Assam 1)Kamrup( Rural) District

Total Page:16

File Type:pdf, Size:1020Kb

Assam 1)Kamrup( Rural) District Assam 1)Kamrup( Rural) district Major observations of Regional Evaluation Team, Kolkata about the Evaluation work in Kamrup (Rural) district of Assam in June, 2010. I. Details of the visited Institutions: District visited BPHCs, RH, PPCs and NGSCs visited visited Kamrup (Rural) BPHC: Uparholi Rajabaha, Maniari Tinali, Amranga Baihat, Tarap FRUs: Suailkuchi, Hajo Losana, Jamtal, Bongshser, Dampur, Bongshore CHC: Mirza Baradadhi, Damdama and Mirza II. Major Observations: 1. Health Human Resources: a. Some posts of medical personnel at the various health centres in the district were reported to be lying vacant i.e. 22 MOs (out of 206 sanctioned), 15 specialist (out of 38 sanctioned). b. Under the category of non-medical, 20 posts (out of 602 sanctioned) of ANM, 2 posts (out of 20 sanctioned) of MPW (M), 5 posts (out of 33 sanctioned) of LHV/HS (F), 19 post (out of 164 sanctioned) of Staff Nurse and 9 posts (out of 73 sanctioned) of Lab Technician were also lying vacant in the various institutions/ centres in the district. 2. Functioning of Rogi Kalyan Samiti (RKS): a. It was reported that as many as 70 RKS have been constituted and also were functioning in the district but only 3 RKS were registered till the time of visit. It was also reported that the members of RKS meet regularly. b. Funds provided to the RKSs and expenditure incurred were not made available to the team in the district. 3. Functioning of ASHA and VHSC: a. In view of total 991 villages in the district, 1615 ASHAs had been selected in the district and out of them 1523 ASHAs were provided training up to 5th modules. b. All selected ASHAs have been provided with Drug kits. c. As reported, there were 1456 Anganwadi centres and 1615 VHSCs were functioning in the district. d. All VHSCs were having ASHA as a member of the committee. 4. Services of Janani Suraksha Yojana (JSY): a. The team has interviewed of total 54 JSY beneficiaries in the area of all the centres visited in the district. Most of them had the Ante natal and Post natal services. All contacted mothers were registered during ANC in proper time and issued MCH cards. b. Mothers had institutional delivery and also received JSY benefits. They were mostly accompanied by the ANMs or ASHAs while going to the hospital for delivery. 5. Physical infrastructure (HSC/PHC/RH) (i) Health Sub Centres: a. The Sub centres visited at Maniari Tinali and Rajabaha were functioning in Govt. buildings. b. No supply of Mclntsh sheet and Ambu bag/suction, weighing machine (Infant) and DDKs found at Maniari Tinali sub centre. Labour room facility and Delivery table were also not found in the centres visited. c. Drugs like Metronidazole tablets, Ampicillin capsule and Gentamycin injection etc. were not available in both the sub centres visited. d. Skilled Birth Attendance training was not provided to the Auxiliary Nurse Midwives of both the visited Sub centres at Maniari Tinali and Rajabaha. (ii) BPHC/ CHC and FRU: a. Functional Operation Theatre with OT Table was not found at BPHC Uparhali. b. Jeep, X-ray facility, Blood storage unit, Anesthesia equipments and surgical equipments related to CHC expertise were not available at CHC Mirza. c. FRUs Suailkuchi and Hajo were well equipped and drugs were also available. 6. Opinion and awareness of the Community on the Health Services: (i). ANMs Services: a. Most of the mothers interviewed for assessing the opinion and knowledge about the services provided by the concerned ANMs at sub centre level were happy to have the ANMs available at village level as and when needed. b. Mothers found receiving ANC and PNC services and necessary advice for new born care. c. However, they need proper guidance about use of contraceptive and knowledge about all health facilities where they can get. (II). MPW (M) Services: a. The work of MPW (M) of Maniari Tinali Sub centre was assessed and it was observed that the MPW (M) participated in the programmes relating to Public Health in the villages under the jurisdiction of the sub centre. b. He was not staying at sub centre headquarter. (iii). Services of PHC/FRU: a. The team interviewed pregnant women, recently delivered women, mothers upto two year old child, ASHAs and also village leaders in the area of PHCs and FRUs and found that they were satisfied with the services provided by the PHC/FRU MO and staff. b. The Medical officers at Uparhali BPHC, Hajo FRU and Suailkuchi FRU were visiting the villages of their areas regularly. 7. Sample Verification of F.W. acceptors: a. The team selected a total of 164 F.W. acceptors for sample verification and out of that 115 (70.12%) could be contacted. Discrepancy was noticed in total number of children in 15 (13.04%) cases. b. 41 (35.65%) acceptors informed that they did not receive any follow up services after having accepted the services. 