10 References

Total Page:16

File Type:pdf, Size:1020Kb

10 References 10 references 10 References Anderson, G. F. (1955) Fifty Years of Electricity Supply: The Story of Sydney’s Electricity Undertaking, Sydney County Council. Australian Radiation Protection and Nuclear Safety Agency (2003) Fact Sheet 8, The controversy over electromagnetic fields and possible adverse health effects Accessed at www.arpansa.gov.au/pubs/factsheets/008.pdf Last accessed 19/7/2006. Collins, D. 1798 An Account of the English Colony in New South Wales: With Remarks on the Dispositions, Customs, Manners, etc of the Native Inhabitants of that Country. Volume 1. Reprinted in 1975 by A. H. and A. W. Reed. Sydney. Dallas, M. and Irish, P. (2004) Aboriginal Heritage Assessment. Breen Holdings Pty Limited and Consolidated Development Pty Limited Lands at the Kurnell Peninsula, NSW. Report to Aitken McLachlan Thorpe. Donlon, D. (1991) The LA Perouse skeletons; Report on 32 skeletons from within the boundaries of the La Perouse Local Aboriginal Land Council, NSW. RESTRICTED. Douglas Partners (1990) Report on Geotechnical Investigation, Bunnerong Power Station Site, Lot 100 Military Road, Botany, Project 14235, December 1990. Douglas Partners (2002) Report on Geotechnical Investigation for Proposed Caltex Mooring Piles, Kurnell, for Waterway Constructions Pty Ltd. Project 27773A, June 2002. Fitzhardinge, L.F. (1961) ‘Notes to Expedition to Botany Bay’, in, Sydney's First Four Years. Angus and Robertson. Gibbs, H. (1991) Inquiry into community needs and high voltage transmission line development. Report to the NSW Minister for Minerals and Energy. Department of Minerals and Energy, Sydney, NSW, February 1991. Hann, J. M. (1985) Sand Deposits in Botany Bay. Geological Survey of NSW Report No. GS1984/174. Herbert, C. (1983) ‘Igneous Rocks’, in Geology of the Sydney 1:100,000 Sheet, in Geology of the Sydney 1:100,000 Sheet, edited by C. Herbert, NSW Department of Mineral Resources, Sydney, pp. 93-115. Johnson, B. D., Albani, A. D., Rickwood, P. C., and Tayton, J. W. (1977) ‘The Bedrock Topography of the Botany Basin, New South Wales’, Journal of the Geological Society of Australia 24(7), 403-408. Kass, T. (1989) The Bare Island and La Perouse Monuments Historic Sites, La Perouse: An Historical Investigation, Report to NSW NPWS. Kinhill Engineers (1991) Proposed Parallel Runway; Sydney (Kingsford Smith) Airport. Supplement to the Draft Environmental Impact Statement, 2 Volumes. Larcombe, F. A. (n. d.) The History of Botany 1788-1963. Council of the Municipality of Botany. McGuigan, A. (n. d.) Aboriginal Reserves in NSW: A Land Rights Research Aid. Occasional Paper #4, NSW Ministry of Aboriginal Affairs. McNally, G. H. and Branagan, D. F. (1998) ‘An Overview of the Engineering Geology of the Botany Basin, in Environmental Geology of the Botany Basin, edited by G. H. McNally and J. Jankowski, pp. 1-23. National Health and Medical Research Council (1989) Interim Guidelines on limits of exposure to 50/60Hz electric and magnetic fields, Radiation Health Series No. 30, 166 EnergyAustralia Australian Radiation Laboratory on behalf of the National Health and Medical Research Council. NSW Department of Environment and Climate Change (2004a) Eastern Suburbs Banksia Scrub in the Sydney Basin Bioregion, Threatened Species Information Profile. NSW Department of Environment and Conservation (2004b) Eastern Suburbs Banksia Scrub Endangered Ecological Community Recovery Plan, NSW Department of Environment and Climate Change, Hurstville. NSW Department of Environment and Conservation (2006a). NSW Threat Abatement Plan – Invasion of native plant communities by Chrysanthemoides monilifera (Bitou Bush and Boneseed), Department of Environment and Climate Change (NSW), Hurstville. NSW Department of Environment and Conservation (2006b) Recommendation for the Identification of Critical Habitat for the Eastern Suburbs Banksia Scrub Endangered Ecological Community, Recommendation Report prepared for public exhibition pursuant to Part 3 of the Threatened Species Conservation Act 1995. NSW Department of Environment and Climate Change, Hurstville NSW Public Works Department (1990) Landscape Analysis