Timeline to Final Approved Cost Approved Balance LUPCODE Name of Project / Location HPC Meeting Date of HPC Department District complete the (In Cr.) Amount in HPC (In Cr.) Project LUP0001 Construction of KGBV - Lanilab Khansahib 1 03.10.2018 School Education Deptt. 1.03700 0.73700 31.06.2019 LUP0002 Construction of KGBV - Gogjipathri Nagam 1 03.10.2018 School Education Deptt. Budgam 0.51390 0.21390 31.05.2019 LUP0003 Construction of KGBV - Patwaw Budgam 1 03.10.2018 School Education Deptt. Budgam 1.17730 0.78980 31.06.2019 LUP0004 Construction of KGBV - Nagbal Khag 1 03.10.2018 School Education Deptt. Budgam 1.03070 0.73070 31.10.2019 Constr of 1x50 mtr Treussed girder Jeepable Dand Foot Bridge over Doodganga Nallah near LUP0086 1 03.10.2018 Public Works Deptt. Budgam 1.59830 0.71430 31.08.2019 Alipora LUP0087 Constt of 2X22 mtr span P/G steel bridge over Nallah Shaliganga at Quangipora Chadoora 1 03.10.2018 Public Works Deptt. Budgam 3.58240 2.34240 31.03.2020 Construction of 1x36 Mtr Span Steel girder Foot bridge on Nallah Sukhnag at Peth LUP0088 1 03.10.2018 Public Works Deptt. Budgam 1.48120 0.90120 31.08.2019 Hanjibugh Constr of 1x8 mtr span steel decked Bridge on Gumboora Ichhama road over Nallah Satmar in LUP0089 1 03.10.2018 Public Works Deptt. Budgam 1.06250 0.88750 31.08.2019 Km 2nd including approach road LUP0090 Const of 2x20 mtr span steel girder bridge on Hazarpora Kandhama link road at Khag 1 03.10.2018 Public Works Deptt. Budgam 3.63820 1.65880 31.08.2019 Constt. of 3x27 mtr span steel trussed girder bridge over Nallah Shaliganga on at Dragger Hill LUP0091 1 03.10.2018 Public Works Deptt. Budgam 7.84210 5.13869 31.08.2019 Kachwari road LUP0092 Construction of 1x40 Mtr single Span bridge over Nallah Ferozpora at Town-hall Magam 1 03.10.2018 Public Works Deptt. Budgam 3.77980 3.57980 31.03.2021 Construction of 2x31 Mtr span steel trussed girder bridge over nallah Shaliganga on Nair Gund LUP0093 1 03.10.2018 Public Works Deptt. Budgam 5.75500 3.38000 31.03.2020 Guhi-Dragger road LUP0275 Laying of Common Raw Water Main for 5 No WSS's Lanilab, Arigam-Bugro 2 10.10.2018 Public Health Engineering Budgam 6.04000 5.74000 31.12.2020 LUP0276 WSS Kuzwera 2 10.10.2018 Public Health Engineering Budgam 5.46730 2.04730 31.12.2020 LUP0277 WSS Greater Chadora 2 10.10.2018 Public Health Engineering Budgam 7.70000 7.00000 31.12.2020 LUP0278 WSS Nilnag Hafroo 2 10.10.2018 Public Health Engineering Budgam 7.66500 0.99010 31.12.2020 LUP0279 WSS Fohar Batapora 2 10.10.2018 Public Health Engineering Budgam 5.33340 5.28340 31.12.2020 LUP0280 Aug. Budgam Town Phase - Ist 2 10.10.2018 Public Health Engineering Budgam 3.14000 0.76960 31.03.2020 LUP0281 Aug. Khanshaib Town 2 10.10.2018 Public Health Engineering Budgam 3.25000 1.19100 31.03.2020 LUP0491 PHC Nowpora Budgam 2 10.10.2018 Health & Medical Education Budgam 1.67000 0.47000 30.06.2019 LUP0492 PHC Makhama 2 10.10.2018 Health & Medical Education Budgam 2.33500 0.53500 31.03.2020 LUP0493 PHC Chewdara 2 10.10.2018 Health & Medical Education Budgam 1.88000 1.78000 31.03.2020 LUP0494 PHC Talpora 2 10.10.2018 Health & Medical Education Budgam 1.88000 1.68000 30.06.2019 LUP0495 PHC Budran 2 10.10.2018 