Interstate 580 Safety Lighting and Power Supply Installation Project

Total Page:16

File Type:pdf, Size:1020Kb

Interstate 580 Safety Lighting and Power Supply Installation Project Interstate 580 Safety Lighting and Power Supply Installation Project ALAMEDA COUNTY, CALIFORNIA DISTRICT 4 – ALA – 580 (PM R1.3/ R6.0) EA 04-0K680/ EFIS 0416000125 Initial Study with Proposed Mitigated Negative Declaration Prepared by the State of California, Department of Transportation October 2019 This page is intentionally left blank. General Information about This Document What’s in this document: The California Department of Transportation (Caltrans) has prepared this Initial Study (IS), which examines the potential environmental impacts of the proposed Interstate 580 Safety Lighting and Power Supply Installation Project (project) located near the City of Livermore in Alameda County, California. Caltrans is the lead agency under the California Environmental Quality Act (CEQA). This document explains why the project is being proposed, the existing environment that could be affected by the project, potential impacts of each of the alternatives, and the proposed avoidance and minimization measures, and/or mitigation measures. What you should do: • Please read this document. • Additional copies of the document are available for review at the locations below, and the related technical studies are available at the Caltrans District 4 Office: Caltrans District 4 Office Livermore Public Library 111 Grand Ave 1188 South Livermore Ave Oakland, CA 94612 Livermore, CA 94550 This document can also be accessed electronically at the following website: https://dot.ca.gov/caltrans-near-me/district-4/d4-popular-links/d4-environmental-docs • We would like to hear what you think. If you have comments regarding the proposed project, please send your written comments, including requesting that Caltrans hold a public meeting, to Caltrans by November 14, 2019. • Send comments via U.S. mail to: Sabrina Dunn, Environmental Planner California Department of Transportation, District 4 P.O. Box 23660, MS: 8B, Oakland, CA 94612 • Send comments via email to [email protected]. What happens next: After comments are received from the public and reviewing agencies, Caltrans may (1) give environmental approval to the proposed project, (2) do additional environmental studies, or (3) abandon the project. If the project is given environmental approval and funding is obtained, Caltrans could design and construct all or part of the project. Alternate formats: For individuals with sensory disabilities, this document can be made available in Braille, in large print, or digital audio. To obtain a copy in one of these alternate formats, please call or write to the California Department of Transportation, District 4, Attn: Brian Gassner, Environmental Branch Chief, P.O. Box 23660, Oakland, CA 94623-0660; (510) 286-6025 (Voice), or use the California Relay Service 1 (800) 735-2929 (TTY), 1 (800) 735-2929 (Voice) or 711. ____________________________________________________________________________ Initial Study with Proposed Mitigated Negative Declaration Interstate 580 Safety Lighting and Power Supply Installation Project i This page is intentionally left blank. ____________________________________________________________________________ Initial Study with Proposed Mitigated Negative Declaration Interstate 580 Safety Lighting and Power Supply Installation Project ii This page is intentionally left blank ____________________________________________________________________________ Initial Study with Proposed Mitigated Negative Declaration Interstate 580 Safety Lighting and Power Supply Installation Project iv Proposed Mitigated Negative Declaration Pursuant to: Division 13, Public Resources Code Project Description The California Department of Transportation (Caltrans) proposes to construct the Interstate 580 (I-580) Safety Lighting and Power Supply Installation Project to improve existing roadway conditions and enhance traffic safety on the Altamont Pass. This will be accomplished by installing lighting along eastbound I-580 from West Grant Line Road Undercrossing to North Flynn Road Overcrossing near the City of Livermore in Alameda County (Postmile [PM] R1.3 to PM R6.0). The project will also install new power poles and electrical vaults on the southern side of the same expanse of I-580 to provide power for the lighting. Determination This proposed