for La Perouse and Bare Island Historic Site. Conservation Plan, Report by Environmental Design Section, Public Works Department to the NSW NPWS. Pringle, G. (1979) La Perouse Precinct Planning Report – A review. June 1979. Randwick Municipal Council. Randwick and District Historical Society (1989) A Randwick Ramble, Randwick and District Historical Society, Sydney. Randwick Municipal Council (1985) Randwick A Social History. NSW University Press. Reed, A.W. (ed.) (1969) Captain Cook in Australia: Extracts from the Journals of Captain James Cook. Rich, E. (1986) Yarra Point Site #5-6-292: Archaeological Investigation, Report to the Randwick Municipal Council. Ross, A. (1988) ‘Tribal and Linguistic Boundaries: A Reassessment of the Evidence’, in, Aplin G. (ed.) A Difficult Infant: Sydney before Macquarie. NSW Press, Australia pp. 42-53. Roy, P. S. (1983) ‘Groundwater’, in Geology of the Sydney 1:100,000 Sheet, edited by C. Herbert, NSW Department of Mineral Resources, Sydney, pp. 41-91. Silva, E. J. (1978) A history of the Sir Joseph Banks Hotel, Botany, Unpublished report. Smith, L., Rich, E. and Hesp, P. (1990) Aboriginal Sites on Kurnell Peninsula: A Management Study Volumes 1 & 2. Report to the NSW National Parks and Wildlife Service and the Australian Heritage Commission. Tench, W. (1793) ‘A Complete Account of the Settlement at Port Jackson’, in, Sydney's First Four Years. Angus and Robertson. Tench, W. (1961) 1789-1793 Sydney's First Four Years: being a reprint of A Narrative of the Expedition to Botany Bay and A Complete Account of the Settlement at Port Jackson. Reprinted in 1961 by Angus and Robertson, Sydney. Turbet, P. (1989) The Aborigines of the Sydney District Before 1788. Kangaroo Press, Kenthurst. Total Earth Care (2006) Flora and Fauna Assessment: Bunnerong Subtransmission Substation Proposed Stage 1 Expansion, Military Road, Matraville. Report prepared for EnergyAustralia. Wilkenfeld, G. and Spearritt, P. (2004) Electrifying Sydney: 100 Years of EnergyAustralia. EnergyAustralia, Sydney. Williams, I. (1988) La Perouse the place, the people and the sea. A collection of writing by the Aboriginal community. Aboriginal Studies Press, Canberra. Botany Bay Cable Project Environmental Assessment 167 10 references Woolley, D. R. (1983) ‘Quaternary Geology’, in Geology of the Sydney 1:100,000 Sheet, edited by C. Herbert, NSW Department of Mineral Resources, Sydney, pp. 146-148. 168 EnergyAustralia .
Recommended publications
  • MEU History Pre Pages
    132 UNITED: A HISTORY OF THE MUNICIPAL EMPLOYEES UNION IN NSW 15 The Electricity Industry rom its earliest years the Union became involved in the electricity industry, enrolling F members employed in various classifications in the Electricity Department of the City Council, including workers at Pyrmont Power Station, but not embracing those employed as tradesmen.1 Issues over pay and conditions, seniority, and redundancies occurred regularly, particularly with fluctuations in the need for power supply. One early issue in 1915 was that time clocks were not opened until the precise time of ceasing work, which meant that employees could not have a bath before then, resulting in delays in leaving the premises and consequently missed transport connections. This was rectified by management agreeing to open time clocks five minutes before ceasing time.2 By 1924, the City Council had gradually extended its electricity supply area, retailing its power in thirty-four Sydney suburbs, and supplying electricity in bulk to another seven suburbs. However, to achieve this, the City Council had to purchase electricity from the Railway Commissioners. To meet increasing demands, the City Council then constructed the largest electricity generating power station in the Southern Hemisphere, seven miles (eleven kms.) from central Sydney, on the northern shore of Botany Bay. It was called Bunnerong (Aboriginal for Sleeping Lizard), the name of the area on which it was constructed. It was stated in 1928 that “it would stand as a monumental work of members of the Union, who were mainly employed on its construction, there being on site about one thousand employees”.3 Bunnerong Power Station Source: S.