Health & Medical Education Budgam 1.88000 1.68000 31.03.2020 LUP0496 NTPHC Choon 2 10.10.2018 Health & Medical Education Budgam 1.89480 1.54480 31.03.2020 LUP0497 PHC 2 10.10.2018 Health & Medical Education Budgam 2.40950 1.87000 31.03.2020 LUP0538 I.T Tower Building -II, Rangreth 2 10.10.2018 Industries & Commerce Deptt Budgam 4.25000 1.25000 31.10.2019 LUP0539 Common Effluent Treatment Plant (CETP), Rangreth 2 10.10.2018 Industries & Commerce Deptt Budgam 5.26000 3.76000 31.10.2019 LUP0583 WSS Adina Draripora 3 24.10.2018 Public Health Engineering Budgam 2.69100 1.58800 31.12.2019 LUP0584 WSSKathwar 3 24.10.2018 Public Health Engineering Budgam 1.04000 0.17850 31.12.2019 LUP0585 WSS KumarMohalla Raithan 3 24.10.2018 Public Health Engineering Budgam 0.95420 0.56420 31.12.2019 LUP0586 WSS Lakripora 3 24.10.2018 Public Health Engineering Budgam 2.99000 0.30620 31.12.2019 LUP0587 WSS Nagrad Khah 3 24.10.2018 Public Health Engineering Budgam 0.72300 0.16300 31.12.2019 LUP0588 WSS Pakerpora 3 24.10.2018 Public Health Engineering Budgam 2.48990 1.82990 31.12.2020 LUP0589 WSS Palar 3 24.10.2018 Public Health Engineering Budgam 1.66310 0.49430 31.12.2019 LUP0590 WSS Qazibagh 3 24.10.2018 Public Health Engineering Budgam 1.07300 0.25300 31.12.2019 LUP0591 WSS Razwan 3 24.10.2018 Public Health Engineering Budgam 1.28580 0.36480 31.12.2019 LUP0592 WSS Ringzibal 3 24.10.2018 Public Health Engineering Budgam 0.58600 0.12100 31.12.2019 LUP0593 WSS shamsabad 3 24.10.2018 Public Health Engineering Budgam 0.98900 0.44170 31.12.2019 LUP0594 WSS Sheikhpora 3 24.10.2018 Public Health Engineering Budgam 2.42700 0.70700 31.12.2019 LUP0595 WSS Kralpora Sofipora 3 24.10.2018 Public Health Engineering Budgam 2.86100 1.41100 31.12.2019 LUP0596 WSS Mirpora Hayatpora 3 24.10.2018 Public Health Engineering Budgam 0.74950 0.42060 31.12.2019 LUP0597 WSS New Colony Malpora 3 24.10.2018 Public Health Engineering Budgam 1.84040 0.73000 31.12.2019 LUP0598 WSS Sundipora 3 24.10.2018 Public Health Engineering Budgam 2.40000 0.17440 31.12.2019 LUP0774 Constr. Of 1x20 mtr span trussed Bridge on Nallah Gogaldara Pethsharan Road 3 24.10.2018 Public Works Deptt. Budgam 3.67140 3.22140 31.08.2019 Constr. Of 1x18 mtr span steel girder Bridge with RCC slab deck in Km 5th at Sebdan over Ahaji LUP0775 3 24.10.2018 Public Works Deptt. Budgam 2.05750 1.18250 30.11.2019 Canal connecting to Bathar Railway Road LUP0776 Constr of 1x24 mtr span steel bridge at Karipora (Intermediate lane truss girder bridge) 3 24.10.2018 Public Works Deptt. Budgam 2.15770 1.36270 31.10.2019 LUP0777 Construction of 25 Mtr span bridge at Loolipora Yaham 3 24.10.2018 Public Works Deptt. Budgam 0.77210 0.61810 31.10.2019 LUP0933 Improvement to Kenz khul 3 24.10.2018 Irrigation & Flood Control Budgam 7.55090 5.84530 30.11.2018 LUP1003 Construction of 10 additional accommodation for HSS Budgam. 