THE COUNCIL place commencing on 14 May 2020 between 08:00 and 23:59. The proposed The Council has made The (Public Footpath No. Order will come into operation on 14 May 2020, as signed, with maximum 83, Penn) (Temporary Footpath Closure) Order 2020 under Section 14(1) of 18 months duration. the Road Traffic Regulation Act 1984, which will temporarily prohibit any Dated 1May 2020 person from proceeding, except for access, in that length of Public Footpath The Council has made Buckinghamshire Council (Dedmere Road, Marlow No. 83, Penn, from Whielden Lane to Public Footpath No. 7, Coleshill. in the Parish of Marlow CP) (Temporary Prohibition of Through Traffic) The closure is required whilst tree felling and improvement works take Order, 2020 which will temporarily prohibit any vehicle from proceeding, place commencing on 1May 2020 for 6months. The alternative route for except for access, in Dedmere Road for adistanceofapproximately 63 metres. pedestrians affected by the closure will be via the existing highway. The Order Alternative route: Glade Road, Road, Newtown Road and will come into operation on 1May 2020, as signed, with amaximum duration vice versa. The closure is required whilst Thames Water new connection of 6months or until the works have been completed, whichever is the soonest. works take place commencing on 4May 2020 between 08:00 and 23:59. The Council has made The Buckinghamshire Council (Public Footpath No. The proposed Order will come into operation on 4May 2020, as signed, 18, -cum-Ilmer) (Temporary Footpath Closure) Order 2020 under with maximum 18 months duration. Section 14(1) of the Road Traffic Regulation Act 1984, which will temporarily Dated 1May 2020 prohibit any person from proceeding, except for access, in that length of Public Footpath No. 18, Longwick-cum-Ilmer, from for adistance The Council intends to make Buckinghamshire Council (Peterley Lane, of approximately 175 metres in anorth-east direction. The closure is required Prestwood in the Parish of Great Missenden CP) (Temporary Prohibition whilst improvement works to the public right of way take place commencing of Through Traffic) Order, 2020 which will temporarily prohibit any vehicle on 1May 2020 for 6months. The alternative route for pedestrians affected from proceeding, except for access, in Peterley Lane from junction of A4128 by the closure will be via Public Bridleway No. 19, Longwick-cum-Ilmer. for adistanceofapproximately 100 metres. Alternative route: Peterley Lane, The Order will come into operation on 1May 2020, as signed, with a Nags Head Lane, London Road, High Street, Station Approach, Martinsend maximum duration of 6months or until the works have been completed, Lane, Wycombe Road and vice versa. The closure is required whilst UKPN whichever is the soonest. carriageway reinstatement works take place commencing on 18 May 2020 between 08:00 and 23:59. The proposed Order will come into operation on The Council has made Buckinghamshire Council (Forty Green Road, Forty 18 May 2020, as signed, with maximum 18 months duration. Green in the Parish of Penn CP) (Temporary Prohibition of Through Traffic) Dated 1May 2020 Order, 2020 which will temporarily prohibit any vehicle from proceeding, except for access, in Forty Green Road for adistance of approximately 85 The Council intends to make Buckinghamshire Council (Littleworth Road, metres. Alternative route: Forty Green Road, Penn Road, Station Road, in the Parish of Downley CP) (Temporary Prohibition of Through Gregories Road, Holtspur Top Lane, Holtspur Lane and vice versa. Traffic) Order, 2020 which will temporarily prohibit any vehicle from The closure is required whilst Openreach works to access box in the proceeding, except for access, in Littleworth Road from junction of Jubile carriageway take place commencing on 4May 2020 between 09:30 and 15:30. Road for adistanceofapproximately 35 metres. Alternative route: Littleworth The proposed Order will come into operation on 4May 2020, as signed, Road, Commonside, High Street, Plomer Green Lane, Plomer Hill and with maximum 18 months duration. vice versa. The closure is required whilst remedial works following sewer Dated 1May 2020 repair take place commencing on 18 May 2020 between 08:00 and 23:59. The proposed Order willcome into operation on 18 May 2020, as signed, The Council has made Buckinghamshire Council (Chancellors, Penn Street in with maximum 18 months duration. the Parish of Penn CP) (Temporary Prohibition of Through Traffic) Order, Dated 1May 2020 2020 which will temporarily prohibit any vehicle from proceeding, except for access, in Chancellors for 1a distance of approximately 10 metres. Alternative The Council intends to make Buckinghamshire Council (Dobsons route: Chancellors and vice versa. The closure is required whilst resurfacing Lane, Fawley in the Parish of Fawley CP) (Temporary Prohibition of works take place commencing on 4May 2020 between 00:00 and 23:59. Through Traffic) Order, 2020 which will temporarily prohibit any vehicle The proposed Order will come into operation on 4May 2020, as signed, from proceeding, except for access, inDobsons Lane for adistanceof