Mitigated Negative Declaration (MND) is included to give notice to interested agencies and the public that it is Caltrans’ intent to adopt an MND for this project. This does not mean that Caltrans’ decision regarding the project is final. This MND is subject to change based on comments received by interested agencies and the public. Caltrans has prepared an Initial Study (IS) for this project, and pending public review, expects to determine from this study that the proposed project would not have a significant effect on the environment for the following reasons: The proposed project would have no effect on agricultural lands and forest resources, air quality, cultural resources, geology and soils, hazards and hazardous materials, hydrology/water quality, land use and planning, mineral resources, noise, population and housing, public services, recreation, transportation and traffic, tribal cultural resources, and utilities and service systems. With standard conservation measures, avoidance and minimization measures, and mitigation measures, the proposed project would have less than significant effects to aesthetics and less than significant impacts to biological resources, specifically the California tiger salamander (Ambystoma californiense; CTS) and California red-legged frog (Rana draytonii; CRLF). Melanie Brent Date Deputy District Director Office of Environmental Analysis California Department of Transportation District 4 ____________________________________________________________________________ Initial Study with Proposed Mitigated Negative Declaration Interstate 580 Safety Lighting and Power Supply Installation Project v This page is intentionally left blank ____________________________________________________________________________ Initial Study with Proposed Mitigated Negative Declaration Interstate 580 Safety Lighting and Power Supply Installation Project vi Table of Contents Proposed Mitigated Negative Declaration v CHAPTER 1 Proposed Project 1 1.1 Introduction 1 1.2 Background 2 1.3 Purpose and Need 2 1.4 Project Description 3 1.5 Project Features 4 1.6 Permits and Approvals Needed 5 CHAPTER 2 Affected Environment; Environmental Consequences; and AMMs and/or Mitigation Measures 6 2.1 CEQA Environmental Checklist 6 2.1.1 Aesthetics 7 2.1.2 Agriculture and Forest Resources 10 2.1.3 Air Quality 12 2.1.4 Biological Resources 14 2.1.5 Cultural Resources Error! Bookmark not defined. 2.1.6 Geology and Soils 29 2.1.7 Greenhouse Gas Emissions 30 2.1.8 Hazards and Hazardous Materials 43 2.1.9 Hydrology and Water Quality 45 2.1.10 Land Use and Planning 48 2.1.11 Mineral Resources 49 2.1.12 Noise 50 2.1.13 Population and Housing 52 2.1.14 Public Services 53 2.1.15 Recreation 54 2.1.16 Transportation and Traffic 55 2.1.17 Tribal Cultural Resources 57 2.1.18 Utilities and Service Systems 58 2.1.19 Mandatory Findings of Significance 60 CHAPTER 3 Comments and Coordination 61 CHAPTER 4 List of Preparers 62 CHAPTER 5 Distribution List 64 List of Figures Figure 1. Project Vicinity Map .......................................................................................... 1 Figure 2. Biological Study Area ..................................................................................... 16 Figure 3. California 2017 Greenhouse Gas Emissions.................................................. 33 Figure 4. Change in California GDP, Population and GHG Emissions since 2000 ....... 34 Figure 5. California Climate Strategy............................................................................. 37 ____________________________________________________________________________ Initial Study with Proposed Mitigated Negative Declaration Interstate 580 Safety Lighting and Power Supply Installation Project vii List of Tables Table 1. Temporary and Permanent Impacts within the BSA to Suitable Habitat for Listed Species ................................................................. Error! Bookmark not defined. Table 2. Summary of Construction-related GHG Emission Estimates........................... 