3 24.10.2018 School Education Deptt. Budgam 1.24550 0.57050 31.08.2019 LUP1045 NTPHC at Hariwani 4 20.11.2018 Health & Medical Education Budgam 1.88000 1.78000 30.06.2019 LUP1046 Laboratory Block at PHC Hardpazoo 4 20.11.2018 Health & Medical Education Budgam 0.39950 0.24950 30.06.2019 LUP1047 PHC at Pathkoot 4 20.11.2018 Health & Medical Education Budgam 6.09000 3.79000 30.06.2019 LUP1048 NTPHC at Jawalpora 4 20.11.2018 Health & Medical Education Budgam 1.89480 1.54480 30.06.2019 LUP1049 NTPHC at Ratsun 4 20.11.2018 Health & Medical Education Budgam 1.89480 1.54480 30.06.2019 LUP1050 NTPHC at Dooniwara 4 20.11.2018 Health & Medical Education Budgam 1.99500 1.59500 30.06.2019 LUP1051 NTPHC Challyan 4 20.11.2018 Health & Medical Education Budgam 1.89000 1.79000 30.06.2019 LUP1109 WSS Magam 4 20.11.2018 Public Health Engineering Budgam 3.41740 1.05600 31.12.2019 LUP1110 WSS Shunglipora Nasserpora 4 20.11.2018 Public Health Engineering Budgam 3.92670 1.77120 31.12.2019 LUP1111 WSS Sonoor Kalipora 4 20.11.2018 Public Health Engineering Budgam 2.40820 0.68820 31.12.2019 LUP1112 WSS Nowrozbaba Trapai 4 20.11.2018 Public Health Engineering Budgam 0.87330 0.73000 31.12.2019 LUP1113 WSS Chadoora Town 4 20.11.2018 Public Health Engineering Budgam 4.92660 2.66160 31.12.2020 LUP1114 WSS Up- gradation Charishareif Town Phase-II 4 20.11.2018 Public Health Engineering Budgam 9.53700 7.85180 31.12.2020 LUP1115 WSS Mir Mohalla Bonpora 4 20.11.2018 Public Health Engineering Budgam 5.39290 1.84450 31.12.2020 LUP1116 WSS Handle Bagh 4 20.11.2018 Public Health Engineering Budgam 7.01780 2.61610 31.12.2020 LUP1228 Construction of 1x10 Mtr span steel decked bridge on Wamin Nallah at Brass Gujjar Basti 4 20.11.2018 Public Works Deptt. Budgam 0.79680 0.44680 31.10.2019

LUP1229 Construction of 1x10 Mtr span steel decked bridge on Gogaldara Nallah at Shuplin Gujjar Basti 4 20.11.2018 Public Works Deptt. Budgam 0.86290 0.66290 31.03.2020 LUP1230 Construction of 1x22 Mtr span steel girder bridge at Rakhi Wachoo Khansahib 4 20.11.2018 Public Works Deptt. Budgam 2.41220 1.73720 31.08.2019 Construction of 1x10 Mtr span RCC Minor bridge over nallah Anem on Loolipora Kalipora road at LUP1231 4 20.11.2018 Public Works Deptt. Budgam 1.94810 1.85440 30.11.2019 Khag Construction of 100.00 Mtr span single lane plate girder bridge over nallah sukhnag at sail LUP1232 4 20.11.2018 Public Works Deptt. Budgam 6.43360 4.42360 31.12.2019 Beerwah Budgam LUP1233 Construction of Arwah-Wuhangam bridge at Arwah Beeru Budgam 4 20.11.2018 Public Works Deptt. Budgam 5.23740 2.10860 31.03.2020 LUP1309 Sewerage scheme Chara-i-Shareif Budgam 5 12.12.2018 Housing & Urban Dev Deptt. Budgam 14.76000 14.01000 31.03.2021 LUP1310 D/S Budgam Phase II 5 12.12.2018 Housing & Urban Dev Deptt. Budgam 11.80000 10.58150 31.03.2022 LUP1311 D/S Chadora 5 12.12.2018 Housing & Urban Dev Deptt. Budgam 2.81410 1.86070 31.03.2020 Construction of 50 MVA, 132/33 KV, Grid station, Navbugh Chadoora with 18 Kms. D/C 132 KV TL LUP1361 5 12.12.2018 Power Development Deptt Budgam 33.86240 18.72560 31.03.2020 & 6.3 MVA, 33/11 KV Receiving station Evacuation of power from 50 MVA, 132/33 KV Magam Grid Stn. Const of 33 KV double circuit line LUP1362 from Magam Grid Stn upto R/Stn Magam. Reconductoring/upgradation of conductor size from 5 12.12.2018 Power Development Deptt Budgam 2.05440 0.80000 30.09.2019 R/Stn Magam upto village arwah tapping point. LUP1363 Construction of 33/11 KV 1x6.3 MVA at Receiving station, Arizal 5 12.12.2018 Power Development Deptt Budgam 4.53430 0.73550 30.09.2019 LUP1366 Evacuation of Power of 33 KV level for 132/33 KV Grid Station, Budgam. 