8. Reconciliation of the reporting performance under Sterilization: a. Sterilization performance reported by the district office for FRU at Suailkuchi for the year 2009- 10 did not tally with the report of FRU and the number was less by 20 sterilizations. In fact the figures were 632 but district office showed as 612. b. The service register for CuT was not completed at Uparhali BPHC and Hajo FRU as such the reported figure could not be verified at these centres. c. CuT performance reported by the district office for the BPHC, CHC and FRUs for the year 2009-10 also not tally with the figures reported at PHC, CHC and FRUs visited by the team. 9. Registers, records and reports maintained at the visited centres: a. Updated Eligible couple register neither maintained nor made available to the team at BPHC Uparhali and FRU at Suailkuchi. b. Service registers for Sterilization cases was not maintained properly and updated at FRU at Suailkuchi and Hajo. c. Service register for CuT acceptors was found incomplete at the visited centres. d. Stock register of contraceptive items was not maintained properly in all the institutions visited. Some essential information like supply and expenditure of medicines and other materials etc. were not recorded. 10. Miscellaneous observation and suggestions: a. JSY payment register was not maintained properly. Date of delivery, addresses of beneficiaries and also date of payment in some of the cases were not recorded by the accounts personnel in the visited institutions at FRUs at Suailkuchi and Hajo and at Mirza CHC. b. It was observed that the monitoring and regular supervision at periphery level was not effective. The LHVs, BEE and Health Educators supervised Sub centre and dispensaries but no feedback as the discrepancies found by these officials was given for immediate rectification. As such there was very little improvement in the maintenance of record and registers. c. It was observed that the Accountant/ Account Clerks need orientation training for preparation of SOE and UC as well as maintenance of cash registers and records. District NRHM Unit officials could not provide proper integrated statement of expenditure of NRHM activities for the period 2009-10, so team could not examine the actual position of the programme in the district. 2). District: Kamrup (Metropolitan) Major observations of Regional Evaluation Team, Kolkata about the Evaluation work in Kamrup (Metropolitan) districts of Assam in June, 2010. I .Details of the visited Institutions: District visited BPHCs, RH, PPCs and NGSCs visited visited Kamrup (Metrop BPHC: Sonapur Kamarkuchi, Bomani Jorabad, Gota Nagar (Urba FRU: Pandu and Ganshpa area MCW: Dhirenpara II .Major Observations 1. Functioning of Rogi Kalyan Samiti (RKS): a. It was reported that total 26 RKS had been constituted and functioning in the district b. It was also reported that the members of RKS meet regularly. 2. Functioning of ASHA Scheme: a. In view of total 298 villages in the district, 211 ASHAs had been selected and all ASHAs have been trained up to 5th modules. b. The distribution of Drug kits to all trained ASHAs has been completed in the district. 3. Untied Funds: The District received an amount of Rs. 9,33,408 in 2008-09 and Rs. 11,10,535 in 2009-10 as Untied Funds for strengthing the services of PHCs and out of that Rs. 4,82,873 was spent during 2008-09 but no fund was utilized in 2009-10. 4. Services of Janani Suraksha Yojana (JSY): a. Regular and sufficient flow of funds was available and the beneficiaries were being provided with cash assistance under the scheme. b. The district had spent Rs. 2,60,38,818 for providing incentive to 17875 JSY beneficiaries against the provision of Rs. 2,52,97,858 in the year 2008-09 and Rs. 2,44,51,915 have been spent in the year 2009-10 for 15122 JSY beneficiaries out of Rs 3,02,59,039 provided during the year. c. 28 recently delivered mothers and JSY beneficiaries contacted in the district for on the spot verification. All contacted beneficiaries had received cash incentives in time and also availed the services under the scheme. However, quality of Post Natal visit by field workers was required to be increased involving ASHAs/ AWW. d. Referral Transport funds Rs. 24,50,000 was also allotted to the institutions for providing to JSY beneficiaries and out of that Rs.1,62,279 in the year 2008-09 and Rs. 22,87,721 have been spent during 2009-10. 5. Physical infrastructure (HSC/PHC/RH) (i) Health Sub Centres: a. The Sub centres visited at Bomani Jorabad and Kamarkuchi were functioning in Govt. buildings. Water and Electricity supply was not available in these centres.