36 List of Appendices Appendix A. Title VI Policy Statement Appendix B. Avoidance and Minimization Measures and/or Mitigation Measures Appendix C. List of Acronyms and Abbreviations Appendix D. U.S. Fish and Wildlife Species List, October 1, 2019 Appendix E. List of Technical Studies ____________________________________________________________________________ Initial Study with Proposed Mitigated Negative Declaration Interstate 580 Safety Lighting and Power Supply Installation Project viii CHAPTER 1 Proposed Project Introduction The California Department of Transportation (Caltrans) is the lead agency under the California Environmental Quality Act (CEQA). Caltrans proposes to improve existing roadway conditions and enhance traffic safety by installing lighting along eastbound (EB) I-580 from West Grant Line Road Undercrossing to North Flynn Road Overcrossing near the City of Livermore in Alameda County (PM R1.3 to PM R6.0). The total length of the project is 4.7 miles. The Project Vicinity Map is shown below in Figure 1. Figure 1. Project Vicinity Map ____________________________________________________________________________ Initial Study with Proposed Mitigated Negative Declaration Interstate 580 Safety Lighting and Power
Recommended publications
  • Altamont Corridor Vision Universal Infrastructure, Universal Corridor Altamontaltamont Corridor Corridor Vision: Vision Universal Infrastructure, Universal Corridor
    Altamont Corridor Vision Universal Infrastructure, Universal Corridor AltamontAltamont Corridor Corridor Vision: Vision Universal Infrastructure, Universal Corridor What is the Altamont Corridor Vision? The Altamont Corridor that connects the San Joaquin Valley to the Bay Area is one of the most heavily traveled, most congested, and fastest growing corridors in the Northern California megaregion. The Bay Area Council estimates that congestion will increase an additional 75% between 2016 and 2040. To achieve state and regional environmental and economic development goals, a robust alternative is needed to provide a sustainable / reliable travel choice and greater connectivity. The Altamont Corridor Vision is a long-term vision to establish a universal rail corridor connecting the San Joaquin Valley and the Tri-Valley to San Jose, Oakland, San Francisco and the Peninsula. This Vision complements other similar investments being planned for Caltrain, which is in the process of electrifying its corridor and rolling stock; Capitol Corridor, which is moving its operations to the Coast Subdivision as it improves its service frequency and separates freight from passenger service; a new Transbay Crossing, which would allow for passenger trains to flow from Oakland to San Francisco; the Dumbarton Rail Crossing, which is being studied to be brought back into service; and Valley Rail, which will connect Merced and Sacramento. The Vision also complements and connects with High- Speed Rail (HSR), and would enable a one-seat ride from the initial operating segment in the San Joaquin Valley throughout the Northern California Megaregion. One-Hour One-Seat One Shared Travel Time Ride Corridor Shared facilities, Oakland, Stockton, Express service, integrated Peninsula, Modesto modern rolling ticketing, San Jose stock timed connections • The limited stop (two intermediate stops) travel time between Stockton and San Jose is estimated to be 60 minutes.
    [Show full text]
  • Brushy Peak Regional Preserve
    From Ohlone Land to Parkland M min To Clayton & ar Ca o D Byron sh k ia Walnut Creek Cree b Round Road lo Rush period, the rocky outcrops of Brushy Peak became Valley M Brushy Peak o Year opened: 2005 Acres: 1,979 retreats for bandits. During the 1870s, homesteads were rga n Te rr Mt. Diablo it Highlights: Hiking, bicycling, horseback riding. settled on and around Brushy Peak. Between the 1890s Morgan o State r Territory y Los Vaqueros Park Did you know? During the Gold Rush era, Brushy and World War I, local ranch families held picnics and Reservoir Regional Preserve Vasco R Peak was a favorite hideout of the legendary Mexi- dances around the rock outcrops, and in 1900 and 1901 o Caves a d Camino T Livermore can bandit Joaquin Murietta. San Francisco’s Bohemian Club held outings on the peak a s s a j a for prominent local citizens. During the 1920s and 1930s r North a ighla H nd Joseph Laughlin built farm buildings on the property, HISTORY Brushy Peak is a 1,702-foot landmark at Road which are probably the remains of the buildings seen in CONTRA COSTA COUNTY the juncture of the San Francisco Bay Area, the Cali- 0 2.5 Miles ALAMEDA COUNTY Brushy Peak fornia Delta, and the Central Valley. The peak and its the parkland today. Manning Regional Preserve Rd. ad C Ro o ss Brushy Peak was identified as a potential park by the Road l a environs have been recognized as sacred by generations l i P d e Rd.
