Roadworks & Events Report
Total Page:16
File Type:pdf, Size:1020Kb
Roadworks & events report Effective from 28th August 2020 For further information please contact the following: Edinburgh and Midlothian contact CLARENCE on 0800 23 23 23 Key Work suspended or postponed, some restrictions remain in place Traffic Scotland - information on motorways and City Bypass New information in this version Spaces for People measures SE Scotland trunk roads maintained by BEAR Underlined entries contain links to maps or further information Transport for Edinburgh - Lothian Buses and Edinburgh Trams Follow Edintravel on Twitter for regular updates See details of Ward boundaries Entries are arranged by Ward and then by start date. Planned roadworks and events affecting major routes have been approved by the Citywide Traffic Management Group (a partnership between City of Edinburgh Council Transport Officers, Locality teams, Lothian Buses and Police Scotland.) = temporary traffic lights in use = diversion in operation Ward Street Location Description Traffic Control Start date Finish date CALA / Barratt Homes development - construction Various lane closures / contraflow arrangements. of site entrance, installation of new pedestrian Almond MAYBURY ROAD Between East Craigs and Barnton Speed limit reduced to 30mph along whole length between Barnton and 08/01/20 TBC crossing points and redetermination of west Maybury junctions footway. Between Silverknowes Parkway and City of Edinburgh Council - to provide space for Until further Almond SILVERKNOWES ROAD Road closed to all vehicles except cycles 30/04/20 Marine Drive safe walking and cycling notice City of Edinburgh Council - to provide space for Until further Almond CAMMO WALK Road closed except for residents' access and cycles 08/05/20 safe walking and cycling notice Between Craigs Road and roundabout at City of Edinburgh Council - to provide space for Until further Almond MAYBURY ROAD New temporary pedestrian crossing in operation 30/06/20 Maybury Drive safe walking and cycling notice Until further Almond HAWES PIER Police Scotland initiative Car park closed 10pm - 5am each night 10/07/20 notice STIRLING ROAD, Almond At M90 overbridge Scottish Power - cable jointing Temporary traffic lights 26/08/20 08/09/20 KIRKLISTON Road closed 8.30am - 4pm, diversion signed via Cramond Road North - Almond WHITEHOUSE ROAD Between Cramond Avenue and Fair-A-Far Forestry contractor - removal of diseased tree 30/08/20 30/08/20 Gamekeeper's Road Telecoms company - installation of new phone Almond MUIRHOUSE AVENUE At Pennywell Road Road closed 31/08/20 04/09/20 mast (TBC as at 04/08/20) *postponed* Varying lane closures and contraflow arrangements. St James' Place, LEITH STREET / PICARDY City Centre St James redevelopment works. Cathedral Lane and St James' car parks closed. Alterations to lane layout 04/01/16 Autumn 2020 AREA on all approaches to Picardy roundabout as work progresses Between Waverley station access and Unsafe rock face, restrictions in place to provide City Centre CALTON ROAD Temporary traffic lights. Ongoing New Street safety zone Various lane and road closures as signed on-street. Between Hanover Street and Frederick City of Edinburgh Council - public space City Centre ROSE STREET Rose Street and Rose Street North / South Lanes closed as required 06/05/19 October 2020 Street improvements including laying of new setts from 03/08/20 Traffic reduced to one lane in each direction. Footway closures and temporary walkways as signed. Bus stops relocated as required. City Centre NORTH BRIDGE City of Edinburgh Council - bridge refurbishment 15/02/20 Summer 2021 Regular changes to traffic management as work switches between east and west sides and progresses southwards To provide adequate pedestrian space passed the Until further City Centre LEVEN STREET At Valleyfield Street Lane closures / contraflow to accommodate pedestrian walkway 04/06/20 development site at Pacific Building notice Between South St David Street and East City of Edinburgh Council - to provide space for Until further City Centre PRINCES STREET Buses, taxis and cycles only 7.30am - 6.30pm each day 18/06/20 End junction safe walking and cycling notice City of Edinburgh Council - to provide space for Road closed at Princes Street (except for cycles). Taxi and loading Until further City Centre WAVERLEY BRIDGE 18/06/20 safe walking and cycling access via Market Street notice City of Edinburgh Council - to provide space for Until further City Centre FORREST ROAD Installation of segregated cycle lanes 22/06/20 safe walking and cycling notice City of Edinburgh Council - to provide space for Road closed except for cycles and blue badge holders. Until further City Centre COCKBURN STREET 10/07/20 safe walking and cycling Loading permitted 6.30am - 10.30am each