred with reasons application due to area under the project 1S less then , mandatory requirement (above 5.00 acre).

21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field officesl state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC No .------,------'--'---

-- ~- I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I Pre-IPA Project 2019-20-PIPA- IMaharashtra- Istate: Code: 27BMHBOOO032 Pune I~ Type of Date of Meetin~lo3/09/20 19 IFresh ~ Case: I~

1 Agenda Item No Volume-01 (03) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Narne of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project SHRI ABHISHEK ARUN SALUNKE 6 Village-Sangvi Kati Tal-Tuljapur, Dist- Project Location Osmanabad 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /BI J))/0BC 10 Type of Area(GeneraIlTSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 17/08/2019 14 Date of Receipt of Hard Copy of Application 26/08/2019 15 As per Online Application: ('rop Calt'gory. An'a/C~lpacily L nit Naul(' IFRUITS IGRAPES~O jAcrel Activity/ Crop/ Area/ Capacity Approved by PPAC: Crop Calt'gory '\fca/Capacity Cnit Name IFRUITS IGRAPESI5.50 IAcre 16 Project Cost (Rs. in lakh) 40.72 17 Promoter's share (Rs. in lakh) 10.18 18 Loan Amount (Rs. in lakh) 30.54 19 Applicable Scheme New-After 31/03/2014 20 Approved The proposal discussed & approved by Decision of PPAC : Approved with specific the Committee for issuance of Pre-In mention of amount/ Rejected with reasons/ Principal Approval (Pre-IPA) based on Deferred with reasons the information given III Agenda Note/checklist. 21 AddI. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting No (iii)Through phone by PPAC No I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project 2019-20~PIPA- I Maharashtra- Iistate: Code: 27BMHBOOO033 I Pune I~ Type of 03 09 I IFresh IDate of Meeting: 11 / /2019 Case: I~I

1 Agenda Item No Volume-01 (04) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project SHR1 GlR1SH JAYWANTRAO PATIL 6 Village Sadepur Tal-South Solapur Dist- Project Location Solapur (Maharashtra)

7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category OBC-GEN (General/SCP /TSP /Minority(M/C/S/P IB/J))/OBC 10 Type of Area(GeneraI/TSP) Gen II Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 17/08/2019 14 Date of Receipt of Hard Copy of Application 26/08/2019 15 As per Online Application: Crop Call-norv Area!Capacily Cnil b " Nauu.' IFRUITS IGRAPES~.~ Activityl Cropl Areal Capacity Approved by PPAC: ('rop Category Arca/C'apacHy Cnit Namt' IIFRUITS IGRAPES 18.00 IAcre 16 Project Cost (Rs. in lakh) 32.34 17 Promoter's share (Rs. in lakh) 8.09 18 Loan Amount (Rs. in lakh) 24.25 19 Applicable Scheme New-After 31/03/2014 20 Approved The proposal discussed & approved by Decision of PPAC : Approved with specific the Committee for issuance of Pre-In mention of amount! Rejected with reasons/ Principal Approval (Pre-IPA) based on Deferred with reasons the information given in Agenda Note/checklist. 21 AddI. remarks 22 (i)Presently at head office No (ii)Presently at field officesl state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC No -_._------_._-_. __._._--_. . . . ., . " - I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project 2019-20-PIPA- I Maharashtra- Iistate: Code: j27BMHBOOO034 Pune I~ Type of I IFresh IDate of Meeting : 1103/0912019 Case: I~

1 Agenda Item No Volume-Ol (05) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Production and Name of Scheme Post Harvest Management of Horticulture Crops 5 SHRI ASHOK SUKHDEO Name of Project NANAWARE 6 Village-Bhandi Shegaon, Tal- Project Location Pandharpur, Dist-So1apur 7 Gender(Ma1e/Fema1e) MALE 8 Constitution of Applicant: INDIVIDUAL Promoterl Applicant 9 Social Category SC (General/SCP ITSP IMinority(MIC/S/P IBI J))/OBC 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rr1 12 Disability N 13 Date of Receipt Online Application 18/08/2019 14 Date of Receipt of Hard Copy of Application 22/08/2019 15 As per Online Application: ( "tt'gm'\ NCrop ;\ 1"(,11,'(' apal'lv'( r"til''( , "; ':Ifill' .. IFRUITS 1~7,OO ~ Activityl Cropl Areal Capacity Approved by PPAC:

("ttl'Horv,. _ -,... . ,r\"Crop :,\n"lif"lfndIY,•. J . 'f. •. ' • I, nit " "1 'auu.' " IFRUITS JLIMEI2:00 ~ 16 Project Cost (Rs. in Iakh) 17.30 17 Promoter's share (Rs. in lakh) 4.32 18 Loan Amount (Rs. in lakh) 12.98 19 Applicable Scheme New-After 31/03/2014 20 Approved The proposal discussed & approved Decision of PPAC : Approved with specific by the Committee for issuance of mention of amountl Rejected with reasonsl Pre-In Principal Approval (Pre-IPA) Deferred with reasons based on the information given in Agenda Note/checklist.

21 AddI. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state Participation of applicant in the PPAC Meeting officers No

(iii)Through phone by PPAC No ., ~ - I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project 2019-20-PIPA- Maharashtra- Istate: Code: 27BMHBOOO035 ~ Pune I~ Type of IDate of Meetin~103/09/20 19 IFresh ~ Case: I~

1 Agenda Item No Volume-O1 (06) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Production and Name of Scheme Post Harvest Management of Horticulture Crops 5 Name of Project SMT. SUJATA ASHOK NANA WARE Village-Bhandi Shegaon, Tal- 6 Project Location Pandharpur, Dist-Solapur 7 Gender(Male/Female) FEMALE Constitution of Applicant: 8 INDIVIDUAL Promoter/Applicant Social Category 9 SC (General/SCP /TSP /Minority(M/C/S/P /B/J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 18/0812019 14 Date of Receipt of Hard Copy of Application 22/0812019 15 As per Online Application: Cat(~gory N/Crop \.fl'a!.apatttv(' . 1."';mt lame • IFRUITS IGUAVAI7.50 ~ Activity/ Crop/ Area/ Capacity Approved by PPAC: Crop CMenon Area/Clpm:ity'. Cnif "' .' Name FRUITS IGUAVAI7.50~ 16 Project Cost (Rs. in lakh) 17.68 17 Promoter's share (Rs. in Iakh) 4.42 18 Loan Amount (Rs. in lakh) 13.26 19 Applicable Scheme lNew-After 31/03/2014 20 Approved The proposal discussed & approved by Decision of PPAC : Approved with specific the Committee for issuance of Pre-In mention of amount/ Rejected with reasons/ Principal Approval (Pre-IPA) based on Deferred with reasons the information given 111 Agenda Note/ checklist. 21 Add!. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state Participation of applicant in the PPAC Meeting officers No (iii)Through phone by PPAC No - - - I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project 2019-20-PIPA- I Maharashtra- llstate: Code: 27DMHDOOO020 Nashik I~ I Type.of IFresh. Date of Meeting: 103/09/2019 ; Case. I~

1 Agenda Item No Volume-Ol (07) 2 Date of Draw 3 Priority No Development of Commercial Horticulture 4 Name of Scheme through Production and Post Harvest Management of Horticulture Crops MRS. SEEM A SAMDHAN PATIL 5 Name of Project Village - Pahan, Taluka - Pachora, Distt.- 6 Project Location (Maharashtra) 7 Gender(Male/Female)' FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P fB/J))/OBC 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 25/07/2019 14 Date of Receipt of Hard Copy of Application 14/08/2019 As per Online Application: 15 Crop Cal t'gllr) An'a!Cal)~\city l, nil Nanw Activity/ Crop/ Area/ Capacity [FRUITS 1~~:Z~DI7.50 IAcrel

16 Project Cost (Rs. in lakh) 15.99 17 Promoter's share (Rs. in lakh) 4.00 18 Loan Amount (Rs. in lakh) 11.99 New-After 31/03/2014 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 24.08.2019. Division to expeditiously Deferred with' reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes - - - '"" ""- - r MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre- IPA Proj ect 2019-20- PIPA- Maharashtra- Code: 27DMHDOOO022 "~Ete:~ Nashik I~ I Type of J IFresh IDate of Meeting : 1103/09/2019 I Case: I~

1 Agenda Item No Volume-OI (08) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Production and Post Name of Scheme Harvest Management of Horticulture Crops MR. DNYANESHWAR DHONDU 5 PATIL &JYOTI DNYANESHWAR Name of Project PATIL & DHONDU DASHRATH PATIL NIPANE, JAVKHEDSIM,TAL- 6 Project Location ERANDOL,DIST-JALGAON (Maharashtra) 7 Gender(MaIe/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP lMinority(M/C/S/P IB/J) )/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 27/07/2019 14 Date of Receipt of Hard Copy of Application 16/08/2019 As per Online Application: 15 Crop Ca\l't;nry An:a/Cap~leily lJoil Activity/ Crop/ Area/ Capacity Name IFRUITS ILEMONI7.90 IAcrel

16 Project Cost (Rs. in lakh) 19.24 17 Promoter's share (Rs. in lakh) 6.73 18 Loan Amount (Rs. in lakh) 12.51 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 24.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete infonnation & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks 22 (i)PresentIy at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes ,\ • .L ",.-- [0 - r\~l . . I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) ~ Pre-IPA Project 2019- 20-PIPA- IMaharashtra- ilstate: Code: 27DMHDOOO026 Nashik I~ IType of IFresh IDate of Meeting : 1103/09/2019 I Case: I~

1 Agenda Item No Volume-Ol (09) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Production and Name of Scheme Post Harvest Management of Horticulture Crops SMT. RAKSHA NIKHIL KHADSE & 5 Name of Project MANDAKINI EKNATH KHADSE At- , Tal-Muktainagar, Tal- 6 Project Location Jalgaon (Maharashtra) 7 Gender(Male/Female) FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(MIC/S/P /B/J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 01/08/2019 14 Date of Receipt of Hard Copy of Application 14/08/2019 As per Online Application: 15 ( t Crop \ '(' . t"' .a ('''on",..., . N:unl' .' feu: ,apll(:llv. !nIl Activity/ Crop/ Area/ Capacity IFRUITS IDATEIPALM 15.00 IAcrel

16 Project Cost (Rs. in lakh) 25.48 17 Promoter's share (Rs. in lakh) 12.74 18 Loan Amount (Rs. in lakh) 12.74 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information!' clarification Decision ofPPAC : Approved with specific sought by the division vide email mention of amount/ Rejected with reasons/ dated 24.08.2019. Division to with Deferred with reasons expeditiously follow up applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state Participation of applicant in the PPAC Meeting officers Yes (iii)Through phone by PPAC Yes

....._,., .." ...... ". ,._" .. - ...... •. _-_ .._...... "",, .._-_ ...... ,.. "" ...... _ __ __ ~ ", .. _.".,._" .. ,,, ..•...... •. _- ...... _ __ --""" " -"_ ..•. _.. ,' "", ...... , ._",', .._._ .." .... ,,,...,--~,,..._--_ ... ..,._'- •.._ .....•. _"-'"', .. , ....._...... __ .~...... _...... -..... ,-" . _- ,,'~j661 ..-- 11- - .' I MINUTES FOR PPAC (Date of Meeting: 03/0912019) I Pre-IPA Project 2019-20-PIPA- IMaharashtra- Iistate: Code: 27DMHDOOO028 Nashik I~ Type of I IFresh IDate of Meeting: IE2019 I Case: I~

1 Agenda Item No Volume-OI (10) 2 Date of Draw 3 Priority No Development of Commercial Horticulture 4 Name of Scheme through Production and Post Harvest Management of Horticulture Crops MR. GOKUL BABURAO VERULE & 5 Name of Project OTHERS GAT NO. 899, VILLAGE: VADNER 6 Project Location BHAIRAV, TAL: CHANDWAD, DIST: NASHIK 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category OBC-GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 02/08/2019 14 Date of Receipt of Hard Copy of Application 19/08/2019 15 As per Online Application: Crop Arca/Capacil) l nil Catc"lH'\'b ~ Activity/ Crop/ Area/ Capacity ;\Jame IFRUITS IGRAPES 18.00 IAcrel