    [Show full text]
  • Drawings and Wangi Power Station
    WHAT IF? WHAT NEXT? SPECULATIONS ON HISTORY’S FUTURES SESSION 2A ROUTES TO THE PAST Critical, Cultural or Commercial: Intersections Between Architectural History and Heritage TO CITE THIS PAPER | Michael Chapman and Leonie Matthews. “The Archive of Power: Drawings and Wangi Power Station.” In Proceedings of the Society of Architectural Historians Australia and New Zealand: 37, What If? What Next? Speculations on History’s Futures, edited by Kate Hislop and Hannah Lewi, 227-235. Perth: SAHANZ, 2021. Accepted for publication December 11, 2020. PROCEEDINGS OF THE SOCIETY OF ARCHITECTURAL HISTORIANS AUSTRALIA AND NEW ZEALAND (SAHANZ) VOLUME 37 Convened by The University of Western Australia School of Design, Perth, 18-25 November, 2020 Edited by Kate Hislop and Hannah Lewi Published in Perth, Western Australia, by SAHANZ, 2021 ISBN: 978-0-646-83725-3 Copyright of this volume belongs to SAHANZ; authors retain the copyright of the content of their individual papers. All efforts have been undertaken to ensure the authors have secured appropriate permissions to reproduce the images illustrating individual contributions. Interested parties may contact the editors. THE ARCHIVE OF POWER: DRAWINGS AND WANGI POWER STATION Michael Chapman | University of Newcastle Leonie Matthews | University of Notre Dame The power station at Wangi Wangi, located on the edge of Lake Macquarie in New South Wales, is one of the largest and most ambitious pieces of architectural infrastructure in Australia’s post-war history and marks a key shift in approaches to both power production and industrialisation. Built across a decade of construction at the culmination of the Second World War, the power station was the result of a drawn archive of over 8000 architectural drawings, which meticulously document every element and fragment of the building: its siting, its detailing, the machinery and its eventual operation and connection with the state’s electrical grid.
    [Show full text]
  • THE ELECTRICITY COMMISSION of NEW SOUTH WALES and Its Place in the Rise of Centralised Coordination of Bulk Electricity Generation and Transmission 1888 - 2003
    THE ELECTRICITY COMMISSION OF NEW SOUTH WALES and its place in the rise of centralised coordination of bulk electricity generation and transmission 1888 - 2003 Kenneth David Thornton Bachelor of Arts (UNE). Graduate Certificate Human Resource Management (Charles Sturt) Doctor of Philosophy (History) School of Humanities and Social Science 2015 Cover image: Electricity Commission of New South Wales Logo – October 1960 (ECNSW 02848) 2 The thesis contains no material which has been accepted for the award of any other degree or diploma in any university or other tertiary institution and, to the best of my knowledge and belief, contains no material previously published or written by another person, except where due reference has been made in the text. I give consent to the final version of my thesis being made available worldwide when deposited in the University’s Digital Repository**, subject to the provisions of the Copyright Act 1968. **Unless an Embargo has been approved for a determined period. (Signed) Kenneth David Thornton 3 4 Acknowledgments I wish to acknowledge the following people and organisations for their invaluable help. First, research would have been extremely difficult, if not impossible to complete, without the assistance of my former employer, Eraring Energy. In particular, Managing Director, Peter Jackson, for allowing me to use the facilities at Eraring Power Station even though I had retired. Corporate Information Managers, Joanne Golding and Daniel Smith for providing access to a wealth of primary sources and for not complaining when I commandeered a corner of their work area to further my research. Many former colleagues of the Electricity Commission of New South Wales, Pacific Power and Eraring Energy, who gave of their time and expertise in the form of answering questionnaires or actual interviews.
    [Show full text]
  • Regions and Marginal Loss Factors: Fy 2017-18
    REGIONS AND MARGINAL LOSS FACTORS: FY 2017-18 NATIONAL ELECTRICITY MARKET Published: 06 November 2017 REGIONS AND MARGINAL LOSS FACTORS: FY 2017-18 IMPORTANT NOTICE Purpose This document has been prepared by AEMO as the ‘Regions Publication’ under clause 2A.1.3 of the National Electricity Rules (Rules), and to inform Registered Participants of the inter-regional loss factor equations and intra-regional loss factors for 2017-18 under clauses 3.6.1 and 3.6.2 of the Rules, and has effect only for the purposes set out in the Rules. The Rules and the National Electricity Law (Law) prevail over this document to the extent of any inconsistency. Disclaimer This document also contains explanatory information. Explanatory information does not constitute legal or business advice, and should not be relied on as a substitute for obtaining detailed advice about the Law, the Rules, or any other applicable laws, procedures or policies. AEMO has made every effort to ensure the quality of the information but cannot guarantee its accuracy or completeness. Accordingly, to the maximum extent permitted by law, AEMO and its officers, employees and consultants involved in the preparation of this document: make no representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of the information in this document; and are not liable (whether by reason of negligence or otherwise) for any statements or representations in this document, or any omissions from it, or for any use or reliance on the information in it. Copyright 2017 Australian Energy Market Operator Limited. The material in this publication may be used in accordance with the copyright permissions on AEMO’s website.