    [Show full text]
  • Altamont Corridor Vision
    Rob Padgette Deputy Managing Director Capitol Corridor Joint Powers Authority 1 3 4 Connecting to other systems • Free transit transfer program » 22 rail and transit services » Connection to BART at Richmond • Bike access program » Station eLockers and onboard storage racks • First mile/last mile partnerships » Scoot, Jump, Ford GoBike, Gig, Getaround 5 Surging South Bay Ridership Percent Station 2015 2018 Increase San Jose 168,300 191,500 14% Santa Clara 30,300 56,600 87% Santa Clara/Great America 131,100 178,600 36% Freemont 35,500 44,800 26% Total 365,200 471,500 29% Capitol Corridor’s Vision Plan CCJPA Vision Plan 2013 Vision Plan Update High-level, aspirational vision of faster, more frequent, cleaner, quieter, better connected and altogether more attractive rail service 2016 Vision Implementation Plan Engineering plan of segmented, phased improvements to achieve Vision Plan California State Rail Vision State Rail Plan (2018) 2022 Short-Term Plan • Improve service speeds, frequencies, and transit connectivity between Oakland and San Jose 2027 Mid-Term Plan • Open an East Bay hub station to allow connections north- south between Oakland and San Jose and east-west across a Dumbarton Bay Crossing • Half-hourly peak and at least bi-hourly off-peak services between Oakland and San Jose Sacramento to Roseville Service Expansions Third Track • Sacramento to Roseville Third Track: 10 roundtrips between Sacramento and Roseville • Oakland to San Jose Phase 2: service re-route to cut 13 min from existing travel Oakland to San Jose time and to
    [Show full text]
  • The Long Road from Babylon to Brentwood: Crisis and Restructuring in the San Francisco Bay Area
    UC Berkeley ISSI Fellows Working Papers Title The Long Road from Babylon to Brentwood: Crisis and Restructuring in the San Francisco Bay Area Permalink https://escholarship.org/uc/item/93x39448 Author Schafran, Alex Publication Date 2010-11-29 eScholarship.org Powered by the California Digital Library University of California ISSC WORKING PAPER SERIES 2009-2010.47 The Long Road from Babylon to Brentwood: Crisis and Restructuring in the San Francisco Bay Area by Alex Schafran Department of City and Regional Planning University of California, Berkeley November 29, 2010 Alex Schafran Department of City and Regional Planning University of California, Berkeley [email protected] Communities on the fringes of the American metropolis – exurbs, or exurbia – have recently garnered attention as the centers of the foreclosure crisis and its aftermath. On the one hand, this attention to the urban nature of the crisis is welcome, as the metamorphosis of the mortgage fiasco into a financial crisis cum global economic meltdown turned popular attention away from the urban roots of this calamity. But this emphasis on the exurbs as the site of crisis lends itself to the misconception that they are the sole source of crisis, rather than the restructuring of the metropolis as a whole. Using a mixture of ethnography, history and journalism, this paper weaves together the story of how the San Francisco Bay Area was restructured over the course of the past thirty years in a way that produced not only a new map of urban and exurban segregation, but the roots of the crisis itself. Working across multiple scales, it examines how three interwoven factors – demographics, policy and capital – each reacted to the landscape inherited at the end of the 1970’s, moving about the region in new ways, leaving some places thriving and others struggling with foreclosure, plummeting property values and the deep uncertainty of the current American metropolis.
    [Show full text]
  • A Population Study of Golden Eagles in the Altamont Pass Wind Resource Area
    June 1999 • NREL/SR-500-26092 A Population Study of Golden Eagles in the Altamont Pass Wind Resource Area: Population Trend Analysis 1994–1997 Predatory Bird Research Group Long Marine Laboratory University of California Santa Cruz, California National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute ••• Battelle ••• Bechtel Contract No. DE-AC36-98-GO10337 June 1999 • NREL/SR-500-26092 A Population Study of Golden Eagles in the Altamont Pass Wind Resource Area: Population Trend Analysis 1994–1997 Predatory Bird Research Group Long Marine Laboratory University of California Santa Cruz, California NREL Technical Monitor: Karin Sinclair Prepared under Subcontract No. XAT-6-16459-01 National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute ••• Battelle ••• Bechtel Contract No. DE-AC36-98-GO10337 Recommended Citation: Hunt, W.G., R.E. Jackman, T.L. Hunt,.D.E. Driscoll and L. Culp. 1998. A population study of golden eagles in the Altamont Pass Wind Resource Area: population trend analysis 1997. Report to National Renewable Energy laboratory, Subcontract XAT-6-16459-01. Predatory Bird Research Group, University of California, Santa Cruz. NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.