day. notice City of Edinburgh Council - to provide space for Until further City Centre VICTORIA STREET Road closed except for cycles 10/07/20 safe walking and cycling notice BAM Construction - water main connection at City Centre MORRISON STREET Eastbound approach to Semple Street 2 lanes (of 3) closed 27/07/20 Ongoing Capital Square development At Leven Street, Home Street. City of Edinburgh Council - to provide space for Re-designating key parts of the road to help pedestrians, people using Until further City Centre TOLLCROSS 31/07/20 Brougham Street and Earl Grey Street safe walking and cycling wheelchairs, prams or bicycles to physically distance notice City of Edinburgh Council - trial holes for CCWEL City Centre MELVILLE STREET At Walker Street Minor lane and parking restrictions 03/08/20 21/09/20 project Section between South St David Street City of Edinburgh Council - bus shelter renewal Part of south footway closed, westbound lane closure to accommodate 3 weeks City Centre PRINCES STREET 10/08/20 and Mound (stop PT at Mound precinct) walkway TBC Start dates indicate earliest anticipated start. Finish dates represent formal notice periods - From 28 August 2020 www.edinburgh.gov.uk/edintravel works may finish earlier or be extended. Laing O'Rourke - footway, cycleway and drainage works; Road closed to westbound traffic from Conan Doyle pub to Elder Street. City of Edinburgh Council - site surveys for 6am City Centre YORK PLACE 17/08/20 CCWEL cycleway (nightshift works); Closure extended to North St Andrew Street 8pm - 6am each weeknight 12/10/20 Edinburgh Trams - routine track maintenance for the first 5 weeks (nightshift works) Temporary traffic lights. No access to Dundee Street from East SEMPLE STREET / City of Edinburgh Council - footway and Fountainbridge, diversion via Semple Street - Morrison Street - Gardner's City Centre FOUNTAINBRIDGE 19/08/20 3 weeks carriageway resurfacing, traffic signals upgrade Crescent. JUNCTION Footway on west side of Ponton Street closed Road closed to westbound traffic. Diversion via Pleasance - West Richmond Street - West Nicolson Street - 6am City Centre COWGATE At Candlemaker Row Redevelopment of India Buildings 18 months Potterrow - Teviot Place - Lauriston Place - Lady Lawson Street - West 24/08/20 Port Balfour Beatty - alterations to bridge refurbishment City Centre NORTH BRIDGE Road closed in both directions 8pm - 6am 28/08/20 29/08/20 traffic management City Centre PRINCES STREET At the tram stop Edinburgh Trams - routine track maintenance Road closed to westbound traffic 11pm - 5am for 4 nights 31/08/20 04/09/20 16/08/20 16/08/20 City Centre SOUTH ST DAVID STREET At Jenners Masonry repairs Northbound lane 1 closed 4am - 10am approximately 01/09/20 01/09/20 SOUTH CHARLOTTE City Centre At junction with Charlotte Square Scottish Water - ironwork repairs Southbound lane closure 02/09/20 02/09/20 STREET 06/09/20 06/09/20 City Centre GEORGE STREET St Andrew Square to Hanover Street Crane operations Road closed to westbound traffic and and 13/09/20 13/09/20 Crane operations for high-level window City Centre EARL GREY STREET Outside Bank of Scotland Southbound lanes 1 and 2 closed 13/09/20 13/09/20 replacement SGN - gas main renewal Colinton / Temporary traffic lights. Redford Road closed from 10/08/20, Late COLINTON ROAD At Redford Road *work suspended, traffic management cleared, 12/10/19 Fairmilehead Thorburn Road closed from 31/08/20 September resumes 10/08/20 SGN - gas main renewal Corstorphine / Between Clermiston Road and Kaimes ST JOHN'S ROAD *work suspended and restrictions lifted 30/03/20* Temporary traffic lights, Belgrave Road closed 26/02/20 Late October Murrayfield Road Work scheduled to resume 14/09/20 for 5 weeks Corstorphine / At Broomhall Avenue / Carrick Knowe 10 days SAUGHTON ROAD NORTH Scottish Water - mains upgrade Temporary traffic lights 07/09/20 Murrayfield Parkway TBC City of Edinburgh Council - carriageway Craigentinny/ Between Jock's Lodge and Northfield Lane closures and Restalrig Avenue (Smokey Brae) closed. Late PORTOBELLO ROAD resurfacing. 18/02/20 Duddingston Broadway Temporary traffic lights at Jock's Lodge junction expected from 03/09/20 September Work resumes 07/08/20 Craigentinny Avenue - temporary traffic lights and Fillyside Terrace Craigentinny/ closed; FILLYSIDE AREA Openreach - network upgrade 17/08/20 28/08/20 Duddingston Nantwich Drive - working from Fillyside Terrace to Craigentinny Road. 2/3-way temporary traffic lights and Fillyside Terrace closed as required Craigentinny/ City of Edinburgh Council - repairs / upgrade to Path closed, diversion signed via Holyrood Park Road - Duddingston Low INNOCENT TUNNEL 07/09/20 16/09/20 Duddingston tunnel lighting Road with temporary crossing facility on Holyrood Park Road Lane closures / contraflow, bus stop closures as