Recommended publications
  • Chirang District
    STATE: ASSAM AGRICULTURE CONTINGENCY PLAN: CHIRANG DISTRICT 1.0 District Agriculture profile 1.1 Agro –Climatic Region (Planning Commission) Eastern Himalayan Region Agro- Climatic/ Ecological Zone Lower Brahmaputra Valley Zone, Assam Agro Ecological Sub Region (ICAR) Assam & Bengal Plain, hot perhumid ecosystem with alluvium derived soils Agro Climatic Zone (NARP)* 011 Lower Brahmaputra Valley Zone List all the districts falling under the NARP Zone Kamrup, Nalbari, Barpeta, Bongaigaon, Baska, Chirang, Kokrajhar, Dhubri, Goalpara Geographic Coordinates of district Latitude Longitude Altitude 26°28' to 26° 54' North 89.42° to 90°06' East 31 m MSL Name and address of the concerned Regional Agricultural Research Station, AAU, Gossaigaon ZRS/ZARS/RARS/RRS/RRTTS Mention the KVK located in the district Krishi Vigyan Kendra, Chirang, Assam Agricultural University, Kajalgaon -783385 1.2 Rainfall Average (mm) Normal Onset Normal Cessation (specify week and (specify week and month) month) SW monsoon (June-Sep’2013) 1961.4 1st week of June 4th week of September NE Monsoon (Oct-Dec’2013) 171.6 Winter (Jan- Feb’2013) 34.6 Summer (March-May’2014) 670.5 1st week of April 4th week of may Annual 2838.1 Source: http://www.agriassam.in/rainfall/districtwise-rainfall-during-2012.pdf *If a district falls in two NARP zones, mention the zone in which more than 50% area falls 1 1.3 Land use pattern Geographical Forest Land under Permanent Cultivable Land Under Barren and Current Other of the district area area non- pastures wasteland Misc. tree uncultivable fallows fallows (latest statistics) agricultural crops and land use groves Area (000’ ha) 109.0 9.7 7.0 6.8 2.6 1.6 0.5 4.1 0.5 (Source: SREP Chirang district) 1.4 Major Soils Major soil description Total Area (‘000 ha) Percent (%) of total 1.