16 Project Cost (Rs. in lakh) 39.66 17 Promoter's share (Rs. in lakh) 9.91 18 Loan Amount (Rs. in lakh) 29.75 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/infOlmation/ clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 24.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes ...... __ ." •.•,.,.•. __ ••••.••• " ••_..__ .",.,~'. __.•_~ ...•.__ ••.. ,',.,,,_.w._" ___ ...,.". ___ ••.•••.. _ •.•••• _ .....•. ___ ••••• M_ •• ~ •• ~._ •• _ •••• "' ••••••••••••• ___ •••••• __ •• _ ••••••• ,_ _._.~,~_.." ..".- ., ..... _._""" ....•_...... --_._--_ ..•.._._.."...._-_ ...... --_._.-" .....__._...... __ ..... " .._,.--".,.,',-_ ..'".'''"'.-'--'" ,." ... _..,

~, .".-. IJ-~ -, I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I Pre-IPA Project 20 19-20-PIPA- I Maharashtra- Iistate: Code: 27DMHDOOO034 INashik i~ I Type of IDate of Meeting: 1103/09/2019 Case: Eh I~ ! I

1 Agenda Item No Volume-O1 (11) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 SHRI PURUSHOTTAM MURLIDHAR Name of Project KATHE & OTHER-3 6 Chitegaon Tal-Niphad Dist- Nashik Project Location '(Maharastra) 7 Gender(Male/Female) MALE 8 Constitution of Applicant: Group of Farmer growers / Consumers Promoter/Applicant 9 Social Category OBC-GEN (General/SCP /TSP /Minority(MlC/S/P /B/ J) )/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 07/08/2019 14 Date of Receipt of Hard Copy of Application 13/08/2019 15 As per Online Application: Crop C,ltq~ory An:a/Capacity Cnit NHme IFRUITS IGRAPESI22.00 ~ Activity/ Crop/ Area/ Capacity Approved by PPAC: (:rop Cah'''orv Area/Capacity Cnit b , ~am(' ~_RUITS IGRAPESI22.00 IAcrel 16 Project Cost (Rs. in lakh) 76.92 17 Promoter's share (Rs. in lakh) 19.23 18 Loan Amount (Rs. in lakh) 57.69 19 Applicable Scheme New-After 31/03/2014 20 Approved The proposal discussed & approved by Decision of PPAC : Approved with specific the Committee for issuance of Pre-In mention of amount/ Rejected with reasons/ Principal Approval (Pre-IPA) based on Deferred with reasons the information given in Agenda Note/checklist. 21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes '- - - y '- 'f '\0 .".-- 1.3 - I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project 2019-20-PIPA- - 11sH="- I Maharashtra- Code: 27DMHD000035 !~', Nashik I~ IDa,e of Meeting : 11°3/09/2019 Ii>'~~IFTeSh l~

1 Agenda Item No Volume-01 (12) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Production and Name of Scheme Post Harvest Management of Horticulture Crops 5 MR. PRASHANT PRABHAKAR Name of Project CHAVHAN & OTHERS At/Post - Lulle, Taluka - Malegaon, 6 Project Location Distt.- Nashik (Maharashtra) 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/ J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 08/08/2019 14 Date of Receipt of Hard Copy of Application 19/08/2019 15 As per Online Application: Crop \ 1(' . t" Catt~gory , i rl'HiUpacll:v jUll Activity/ Crop/ Area/ Capacity NaUlt' ' " , IFRUITS IGUAVAII0.00 ~

- 16 Project Cost (Rs. in lakh) 41.58 17 Promoter's share (Rs. in lakh) 8.32 18 Loan Amount (Rs. in lakh) 33.26 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/informati onlclarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 24.08.2019. Division to expeditiously for Deferred with reasons follow up with applicant compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Add!. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state Participation of applicant in the PPAC Meeting officers Yes (iii)Through phone by PPAC Yes

..,.,._._.._...•..•.._._...... ~._w.•...___ • • • __ ., c. , •••• _"._ ••••••• _._._" •••• _._ ••• , •.•• ,_,." •••• _ ••••••••• ~_ ••••.• ,_.~ __ ."',, •• _.-r' •• ___ •••••••• _ ••• ,.,_., •••••• _ ••••••••••••••••••••••••••• _""' •••"" ••• ~.,"', •••••_._ ••_ •• " ••••"_ ••••••• " •••• _ •••••••••••• _H •• ,',,' ____ .,' ". __.~.,.,,", ••••~_.,.,',.,_. ___ ••• ,".,~_._ • --," , i~r-,l 6{ .-- [l.{- o "" .- - - I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I Pre-IPA Project 2019-20-PIPA- Maharashtra- IIState~ Code: 27DMHDOOO037 ] Nashik 1~ IType of IDate of Meeting : 1103/09/2019 ICase: .--l IE l~

1 Agenda Item No Volume-OJ (13) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 MR. AMOL NIVRUTTI RAKIBE & Name of Project OTHERS 6 At Post- Thengoda, Tal. Baglan, Dist- Project Location Nashik (MH) 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoterl Applicant 9 Social Category GEN (General/SCP ITSPIMinority(M/C/S/P IBIJ) )/OBC - 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 14/08/2019 14 Date of Receipt of Hard Copy of Application 20108/2019 15 As per Online Application: Crop (' a leoo fV Arl'a/Capadt:" Cni! ~ ~ Name IFRUITS IGRAPESI9.00 I~ Activityl Cropl Areal Capacity Approved by PPAC: Crop Calt'('On Arca/Capacit." tnit ", . "'amt' IFRUrrS JGRAPESI~O IAcrel 39.13 16 Project Cost (Rs. in lakh) - 17 Promoter's share (Rs. in lakh) 9.78 18 Loan Amount (Rs. in lakh) 29.35 19 Applicable Scheme New-After 31/03/2014 20 Approved The proposal discussed & approved by Decision of PPAC : Approved with specific the Committee for issuance of Pre-In mention of amountl Rejected with reasonsl Principal Approval (Pre-IPA) based on Deferred with reasons the information given III Agenda Notel checklist.

21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field officesl state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes ~ ---~_._---, ------'- l\~ obl Is--- r I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I 20l9-20-PIPA- Maharashtra- Pre-IPA Project -Il~tate: I Code: 27DMHDOOO039 Nashik I~I IType.o~IFresh IDate of Meeting : 1103/09/2019.. ' Case. I ' . j~

1 Agenda Item No Volume-Ol (14) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 MRS. KALPANA SAHEBRAO Name of Project BHALERAO & OTHERS 6 Village - Tisgaon, Taluka - Dindori, Project Location Distt.- Nashik (Maharashtra) 7 Gender(Male/Female) FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/0 BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 14/08/2019 14 Date of Receipt of Hard Copy of Application 20/08/2019 15 As per Online Application: Crop Cail'gory An:aJCapacHy Lni!, Activity/ Crop/ Area/ Capacity Name IFRUITS IGRAPESI6.00 IAcrel

16 Project Cost (Rs. in Iakh) 31.22 17 Promoter's share (Rs. in lakh) 6.24 18 Loan Amount (Rs. in lakh) 24.98 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 24.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete . information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes ••II , '~I I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project 2019-20-PIPA- IMaharashtra- Iistate: Code: 27DMHDOOO040 Nashik I~ IType of ~IFresh IDate of Meeting : 1103/09/2019 I Case: j I~

1 Agenda Item No Volume-Ot (15) Date of Draw 2 - 3 Priority No 4 Development of Commercial Horticultu~e Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 MRS. CHHAYA ARUN BORASTE & Name of Project OTHERS 6 Village - Sakore, Taluka - Niphad, Distt.- Project Location Nashik (Maharashtra) 7 Gender(Male/Female) FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(MlC/S/P /B/ J) )/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 15/08/2019 14 Date of Receipt of Hard Copy of Application 20/08/2019 15 As per Online Application: Crop Categury !\rl'a/(:apadly Lui! Activity/ Crop/ Area/ Capacity Name lFRUITS \GRAPESI6.00 IAcrel I

16 Project Cost (Rs. in lakh) 32.93 17 Promoter's share (Rs. in lakh) 8.23 18 Loan Amount (Rs. in Iakh) 24.69 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 24.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes I - I\~ l", -/7~ - I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project 2019-20-PIPA- IMaharashtra- llstate: Code: 27DMHDOOO041 Nashik I~ Type of JIFresh \Date of Meeting: 1103/09/2019 ICase: ~ l~

1 Agenda Item No Volume-O1 (16) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 MR. MAHESH BHAUSAHEB Name of Project BORADE & OTHERS 6 At Post- Shrirampur, Tal. Sinnar, Dist. Project Location Nashik(MH) 7 Gender(Male/Female) , MALE 8 Constitution of Applicant: .INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/J) )/OBC 10 'Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 15/08/2019 14 Date of Receipt of Hard Copy of Application 20/08/2019 15 As per Online Application: Crop C;.rit'gory Art'a!Capal.~ity Cnit Activity/ Crop/ Area/ Capacity Name IFRUITS IGRAPESI8.50 IAcrej

16 Project Cost (Rs. in lakh) 42.29 17 Promoter's share (Rs. in lakh) 9.81 18 Loan Amount (Rs. in lakh) 32.48 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 24.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes t ~. ._- -,,- ,- ~l() - , •.. -. MINUTES FOR PPAC (Date of Meeting: 03/09/2019) Pre-IPA Project \20l9-20-PIPA- Maharashtra- llstate: ~ Code: I 27CMHC000008 Nagpur \~ IType of \Fresh Date of Meeting : 1103/09/2019 Case: I~I

1 Agenda Item No Volume-OI (17) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Production and Name of Scheme Post Harvest Management of Horticulture Crops 5 MR.SURENDRA GULABRAO Name of Project POTEY 6 At-Pimpri Dikkar Tal-Akot Dist- Project Location Akola (Maharashtra) 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL

Promoter/Applicant ,. 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/ J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 02/08/2019 14 Date of Receipt of Hard Copy of Application 13/08/2019 15 As per Online Application: ( . Crop:\ If' ,. II 'f .att'j;~(lrv ,rcHfaparilv .III . Activity/ Crop/ Area/ Capacity , .. NaUlt' • jFRUITS ILIME110.00 IAcrel

16 Project Cost (Rs. in lakh) 15.89 17 Promoter's share (Rs. in lakh) 5,89 18 Loan Amount (Rs. in lakh) 10.00 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email mention of amount/ Rejected with reasons/ dated 24.08.2019. Division to Deferred with reasons expeditiously follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state Participation of applicant in the PPAC Meeting officers Yes (iii)Through phone by PPAC No . l

...... _.._ ...... •. .. ", ... , ...__ ._...... , .. ..."...._._...... ,._...... __ ...... -.•...... • _.-.,...... _..-.._ ....._.__ ...... "._-~.." .."'- ... .. _ •• , •••••• _ ••••••• __ ._,,,.,., __ • __ ,,_ ••• _"' ••••• __ •• _.' •• ,•••• _._ ••••••••••• _._,." •••••••••• n ••••• _ •• _ •• __ •••••• _M._., ••• ,.,_._ •• ,' ••••••••• _-,.".",.,-_ ••••• " ••••• __ •••••••• -._.- ••••• ,._-_ •••• _-~ _ __ ~ 'Ob - /9 ..-. . - ., - I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I Pre-IPA Project !2019-20-PIPA- Maharashtra- Istate: Nagpur Code: I 27CMHCOOOO09 ] l~ IType of IFresh Date of Meeting : IE09/2019 Case: l~

1 Agenda Item No Volume-Ol (18) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Production and Name of Scheme Post Harvest Management of Horticulture Crops 5 Name of Project MR. VILAS RAMDAS THAKARE 6 At-Malegaon(ma), Tehsil - Amravati, Project Location Distt.- Amravati (Maharashtra). 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability ~ 13 Date of Receipt Online Application 02/08/2019 14 Date of Receipt of Hard Copy of Application 13/08/2019 15 As per Online Application:

C,atcHorv, Crop i:"f'n:a/ ,:apao!v. r,JIll''/ Activity/ Crop/ Area/ Capacity '" "Name v • ' IFRUITS IUMEIIO.OO IAcrel

16 Project Cost (Rs. in lakh) 17.26 17 Promoter's share (Rs. in lakh) 4.36 18 Loan Amount (Rs. in lakh) 12.90 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision ofPPAC : Approved with specific sought by the division vide email mention of amount/ Rejected with reasons/ ' dated 24.08.2019. Division to Deferred with reasons expeditiously follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time,