    [Show full text]
  • Transgrid Transmission Annual Planning Report 2014
    NEW SOUTH WALES Transmission Annual Planning Report 2014 Disclaimer The New South Wales Transmission Annual Planning Report 2014 is prepared and made available solely for information purposes. Nothing in this document can be or should be taken as a recommendation in respect of any possible investment. The information in this document reflects the forecasts, proposals and opinions adopted by TransGrid as at 30 June 2014 other than where otherwise specifically stated. Those forecasts, proposals and opinions may change at any time without warning. Anyone considering this document at any date should independently seek the latest forecasts, proposals and opinions. This document includes information obtained from AEMO and other sources. That information has been adopted in good faith without further enquiry or verification. The information in this document should be read in the context of the Electricity Statement of Opportunities and the National Transmission Network Development Plan published by AEMO and other relevant regulatory consultation documents. It does not purport to contain all of the information that AEMO, a prospective investor or Registered Participant or potential participant in the NEM, or any other person or Interested Parties may require for making decisions. In preparing this document it is not possible nor is it intended for TransGrid to have regard to the investment objectives, financial situation and particular needs of each person or organisation which reads or uses this document. In all cases, anyone proposing to rely on or use the information in this document should: 1. Independently verify and check the currency, accuracy, completeness, reliability and suitability of that information; 2.
    [Show full text]
  • Development of a Comprehensive Decision Making Framework for Power Projects in New South Wales (NSW)
    Development of a Comprehensive Decision Making Framework for Power Projects in New South Wales (NSW) AYSE TOPAL A dissertation submitted to the University of Technology, Sydney in fulfilment of the requirements for the degree of Doctor of Philosophy (Engineering) Energy Planning and Policy Centre Faculty of Engineering and Information Technology University of Technology, Sydney 2014 Certificate of Authorship I certify that the work in this thesis has not previously been submitted for a degree, nor has it been submitted as part of the requirements for a degree, except as fully acknowledged within the text. I also certify that the thesis has been written by me. Any help that I have received in my research work and the preparation of the thesis itself has been acknowledged. In addition, I certify that all information sources and literature used are indicated in the thesis. Signature of Candidate ___________________________ i Acknowledgements There are a number of people I would like to express my sincerest gratitude, who have supported me during my Ph.D. course. Firstly, I would like to sincerely thank my supervisor Prof. Deepak Sharma for his support, guidance and encouragement during the entire time of my PhD. His assistance during the entire time has provided me with an invaluable opportunity to finish my PhD course. I would like to express my gratitude to Mr. Ravindra Bagia, my co-supervisor, for providing guidance during my study. I would like to thank Dr Tripadri Prasad, for their guidance that helped to improve this study. I would like to give my special thanks to the Ministry of Education (MOE) from Turkey, where I received scholarship for my study.
    [Show full text]
  • Schematic Representation of Energyaustralia's Transmission
    Attachment 1 Schematic representation of EnergyAustralia’s Transmission Assets As at 1 July 2004 EnergyAustralia’s submission to ACCC – September 2003 Sydney and Central Coast areas TG Munmorah 97E Charmhaven TG Macquarie Syd N Park Wyong 92A 11 kV exit 98B 11 kV exit TG 92B Lane Cove 99C Tuggerah 926 927 132 kV exit 958 Gosford 92F 132 kV exit 11 kV exit Somersby Homebush 92J 66, 33 kV exit 95E Bay Meadowbank 952 935 TG Mason 90X 33 kV exit 11 kV exit Syd E 11 kV exit 11 kV exit 33 kV exit 132 kV exit Park 203 Drummoyne 202 90W 132 kV 204 132 kV exit exit Rozelle Chullora 900 Pyrmont 91A St Peters 9S6 132 kV exit 9S9 91X 91B 91Y 11 kV exit TG Beac 91M/3 132 kV exit Canterbury 11 kV exit Marrickville 33 kV exit 908 Bunnerong 909 91M/1 91L 33 kV exit 910 911 91F Peakhurst TG 91J Syd S 33 kV exit 1 Newcastle area TG Taree NorthPower Stroud Road 860 Capral (66 kV) 96F Smelter 963 96W 96B 95L Kurri Tomago 132 kV exit 66 kV exit 9NA 33 kV exit 96U 33 kV exit 962 TG 96A TG Waratah Newcastle West 2 Attachment 2 Changes to the configuration of EnergyAustralia transmission network assets New Parallel and Supporting Assets at 1 July 2004 August 2003 This information is provided in response to questions pertaining to the changing operation and configuration of EnergyAustralia’s transmission network assets. The Code’s definition of transmission assets will result in several distribution assets being reclassified as transmission assets during the next regulatory period (2004-2009).