    [Show full text]
  • LIST of POST GST COMMISSIONERATE, DIVISION and RANGE USER DETAILS ZONE NAME ZONE CODE Search
    LIST OF POST GST COMMISSIONERATE, DIVISION AND RANGE USER DETAILS ZONE NAME GUW ZONE CODE 70 Search: Commission Commissionerate Code Commissionerate Jurisdiction Division Code Division Name Division Jurisdiction Range Code Range Name Range Jurisdiction erate Name Districts of Kamrup (Metro), Kamrup (Rural), Baksa, Kokrajhar, Bongaigon, Chirang, Barapeta, Dhubri, South Salmara- Entire District of Barpeta, Baksa, Nalbari, Mankachar, Nalbari, Goalpara, Morigaon, Kamrup (Rural) and part of Kamrup (Metro) Nagoan, Hojai, East KarbiAnglong, West [Areas under Paltan Bazar PS, Latasil PS, Karbi Anglong, Dima Hasao, Cachar, Panbazar PS, Fatasil Ambari PS, Areas under Panbazar PS, Paltanbazar PS & Hailakandi and Karimganj in the state of Bharalumukh PS, Jalukbari PS, Azara PS & Latasil PS of Kamrup (Metro) District of UQ Guwahati Assam. UQ01 Guwahati-I Gorchuk PS] in the State of Assam UQ0101 I-A Assam Areas under Fatasil Ambari PS, UQ0102 I-B Bharalumukh PS of Kamrup (Metro) District Areas under Gorchuk, Jalukbari & Azara PS UQ0103 I-C of Kamrup (Metro) District Areas under Nagarbera PS, Boko PS, Palashbari PS & Chaygaon PS of Kamrup UQ0104 I-D District Areas under Hajo PS, Kaya PS & Sualkuchi UQ0105 I-E PS of Kamrup District Areas under Baihata PS, Kamalpur PS and UQ0106 I-F Rangiya PS of Kamrup District Areas under entire Nalbari District & Baksa UQ0107 Nalbari District UQ0108 Barpeta Areas under Barpeta District Part of Kamrup (Metro) [other than the areas covered under Guwahati-I Division], Morigaon, Nagaon, Hojai, East Karbi Anglong, West Karbi Anglong District in the Areas under Chandmari & Bhangagarh PS of UQ02 Guwahati-II State of Assam UQ0201 II-A Kamrup (Metro) District Areas under Noonmati & Geetanagar PS of UQ0202 II-B Kamrup (Metro) District Areas under Pragjyotishpur PS, Satgaon PS UQ0203 II-C & Sasal PS of Kamrup (Metro) District Areas under Dispur PS & Hatigaon PS of UQ0204 II-D Kamrup (Metro) District Areas under Basistha PS, Sonapur PS & UQ0205 II-E Khetri PS of Kamrup (Metropolitan) District.
    [Show full text]
  • Initial Environment Examination IND
    Initial Environment Examination Project Number: 41614-023 November 2017 Part A: Main Report (Pages 1-102) and Annexures IND: Assam Power Sector Enhancement Investment Program - Tranche 1 Submitted by Assam Power Distribution Company Limited, Guwahati This report has been submitted to ADB by the Assam Power Distribution Company Limited, Guwahati and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This report is an updated version of the IEE report posted in August 2009 available on http://www.adb.org/projects/documents/assam-power-sector-enhancement-investment- program-2. This updated initial environment examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ASSAM ELECTRICITY GRID CORPORATION LIMITED Loan 2592-IND (Tranche 1) INITIAL ENVIRONMENTAL EXAMINATION TRANSMISSION SYSTEM EXPANSION ASSAM POWER SYSTEM ENHANCEMENT PROJECT GUWHATI NOVEMBER 2017 Assam Electricity Grid Corporation Limited EXECUTIVE SUMMARY 1 CHAPTER – 1 3 INTRODUCTION 3 1.1 INTRODUCTION AND SCOPE OF ASSESSMENT 3 1.2 BACKGROUND AND PRESENT SCENARIO
    [Show full text]
  • List of Primary Health Centres S No
    List of Primary Health Centres S No. District Name Sub District Name Facility Name Location 1 Baksa Barama Barimakha SD Rural 2 Baksa Barama Debasara SD Rural 3 Baksa Barama Digheli SD Rural 4 Baksa Barama Medaghat MPHC Rural 5 Baksa Golagaon Anchali MPHC Rural 6 Baksa Golagaon Betbari SHC Rural 7 Baksa Golagaon Golagaon BPHC Rural 8 Baksa Golagaon Jalagaon MPHC Rural 9 Baksa Golagaon Koklabari SHC Rural 10 Baksa Jalah CHARNA MPHC Rural 11 Baksa Jalah MAJORGAON MPHC Rural 12 Baksa Jalah NIMUA MPHC Rural 13 Baksa Jalah SARUMANLKPUR SD Rural 14 Baksa Jalah SAUDARVITHA MPHC Rural 15 Baksa Mushalpur Adalbari SD Rural 16 Baksa Mushalpur Angardhawa MPHC Rural 17 Baksa Mushalpur Athiabari SD Rural 18 Baksa Mushalpur Borbori MPHC Rural 19 Baksa Mushalpur Dighaldonga MPHC Rural 20 Baksa Mushalpur Karemura SD Rural 21 Baksa Mushalpur Niaksi SD Rural 22 Baksa Mushalpur