21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state Participation of applicant in the PPAC Meeting officers No (iii)Through phone by PPAC No 1 .. . -, "

~ - J-O- .- .- C MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I Pre-IPA Project 20 19-20-PIPA- IMaharashtra- Iistate: Code: 27CMHCOOOO10 Nagpur lij Type of I IFresh Date of Meeting: 1103/09/2019 Case: l~

1 Agenda Item No Volume-01 (19) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Production and Name of Scheme Post Harvest Management of Horticulture Crops 5 MR.BHIMRAO SHANKARRAO Name of Project KHOBRAGADE 6 At-Wadgaon Ziri Tal-Nandgaon Project Location Khandeshwar Dist-Amravati (Maharashtra) 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category SC (General/SCP /TSP /Minority(M/C/S/P /B/J))/0 BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 02/08/2019 14 Date of Receipt of Hard Copy of Application 14/08/2019 15 As per Online Application: Crop Catei.{llry Art.'a/Capadty lJnil Activity/ Crop/ Area/ Capacity Name IFRUITS IGUAVAI7.00 IAcrel

16 Project Cost (Rs. in lakh) 11.02 17 Promoter's share (Rs. in lakh) 2.75 18 Loan Amount (Rs. in lakh) 8.26 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 24.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state Participation of applicant in the PPAC Meeting officers No , (iii)Through phone by PPAC No ,

-_.,,, ....._.•..,, " ...... •. _.". '..¥--_...... _._...... ",..,..._-_ ...... _~.....,'..,.__ ...... "_.....""...,_ .....-.,"_ ..,,...... , , .~....._.".. .. _._,.." ...._._.- ..,,"-_., "'-_ ...... _-_ ...... • __ ... " ...... _-_._ .....•_.._.~.~-~.,"',._._.._._._ ....._-_ ...... -,-_,""""-"",,,,,,_-,-""""~ ~. - J-'''' \ ~,~ I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) -l Pre-IPA Project 20 I9-20-PIPA- Maharashtra- ~tate: I Code: 27CMHCOOOOIl Nagpur I~ IType of [FreSh \Date of Meeting : 1103/09/2019 Case: I~

1 Agenda Item No Volume-Ol (20) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Production and Name of Scheme Post Harvest Management of Horticulture Crops MR.NIKHIL DNYAESHWAR 5 Name of Project DESHMUKH 6 At-Kanzra Tal-Nandgaon Project Location Khandeshwar Dist-Amravati (Maharashtra) 7 Gender(MaleIFemale) MALE Constitution of Applicant: 8 INDIVIDUAL Promoter/Applicant Social Category 9 GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 09/08/2019 14 Date of Receipt of Hard Copy of Application 20/08/2019 15 As per Online Application: . Crop',., . Cale!~(lrv N ,Al"(~a/CHpnC'ltv trllt Activity/ Crop/ Area/ Capacity . . 1'ImH~ • IFRUITS IUMEI13.00 IAcrel

16 Project Cost (Rs. in lakh) 17.85 17 Promoter's share (Rs. in lakh) 4.85 18 Loan Amount (Rs. in lakh) 13.00 19 Applicable Scheme lNew-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information/ clarification Decision ofPPAC : Approved with specific sought by the division vide email mention of amount/ Rejected with reasons/ dated 24.08.2019. Division to Deferred with reasons expeditiously follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state Participation of applicant in the PPAC Meeting officers No (iii)Through phone by PPAC No ~._...".,.- .

" - . S - -- I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I Pre-IPA Project 20 19-20-PIPA- Maharashtra- ~IState:~ Code: I 27CMHC000014 Nagpur I~ jTYPe of IFresh Date of Meeting: 1103/09/2019 Case: I~

1 Agenda Item No Volume-O1 (21) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 MR.SENAPATl PRABHAKARRAO Name of Project TAKORE 6 At-Bhilkheda Tal-Chikhaldara Dist- Project Location Amravati 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category , GEN (General/SCP /TSP /Minority(M/C/S/P /B/ J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 21/08/2019 14 Date of Receipt of Hard Copy of Application 26/08/2019 15 As per Online Application: Crop Calcgor)' /\n'aiCapacity Cui! Name IFRUITS IORANGEI7.00 ~ Activity/ Crop/ Area/ Capacity Approved by PPAC: ('"op Area/Capacity Lnit C'atc~~or) ]\iam,' FRUITS IORANGEI7.00, JAcrel 13.80 16 Project Cost (Rs. in lakh) - 17 Promoter's share (Rs. in lakh) 3.45 18 Loan Amount (Rs. in lakh) 10.35 19 Applicable Scheme New-After 31/03/2014 20 Approved The proposal discussed & approved by Decision of PPAC : Approved with specific the Committee for issuance of Pre-In mention of amount/ Rejected with reasons/ Principal Approval (Pre-IPA) based on Deferred with reasons the information gIven in Agenda Note/Checklist. 21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting No (iii)Through phone by PPAC No

,~ - - _. ",H' I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project 2019-20-PIPA- IMaharashtra- llstate: 27DMHDOOO023 Nashik Code: - I~ I Type of Eeview \Date of Meeting ; I03/09/2019 i Case: II~

1 Agenda Item No Volume-Ol (22) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 MR. CHHOTUSINGH GULABSINGH Name ofPro.iect KHADDA (JAT) 6 At post- Dapure, Tal. Malegaon, Dist- Project Location Nashik (MH) 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoterl Applicant 9 Social Category GEN (General/SCP ITSPIMinority(MlC/S/P IBIJ))/OBC 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 27/07/2019 14 Date of Receipt of Hard Copy of Application 01/08/2019 15 As per Online Application: Crop Calcgor) ..\n:a/Cupacity Cuit Name Activityl Cropl Areal Capacity IFRUITS ISWEETORANGE I6.75 ~ _. 16 Project Cost (Rs. in lakh) 23.99 17 Promoter's share (Rs. in lakh) 6.00 18 Loan Amount (Rs. in lakh) 17.99 19 Applicable Scheme New-After 31/03/2014 20 Rejected The Committee discussed the proposal in detail 10 the light of NHB Scheme Decision ofPPAC : Approved with specific guidelines and rejected as Land is already mention of amountl Rejected with reasonsl under mortgage to different activity Deferred with reasons which is not allowed for Pre-IPA as per scheme guidelines of Pre-IPA 2019-20 & there 1S concealment of facts by the applicant.

21 Addl. remarks 22 (i)Presently at head office No ! (ii)Presently at field officesl state officers Participation of applicant in the PPAC Meeting No (iii)Through phone by PPAC No _. _. .". .- .. -~" - . " ~r> -- - MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I IPre-IPA Project Code: 112019-20-PI~A-22ACG0000003 JIState: J!9ihattisgarh m I!2ite of Meeting : ~~/09/20}9_ _ ilType ofCa~lf!esh ~~

1 Agenda Item No Volume-II (01) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project MRS. HEMVATI W/O MASU 6 village- Gadamguda ,tahsil - jagdalpur, Project Location Distt. Bastar CG 7 Gender(Male/Female) FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category OBC-GEN (General/SCP /TSP /Minority(M/C/S/P fB/J))/OBC 10 Type of Area(General/TSP) TSP 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 29/07/2019 14 Date of Receipt of Hard Copy of Application 08/08/2019 15 As per Online Application: Crop Category Area/(:apacity {'nit Activity/ Crop/ Area/ Capacity Name IFRUITS IBANANAI5.95 IAcrel

16 Project Cost (Rs. in lakh) 12.00 17 Promoter's share (Rs. in lakh) 3.00 18 Loan Amount (Rs. in lakh) 9.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision ofPPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Present1y at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA ------_._------"~"'~-~-_._--_._--_.__._- MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Code: JI2019-20-PIPA-22ACGOOOo.Oo~J1State: . ~IChhattis~~ IDate of Meeting : J1QiI09/2019 Iltl'pe ofCas~j[Fresh I~

1 Agenda Item No Volume-II (02) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 MR. NARESH SETHIYA & SMT. Name of Project DAYAMANI - village - Singhanpur , Tahsil- jagdalpur , 6 Project Location distt. -bastar CG PIN -494005 7 Gender(Male/Female) MALE Constitution of Applicant: 8 INDIVIDUAL Promoter/Applicant Social Category 9 OBC-GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(GeneraI/TSP) TSP 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 30/07/2019 14 Date of Receipt of Hard Copy of Application 13/08/2019 15 Asper Online Application: C'rop ('Htl'gor)' ArcafCap~ll:ity Unit Activity/ Crop/ Area/ Capacity Nam(' IFRUITS IBANANAIIO.OO IAcrel

16 Project Cost (Rs. in lakh) 19.00 17 Promoter's share (Rs. in lakh) 5.00 18 Loan Amount (Rs. in lakh) 14.00 - 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 28.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA • - - _._-_.~ ---

~ - MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I IPre-IPA Project Code:JIiQ!?-20-P!PA-22ACG0000905 JlState: IIChhattisgarh I~ ~fMeeting :~103/09/2019 .JIType of Case: IIFresh --.J~

1 Agenda Item No Volume-II (03) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project SHRISUKRAM 6 Village-Nainnar, Tehsil- Tokapal, District- Project Location Bastar (Chhattisgarh) 7 Gender(Male/Female) MALE Constitution of Applicant: 8 INDIVIDUAL Promoter/Applicant Social Category 9 OBC-GEN (General/SCP /TSP /Minority(M/C/S/P IB/J))/OBC 10 Type of Area(General/TSP) TSP 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 30/07/2019 14 Date of Receipt of Hard Copy of Application 08/08/2019 15 As per Online Application: ('rop ('atl.:~or) Area/Capacity IInit Activity/ Crop/ Area/ Capacity Nallll' IFRUITSIBANANAI5.50 IAcr~1

16 Project Cost (Rs. in lakh) 11.00 17 Promoter's share (Rs. in lakh) 2.50 18 Loan Amount (Rs. in lakh) 8.50 19 ApplicaJ;>le Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 27.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes

(iii)Through phone by PPAC NA t.. \1\

~~ rr======- =-=-=-======;] MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Code: JIi2.19-20-PIPA-22ACG0000006 JIState: _ IIChhattisgarh I~ IDate of Meeting : 1[03/09/2019 _ IIType of Case: IIFresh m

1 Agenda Item No Volume-II (04) 2 Date of Draw 3 Priority No 4 Development of Commercial HOlticulture Narne of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project SHRI -MAHADEV, KECHDU.SOMA 6 Village- Nawaguda, Po- Bademurama, Project Location Tahsil- Jagdalpur , Distt. - Baster CG 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category ST (General/SCP /TSP /Minority(M/C/S/P fB/J) )/0BC 10 Type of Area(General/TSP) TSP 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 31/07/2019 14 Date of Receipt of Hard Copy of Application 08/08/2019 15 As per Online Application: ('rop ('atl'gory Area/C.lpadfy hlit Activity/ Crop/ Area/ Capacity Naml' IFRUITS "IBANANA!8'-00 IAcrel

16 Project Cost (Rs. in lakh) 16.00 17 Promoter's share (Rs. in lakh) 4.00 18 Loan Amount (Rs. in lakh) 12.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missmg documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA -, ~ r\' I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) 1 [Pre-IPA Project Code:JI2019~20-PIPA_-22ACG0000007 IIState: IIChhattisgarh I~ IDate of Meeting : 1~/2019 IIi'rpe ofCas~J[Fresh J~

1 Agenda Item No Volume-II (05) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project SMT. RAMSHEELA JANARDAN 6 Village - Chumkuawan. Tahsil - Biaspur , Project Location Distt. - Bilaspur CG. 7 Gender(MalelFemale) FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category SC (General/SCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(GeneraIlTSP) TSP 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 01/08/2019 14 Date of Receipt of Hard Copy of Application 08/08/2019 15 As per Online Application: I ('!"OP Ca/cgory .Area!C'npacity l;nil Activity/ Crop/ Area/ Capacity NUllll' IFRUITS IBANANAllO.OO IAcrel

16 Project Cost (Rs. in lakh) 19.00 17 Promoter's share (Rs. in lakh) 6.50 18 Loan Amount (Rs. in lakh) 12.50 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 27.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of mlssmg documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 AddI. remarks - 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes

(iii)Through phone by PPAC NA i

~'o6l [ MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Code: 112019-20-PIPA-22ACG0090008JState: JIChhattis~~ IDate of Meeting :-.-J1~3/09/2019 _ _-.-JIType of Case: I~h m

1 Agenda Item No Volume-II (06) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project AAYTU & SUKLU 6 village-pondum,tehsi1 & Dist-dantewada Project Location (C.G) 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category ST (General/SCP /TSP /Minority(M/C/S/P IB/J) )/0 BC 10 Type of Area(General/TSP) TSP 11 Area Category Rr1 12 Disability 0 13 Date of Receipt Online Application 04/08/2019 14 Date of Receipt of Hard Copy of Application 13/08/2019 15 As per Online Application: C"rop { 'al('~or~ AreaiCapacity rnit Activity/ Crop/ Area/ Capacity Nalll(' [FRUITS IBANANAI7.00 ~

16 Project Cost (Rs. in lakh) 13.00 17 Promoter's share (Rs. in lakh) 4.00 18 Loan Amount (Rs. in lakh) 9.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 AddI. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA .

~y;(()ll \toII I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I IPre-IPA Project Code: 112019-20-PIP~-29AKA0000016 l~ ~IKamataka I~ IDate of Meeting : 1@3/99/20191Ihpe_ofCase: Ilfush I~

1 Agenda Item No Volume-II (07) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Narne of Scheme through Production and Post Harvest Management of Horticulture Crops 5 RAJASHEKHAR YALAGONDAPPA Name of Project LAKKOND 6 Project Location kakkameli 7 Gender(Male/Female) MALE 8 Constitution of Applicant: AGRICULTURE PRODUCE Promoter/Applicant MARKETING COMMITTEES 9 Social Category OBC-GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 25/07/2019 14 Date of Receipt of Hard Copy of Application 02/08/2019 15 As per Online Application: ('rop CltteJ,:,ory. An'a/Capaci1y Luit Activity/ Crop/ Area/ Capacity Name IFRUITS IGRAPESI5.20 IAcrel

16 Project Cost (Rs. in lakh) 18.20 17 Promoter's share (Rs. in lakh) 3.64 18 Loan Amount (Rs. in lakh) 14.56 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision ofPPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 27.08.20] 9. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 AddI. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA It\ .~ '~ ;\

~~ MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Code:Jfu9-20-PIPA-29AKAOOO~01 U~ I[Kamataka I~ !Date of Meeting ::=]@/09/2019 ]Type of Case:]~O~

1 Agenda Item No Volume-II (08) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 BHEEMASHANKAR Name of Project YALAGONDAPPALAKKOND 6 Project Location kakka1ameli 7 Gender(Male/Female) MALE 8 Constitution of Applicant: AGRICULTURE PRODUCE Promoter/Applicant MARKETING COMMITTEES 9 Social Category OBC-GEN (General/SCP /TSP IMinority(M/C/S/P /B/J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rr1 12 Disability 0 13 Date of Receipt Online Application 25/07/2019 14 Date of Receipt of Hard Copy of Application 02/08/2019 15 As per Online Application: ('rop Cale~()ry :Area/('apacity Unit Activity/ Crop/ Area/ Capacity NaIlH~ IFRUITS IGRAPESI5.20 IAcrel

16 Project Cost (Rs. in lakh) 18.20 17 Promoter's share (Rs. in lakh) 3.64 18 Loan Amount (Rs. in lakh) 14.56 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information/clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 AddI. remarks 22 (i)Present1y at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA • ~'06\bq\

-- SJ-- I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I IPre-IPA Project Code: 112019-20-PI~A-29AKA0000018 IIState: Il!<-arnatakam ~ of Meeting: ~~/09/20 19 IITypeof C~[Fresh I~

1 Agenda Item No Volume-II (09) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project SHIVAPPA BASAPPA KOTTALAGI 6 Project Location KANCHINAL 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (GenerallSCP /TSP lMinority(MlC/S/P /B/J))/OBC. 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 29/07/2019 14 Date of Receipt of Hard Copy of Application 16/08/2019 15 As per Online Application: Crop Catt:gory An::l/C'padty Unit Activity/ Crop/ Area/ Capacity N~lIlU' IFRUITS IGRAPES 16.00 IAcrel

16 Project Cost (Rs. in lakh) 20.00 17 Promoter's share (Rs. in lakh) 7.00 18 Loan Amount (Rs. in lakh) 13.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information/clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 28.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks 22 (i)Present1y at head office NA (ii)Present1y at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA , II' '\

~

- 3.3- I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project cod~[i2iY-?0-PIPA-29AKA0000019MJIState: !IKamataka J~ IDate of Meeting : .J@iZ~9/2019 J[fu~ of~J1Fresh m

1 Agenda Item No Volume-II (10) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 KALAVATI SHIVAPPA ASKI & Name of Project OTHERS 6 S.NO. 49/3 & 49/4AT & POST - Project Location KANNAL.TAL - ATHANI. DIST - BELGAUM 7 Gender(Male/Female) FEMALE Constitution of Applicant: 8 INDIVIDUAL Promoter/Applicant , Social Category 9 GEN (General/SCP /TSP lMinority(MlC/S/P /B/J) )/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 30/07/2019 14 Date of Receipt of Hard Copy of Application 16/08/2019 15 As per Online Application: (rop Ca{(~gory Area/Capadly Cnit Activity/ Crop/ Area/ Capacity Naml' IFRUITSJGRAPES 16.00 IAcrel

16 Project Cost (Rs. in lakh) 20.00 17 Promoter's share (Rs. in lakh) 8.00 18 Loan Amount (Rs. in lakh) 12.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/inforrnati on/clari ficati on Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA " ~~ - 311- MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I !Pre-IPA Project Code: 1120!9-20-~IPA-29AKAOOOOO~]State: I~~~ IDate of Meeting : J~3/09/2019 .I[!ire of Case: l!fi~sh I~

1 Agenda Item No Volume-II (11) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project KALLAPPA SAN GAPPA UPASE 6 AT & POST - KANCHINAL.TAL - Project Location CHAD CHAN. DIST - VIJAYAPUR. 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP lMinority(M/C/S/P /B/J))/0BC. 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rrl

12 Disability . 0 13 Date of Receipt Online Application 30/07/2019 14 Date of Receipt of Hard Copy of Application 16/08/2019 As per ()nline Application: 15 .~ . ('rop Calt.'gory Arf'a/Oll}}l ci1:\ t:nit Activity/ Crop/ Area/ Capacity Name IFRUITS IGRAPESI6.00 IAcr~1

16 Project Cost (Rs. in lakh) 20,00 17 Promoter's share (Rs. in lakh) 7.00 18 Loan Amount (Rs. in lakh) 13.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information/clarification Decision ofPPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 28.08.20] 9. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Add!. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes

(iii)Through phone by PPAC NA ~I . .~ .. ,¥ /\ MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I IPre-IPA Project Code: J12019-20-PIPA-29AKA000002J [[State: ~[Kamat~~ ~ of Meeting : :=I@i@!20~9 JIType of Case: IIFr.esh m

1 Agenda Item No Volume-II (12) 2 Date of Draw 3 Priority No 4 'Development of Commercial Horticulture Narne of Scheme through Production and Post Harvest Management of Horticulture Crops 5 BANDU KASHIRAM PAWAR & Name of Project OTHERS 6 AT & POST KOKATANURTAL- Project Location ATHANI. DIST - BELGAUM 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (GeneraIlSCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 30/07/2019 14 Date of Receipt of Hard Copy of Application 16/08/2019 15 As per Online Application: ('rop Cah.'gory Art'a/Capacity Cnit Activity/ Crop/ Area/ Capacity Namt' IFRUITS IGRAPESI7.00 [AcreI

16 Project Cost (Rs. in lakh) 20.00 17 Promoter's share (Rs. in lakh) 4.00 18 Loan Amount (Rs. in lakh) 16.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA I, - -- ~ I MINUTES FOR PPAC (Date of Meeting : 03/0912019) !Pre-IPA Project Code: IliQii-}9_-_PIPA-29AKA0000022 ]IState: =>]\Kamataka I~ \Date of Meeting : ]03/09/2019 _OJ[Typeof~~IFresh ]~

Volume-II (13) 1 Agenda Item No 2 Date of Draw 3 Priority No Development of Commercial Horticulture 4 Narne of Scheme through Production and Post Harvest Management of Horticulture Crops ANANT SHIVAPPA ASKI & OTHERS 5 Name of Project 68/2 & 71/2AAt & Post - Kannal 6 Project Location MALE 7 Gender(Male/Female) 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/OBC 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rrl 12 Disability 0 10/0812019 13 Date of Receipt Online Application 14 Date of Receipt of Hard Copy of Application 20/08/2019 As per Online Application: 15 Crop Cah'gory ;\n~a/('.lpadty l'nit Activity/ Crop/ Area/ Capacity Name IFRUITS [GRAPESI6.00 IAcrel

16 Project Cost (Rs. in lakh) 20.00 17 Promoter's share (Rs. in lakh) 5.00 18 Loan Amount (Rs. in lakh) 15.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documen ts/information/ clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 29.08.2019. Division to expeditiously follow up with applicant for compliance Deferred with reasons of mlssmg documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks (i)Presently at head office NA 22 (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) IPre-IPA Project C~120 19-20-PIPA-29AKA0009023 JIState: ~~~~ IDate of Meeting : 1[03/09/2019 .~IType of_Case:JIFresh m

Volume-II (14) 1 Agenda Item No 2 Date of Draw 3 Priority No Development of Commercial Horticulture 4 Narne of Scheme through Production and Post Harvest Management of Horticulture Crops KUMAR BAGAVANT MANGASULI & 5 Name of Project OTHERS 66/2KAT & Post- KannalTal Athani. Dist 6 Project Location - BE1gaum 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/ J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rr1 12 Disability 0 13 Date of Receipt Online Application 10/08/2019 14 Date of Receipt of Hard Copy of Application 19/08/2019 As per Online Application: 15 . r , Crop Call'gory' IAn'a/C\lpacity Cnit Activity/ Crop/ Area/ Capacity Nam(;' IFRUITS IGRAPESi6.00 IAcre'1

16 Project Cost (Rs. in lakh) 20.00 17 Promoter's share (Rs. in lakh) 5.00 18 Loan Amount (Rs. in lakh) 15.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 28.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete , information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks (i)Presently at head office NA 22 (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA "\ - - ~,, ~38- MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I &IPA Project Code: 11iQ19-20-~IPA-29AKA0000025 IIState::=JIKamataka m IDate of Meeting : ---.Jl93/09/2919 J~ofCasiJlfush m

1 Agenda Item No Volume-II (15) 2 Date of Draw 3 Priority No Development of Commercial Horticulture 4 Name of Scheme through Production and Post Harvest Management of Horticulture Crops ,VITHAL TUKARAM HARAPALE & 5 Name of Project OTHERS 6 5/lAT & POST - KOHALLITAL - Project Location ATHANI. DIST - BELGAUM 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 10/08/2019 14 Date of Receipt of Hard Copy of Application 19/08/2019 15 As per Online Application: (' •.op (:alt'gory Ar\:'a/Capadty Cnit Activity/ Crop/ Area/ Capacity NaUlt' IFRUITS IGRAPESI7.00 IAcrel

16 Project Cost (Rs. in lakh) 20.00 17 Promoter's share (Rs. in lakh) 5.00 18 Loan Amount (Rs. in lakh) 15.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of mlssmg documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA -----I

~ ~'O

- 3-Cj- I . MINUTES FOR PPAC (Date of Meeting: 03/09/2019) (Pre-IPA Project Code: 1[2019-20-PIPA~29AKAOOO~027 JISt~te: IIKamataka m IDate of Meeting: 1103/09/2Q1~. _ JIType of Case: IIFresh .-J~

Volume-II (16) 1 Agenda Item No 2 Date of Draw 3 Priority No Development of Commercial 4 Horticulture through Production and Name of Scheme Post Harvest Management of Horticulture Crops --.' SIDDARAM SHIVAMURTEPPA 5 Name of Project PATIL Athuvinhalli tq sindagi dist: Bijapur 6 Project Location 7 Gender(Male/Female) MALE AGRICULTURE PRODUCE 8 Constitution of Applicant: Promoter/Applicant MARKETING COMMITTEES 9 Social Category OBC-GEN (GeneraIlSCP/TSP /Minority(M/C/S/P /B/J))/OBC 10 Type of Area(GeneraIlTSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 12/08/2019 14 Date of Receipt of Hard Copy of Application 16/08/2019 As per Online Application: 15 C'rop '. . .. C'ai.l'gnr} N .' Area;t ap~lCltv 1:ml., Activity/ Crop/ Area/ Capacity . 'auI,,' • IFRUITS IGUAVAI5.30 IAcrel

16 Project Cost (Rs. in lakh) 35.10 17 Promoter's share (Rs. in lakh) 7.02 18 Loan Amount (Rs. in lakh) 28.08 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 28.08.2019. Division to expeditiously applicant for Deferred with reasons follow up with compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks (i)Presently at head office NA 22 (ii)Presently at field offices/ state Participation of applicant in the PPAC Meeting officers Yes (iii)Through phone by PPAC NA

~ .