    [Show full text]
  • Former Sydney County Council Building
    552A-570 George Street Sydney Heritage Advice – response to the proposed local heritage listing nomination for the site Prepared for Far East Town Hall Pty Ltd July 2019 Document Control Page CLIENT: Far East Town Hall Pty Ltd PROJECT NAME: 552A – 570 George Street – Updated Heritage Advice SITE NAME: 552A – 570 George Street, Sydney EXTENT HERITAGE PTY LTD INTERNAL REVIEW/SIGN OFF WRITTEN BY DATE VERSION REVIEWED APPROVED MacLaren North 24.08.2018 1.0 DRAFT MacLaren North 25.08.2018 Vidhu Gandhi MacLaren North 05.09.2018 2.0 DRAFT MacLaren North 05.09.2018 Vidhu Gandhi MacLaren North 12.09.2018 FINAL MacLaren North 12.09.2018 Vidhu Gandhi Lucy Irwin 31.07.2019 UPDATED MacLaren North 31.07.2019 FINAL Copyright and Moral Rights Historical sources and reference materials used in the preparation of this report are acknowledged and referenced in figure captions or in text citations. Reasonable effort has been made to identify, contact, acknowledge and obtain permission to use material from the relevant copyright owners. Unless otherwise specified in the contract terms for this project EXTENT HERITAGE PTY LTD: Vests copyright of all material produced by EXTENT HERITAGE PTY LTD (but excluding pre-existing material and material in which copyright is held by a third party) in the client for this project (and the client’s successors in title); Retains the use of all material produced by EXTENT HERITAGE PTY LTD for this project for EXTENT HERITAGE PTY LTD ongoing business and for professional presentations, academic papers or publications. Table of Contents Executive Summary ............................................................................................................. 4 Brief History: Timeline of development of the site ...............................................................
    [Show full text]
  • Download and Otherwise Freely Deal with This Work for Any Purpose Provided That You Attribute the State Records Authority As the Owner
    2015/2016 Annual Report 2015-16 ISSN 0545-3593 State Records Authority of New South Wales PO Box 516 Kingswood NSW 2747 Published 2016 Images from digitisation in 2015-16 Cover: Town Hall luncheon for returned soldiers, Anzac Day 1916. From NRS 4481, ST5793 Total external costs for publication (printing only) $500.00 including GST Printed on 100% recycled paper Available in PDF format at www.records.nsw.gov.au © State of New South Wales through the State Records Authority of New South Wales, 2016. You may copy, distribute, display, download and otherwise freely deal with this work for any purpose provided that you attribute the State Records Authority as the owner. However, you must obtain permission if you wish to (1) charge others for access to the work (other than at cost), (2) include the work in advertising or a product for sale or (3) modify the work. Images throughout this report are of items in the State archives digitised during 2015-16. Images with a Digital ID number are available to order online and through Photo Investigator. As at 30 June 2016 the State Records Authority of New South Wales is a related entity of the Department of Finance, Services and Innovation (DFSI). Where a reference is made to a current policy or related document released under the previous title of the Department of Finance and Services (DFS) and the Office of Finance and Services (OFS) that name is still used in the text. The Hon Dominic Perrottet MP Minister for Finance, Services and Property GPO Box 5341 SYDNEY NSW 2001 31 October 2016 Dear Minister, On behalf of the State Records Authority of New South Wales I take pleasure in forwarding the Annual Report and Financial Statements of the Authority for the year ended 30 June 2016.