Pamuapathar SHC Rural 23 Baksa Mushalpur Subankhata SD Rural 24 Baksa Mushalpur Thamna MPHC Rural 25 Baksa Mushalpur Tupalia Baganpara MPHC Rural 26 Baksa Niz Kaurbaha Dwarkuchi SD Rural 27 Baksa Niz Kaurbaha Goreswar MPHC Rural 28 Baksa Niz Kaurbaha Naokata MPHC Rural 29 Baksa Niz Kaurbaha Niz Kaurbaha BPHC Rural 30 Baksa Niz Kaurbaha Sonmahari MPHC Rural 31 Baksa Niz Kaurbaha Uttar Betna SD Rural 32 Baksa Niz Kaurbaha Bangalipara New PHC Rural 33 Baksa Tamulpur Gandhibari MPHC Rural 34 Baksa Tamulpur Kachukata MPHC Rural 35 Baksa Tamulpur Kumarikata SD Rural 36 Baksa Tamulpur Tamulpur BPHC Rural 37 Barpeta Barpeta Road KAMARGAON Rural 38 Barpeta Barpeta Road ODALGURI Rural 39 Barpeta
    [Show full text]
  • EXECUTIVE SUMMARY the Criticality of Capital Formation ‘In’ and ‘For’ Agriculture Need Not Be Over Emphasized
    PLP 2016-17 Chirang District EXECUTIVE SUMMARY The criticality of capital formation ‘in’ and ‘for’ agriculture need not be over emphasized. However, the recent declining trend in investment credit vis-à-vis crop loan has serious implications for sustaining capital formation. The theme selected for the PLP 2015-16 is “Accelerating the pace of capital formation in agriculture and allied sector”. The PLP maps the potential in priority sectors which could be exploited with institutional credit within a specified time frame. PLP are intended to provide a meaningful direction to the flow of credit to different sectors at the ground level taking into account all relevant factors. The various linkage and other support required to be provided by line departments to facilitate credit flow as planned are also listed in the PLP. CHIRANG district is one of the four districts of Bodoland Territorial Area District (BTAD) under the Government of Assam. It is bounded by the Kingdom of Bhutan on the North, Bongaigaon district on the South, Baksa on the East and Kokrajhar on the West. The district has 2 sub-divisions Kajalgaon sadar and Bijni civil subdivision and 3 blocks – Sidli, Borobazar and Manikpur. The district Head quarters is well connected with other parts of the state. According to the 2011 census Chirang district has a population of 481,818. This gives it a ranking of 547th in India (out of a total of 640). The district has a population density of 244 inhabitants per square kilometre (630 /sq mi). Its population growth rate over the decade 2001-2011 was 11.26%.
    [Show full text]
  • RESEARCH ARTICLE OPEN ACCESS Spatial Pattern And
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Crossref Goswami Barooah. Space and Culture, India 2014, 2:1 Page | 24 RESEARCH ARTICLE OPEN ACCESS Spatial Pattern and Variation in Literacy among the Scheduled Castes Population in the Brahmaputra Valley, Assam Dr Momita Goswami Barooah† Abstract Scheduled Caste (SC) population constitutes a sizeable portion of the total population of Assam accounting for 6.32 per cent according to the 2011 Census. They comprise a socially backward class in the Indian society—downtrodden illiterate people of the Indian social fabric. Literacy and educational attainment are considered the hallmark of a modern society. The traits of the modern society, such as, industrialisation, modernisation and urbanisation are closely associated with the level of literacy and education. In the middle part of the 20th century, the literacy rate among them was very low. However, in the later part of the 20th century and in the current millennium due to the developmental measures implemented by both the Central as well as State Governments of India and due to the influence of mass media, there has been a change in the pattern of literacy. The literacy rate of the SC population in the Brahmaputra Valley, Assam was 66.34 per cent in 2011 against 61.15 per cent for general population, which is slightly lower than the SC population in the Valley. The study of the pattern of literacy among various social groups of SCs in the study area provides an insight into the socio-economic situations. An attempt has been made in this paper to analyse the spatial pattern of literacy and its variations among the scheduled caste population in the Brahmaputra Valley, Assam.