..- LtD- r;=:======-==O =oo'======il MINUTES FOR PPAC (Date of Meeting: 03/0912019) I IPre-IPA Project Cod~1i919-20-PIPA-29AKAOOOOo028~IState: =:]i!

1 Agenda Item No Volume-II (17) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 SIDARAYA GOVINDAPPA Name of Project NEMAGOUD 6 162/lkAT & POST - AIGALI.TAL- Project Location ATHANI. DIST -BELGAUM 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /BI J))10 BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability o 13 Date of Receipt Online Application 14/08/2019 14 Date of Receipt of Hard Copy of Application 22/08/2019 15 As per Online Application: '(""a!cuorv, {.'rop .[\ l"l!aoaIJacltvJ{" • {"Jlut Activity/ Crop/ Areal Capacity •.• '; NaUlt' ! .- IFRUITS IGRAPESj6.00 ~

16 Project Cost (Rs. in lakh) 40.00 17 Promoter's share (Rs. in 1akh) 10.00 18 Loan Amount (Rs. in lakh) 30.00 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Add!. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA - ~1()q\~Ol'\ r;======~o'=-=-======9 II MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I ltiiIPA Project Code: ][~19-20-PIPA-33ATN0000015]I~tate: Iltami1~~~ IDate of Meeting: ~103/09/20 19 J~f C~IFresh m

Volume-II (18) 1 Agenda Item No 2 Date of Draw 3 Priority No Development of Commercial Horticulture 4 through Production and Post Harvest Name of Scheme Management of Horticulture Crops AUGUSTINE S 5 Name of Project ERASAKKANAYAKKANUR 6 Project Location 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category OBC-GEN (GenerallSCP /TSP /Minority(MlC/S/P /B/J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 02/08/2019 14 Date of Receipt of Hard Copy of Application 14/08/2019 As pe~ Online App~~icatio~: 15 -- , Crop (att'gory .\rca/Capacity lilli! Activity/ Crop/ Area/ Capacity Nault' IFRUITS' IMANGOI2l.45 iAcrel

16 Project Cost (Rs. in lakh) 72.30 17 Promoter's share (Rs. in lakh) 14.47 18 Loan Amount (Rs. in lakh) 57.83 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information/ clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC NA ------If MINUTES FOR PPAC (Date of Meeting : 03/09/2019) IPre-IPA Project Code: 1~20-PIPA-37TTG0000001 j[State: IITelangana I~ IDate of Meeting : J103/0Y/20l~. JIType ofC~IFresh m

1 Agenda Item No Volume-II (19)

2 Date of Draw -- 3 Priority No Development of Commercial 4 Horticulture through Production and Name of Scheme Post Harvest Management of Horticulture Crops MRS. GOWRISHETTY SWAPNA W/O 5 Name of Project G. ARUNKUMAR 6 Project Location 7 Gender(Male/Female) ,FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/ J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 28/06/2019 14 Date of Receipt of Hard Copy of Application As per Online Application: 15 ('rop ('ail'gor~ .\rcafC apacHy l1nit Activity/ Crop/ Area/ Capacity NaUlt' IFRUITS IGUAVAI12.12 IAcrel

16 Project Cost (Rs. in lakh) 30.00 17 Promoter's share (Rs. in lakh) 0'.00 18 Loan Amount (Rs. in lakh) 0.00 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 28.08.2019. Division to expeditiously for Deferred with reasons follow up with applicant compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state Participation of applicant in the PPAC Meeting officers Yes (iii)Through phone by PPAC Yes

~ I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I IPre-IPA Project Code: 1[2019-20-PIPA-~7TTG0000002 I[~tate: IITelangana m IDate of Meeting : 1103/09/20!9. ~IType of Case: I~ferred m

1 Agenda Item No Volume-II (20) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 MRS. GOWRISHETTY SANTHOSHINI Name of Project W/O GOWRISHETTY SRIPATHI 6 Urukonda Village & MandaI, Project Location Nagarkurnool District (New), Mahabubnagar District (Old) 7 Gender(Male/Female) FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoterl Applicant 9 Social Category GEN (General/SCP ITSP IMinority(MlC/SIP IB/ J))10 BC 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 29106/2019 14 Date of Receipt of Hard Copy of Application 04/07/2019 15 As per Online Application: Crop Catq~or:v iA,rea/Capadty ('nil Name Activityl Cropl Areal Capacity ,- ISWEETI"- FRUITS ORANGE 12.12 --'Acrel

16 Project Cost (Rs. in lakh) 24.50 17 Promoter's share (Rs. in lakh) 6.13 18 Loan Amount (Rs. in lakh) 18.38 19 Applicable Scheme New-After 31/0312014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision ofPPAC : Approved with specific sought by the. division vide email dated mention of amount/ Rejected with reasonsl 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/ incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC No

. .""," . - --- .- .. -. I, ~ f\~ - ~ I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Code: 1[2019-20-PIPA-37TTG~000003 J~ate: ~ITelanganc:J~ IDate of Meeting : 1103/09/2019 IIType of Case: IIDeferri[]~

1 Agenda Item No Volume- II (21) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 MR. GOWRISHETTY CHANDRAIAH Name of Project AND GOWRISHETTY LEELAVATHI 6 Vurukonda Village, Vurukonda MandaI, Project Location Nagarkurnoo1 District, Telangana State 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(GeneraIlTSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 29/06/2019 14 Date of Receipt of Hard Copy of Application 08/07/2019 15 As per Online Application: (.'rop <:ategoryl Al'ca!CapacifylTnit. Activity/ Crop/ Area/ Capacity NaUlt' IFRUITS .IMANGOI23.l5 IAcrel

16 Project Cost (Rs. in lakh) 46.00 17 Promoter's share (Rs. in lakh) 11.50 18 Loan Amount (Rs. in lakh) 34.50 19 Applicable Scheme New-After 31/03/2014 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information! clarification Decision of PPAC : Approved with specific sought by the division vide email dated mention of amount/ Rejected with reasons/ 26.08.2019. Division to expeditiously Deferred with reasons follow up with applicant for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time. 21 AddI. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC No 1\ -- -

~ I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I ~A Project Code: 1l?_019-20-PIPA.-19AWBOOO~~te: IIWestBengal m IDate of Meeting : 1103/29/201~ l~fCase: I~~esh I~

1 Agenda Item No Volume-II (22) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Narne of Scheme Production and Post Harvest Management of Horticulture Crops 5 Name of Project PUSHPA SHARDA 6 ViII: Uttar Tilpara, P.O. Dohira, P.S. Sainthia, Dist: Project Location Birbhum, W.B. 731234 7 Gender(MalelFemale) FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP lMinority(M/C/S/P /B/ J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 02/08/2019 14 Date of Receipt of Hard Copy of Application 16/08/2019 As per Online Application: 15 - ,. ('alt'gory ('rop ~ame An~a!Capadty, {Init FRUITS BANANA 6.00 Acre Activity/ Crop/ Area/ Capacity INTEGRATED INTEGRATED PHM 5.00 MT PROJECT

16 Project Cost (Rs. in lakh) 75.00 17 Promoter's share (Rs. in lakh) 17.45 18 Loan Amount (Rs. in lakh) 57.55 19 Applicable Scheme 20 Deferred The PPAC discussed & deferred the proposal for want of lacking documents/information/clarification Decision of PPAC : Approved with specific sought by the division vide email dated 28.08.2019. mention of amount/ Rejected with reasons/ Division to expeditiously follow up with applicant Deferred with reasons for compliance of missing documents/incomplete information & submit the proposal before PPAC at the earliest within stipulated time.

21 Add!. remarks 22 (i)Presently at head office NA Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers Yes (iii)Through phone by PPAC NA

._.•.••_•.__ .•... .0"_,.". __ ._._ •••,•..•.. __ ••.,,.-._ ••_ ••.•.••.••••_ •••••••••...... _.T .•.•_ ••.,.••_ ••,,,.,,_ ••••-•••••_., ..,....•..__ ..H""'"' __ ••..••...•••.•..• ",." ••, ...•.,•••__ •.,,••..••••- ..••••••••••••••••._ ...... ••__ ._ ..•••..,.__ .- ..."'., •._ ....,"".'--" " .•_-".,', •.__ •••,."., ....• _._ ..•...•__ .~""",.,._._ ••••...•....•.._._"", ,'-~~._ .••••. _._""",.,._._ •.•••.•...•.•.~._ •.••.••.• _ ••..,...._-_ •.•••.",--, ...... •••..•.••••.•..•__ ._._, ..•_,,~ •.•••..,.... MINUTES FOR PPAC (Date of Meeting: 03/09/2019) Pre-IPA Project !2019-20-PIPA- ] Himachal Istate: Pradesh Code: ,02AHPOOOOOO1 J~ IType of Date of Meeting: 1103/09/2019 Case: IIFresh l~

Volume-Ill (01) 1 Agenda Item No 2 Date of Draw PHM & Cold Chain 3 Priority No Development of Commercial Horticulture through 4 Production and Post Harvest Management of Name of Scheme Horticulture Crops BlRBAN SINGH RAWAT I HILLY FOODS 5 Name of Project VPO Nandpur Via Hatkoti Tehsii Jubbal Distt shimia 6 Project Location H.P 171206 MALE 7 Gender(Male/Female) 8 Constitution of Applicant: INDIVIDUAL Promoterl Applicant 9 Social Category GEN (GenerallSCP ITSPIMinority(M/C/S/P IBIJ))/OBC Gen 10 Type of Area(GeneraIlTSP) HRrI 11 Area Category 0 12 Disability 04/08/2019 13 Date of Receipt Online Application 14/08/2019 14 Date of Receipt of Hard Copy of Application As per Online Application: 15 (:rop :\ame Area/Capacity enit Cateoorvb 'c FRUIT MT Activityl Cropl Areal Capacity PRIMARY PROCESSING 200.00 per PROCESSING UNIT annum

25.00 16 Project Cost (Rs. in lakh) 7.00 17 Promoter's share (Rs. in lakh) 18.00 18 Loan Amount (Rs. in Iakh) New-After 31/03/2014 19 Applicable Scheme 20 Deferred The PPAC discussed and deferred the proposal for want of lacking documents I information I Decision of PPAC : Approved with specific clarification sought by the division vide e-mail dated mention of amountl Rejected with reasonsl 31.08.2019. Division to expeditiously follow up with Deferred with reasons applicant for compliance of missing documentsl incomplete information and submit the proposal before PPAC at the earliest within stipulated time.

21 Addl. remarks (i)Presently at head office No 22 Participation of applicant in the PPAC Meeting (ii)Presently at field officesl state officers No (iii)Through phone by PPAC Yes Minutes of PPAC Under Pre-IPA Scheme 2019-20 Maharashtra- Pre-IPA Project 20 19-20-PIPA- Nagpur Code: 27CMHCCSOOOO03 ~ I~ IType of Date of Meeting: [03/09/2019 Case: I\Fresh l~

Volume-III (02) 1 Agenda Item No 2 Date of Draw PHM & Cold Chain 3 Priority No Capital Investment Subsidy Scheme for Construction 1 4 Expansionl Modernization of Cold Storage and Storages of Name of Scheme Horticultural Products KIRAN SANDEEP KACHOLlYA 5 Name of Project Plot No. N-166, Akola Growth Center, Akola-444104 6 Project Location FEMALE 7 Gender(Male/Female) 8 Constitution of Applicant: PROPRIETORSHIP Promoterl Applicant 9 Social Category GEN (GeneraIlSCP ITSP /Minority(M/C/S/P IB/ J))10 BC Gen 10 Type of Area(GeneraIlTSP) 11 Area Category Urn 12 Disability 0 09108/2019 13 Date of Receipt Online Application 19108/2019 14 Date of Receipt of Hard Copy of Application As per Online Application: 15 CHPHCitV I '\ I f CS . . . um lcr 0" or f It(~ms Sub-Hems 0 C:ompollent add on ("I I i .. UtIlI )crs cmnponcnt.