    [Show full text]
  • Alphabetical List of Acts
    Legislative Council New South Wales Alphabetical List of Acts (Public and Private) From 1856 (23rd Edition 2011) (Compiled in the Legislative Council Office) Legislative Council “Alphabetical List of Acts (Public and Private) from 1856” First edition, 1977; Second edition, 1982; Third edition, 1984; Fourth edition, 1985; Fifth edition, 1987; Sixth edition, 1989; Seventh edition, 1991; Eighth edition, 1992; Ninth edition, 1993; Tenth edition, 1994; Eleventh edition, 1995; Twelfth edition, 1996; Thirtieth edition, 1997; Fourteenth edition, 1998, Fifteenth edition 1999, Sixteenth edition 2000; Seventeenth edition 2001; Eighteenth edition 2002; Nineteenth edition 2003; Twentieth edition 2004; Twenty first edition 2005, Twenty second edition 2006. Twenty third edition 2011, This work has been catalogued by the NSW Parliamentary Library as follows: NEW SOUTH WALES–Parliament, Legislative Council Office. Alphabetical list of Acts (Public and Private) from 1856. Sydney, 1977–lv. (loose- leaf), 27 cm. Updated annually. Previously issued at intervals cumulated monographic editions: 1. Alphabetical List of Acts (NSW). 1. Statutes NSW–Indexes. Statement of Explanatory Notes used throughout this issue: Ŗ Reprinted Act. ® Repealed or Expired Act. For details of repealed Acts see latest Chronological Table of NSW Statutes. (Compiled in the Legislative Council Office, as at 6 September2011) ISSN 1835-4173 Act Year No. ® Abattoir Road Act Amendment Act 1897 1897 32 ® Abattoir Road Act of 1860 1860 2 ® Abattoir (Sale-yards) Construction Act 1913 1913 17
    [Show full text]
  • Bond University DOCTORAL THESIS the Impact of Supply Chains On
    Bond University DOCTORAL THESIS The Impact of Supply Chains on Productivity and Financial Performance of Power Producers in Australia. Aburadi, Nedal Award date: 2017 Link to publication General rights Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. • Users may download and print one copy of any publication from the public portal for the purpose of private study or research. • You may not further distribute the material or use it for any profit-making activity or commercial gain • You may freely distribute the URL identifying the publication in the public portal. The Impact of Supply Chains on Productivity and Financial Performance of Power Producers in Australia. Nedal Aburadi The thesis submitted in fulfilment for the requirements of the degree of Doctor of Philosophy Bond University Faculty of Society & Design November 2016 Abstract Over the past 10-20 years, Australian federal and state governments have introduced dramatic changes to the Australian power generation market to boost competitiveness and aid with the rapid development of the Australian power generation industry and businesses. These changes included the deregulation, disaggregation and privatisation of the power generation companies and supply chains, resulting in the formation of a new regulatory and management framework called the National Electricity Market. As a result, a variety of different strongly heterogeneous power providers and market operators have emerged in Australia, drastically changing the business environment and causing significant gaps in our understanding of how to manage and regulate this environment in an efficient way.
    [Show full text]
  • Understanding Smart Grids Electrical Engineering – ICT Technologies – Energy Economics 1 - 3 December | Monash Conference Centre | Melbourne
    Understanding Smart Grids Electrical engineering – ICT technologies – Energy economics 1 - 3 December | Monash Conference Centre | Melbourne This three day training course is the most comprehensive course covering smart grids today and has been developed to educate energy market professionals and observers in all aspects of smart grid technology and economics By attending this course, you will: • Understand the fundamental electrical engineering processes enabling smart grids • Discover how ICT technologies are revolutionising the way in which electricity market stakeholders can interact • Analyse the energy economics driving this transition and implications for future energy markets Register before 24 October to save over $300! Visit www.questevents.com.au Organised by: Information Technology In association with: Understanding Smart Grids This three day course has been designed specifically to educate energy industry professionals and observers in the key aspects of Smart Grids, including ICT technologies, electrical engineering and energy economics. Pulling together five industry experts across three days to cover each of these aspects, this course is the most comprehensive review of smart grids available today. If you work within in Australia’s utilities sector or have clients in the sector, then this is your opportunity to get an in-depth knowledge of smart grid technologies, operations and economics so you can make informed business decisions. Topic overview Electricity provision in Australia and around the world is undergoing a profound transformation driven by new technologies, increased demand for fossil fuels in the developing world, and climate policies. The smart grid paradigm encompasses the technological components of this transformation whereby new technologies such as solar panels and batteries will integrate with the existing grid.
    [Show full text]