    [Show full text]
  • Summit Ridge Wind Farm – Request for Amendment 4
    Shawn Smallwood, PhD 3108 Finch Street Davis, CA 95616 Oregon Energy Facility Siting Council c/o Luke May, Siting Analyst Oregon Department of Energy 550 Capitol St. NE Salem, OR 97301 [email protected] 21 February 2019 Re: Summit Ridge Wind Farm – Request for Amendment 4 Dear Chair Beyeler and Members of the Council, On behalf of Friends of the Columbia Gorge, Oregon Wild, the Oregon Natural Desert Association, Central Oregon LandWatch, the Audubon Society of Portland, and East Cascades Audubon Society, I write to comment on the Request for Amendment 4 for the Summit Ridge Wind Farm, which requests a postponement of construction start and end dates for the project and which proposes an amended Habitat Mitigation Plan (January 2019). I primarily wish to comment on (1) the suitability of the habitat assessment underlying the amended Habitat Mitigation Plan, and (2) the need to update baseline surveys, project impact predictions, mitigation measures, and post- construction monitoring protocols. Updated surveys and analyses are needed in part because over the near-decade that has passed since the primary baseline study (Northwest Wildlife Consultants 2010), science has made vast improvements in field survey methods and in our understanding of wind turbine collision factors, displacement effects, and cumulative impacts related to wind projects. Methodology has vastly improved in preconstruction studies needed to predict project-scale and wind turbine-scale impacts, to measure post-construction impacts, and to assess whether and to what degree specific mitigation measures can be tested for efficacy. My qualifications for preparing these comments as expert comments are the following.
    [Show full text]
  • The Long Road from Babylon to Brentwood: Crisis and Restructuring in the San Francisco Bay Area by Alex
    The Long Road From Babylon To Brentwood: Crisis and Restructuring in the San Francisco Bay Area By Alex B. Schafran A dissertation submitted in partial satisfaction of the requirements for the degree of Doctor of Philosophy in City & Regional Planning in the Graduate Division of the University of California, Berkeley Committee in charge: Professor Teresa P.R. Caldeira, Chair Professor Ananya Roy Professor Malo Hutson Professor Richard Walker Fall 2012 Copyright © Alex B. Schafran All Rights Reserved Abstract The Long Road From Babylon To Brentwood: Crisis and Restructuring in the San Francisco Bay Area by Alex B. Schafran Doctor of Philosophy in City & Regional Planning University of California, Berkeley Professor Teresa P.R. Caldeira, Chair This dissertation integrates policy analysis, archival research, ethnographic field work, GIS mapping and statistical analysis to build a broad geo‐historical understanding of the role of planning, policy, capital and race in the production of the foreclosure crisis in the San Francisco Bay Area. It begins from the premise that an explanation of the foreclosure crisis that focuses solely on either finance capital or the action of homeowners misses the critical importance of history, geography and planning to the production of crisis. The specific and racialized historical geography of the initial wave of foreclosure in the Bay Area, which like in Southern California is particularly concentrated in newly built suburban and exurban areas which are exceptionally diverse, is evidence of the deeper role of two generations of urban development, regional economics and planning politics in what is too often cast as a ‘housing problem.’ This dissertation argues that thinking about the current problem as an urban crisis forces us to reexamine the dysfunctionality of planning politics at every scale and the reality of a metropolitan geography where hyper‐diverse demographic and economic sprawl and geopolitical fragmentation is a historical fact rather than a pending reality.