Activity/ Crop/ Area/ Capacity Cold Storage Construction Construction Type-l with 5206.67 3 (New) (New) other add on components

16 Project Cost (Rs. in lakh) 1101.51 17 Promoter's share (Rs. in Iakh) 151.51 18 Loan Amount (Rs. in lakh) 800.00 New-After 31/03/2014 19 Applicable Scheme 21 Deferred The PPAC discussed and deferred the proposal for want of lacking documents 1 information 1 clarification sought by the Decision of PPAC : Approved with specific 02.09.2019. Division to mention of amountl Rejected with reasons/ division vide e-mail dated expeditiously follow up with applicant for compliance of Deferred with reasons missing documentsl incomplete information and submit the proposal before PPAC at the earliest within stipulated time.

22 Addl.remarks (i)Presently at head office Yes 23 Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers No (iii)Through phone by PPAC Yes I Minutes ofPPAC Under Pre-IPA Scheme 2019-20. J IPre-IPA Project Code: 112019-20:PI~A-08ARJOCSOOOOOl IIState:. I!Rajasthan I~ ~_of~eeting: 1103/09/2019 .JltYpe ofCase:J~-.-J~

1 Agenda Item No Volume-III (03) 2 Date of Draw 3 Priority No PHM & Cold Chain 4 Capital Investment Subsidy Scheme for Construction I Narne of Scheme Expansionl Modernization of Cold Storage and Storages of Horticultural Products 5 MIS J B COLD STORAGE (PROPRIETOR-JAYSHREE Name of Project BHURA) 6 Khasra No. 1009/1004, NH-89, Bikaner road, Hiyandsar, Project Location Tehsi1-Nokha, Dist Bikaner, Rajasthan 7 Gender(Male/Female) FEMALE 8 Constitution of Applicant: PROPRIETORSHIP Promoterl Applicant 9 Social Category GEN (General/SCP ITSP IMinority(M/C/S/P IBI J))10 BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 14/08/2019 14 Date of Receipt of Hard Copy of Application 21/0812019 15 As per Online Application: Cap~lrity ; '\ I . .f CS . . um )Cl (I., or of CompolI('nl It(~ms Sub-Itt'ms add 011 , ( hamhcrs ('(,lllpOncnl Activityl Cropl Areal Capacity Cold Storage Construction Construction Type-1 with 6010.00 4 (New) (New) other add on components

16 Project Cost (Rs. in lakh) 497.29 17 Promoter's share (Rs. in lakh) 197.29 18 Loan Amount (Rs. in lakh) 300.00 19 Applicable Scheme New-After 31/03/2014 21 Deferred The PPAC discussed and deferred the proposal for want of Decision of PPAC : Approved with specific lacking documents I information I clarification sought by the mention of amountl Rejected with reasonsl division vide e-mail dated 31.08.2019. Division to Deferred with reasons expeditiously follow up with applicant for compliance of missing documentsl incomplete information and submit the proposal before PPAC at the earliest within stipulated time.

22 Addl. remarks 23 (i)Presently at head office Yes Participation of applicant in the PPAC Meeting (ii)Presently at field officesl state officers No (iii)Through phone by PPAC No .. - - .. ~oq\LOr '06 - II Minutes of PPAC Under Pre-IPA Scheme 2019-20 1 ltiiIPA Project Code: IliQii-20-PI~A=03APBOCSOOOOOI I[St~te: ]Punjab m IDate of MeetiI!g : 1103/09/2019 JIType of~IFresh I~

1 Agenda Item No Volume-III (04) 2 Date of Draw 3 Priority No PHM & Cold Chain Capital Investment Subsidy Scheme for Construction 1 Expansion! 4 Name of Scheme Modernization of Cold Storage and Storages of Horticultural Products 5 Name of Project G.H. COLD STORE VILLAGE RUMI, TEHSIL JAGROAN, DISTRICT LUDHIANA 6 Project Location 7 Gender(Male/Female) MALE 8 Constitution of Applicant: PARTNERSHIP Promoter/Applicant 9 Social Category GEN (General/SCP ITSP IMinority(M/C/S/P IB/J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 12/08/2019 14 Date of Receipt of Hard Copy of Application 28/08/2019 15 As per Online Application.: Capadty :" 1.lInht~r ' orcs or (jellls Suh-itellls of Component add on -. t (hamhen, componcn Cold Storage Construction Type-l with Construction 5500.00 4 Activity/ Crop/ Area/ Capacity other add on (New) (New) components Technology Add on Stand-alone Induction and Alternate component 100.00 1 Modernization Technology of Cold and Storage modernisation

16 Project Cost (Rs. in lakh) 686.67 17 Promoter's share (Rs. in lakh) 186.67 18 Loan Amount (Rs. in lakh) 450.00 19 Applicable Scheme New-After 31/03/2014 21 Deferred The PPAC discussed and deferred the proposal for want oflacking Decision of PPAC : Approved with specific documents 1 information 1 clarification sought by the division vide mention of amount! Rejected with reasons/ e-mail dated 02.09.2019. Division to expeditiously follow up with of missing documentsl incomplete Deferred with reasons applicant for compliance information and submit the proposal before PPAC at the earliest within stipulated time.

22 Addl. remarks 23 (i)Presently at head office No Participation of applicant in the PPAC Meeting (ii)Presentlyat field officesl state officers No (iii)Through phone by PPAC Yes l ~~~lOq{~' ~.50- \ I MINUTES FOR P!AC (Date of Meeting.: 03/09/2019) I IPre-IPA Project Code: 1[Q19-20-PIPA-09CBT0000008 IIState: .~IUp Baraut m IDate of Meeting : I[Q~L09/201?_ IITypeof Case: Ilf"esh I~

1 Agenda Item No Volume-IV (01) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Name of Scheme Production and Post Harvest Management of Horticulture Crops 5 Name of Project SAJAL AGARWAL 6 Khasra No. 68,Village-Chauhatna, Tehsil-Agra, Dist- Project Location Agra UP 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP lMinority(M/C/S/P /B/J))/0BC 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rr1 12 Disability 0 13 Date of Receipt Online Application 31/07/2019 14 Date of Receipt of Hard Copy of Application 09/08/2019 15 As per Online Application: Category ,(omp 1\al11(~ Arca/Cap.ldty {"nit Activity/ Crop/ Area/ Capacity VEGETABLESICUCUMBERl1 0000.00 I~~~~re

16 Project Cost (Rs. in lakh) 112.00 17 Promoter's share (Rs. in lakh) 49.28 18 Loan Amount (Rs. in lakh) 62.72 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed and deferred the proposal for want of lacking documents/ information/ Decision of PPAC : Approved with specific classification sought by the division vide email mention of amount/ Rejected with reasons/ 31.08.2019. Division to expeditiously follow up with Deferred with reasons the applicant for compliance of missing documents/incomplete information and submit the proposal before PPAC at the earliest with in stipulated time. 21 AddI. remarks 22 (i)Presently at head office Yes Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA .(iii)Through phone by PPAC NA MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I up IPre-IPA Project Code: 1120l9-20-~I~A-09CBT0000010 I~~ ==oJl B~~ IDate of Meeting : ~~3/09/20l9 IITypeof Case: IIFresh m

Volume-IV (02) 1 Agenda Item No

2 Date of Draw - 3 Priority No Development of Commercial Horticulture through 4 Production and Post Harvest Management of Name of Scheme Horticulture Crops ARSHAD YASEEN 5 Name of Project Khata No. 253, 34,199,67, VILLAGE- CHIDAVAK, 6 TEHSIL- BULANDSHAHAR, DISTRICT- Project Location BULANDSHAHAR, - 203001 MALE 7 Gender(MalelFemale) 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category . GEN (General/SCP /TSP /Minority(MIC/S/P /B/J))/0BC 10 Type of Area(General/TSP) Gen Rrl 11 Area Category 12 Disability 0 31/07/2019 13 Date of Receipt Online Application 08/08/2019 14 Date of Receipt of Hard Copy of Application As per Online Application: 15 Category Crop '\mnc Area/Capacity [nit

Activity/ Crop/ Area/ Capacity VEGETABLEsl~UCUMBERI8500.00 . 'I~,\,:~re

16 Project Cost (Rs. in lakh) 112.00 17 Promoter's share (Rs. in lakh) 22.00 18 Loan Amount (Rs. in lakh) 90.00 New-After 31/03/2014 19 Applicable Scheme 20 Deferred The Committee discussed and deferred the proposal for want of lacking documents/ Decision of PPAC : Approved with specific information/classification sought by the division vide mention of amount/ Rejected with reasons/ email 31.08.2019. Division to expeditiously follow up with the applicant for compliance of missing Deferred with reasons documents/incomplete information and submit the proposal before PPAC at the earliest with m stipulated time.

21 Addl. remarks (i)Presently at head office Yes 22 Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA .(iii)Through phone by PPAC NA I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I IPre-IPA Project Code: 112019-20-PIPA-09CBTOOOOOJ1 J~!ate: I[UpB~~ IDate of Meeting: ~103/09/20 19 _JlType of C~IFresh m

1 Agenda Item No Volume-IV (03) 2 Date of Draw 3 Priority No Development of Commercial Horticulture through 4 Name of Scheme Production and Post Harvest Management of Horticulture Crops 5 Name of Project SHOBHIT AGARWAL Khasra No. 64, Village - Chauhatna, Tehsil - Agra, 6 Project Location Dist. UP 7 Gender(MalelFemale) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP lMinority(M/C/S/P /B/J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 01/08/2019 14 Date of Receipt of Hard Copy of Application 09/08/2019 15 As per 9nline ~pplication: . Category . ("rop :\nnle An~a!Cap;lcit~ {nit

Activity/ Crop/ Area/ Capacity VEGETABLESICUCUMBERI12000.00 I~~~re

16 Project Cost (Rs. in lakh) 112.00 17 Promoter's share (Rs. in lakh) 49.28 18 Loan Amount (Rs. in lakh) 62.72 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed and deferred the proposal for want of lacking documents/ Decision of PPAC : Approved with specific information/classification sought by the division vide mention of amount/ Rejected with reasons/ . email 31.08.2019. Division to expeditiously follow Deferred with reasons up with the applicant for compliance of missing documents/incomplete information and submit the proposal before PPAC at the earliest with In stipulated time.

