NORTH CENTRAL RAILWAY

GAUTAM BUDH NAGAR PARLIAMENTARY CONSTITUENCY , the most populous state of Nation is served by North Central Railway along with Northern, North Eastern M. C. Chauhan and East Central Railways. Indian Railways (IR) plays a very General Manager important role in development of the state and provides North Central Railway connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers - within it, which is 14% of entire railway network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed train Gatimaan Express, which initially ran between Agra and . It has now been extended upto Jhansi with effect from 01.04.2018 - a move that will boost tourism in bundelkhand region of Uttar Pradesh. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last four years with 376% more investment in comparison to previous years. Results of such a massive investment are becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be a matter of past and a new Railway equipped with state-of-the-art facilities will be able to serve the citizens with greater level of satisfaction. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to .

In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the GAUTAM BUDH NAGAR constituency of Uttar Pradesh in the last four years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency.

It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN GAUTAM BUDH NAGAR PARLIAMENTARY CONSTITUENCY

GAUTAM BUDH NAGAR PARLIAMENTARY CONSTITUENCY

A. ASSEMBLY SEGMENTS: , , , , Khurja

B. WORKS COMPLETED IN LAST FOUR YEARS:

1. Infrastructural developments:

GRoad Over Bridge has been commissioned in Tundla - Ghaziabad section at Level Crossing No-129 Km 1370 of 5-7 at a cost of Rs. 20.22 Cr. GTo improve infrastructure & mobility; Solid State Interlocking at Dadri Station commissioned on 16.04.2017 at a cost of Rs. 10.00 Cr.

Solid State Interlocking commissioned: GKhurja Junction Station on 14.02.2016 at a cost of Rs. 6.00 Cr. GSikanderpur Station on 30.07.2015 at a cost of Rs. 3.00 Cr. GAjaibpur Station on 21.08.2014 at a cost of Rs. 3.00 Cr. GChola Station on 06.06.2015 at a cost of Rs. 2.50 Cr. GWair Station on 03.03.2015 at a cost of Rs. 2.50 Cr. GDankaur Station on 07.12.2014 at a cost of Rs. 2.50 Cr.

B. Improvements in Passenger Amenities: At Khurja Jn.: GTwo LED type station name boards have been installed at a cost of Rs. 0.04 Cr. GAutomatic Ticket Vending Machine provided at Khurja station. GOne New Platform at Khurja Junction Station commissioned on 14.02.2016 at a cost of Rs. 2.90 Cr. GOne deep tube well at Khurja at a cost of Rs. 0.41 Cr. At Dadri station: GOne New Platform at Dadri Station commissioned on 16.04.2017 at a cost of Rs. 3.00 Cr. GOne deep tube well at Dadri at a cost of Rs. 0.35 Cr. At Other station of Gautam Budh Nagar constituency: GOne New Foot Over Bridge at Wair at a cost of Rs. 1.20 Cr. GCovered shed on Foot over bridge at Dadri station at a cost of Rs. 0.15 Cr. G100% LED lights have been provided at platform, station building & circulating area.

C. Others Developments: New trains having stoppages over Gautam Budh Nagar constituency: GTrain No 22427/22428 Bhrigu Express-Weekly from Ballia to Anand Vihar (T). GTrain No 22431/22432 Allahabad- Udhampur Express - Bi-weekly. New stoppages to trains: GTrain No 15707/15708 Amrapali Express from Katihar to Amritsar at Khurja station. GTrain No 14005/14006 Lichchavi Express from Sitamarhi to Anand Vihar (T) at Khurja station.

D. ONGOING WORKS

GChipiyana Buzurg-Dadri - 4th line (12 km) under construction at a cost of Rs. 128.68 Cr. GProvision of watering hydrants at PF No.-5 of Khurja Railway Station under construction at a cost of Rs. 0.73 Cr. GImplementation of roof top solar power project at Dadri Station. Foundation stone laying of Automatic Signaling on Aligarh-Ghaziabad third line and Bi-directional system on middle line along with inauguration of Trial of Centralized Traffic Control and Moblie Train Radio Communication on Etawah-Aligarh Section.

Automatic Ticket Vending Machine at Khurja. Interlocking at Dadri.

New Platform at Khurja.