    [Show full text]
  • Distribution, Nesting Activities, and Age-Class of Territorial Pairs of Golden Eagles at the Altamont Pass Wind Resource Area, California, 2014–16
    Prepared in cooperation with Next Era Energy, Inc., U.S. Fish and Wildlife Service, East Bay Regional Park District, and The Peregrine Fund, Inc. Distribution, Nesting Activities, and Age-Class of Territorial Pairs of Golden Eagles at the Altamont Pass Wind Resource Area, California, 2014–16 Open-File Report 2017–1035 U.S. Department of the Interior U.S. Geological Survey Distribution, Nesting Activities, and Age-Class of Territorial Pairs of Golden Eagles at the Altamont Pass Wind Resource Area, California, 2014–16 By Patrick S. Kolar and J. David Wiens Prepared in cooperation with Next Era Energy, Inc., U.S. Fish and Wildlife Service, East Bay Regional Park District, and The Peregrine Fund, Inc. Open-File Report 2017–1035 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior RYAN K. ZINKE, Secretary U.S. Geological Survey William H. Werkheiser, Acting Director U.S. Geological Survey, Reston, Virginia: 2017 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment—visit http://www.usgs.gov/ or call 1–888–ASK–USGS (1–888–275–8747). For an overview of USGS information products, including maps, imagery, and publications, visit http://store.usgs.gov. Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Although this information product, for the most part, is in the public domain, it also may contain copyrighted materials as noted in the text. Permission to reproduce copyrighted items must be secured from the copyright owner.
    [Show full text]
  • Cahst Bayarea Peir-Eis Summary.Pdf
    Draft Bay Area to Central Valley High-Speed Train (HST) Program Environmental Impact Report/ Environmental Impact Statement (EIR/EIS) Summary Prepared by: California High-Speed Rail Authority USDOT Federal Railroad Administration 925 L Street, Suite 1425 1120 Vermont Avenue N.W. M/S 20 Sacramento, CA 95814 Washington, DC 20590 Contact: Mr. Dan Leavitt Contact: Mr. David Valenstein 916/322-1419 202/493-6368 July 2007 California High-Speed Rail Authority and Federal Railroad Administration. 2007. Bay Area to Central Valley High-Speed Train (HST) Program Environmental Impact Report/ Environmental Impact Statement (EIR/EIS). Draft. Summary. July. Sacramento, CA and Washington, D.C. S-1 SUMMARY S-1.1 Introduction and Background The California High-Speed Rail Authority (Authority) proposes a high-speed train (HST) system for intercity travel in California between the major metropolitan centers of Sacramento and the San Francisco Bay Area in the north, through the Central Valley, to Los Angeles and San Diego in the south. The HST system is projected to carry as many as 117 million passengers annually by the year 2030. The Authority adopted a final business plan (Business Plan) in June 2000, which examined the economic viability of a train system capable of speeds in excess of 200 miles per hour (mph) (322 kilometers per hour [kph]) on a fully grade-separated track, with state-of-the-art safety, signaling, and automated control systems. The Authority and Federal Railroad Administration (FRA) completed a statewide program environmental impact report/ environmental impact statement (EIR/EIS) in November 2005 as the first phase of a tiered environmental review process for the proposed HST system.
    [Show full text]
  • Altamont Corridor Vision and San Joaquin Valley to Sacramento Vision
    CVRWG Meeting: April 26, 2019 Central Valley Rail Working Group Item 1 Introductions Central Valley Rail Working Group Item 2 Valley Rail Program Update Environmental/Schedule & Progress Kevin Sheridan Valley Rail Valley Rail - Immediate Contracting Services • Category A. Project Development Services includes 14 individual projects. • Category B. Right of Way Services will be awarded to a short list of Pre-Qualified On-Call Consultants as needed. • Category C. Construction Management Services will be awarded for the ‘Stockton Cabral Track Extension’ with additional projects awarded to a short list of Pre-Qualified On-Call Consultants. • Category D. Rail Engineering Support Services includes 15 individual projects. • In