21 Addl. remarks 22 (i)Presently at head office Yes Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA (iii)Through phone by PPAC NA I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Cod~~JI2019-20-PIPA-09CBT0000012 !IState: IIUp Baraut m IDate of Meeting: _ J@3/09/2019 IITypeof Case: ]IFresh =:J~

1 Agenda Item No Volume-IV (04) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Name of Scheme Production and Post Harvest Management of Horticulture Crops 5 Name of Project RAJESH VIJAY 6 KHASRA NO. 53,54,55,57 VILLAGE-RUNAKTA, Project Location TEHSIL-KIRAWALI, DIST-AGRA, UTTAR PRADESH 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant Social Category 9 GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(GeneraIlTSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 03/08/2019 14 Date of Receipt of Hard Copy of Application 09/08/2019 15 As per Online Application: Category Crop \ame Area/Capacity Cnit Activity/ Crop/ Area/ Capacity IVEGETABLESICUCU~BERI4000.00 I~~.arel

16 Project Cost (Rs. in lakh) 50.90 17 Promoter's share (Rs. in lakh) 13.23 18 Loan Amount (Rs. in lakh) 37.67 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed and deferred the proposal for want of lacking documents/ Decision of PPAC : Approved with specific information/classification sought by the division vide mention of amount/ lJejected with reasons/ email 02.09.2019. Division to expeditiously follow Deferred with reasons up with the applicant for compliance of missing ! > .".( . documents/incomplete information and submit the proposal before PPAC at the earliest with In stipulated. time. 21 Addl. remarks 22 (i)Presently at head office Yes Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA (iii)Through phone by PPAC NA

- 54- I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Code: IliQiijO-PIPA-05AUAOOOO~[State: _~IUttrakhand I~ IDate of Meeting : 1103/09/2019 l[type of~[f'esh ~~

1 Agenda Item No Volume-IV (05) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Name of Scheme Production and Post Harvest Management of Horticulture Crops 5 Name of Project AMITBHAI VITHALBHAI BHANDERI 6 Survey no.466, Village- Manakpur Adampur, Dist- Project Location Haridwar (Uttrakhand) 7 Gender(MalelFemale) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP lMinority(M/C/S/P /B/J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category HRrI 12 Disability 0 13 Date of Receipt Online Application 05/08/2019 14 Date of Receipt of Hard Copy of Application 08/08/2019 15 As per Online Application: r:"lttgory ('rop !'\anw An~a/Capacil.\ t'nit Activity/ Crop/ Area/ Capacity VEGETABLESICUCUMBERII 0000,00 I~~~,are

16 Project Cost (Rs. in lakh) 101.84 17 Promoter's share (Rs. in lakh) 50.92 18 Loan Amount (Rs. in lakh) 50.92 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed and deferred the proposal for want of lacking documents/ Decision of PPAC : Approved with specific information/classification sought by the division vide mention of amount/ Rejected with reasons/ email 31.08.2019. Division to expeditiously follow Deferred with reasons up with the applicant for compliance of missing documents/incomplete information and submit the proposal before PPAC at the earliest with in stipulated time. 21 Addl. remarks 22 (i)Presently at head office NA Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA (iii)Through phone by PPAC

~oq _.- - j MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project 20 19-20-PIPA- IMaharashtra- Iistate: Code: 27DMHDOOO024 Nashik ~ IDate of Meeting : 11~3/09/2019 1~~::Of IFresh I~

1 Agenda Item No Volume-IV (06) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Name of Scheme Production and Post Harvest Management of Horticulture Crops 5 Name of Project ARCHANA ASHOK WAIKAR & OTHER 3 6 Gat No.92/A, Ambai, Tal Trimbakeshwar, Dist Project Location Nashik - 422212 7 Gender(Male/Female) FEMALE 8 Constitution of Applicant: Group of Farmer growers / Consumers Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/OBC 10 Type of Area(General/TSP) TSP 11 Area Category HRrl 12 Disability 0 13 Date of ReceipfOnline Application 30/07/2019 14 Date of Receipt of Hard Copy of Application 05/08/2019 15 As per Online Application: Catl'gory Cropl'\auH: ArcaiCarmdty Unit Activity/ Crop/ Area/ Capacity IVEGETABLESICAPS~ CUMl4000.00 I~~~.arel

16 Project Cost (Rs. in lakh) 30.00 17 Promoter's share (Rs. in lakh) 9.00 18 Loan Amount (Rs. in lakh) 21.00 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Conm1ittee discussed and deferred the proposal for want of lacking documents/ Decision of PPAC : Approved with specific information/classification sought by the division mention of amount/ Rejected with reasons/ vide email 31.08.2019. Division to expeditiously Deferred with reasons follow up with the applicant for compliance of missing documents/incomplete information and submit the proposal before PPAC at the earliest with in stipulated time. 21 AddI. remarks 22 (i)Presently at head office NA Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA (iii)Through phone by PPAC Yes m. ._ ,- " I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Pre-IPA Project 20l9-20-PIPA- IMaharashtra- Jistate: Code: 27DMHDOOO032 Nashik I~ IType of IFresh IDate of Meeting: 1103/09/2019 Case: -J I~

1 Agenda Item No Volume-IV (07) 2 Date of Draw 3 Priority No Development of Commercial Horticulture through 4 Name of Scheme Production and Post Harvest Management of Horticulture Crops 5 Name of Project EKNATH SONU WAYADE Gat No. 63, At/po-Chandanpuri Tal-Malegaon Dist- 6 Project Location Nashik 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (GenerallSCP /TSP /Minority(M/C/S/P /B/J))/OBC 10 Type of Area(GeneraIlTSP) Gen 11 Area Category Urn 12 Disability 0 13 Date of Receipt Online Application 05/0812019 14 Date of Receipt of Hard Copy of Application 08/08/2019 15 As per Online Application: Category CropI\ame Arcll/Capadty Unit Activity/ Crop/ Area/ Capacity IVEGETABLES~PSICUMI3000.00 I~~are

16 Project Cost (Rs. in lakh) 37.41 17 Promoter's share (Rs. in lakh) 9.35 18 Loan Amount (Rs. in lakh) 28.06 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed and deferred the proposal for want of lacking documents/ Decision of PPAC : Approved with specific information/classification sought by the division mention of amount/ Rejected with reasons/ vide email 31.08.2019. Division to expeditiously Deferred with reasons follow up with the applicant for compliance of missing documents/incomplete information and submit the proposal before PPAC at the earliest with in stipulated time.

21 Addl. remarks 22 (i)Presently at head office NA Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA (iii)Through phone by PPAC NA -----_._----'------'-'_ .._--"'".~--'-_._------,._-_.~ ~;e6l6qlot0 l1 I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I ~A Project Code: 112019-20-PIPA-08ARJ0000002 I[State: __]Rajasthan I~ IDate of Meeting : 1103/09/2012 J~ ofCiiliJ~sh m

1 Agenda Item No Volume-IV (08) 2 Date of Draw 3 Priority No 4 Development of Commercial Horticulture through Name of Scheme Production and Post Harvest Management of Horticulture Crops 5 Name of Project RAJIV CHATURVEDI 6 Khasra No.- 680, 684, 684/1310 & 685, VILLAGE- Project Location SIRAWAS (DHALAWAS), TEHSIL- ALWAR, DISTRICT- ALWAR, RAJASTHAN 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl . 12 Disability 0 13 Date of Receipt Online Application 27/07/2019 14 Date of Receipt of Hard Copy of Application 06/08/2019 As per Online Application: 15 . , f . . Category . ('rop "mne Area/Capacity [nit Activity/ Crop/ Area/ Capacity 1'~EGETA~LESI~~CUMB;RI8500.~-0 .. I~'i:.are

16 Project Cost (Rs. in lakh) 112.00 17 Promoter's share (Rs. in lakh) 42.00 18 Loan Amount (Rs. in lakh) 70.00 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed and deferred the proposal for want of lacking documents/ Decision of PPAC : Approved with specific information/classification sought by the division vide mention of amount/ Rejected with reasons/ email 31.08.2019. Division to expeditiously follow Deferred with reasons . up with the applicant for compliance of missing documents/incomplete information and submit the proposal before PPAC at the earliest with 10 stipulated time. 21 Addl. remarks 22 (i)PresentIy at head office NA Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA (iii)Through phone by PPAC No I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I Iproject Code: I123AMP0006967 IIState: ~~hya Pradesh ~D IDate of Meeting: JIQi/09/20 19 I[Type?f Case.::=JIFres~ :=JD

1 Agenda Item No Volume-IV (09)

2 Date of Draw - 3 Priority No 4 Development of Commercial Horticulture through Name of Scheme Production and Post Harvest Management of Horticulture Crops 5 MAMTA BHARGAVA W/O RAKESH Name of Project BHARGAVA 6 Survey No. 2/2, Village- Jamnya Khurd, Bhicho1i, Project Location Indore M.P. 7 Gender(Male/Female) FEMALE 8 Constitution of Applicant: PARTNERSHIP Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/ J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rural 12 Disability 0 13 Date of Receipt Online Application 03/08/2019 14 Date of Receipt of Hard Copy of Application 09/08/2019 15 As per Online Application: Cafl'gory Crop l\mllcAn:n/Capacity Unit Activity/ Crop/ Area/ Capacity VEGETABLE~ICAPSICUMI4000.00 ... .I~~~.are

16 Project Cost (Rs. in lakh) 51.46 17 Promoter's share (Rs. in lakh) 14.46 18 Loan Amount (Rs. in lakh) 37.00 19 Name of Financing Bank Branch Bank of India 20 177, Tilakpath, Main Rd, Ram Bagh, Indore, Bank Address Madhya Pradesh 452004 21 Applicable Scheme New-After 31/03/2014 22 Deferred The Committee discussed and deferred the proposal for want of lacking documents/ Decision of PPAC : Approved with specific information/classification sought by the division mention of amount/ Rejected with reasons/ vide email 30.08.2019. Division to expeditiously Deferred with reasons follow up with the applicant for compliance of missing documents/incomplete information and submit the proposal before PPAC at the earliest with in stipulated time.

23 Addl. remarks 24 (i)Presently at head office NA Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA (iii)Through phone by PPAC Yes .•. . - •.....J ~qILO L~ -~- I I MINUTES F~R PPAC (Date of Meeting : 03/09/2019) I IPre-IPA Project Code: 112019-20-PIPA-06AHROOOOOO1 IIState: ~IHaryana m IDate of Meeting : 1@i2Q9/~01~ :=JIType of Case: Jrfresh I~

1 Agenda Item No Vol-IV 2 Date of Draw 3 Priority No 1 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project AlIT SINGH 6 KhataiSurvey/Khasra No. 112, Village- Project Location Sahabad, Tehsil- Faridabad, Dist- Faridabad (Haryana) 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 19/08/2019 14 Date of Receipt of Hard Copy of Application 28/08/2019 15 As per Online Application: Crop ('iltl'gory Arca!('apacily Unit Name Activity/ Crop/ Area/ Capacity IFLOWERS ILILLIUj4000.00 IsqujMtr.

16 Project Cost (Rs. in lakh) 81.24 17 Promoter's share (Rs. in lakh) 20.29 18 Loan Amount (Rs. in lakh) 60.93 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed the proposal in Decision of PPAC : Approved with specific detail in the light of NHB Scheme guidelines mention of amount/ Rejected with reasons/ and deferred the project for want of Deferred with reasons completion of lacking documents/information from applicant. 21 AddI. remarks 22 (i)Presently at head office NA Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA (iii)Through phone by PPAC Yes ~------~----~_._-_..._'~,-.--"-----

,- bO - I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Co.~[?019-20-PIPA-06AHR0000002 lI~tate: . IIHaryan~~ IDate of Meeting : 1103/09/2019 Jljype of Case: IIFresh I~

1 Agenda Item No volume-IV (2) 2 Date of Draw 3 Priority No 2 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project SHIV SEHGAL 6 Khewat/Khata No. 18 Mustil No. 16 Kila No. 10/2( 6-7), 11(8-0), 12(8-0), 6/2/2(0-19), 7/2(2-13),912(2-3), Kita 7 measuring 31 Kanal 5 Mala and Kewat/Khata No. 12 Musti1 No. IS Kila No. 21/2(5-18), 16/1(8-0), Kita 2 Project Location measuring 13 kana1 18 mala and Khewat/Khata No. 12 Mustil No. IS Kila No. 20(8-0),21/1(2-2), kita 2 measuring 10 kana1 2 marla and khewat/khata no. 15 Mustil 16 Kila NO.2/1(7-8), Kita 7 Gender(Male/Female) MALE Constitution of Applicant: 8 INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/0BC 10 Type of Area(GeneraIlTSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 23/08/2019 14 Date of Receipt of Hard Copy of Application 28/08/2019 15 As per Online Application: Crop Category Area/Capacity Cnit NanH: Activity/ Crop/ Area/ Capacity IFLOWERS ILILLIUM18000.00 I~~~.arel

16 Project Cost (Rs. in lakh) 133.39 17 Promoter's share (Rs. in lakh) 53.35 18 Loan Amount (Rs. in lakh) 80.03 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed the proposal in Decision of PPAC : Approved with specific detail in the light ofNHB Scheme guidelines mention of amount/ Rejected with reasons/ and deferred the project for want of Deferred with reasons completion of lacking documents/information from applicant 21 Addl. remarks 22 (i)PresentIy at head office Yes Participation of applicant in the PPAC Meeting (ii)Presently at field offices/ state officers NA (iii)Through phone by PPAC Yes

.. "._--_.'._ .•...- ...." --0/- ~bql I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Code: JIiQi2:20~PIPA-06AHR0000003~~: liRaryana m ~ of Meeting : -.-J@BQ~/2019_ IITypeofCas~IFresh J~