    [Show full text]
  • Chirang District
    STATE: ASSAM AGRICULTURE CONTINGENCY PLAN: CHIRANG DISTRICT 1.0 District Agriculture profile 1.1 Agro –Climatic Region (Planning Commission) Eastern Himalayan Region Agro- Climatic/ Ecological Zone Lower Brahmaputra Valley Zone, Assam Agro Ecological Sub Region (ICAR) Assam & Bengal Plain, hot perhumid ecosystem with alluvium derived soils Agro Climatic Zone (NARP)* 011 Lower Brahmaputra Valley Zone List all the districts falling under the NARP Zone Kamrup, Nalbari, Barpeta, Bongaigaon, Baska, Chirang, Kokrajhar, Dhubri, Goalpara Geographic Coordinates of district Latitude Longitude Altitude 26°28' to 26° 54' North 89.42° to 90°06' East 31 m MSL Name and address of the concerned Regional Agricultural Research Station, AAU, Gossaigaon ZRS/ZARS/RARS/RRS/RRTTS Mention the KVK located in the district Krishi Vigyan Kendra, Chirang, Assam Agricultural University, Kajalgaon -783385 1.2 Rainfall Average (mm) Normal Onset Normal Cessation (specify week and (specify week and month) month) SW monsoon (June-Sep’2013) 1961.4 1st week of June 4th week of September NE Monsoon (Oct-Dec’2013) 171.6 Winter (Jan- Feb’2013) 34.6 Summer (March-May’2014) 670.5 1st week of April 4th week of may Annual 2838.1 Source: http://www.agriassam.in/rainfall/districtwise-rainfall-during-2012.pdf *If a district falls in two NARP zones, mention the zone in which more than 50% area falls 1 1.3 Land use pattern Geographical Forest Land under Permanent Cultivable Land Under Barren and Current Other of the district area area non- pastures wasteland Misc. tree uncultivable fallows fallows (latest statistics) agricultural crops and land use groves Area (000’ ha) 109.0 9.7 7.0 6.8 2.6 1.6 0.5 4.1 0.5 (Source: SREP Chirang district) 1.4 Major Soils Major soil description Total Area (‘000 ha) Percent (%) of total 1.
    [Show full text]
  • Prof Nil Ratan Roy Professor in Education Department
    ACADEMIC BIO-DATA 1. NAME: PROF. NIL RATAN ROY 2. POSTAL ADDRESS: Prof Nil Ratan Roy Professor in Education Department of Education, Tezpur University, Napaam, Tezpur, Assam, Pin-784028 Cell No: +917076296461, or +919365329522 Email: [email protected]/ [email protected] 3. QUALIFICATIONS: Ph.D. (Education), MA (Education), Master in Educational Planning & Management, B.Ed., PGDEPM 4. TEACHING EXPERIENCES: a) Professor: Department of Education, Tezpur University, Napaam, Tezpur from 18th November, 2019 onwards. b) Associate Professor: Department of Education, Tezpur University, Napaam, Tezpur [August 2016 to November, 2019] c) Associate Professor: Department of Education, Vinaya Bhavana, Visva-Bharati (An Institute of National Importance), West Bengal[July, 2014-August, 2016] d) Assistant Professor: Department of Education, Assam University, Silchar(A Central University), Assam, [January, 2007-July, 2014] e) Assistant Professor: Department of Education, Bihpuria College, Bihpuria, Lakhimpur, Assam, [November,2005–January, 2007] f) Lecturer: College Of Education, Boko, Kamrup, Assam, [March,2003–March, 2005] 1 5. RESEARCH GUIDING EXPERIENCES (annexure-1) A. Ph.D. (Education) : Awarded 05 : Thesis Submitted 03 : Enrolled 06 B. M.Phil. (Education) : Awarded 05 C. M.Ed. (Dissertation) : Awarded 08 D. M.A. (Dissertation) : Awarded 19 II. E. Research Projects (Completed) :01 (Annexure-II) III. F. Research Projects (Ongoing) : 01 G. Publications (Annexure-III) i) Research Publications ii) Books Published iii) Book Chapters H. Paper presentation in National/International seminar (Annexure-IV) IV. I. Participated in Seminar/Workshops/Training/Refreshers/Orientations i. (Annexure-V) V. J. Resource Person/ Session Chaired/Invited Lectures (Annexure-VI) VI. K. Training Programme/Workshop/Conference(s) Organized (Annexure-VII) VII. L.