addition, Pre-Qualified On-Call Consultants will be identified for additional services through the length of the program for categories including: Project Development, Right of Way, Construction Management, and Rail Engineering Services. Total Amount going to the Board for approval on May 3, 2019: $17,811,825 Stockton Diamond Central Valley Rail Working Group Item 3 Altamont Corridor Vision and San Joaquin Valley to Sacramento Vision Dan Leavitt Altamont Corridor Vision Planning Update: April, 2019 San Joaquin Valley - Sacramento Corridor • Short-term (funded): • 7 additional round-trips between SJV and Sacramento (2 San Joaquins & 5 ACE trains) • Mid-term: • Hourly Service + extension to Yuba City / Marysville and Oroville • Longer-term “Vision” • Connected Corridor North: 15 minute to ½ hour frequency during peak periods;
    [Show full text]
  • Altamont Corridor Alternative Route
    Evaluation of an Alignment for the California High-Speed Rail Project Bay Area to Central Valley Segment Submitted to the California Rail Foundation Sacramento, CA April 25, 2010 setec ferroviaire U:L Paris,le 26 avril2010 GaliforniaRail Foundation 1730Thirteenth Street N" Affaire-02226146 Sacramento Galifornia958,| I pourcette affaire téléphoner au...,,: +33 1 40 04 67 61 USA affairesuivie paf ..,.,.,...,...,.,.,..,.,.... : Philippe Voignier fax...,.,...,...,.,,... ...,:+33 1 7073 47 13 To Richard Tolmach mel : [email protected] Subiect: CaliforniaHSR DearRichard, The CaliforniaRail Foundationhas retainedSETECto provideresearch on technical issues in connectionwith publiccomments on the Bay Area - CentralValley High SpeedRail Final Program Level ElR. I thankyou for havingchosen SETEC. Pleasefind enclosed the proposedSETEC final report ( version4 datedApril 25, 2010). I hopethis reportwill be helpfull. Yourssincerely, l-*uiSnnnra ii" 5û,qi:ai d* iaâapée 7558.] F*ris *eder 'i2 Tei -3 1ti1,1.û*4 ô7ô1,r - Fax : 33t*j1 7{ 734.7 13' 1,1éi: fcrruv.$ilç@Sç{ç{t $triits iaf a4titlssinpiiiié* au capital ile 37Ûût,ûil € - FiS PÂlit$-r*E 4;i ::r,l it"'l'VÀ f R hr-1Û8473-{5Û HSR Infrastructure Expertise Contents 1. Introduction .........................................................................................................................3 2. Altamont Corridor alternative route ......................................................................................4 2.1 Caveats / Preliminary Remarks...................................................................................4
    [Show full text]
  • Supplemental Index for Comments Received on Draft Proposed Order on Request for Amendment 4 of the Summit Ridge Wind Farm Site Certificate
    Supplemental Index for Comments Received on Draft Proposed Order on Request for Amendment 4 of the Summit Ridge Wind Farm Site Certificate As of February 22, 2019, approximately 960 comments received. Council has been provided all unique comments received to date; 3 additional unique comments were received from 2/19 – 2/22 – as presented in the index below and attached Comment Index Date Received Last Name First Name Entity Notes Columbia Gorge Audubon 2/20/2019 Thies Dave Society 2/21/2019 Cross Laurie Public Columbia Gorge, Oregon Wild, Oregon Natural Desert Two sets of comments Association, Central Oregon 2/21/2019 Baker Nathan were submitted; two errata LandWatch, Audubon Society sheets were submitted of Portland, East Cascades Audubon Society ESTERSON Sarah * ODOE From: MAY Luke * ODOE Sent: Wednesday, February 20, 2019 3:10 PM To: ESTERSON Sarah * ODOE Subject: FW: Summit Ridge Wind Farm Testimony Attachments: summit ridge wind & pwr 2.pdf; summit ridge wind & pwr.pdf From: Weatherly Printing [mailto:[email protected]] Sent: Wednesday, February 20, 2019 3:08 PM To: MAY Luke * ODOE <[email protected]> Subject: Summit Ridge Wind Farm Testimony Good afternoon. This e-mail is being sent on behalf of David Thies. The attached files are for the Summit Ridge Wind Farm. thank you -- Paul Weatherly Weatherly Printing Thank You for Shopping Locally! 1114 12th Street Hood River, OR 97031 Phone/Fax: 541-386-2800 Monday - Friday: 8:30am - 5:00pm 1 From: Nathan Baker Sent: Thursday, February 21, 2019 6:16 PM To: MAY Luke * ODOE Cc:
    [Show full text]