1 Agenda Item No Volume-IV (3) 2 Date of Draw 3 Priority No 3 4 Development of Commercial Horticulture Narne of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project DHRUVSEHGAL 6 Khewat/Khata No. 18 Musti1 No. 16 Kila No. 10/2( 6-7), 11(8-0), 12(8-0), 6/2/2(0-19), 7/2(2-13),9/2(2-3), Kita 7 measuring 31 Kana15 Mala and Kewat/Khata No. 12 Mustil No. 15 KilaNo. 21/2(5-18), 1611(8-0), Kita 2 Project Location measuring 13 kanal 18 mala and Khewat/Khata No. 12 MustilNo. 15 Kila No. 20(8-0),21/1(2-2), kita 2 measuring 10 kanal 2 marla and khewatlkhata no. 15Mustil 16 Kila No.2/l(7-8), 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant Social Category 9 GEN (General/SCP /TSP /Minority(M/C/S/P /B/J) )/0BC 10 Type of Area(GeneraIlTSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 27/08/2019 14 Date of Receipt of Hard Copy of Application 28/08/2019 15 As per Online Application: C:rop CalegOl) Area/('apadty Cuit Narnc Activity/ Crop/ Area/ Capacity IFLOWERS ILILLIUM18000.00 I~~~.arel

16 Project Cost (Rs. in lakh) 133.39 17 Promoter's share (Rs. in lakh) 53.35 18 Loan Amount (Rs. in lakh) 80.03 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed the proposal in Decision of PPAC : Approved with specific detail in the light ofNHB Scheme guidelines mention of amount/ Rejected with reasons/ and deferred the project for want of Deferred with reasons completion of lacking documents/information from applicant. 21 AddI. remarks 22 (i)Presently at head office Yes Participation of applicant in the PPAC Meeting (ii)Present1y at field offices/ state officers NA (iii)Through phone by PPAC Yes --_._--,-~-_.-_.,'.- '--""--'--~_¥_'----"--"._--- ""--- 1i/OC( c-- 6:L- I MINUTES FOR PPAC (Date of Meeting : 03/09/2019) I IPre-IPA Project Code: 112019-20-PIPA-08ARJ0000006 ]State: =:JIRajastha~~ [Date of Meeting : 1@3/09/2019 -'ltYpe of Case: IIFresh m

1 Agenda Item No Volume -IV (4) 2 Date of Draw 3 Priority No 4 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project VIPINGUPTA 6 Survey no. 153,154,155,156, Village Project Location Baktapur, Tehsi1- Alwar, Dist- Alwar (Rajasthan) 7 Gender(Male/Female) MALE Constitution of Applicant: 8 INDIVIDUAL Promoter/Applicant Social Category 9 GEN (General/SCP /TSP /Minority(M/C/S/P /B/J))/OBC 10 Type of Area(GeneraIlTSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 11/08/2019 14 Date of Receipt of Hard Copy of Application 14/08/2019 15 As per Online Application: (' Crop \ Ie 'f _all'l,!on,. 'Name ,/ n~a;'"apan V. , l:nit Activity/ Crop/ Area/ Capacity IFLOWER~ROS~6000.00 J;:JMtr.

16 Project Cost (Rs. in lakh) 90,00 17 Promoter's share (Rs. in lakh) 30.00 18 Loan Amount (Rs. in lakh) 60.00 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed the proposal in Decision of PPAC : Approved with specific detail III the light of NHB Scheme mention of amount/ Rejected with reasons/ guidelines and deferred the project for Deferred with reasons want of completion of lacking documents/information from applicant. 21 Addl. remarks 22 (i)Presently at head office NA (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting NA (iii)Through phone by PPAC Yes I MINUTES FOR PPAC (Date of Meeting : 03/0912019) I Pre-IPA Project 2019-20-PIPA- I Madhya Code: J 23AMPOOOOO05 Istate: Pradesh I~ IDate of Meeting : 03 09 IITYPeof 11 / /2019 Case: 0 11 I~

1 Agenda Item No Vol-V (5) 2 Date of Draw 3 Priority No 5 4 Development of Commercial Horticulture Narne of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project NANDAN BAN SOD GRAM TEWAR, TEHSIL JABALPUR, 6 Project Location DISTRICT JABALPUR (M.P.) 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category SC (General/SCP /TSP /Minority(M/C/S/P fB/J))/OBC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 17/08/2019 14 Date of Receipt of Hard Copy of Application 15 As per Online Application:

C..atcgory' ("rop \ rea!'('. apaclh. l:nit . Namt' • Activity/ Crop/ Area/ Capacity /FLOWERSIROSEI3120.00 I~~~.arel

16 Project Cost (Rs. in lakh) 40.00 17 Promoter's share (Rs. in lakh) 10.00 18 Loan Amount (Rs. in lakh) 30.00 19 Applicable Scheme 20 Deferred The Committee discussed the proposal in detail in the light of NHB Scheme guidelines and deferred the project for want of completion of lacking documents/information" s/Clarifi cations Decision of PPAC : Approved with specific from the applicant. Further the PPAC mention of amount/ Rejected with reasons/ also allowed to return the DD, Deferred with reasons no.108895, dated 24.07.2019, for an amount of Rs. 5000/- received from the applicant after getting confirmation from the Account division about the receipt of online application fees from the applicant. 21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field offices/ state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes - .. -6CJ- ~ I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Proje_ctCodiJIE>19-20=PIPA-?3~TN0000912.J1Stat~:~lIamil Nad~._m IDate of Meeting : =:]103/09/2019 _ IITyp~of Case: IIDefelTed I~

1 Agenda Item No VOL-V (6) 2 Date of Draw 3 Priority No 6 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project SHIVARAJA 6 Binnamangalam- Village, Denkanikottai- Project Location Taluk,Krishnagiri - Dist, Tamil Nadu 7 Gender(Male/Female) MALE 8 Constitution of Applicant: INDIVIDUAL Promoterl Applicant 9 Social Category GEN (General/SCP ITSPIMinority(M/C/S/P IBIJ))/OBC 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 22/08/2019 14 Date of Receipt of Hard Copy of Application 15 As per Online Application:

'f ('.•..:licgon.. Crop i\ rea!'c..apat'lV Coil . 'NarlH: . Activityl Cropl Area/ Capacity /FLOWERS/ROSEI4000.00 I~~.arel

16 Project Cost (Rs. in lakh) 60,00 17 Promoter's share (Rs. in lakh) 15,00 18 Loan Amount (Rs. in lakh) 45.00 19 Applicable Scheme 20 Deferred The Committee discussed the proposal in Decision ofPPAC : Approved with specific detail in the light of NHB mention of amount/ Rejected with reasons/ Scheme guidelines and defelTed the project for Deferred with reasons want of completion of lacking documents/information from applicant. 21 Add I. remarks 22 (i)Presently at head office No (ii)Presently at field officesl state officers Participation of applicant in the PPAC Meeting No (iii)Through phone by PPAC Yes -----_._------_ .._- --_._-----_ ..__ ..__._------_._- I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Cod~12019-20-PIPA-22A~~0000~10 J~!ate.:" IIChhattisgarh m IDate of Meeting : JI03/09/2019 .~~ of Case: IIFresh m

1 Agenda Item No Volume -IV (7) 2 Date of Draw 3 Priority No 7 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project YOGESH PAREEK At- Jalki Dist - Mahasamund Dist- 6 Project Location Mahasamund 7 Gender(Male/Female) MALE Constitution of Applicant: 8 INDIVIDUAL Promoterl Applicant Social Category 9 GEN

(General/SCP ITSP IMinority(M/C/S/P IB/J) )/OBC I 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rrl 12 Disability 0 13 Date of Receipt Online Application 16/08/2019 14 Date of Receipt of Hard Copy of Application 22108/2019 15 As per Online Application: ('rop \ Ie 'j ('atrgnry • ! rca ..."pacI v roil Nam(' . Activityl Cropl Areal Capacity I~LOW~RSIROSEI4000.00 'I~~.arel

16 Project Cost (Rs. in lakh) 60.00 17 Promoter's share (Rs. in lakh) 20.00 18 Loan Amount (Rs. in lakh) 40.00 19 Applicable Scheme 20 Deferred The Committee discussed the proposal in Decision ofPPAC : Approved with specific detail III the light of NHB Scheme mention of amountl Rejected with reasonsl guidelines and deferred for want of Deferred with reasons completion of lacking documents I information from applicant. 21 Addl. remarks 22 (i)Presently at head office No (ii)Presently at field officesl state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I IPre-IPA Project Code: 1~19-20-PI~A-_?2ACG0000012 IIState:. IIChhattisgarh m IDate of Meeting : ~lQBi9/20l9 JIType of Case: I'Fresh I~

1 Agenda Item No Volume-IV (8) 2 Date of Draw 3 Priority No 8 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 ABHINAV GREEN POWER INDIA Name of Project PVT.LTD. 6 Village - Dargon , Block - Dhamdha , Project Location Distt. - Durg. CGPin- 491332 7 Gender(Male/Female) MALE 8 Constitution of Applicant: COMPANIES Promoterl Applicant 9 Social Category GEN (General/SCP ITSP IMinority(M/C/S/P IB/ J))/0BC 10 Type of Area(General/TSP) Gen 11 Area Category Rrl 12 Disability N 13 Date of Receipt Online Application 24/08/2019 14 Date of Receipt of Hard Copy of Application 28/08/2019 15 As per Online Application: . . ('rup ". ' Cnit (:Hl'c;nn., . Namt' An"ate apantv . Activity/ Crop/ Area/ Capacity IFLOWER~OSE~~OO.oo I~~.arel

16 Project Cost (Rs. in lakh) 115.00 17 Promoter's share (Rs. in lakh) 28.75 18 Loan Amount (Rs. in lakh) 86.25 19 Applicable Scheme New-After 31/03/2014 20 Deferred The Committee discussed the proposal in Decision of PPAC : Approved with specific detail in the light of NHB Scheme mention of amount/ Rejected with reasonsl guidelines and deferred for want of Deferred with reasons completion of lacking documents I information from applicant.

21 Addl. remarks 22 (i)Presently at head office NA (ii)Presently at field officesl state officers Participation of applicant in the PPAC Meeting Yes (iii)Through phone by PPAC Yes I MINUTES FOR PPAC (Date of Meeting: 03/09/2019) I ~ Code: ~127BMHB948160 II.state: IIMaharashtra-Pune J~ IDate of Meeting : 1@3/09/2019 __ =:JIType ofCas_e: JIFresh m

1 Agenda Item No Volume -IV (9) 2 Date of Draw 3 Priority No 9 4 Development of Commercial Horticulture Name of Scheme through Production and Post Harvest Management of Horticulture Crops 5 Name of Project POURNIMA MANOJKUMAR MANGAVE 6 Project Location Village -Gundewadi, Tal-Miraj, Dist-Sangli 7 Gender(Male/Female) FEMALE 8 Constitution of Applicant: INDIVIDUAL Promoter/Applicant 9 Social Category GEN (General/SCP /TSP /Minority(MlC/S/P /B/J))/0BC 10 Type of Area(GeneraI/TSP) Gen 11 Area Category Rural 12 Disability y 13 Date of Receipt Online Application 17/08/2019 14 Date of Receipt of Hard Copy of Application 22/08/2019

15 ~s per Online Application: , f:ategol"Y Crop Name i\n'a/Capacity Lnit Activity/ Crop/ Area/ Capacity jFLOWERSIGERBERRA/4160.00 . I~~~.arel

16 Project Cost (Rs. in lakh) 69.80 17 Promoter's share (Rs. in lakh) 24.80 18 Loan Amount (Rs. in lakh) 45.00 19 Name of Financing Bank Branch IDBI Bank: 20 Bank Address Branch Miraj Ta1-Miraj Dist-Sangli 21 Applicable Scheme New-After 31/03/2014 22 Deferred The Committee discussed the proposal in detail Decision ofPPAC : Approved with specific in the light of NHB Scheme guidelines and mention of amount/ Rejected with reasons/ deferred the project for re-examination by the Deferred with reasons division and completion lacking documents/information from the applicant/lending bank. 23 Addl. remarks 24 (i)Presently at head office NA Participation of applicant in the PPAC Meeting (ii)Presentlyat field offices/ state officers NA (iii)Through phone by PPAC Yes