with maximum 18 months duration. approximately 126 metres. Alternative route: Dobsons Lane, Benhams Lane, Dated 1May 2020 Marlow Road, Icehouse Lane, Crockmore Lane and vice versa. The closure is required whilst Openreach ducting works in the verge and carriageway take The Council has made Buckinghamshire Council (Gore Hill and A413, place commencing on 21 May 2020 between 08:00 and 23:59. The proposed Amersham) (Temporary Speed Restriction) Order, 2020 which will Order will come into operation on21May 2020, as signed, with maximum temporarily prohibit any vehicle from exceeding the temporary speed limit 18 months duration. of 40mph for adistance of approximately 100m on Gore Hill and A413 Dated 1May 2020 approaches to the roundabout. The restriction is required whilst Affinity Water works take place commencing on 17 May 2020 between 09:00-16:00. TheCouncil intends to make Buckinghamshire Council (Chartridge Lane, The proposed Order will come into operation on 17 May 2020, as signed, Chartridge in the Parish of Chartridge CP) (Temporary Prohibition of with maximum 18 months duration. Through Traffic) Order, 2020 which will temporarily prohibit anyvehicle from Dated 1May 2020 proceeding, except for access, in Chartridge LanefromBerkley Avenue for adistance of approximately 150 metres. Alternative route: Chartridge Lane, The Council has made Buckinghamshire Council (Fullers Hill, Chesham) Park Road, StMarys Way, Red Lion Street, Church Street, Missenden Road, (Temporary Prohibition of Through Traffic) Order, 2020 which will Chesham Road, Frith Hill, Ballinger Road, Village Road and vice versa. temporarily prohibit any vehicle from proceeding, except for access, in Fullers The closure is required whilst Affinity Water new connection works take Hill for adistanceofapproximately 220 metres. Alternative route: Wey Lane, place commencing on 25tMay 2020 between 08:00 and 23:59. The proposed Missenden Road, Chesham Road, Hyde Heath Road, Weedon Hill, Fullers Order will come intooperation on 25 May 2020, as signed, with maximum Hill and vice versa. The closure is required whilst Openreach underground 18 months duration. structure works take place commencing on 17 May 2020 between 09:30 and Dated 1May 2020 15:30. The proposed Order will come into operation on 17 May 2020, as signed, with maximum 18 months duration. The Council intends to make Buckinghamshire Council (Gatemoor Lane, Dated 1May 2020 Forty Green in the Parish of CP) (Temporary Prohibition of Through Traffic) Order, 2020 which will temporarily prohibit any vehicle The Council has made Buckinghamshire Council (Dudley Lane, Roundhouse from proceeding, except for access, in Gatemoor Lane for adistance of Lane, Fawley) (Temporary Prohibition of Through Traffic) Order, 2020 which approximately 169 metres. Alternative route: Whitehouse Lane, Gatemoor will temporarily prohibit any vehicle from proceeding, except for access, in Hill, Bayleys Bottom, Forty Green Road, Riding Lane, Gatemoor Lane Dudley Lane, Roundhouse Lane for adistanceofapproximately 1470 metres. and vice versa. The closure is required whilst Openreachducting works take Alternative route: Dobsons Lane, Church Lane, Bosmore Lane, Cockslease place commencing on 14tMay 2020 between 08:00 and 18:00. The proposed Lane and vice versa. The closure is required whilst Openreach overhead works Order will come into operation on 14 May 2020, as signed, with maximum to restore customer service take place commencing on 13 May 2020 between 18 months duration. 09:30 and 15:30. Road will be closed between 09:30-15:30 only.Works will not Dated 1May 2020 take place over the weekend, road will be open at all other times. Works will commence on Dudley Lane and then Roundhouse Lane. Both roads will not be The Council intends to make Buckinghamshire Council (Kings Lane, The closed at once. The proposed Order will come into operation on 13 May 2020, Lee in the Parish of The Lee CP)(Temporary Prohibition of Through Traffic) as signed, with maximum 18 months duration. Order, 2020 which will temporarily prohibit any vehicle from proceeding, Dated 1May 2020 except for access, in Kings Lane from junction of Chesham Lane for a distance of approximately 114 metres. Alternative route: Kings Lane, Leather The Council has made Buckinghamshire Council (Pednor Bottom To Pednor Lane, Aylesbury Road, London Road, Rocky Lane, Chesham Lane and vice Top, Pednor in the Parish of Chartridge CP) (Temporary Prohibition of versa. The closure is required whilst Openreach customer connection works Through Traffic) Order, 2020 which will temporarily prohibit any vehicle from take place commencing on 25 May 2020 between 09:30 and 15:30. Works proceeding, except for access, in Pednor Bottom To Pednor Top for adistance will be 09:30-15:30, carriageway will be open at all other times. The proposed of approximately 450 metres. Alternative route: Pednor Bottom To Pednor Order will come into operation on 25 May 2020, as signed, with maximum Top, Pednor Bottom, Pednor Road, Drydell Lane, Hollow Way, Pednor Top 18 months duration. and vice versa. The closure is required whilst Openreach ducting works take Dated 1May 2020