5 12.12.2018 Power Development Deptt Budgam 4.30000 0.51280 30.09.2019 LUP1477 Const. of PHC at Arigam 5 12.12.2018 Health & Medical Education Budgam 1.88000 1.83000 31.03.2020 LUP1478 PHC Hanjoora 5 12.12.2018 Health & Medical Education Budgam 3.50000 1.04000 31.08.2019 LUP1479 PHC Aaripanthan 5 12.12.2018 Health & Medical Education Budgam 2.50000 2.00000 31.08.2019 LUP1480 Construction of Rural Health Research Center and Allied Works at Khag 5 12.12.2018 Health & Medical Education Budgam 17.94000 17.14000 31.03.2021 LUP1506 Constr of RCC Counter Forte retaining wall at Miran Resport (Humahma Heights) Humhama 5 12.12.2018 Public Works Deptt. Budgam 1.98770 1.88770 31.03.2020 Construction of 1x37 mtr span steel truss girder Bridge over Nallah Sukhnag at Km 4th on LUP1507 5 12.12.2018 Public Works Deptt. Budgam 4.82260 4.62260 31.03.2021 Wadwan Narbal road LUP1508 Construction of Kremshore Dreygam and Dreygam Banderpora road 5 12.12.2018 Public Works Deptt. Budgam 3.16760 3.00450 31.03.2020 LUP1509 Construction of inner links of Village Suresh & Larkipora Khag 5 12.12.2018 Public Works Deptt. Budgam 2.93260 2.73190 31.03.2020 LUP1510 Construction of Budran link road in Pendobooni 5 12.12.2018 Public Works Deptt. Budgam 1.71690 1.59690 31.03.2020 LUP1511 Construction of Kathwar Check Kathwar road Kulbagh Tilumpora and allied links 5 12.12.2018 Public Works Deptt. Budgam 3.32510 3.03050 31.03.2020 LUP1608 Construction of OBC Hostel at Model Degree College, Chari-Sharief 5 12.12.2018 Social Welfare Budgam 3.15300 2.60300 31.03.2020 LUP1612 Development of play field at Sikh Nambal Rangreth 5 12.12.2018 Youth Services & Sports Deptt Budgam 5.71000 5.46000 30.11.2019 LUP1613 Development of play field at Kral Pathri Khansahab Budgam 5 12.12.2018 Youth Services & Sports Deptt Budgam 3.86000 3.75000 31.06.2019 LUP1614 Development of play field at Magam Budgam 5 12.12.2018 Youth Services & Sports Deptt Budgam 2.75000 1.25000 30.11.2019 LUP1615 Development of play field at Gogo Rangreth 5 12.12.2018 Youth Services & Sports Deptt Budgam 2.74000 2.09000 30.11.2019 LUP1658 NTPHC Lalpora 6 28.02.2019 Health & Medical Education Budgam 3.55000 1.42000 31.03.2020 LUP1659 NTPHC Parisabad 6 28.02.2019 Health & Medical Education Budgam 3.55000 1.66000 31.03.2020 LUP1660 NTPH Hardu Panzoo 6 28.02.2019 Health & Medical Education Budgam 1.80000 1.75000 31.03.2020 LUP1661 PHC Dadompora Chadoora 6 28.02.2019 Health & Medical Education Budgam 2.60000 1.00030 31.03.2020 LUP1673 Construction of Academic Block at GDC Magam 6 28.02.2019 Higher Education Budgam 5.87070 5.87070 31.12.2020 Construction of Sewerage and Drainage Disposal System for Industrial Effluents at Electronic LUP1709 6 28.02.2019 Industries & Commerce Deptt Budgam 2.50000 2.45000 31.03.2020 Complex, Rangreth LUP2083 Construction of 10 roomed Double Storied Building for Govt. HS Bugroo Budgam 6 28.02.2019 School Education Deptt. Budgam 0.96330 0.86330 31.12.2019 LUP2084 Construction of 10 roomed Double Storied Building for Govt. HS TF Shah Budgam 6 28.02.2019 School Education