    [Show full text]
  • KATJU-DISSERTATION-2018.Pdf (2.342Mb)
    THE POLITICAL ECOLOGY OF NON-COMPLIANCE: ENCROACHMENT, ILLICIT RESOURCE EXTRACTION, AND ENVIRONMENTAL GOVERNANCE IN THE MANAS TIGER RESERVE (INDIA) A Dissertation by DHANANJAYA KATJU Submitted to the Office of Graduate and Professional Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY Chair of Committee, Gerard Kyle Committee Members, Forrest Fleischman Thomas Lacher Paul Robbins Amanda Stronza Head of Department, Scott Shafer May 2018 Major Subject: Recreation, Park and Tourism Sciences Copyright 2018 Dhananjaya Katju ABSTRACT This research investigates the interaction between environmental conservation and management in a protected area and the livelihoods of rural producers set against the political backdrop of an ethnically diverse and conflicted socio-cultural landscape. The establishment of protected areas for biodiversity conservation frequently separates people from their physical environment through an overall curtailment of traditional natural resource use. Indigenous or tribal people are regularly viewed forest stewards and victims of conservation enclosures, while being simultaneously labeled as forest destroyers and encroachers on biodiversity conservation landscapes. While existing literature has documented the impacts of protected areas on tribal people, as well as the formation of environmental identities and subjectivities among forest-dwelling communities, scant attention has been paid to how their interactions mediate environmental governance. This dissertation addresses this gap with data from sixteen months of fieldwork in the Manas Tiger Reserve (or Manas; Assam, India) utilizing both qualitative and quantitative methods to evaluate the role of identity, livelihoods, and governance within a political ecology framework. A tribal identity within the Bodo ethnic group developed through interactions of within-group and externally-generated understandings of what it means to be ‘Bodo’, with the dialectic mediated by socio- cultural, political, economic, and ecological factors.
    [Show full text]
  • C:\ DESTYPE=Cache
    Monthly Appropriation Accounts Run Date: 11-AUG-16 Report on Expenditure of Grant /Appropriation-44 North Eastern Council Schemes for the month of April'2016 - (2016-2017) Government of Assam No Major Head Total Grant or Appropriation Available(+)/ Actual Progressive Available %age of Minor Head (Rupees in lakh) over spent(-) Expenditure Expenditure balance(+) prog. Sub Head balance amount for the upto the over spent exp.(col.6) at the current month current amount(-) to total begining of month garnt or the month (Rs. Approp- (Rs. in lakh) (Rs. in lakh) (Rs. in lakh) in lakh) riation (Col.7 of (Col.3- (Col.3) previous month) Col.6) 1 2 3 4 5 6 7 8 O S R Total (a) (b) (c) (a+b+c) 2552 North Eastern Areas II. State Plan and Non Plan Schemes 209 Forest Department 1 {3598} Development of Eco Tourism cum Botanical & Orchid Museum at Jokai 211 Health & Family Welfare Department 2 {0742} Expansion of Regional Dental College, Guwahati 3 {1710} Regional Nursing College (RNC), Guwahati 4 {1711} Estt. of Regional Institute of TB & Respiratory Diseases Attach at Assam Medical College Dibrugarh 5 {1712} Regional Institute of Communicable Diseases at Assam Medical College, Dibrugarh 6 {1719} Support for Additional Facilities for Special & Super Specialisation in Medical Science 7 {2862} Infrastructure Dev of Academic Facilities at DownTown College of Alied Health Science at Panikhaiti 8 {3962} Support for Government Hospitalship on River Brahmahaputra by Centre of NE Studies & Research 9 {4309} Other New Schemes 10 {4764} Cardio-Vascular Institute, AMC, Dibrugarh 213 Sports & Youth Welfare Department 11 {4309} Other New Schemes 12 {5362} Development of Composite Stadium at Silchar DSA Ground 214 Agriculture Department 13 {4309} Other New Schemes 215 Fishery Department 14 {4767} Beel Development for Sustainable Livelihood 219 Education Department 15 {3609} Financial Support for Student of NER 16 {4309} Other New Schemes 223 Tourism Department 17 {4309} Other New Schemes 18 {4698} Publicity & Promotion of Tourism Product & Advertisement through Print & Electronics Media etc.