Deptt. Budgam 0.96330 0.86330 31.12.2019 LUP2085 Construction of 06 roomed Double Storey Building for Govt. HSS Khansahib Budgam 6 28.02.2019 School Education Deptt. Budgam 1.00830 0.90830 31.08.2019 LUP2086 Construction of 09 roomed Three Storied Building for Govt. HSS Wadwan Budgam 6 28.02.2019 School Education Deptt. Budgam 1.86450 1.76450 31.12.2019 LUP2087 Const. of KGBV Bagat I Kanipora Rakhshalina 6 28.02.2019 School Education Deptt. Budgam 1.08320 0.39620 30.06.2019 LUP2088 Const. of KGBV Narbal SK Pora Magam 6 28.02.2019 School Education Deptt. Budgam 1.08320 0.39620 30.06.2019 LUP2089 Providing of WS to 152 uncovered Schools of Budgam 6 28.02.2019 School Education Deptt. Budgam 0.3744 0.3744 30.06.2019 LUP2128 Completion of deficient infrastructure pointed out by AICTE in Govt. Polytechnic Budgam 6 28.02.2019 Skill Development Department Budgam 1.21570 0.81000 31.10.2019 LUP2261 Apni Mandi Khan Sahib, Budgam 7 02.03.2019 Horticulture Budgam 1.43850 0.47850 31.12.2019 LUP2262 Fruit & Vegetable Market, Charishrief 7 02.03.2019 Horticulture Budgam 4.93070 4.07990 31.12.2020 LUP2302 Aug. Budgam Town Phase II 7 02.03.2019 Public Health Engineering Budgam 3.95650 2.52190 31.12.2020 LUP2303 Aug. Beerwah Town 7 02.03.2019 Public Health Engineering Budgam 3.44530 2.34630 31.12.2020 LUP2305 WSS Shiekhpora 7 02.03.2019 Public Health Engineering Budgam 5.89170 3.26570 31.12.2020 LUP2558 Development/Construction of F&V Market at Kremshora Budgam 9 09.02.2020 Horticulture Budgam 6.12250 5.72250 31.03.2021 LUP2565 Completion of Alamdar road from Hapatnar to Chariarisharief 11 13.07.2020 Public Works Deptt. Budgam 3.75990 2.24520 1.03.2021 LUP2566 Construction of 1x36 Mtr span steel girder bridge at Babapora Falchal 11 13.07.2020 Public Works Deptt. Budgam 2.89270 2.15110 1.03.2021 LUP2567 Construction of road from Sogam to Ranger, Sogam to Kathairgund and Sogam to Gundi Rajab 11 13.07.2020 Public Works Deptt. Budgam 3.95610 2.07880 1.03.2021 LUP2568 Upgradation of road from Chararisharief to Batpora Haproo 11 13.07.2020 Public Works Deptt. Budgam 5.67350 3.72950 1.03.2021 Upgradation/ Construction of Hayatpora Wahibugh – Kralcheck – Wadipora Wanpora Qazipora LUP2569 11 13.07.2020 Public Works Deptt. Budgam 5.23460 1.16710 1.03.2021 Newa road LUP2570 Upgradation of ompura hyderpora via narkar roadwith allied link 11 13.07.2020 Public Works Deptt. Budgam 5.94580 5.74580 31.03-2021 LUP2601 CHC Chattergam Budgam 11 13.07.2020 Health & Medical Education Budgam 11.75000 5.31690 31.10.2020 LUP2602 PHC Shogipora Budgam 11 13.07.2020 Health & Medical Education Budgam 3.39000 1.63000 30.09.2020 LUP2603 NTPHC Puhroo Budgam 11 13.07.2020 Health & Medical Education Budgam 3.39000 1.76480 30.06.2020 LUP2604 NTPHC Soibugh 11 13.07.2020 Health & Medical Education Budgam 11.90000 7.09000 31.12.2021 LUP2639 Islamic University-Nursing Hostel Charar- e- Sharief 11 13.07.2020 Higher Education Budgam 10.86170 7.86000 31.05.2020 LUP2669 Construction of 1x20 m twin foot bridge over Nallah Doodganga at Kherigund Chadoora 12 08.01.2021 Public Works Deptt. Budgam 2.09910 1.32790 LUP2670 Upgradation of road from to Khag 12 08.01.2021 Public Works Deptt. Budgam 7.48000 3.43180