    [Show full text]
  • Executive Summary
    PLP 2016-17 Baksa District EXECUTIVE SUMMARY 1.i. Theme of PLP 2015-16 and Sectoral Projections for the year 2016-17 The criticality of capital formation ‘in’ and ‘for’ agriculture need not be overemphasized. However, the recent declining trend in investment credit vis-à-vis crop loan has serious implications for sustaining capital formation. The theme for the PLP 2016-17 is ‘Accelerating the pace of capital formation in agriculture and allied sector’. The PLP maps the potential in priority sectors which could be exploited with institutional credit within a specified time frame. PLPs are intended to provide a meaningful direction to the flow of credit to different sectors at the ground level taking into account all relevant factors. The various linkages and other support services required to be provided by line departments to facilitate credit flow as planned are also listed in the PLP. Baksa District is a newly re-organised district under Bodoland Territorial Council of Assam carved out from three districts viz Nalbari, Barpeta and Kamrup. It is located between 90º.8´ E to 91º.8´ E longitude and 26º.35´N to 26º.83´N latitude on North-West side of Assam. The district is surrounded by Chirang district in the West, Barpeta, Nalbari & Kamrup districts in the South, Udalguri district in the East and Bhutan on the North. The District head quarter is located at Mushalpur. The district is divided into 3 sub-divisions viz. Mushalpur, Tamulpur & Salbari. There are 8 development Blocks in the district with 690 inhabited villages. The total geographical area of the district is spread over 2346 Sq.
    [Show full text]
  • Government of India Ministry of Road Transport and Highways Lok Sabha Unstarred Question No. 733 Answered on 21 November, 2019 R
    GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 733 ANSWERED ON 21ST NOVEMBER, 2019 ROAD PROJECTS IN ASSAM 733. SHRI M. BADRUDDIN AJMAL: Will the Minister of ROAD TRANSPORT AND HIGHWAYS स蔼क परिवहनऔि िाजमा셍ग मंत्री be pleased to state: (a) the details of sanctioned/on-going centrally sponsored road projects in the State of Assam at present; (b) the present status of each of these projects; (c) the details of National Highways along with their length in the State of Assam; and (d) the total amount spent on their maintenance during the last five years, year-wise? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) & (b) 86 projects covering 1515 km length at an estimated cost of Rs. 12822 Crore are ongoing in the state of Assam. Present status of ongoing projects in Assam is at Annexure-I. (c) & (d) 35 National Highways (NHs) having 3909 km length are passing through Assam. Details of NHs in Assam are at Annexure-II. Total amount spent for maintenance of these NHs during last five years is as under: Financial Year 2014-15 2015-16 2016-17 2017-18 2018-19 Expenditure incurred on 47.38 83.48 120.55 117.24 74.27 Maintenance (Rs. in Crore) Annexure-I STATEMENT REFERRED TO IN REPLY TO PARTS (a) & (b) OF THE UNSTARRED QUESTION NO. 733 FOR ANSWER ON 21st NOVEMBER, 2019 ASKED BY SHRI M. BADRUDDIN AJMAL REGARDING ROAD PROJECTS IN ASSAM. Sl. Name of Project Length Cost Phys ical No.
    [Show full text]