Tender: NIT NO. 08/VSD of 2020-21 by AE/VSD/PHED
Total Page:16
File Type:pdf, Size:1020Kb
Tender: N.I.T. NO. 08/VSD OF 2020-21 BY AE/VSD/PHED 1. General Information Type NIT Category Works Mode OFFLINE Method Open Tender District Inviting Authority Assistant Engineer,Bishnupur Sub-Division Tender Id N.I.T. NO. 08/VSD OF 2020-21 BY AE/VSD/PHED Memo No 216/VSD Memo Date 10-12-2020 Description N.I.T. NO. 08/VSD OF 2020-21 BY AE/VSD/PHED Estimated Work Value - 2. EMD (Earnest Money Deposit) Details The Executive Exempted? No Fee Type Demand Draft Payable To Engineer, Bankura Payable At Bankura Division, P.H.E. Dte. 3. Critical Dates Tender Publish Date 10-12-2020 05:20 PM Sale/Submission Start Date Download Start Date Sale/Download End Date 21-12-2020 01:00 PM Last Date of Application 17-12-2020 01:00 PM Last Date of Permission 17-12-2020 03:00 PM Last Date of Submission 21-12-2020 01:00 PM Tech Bid Opening Date 21-12-2020 03:00 PM Tech Bid Uploading Date Fin Bid Opening Date Time Uploading Bid Date Time 4. Pre-bid Meeting Details Date Venue Address 5. Work Details Sl No Description Estimated Cost (Rs.) Completion Time EMD (Rs.) Temporary water supply pipe line of different diameter G.I / PVC pipe lines 1 including stand post etc. for 33rd Bishnupur Mela, 2020 at Bishnupur High 230233.00 10 (ten) days 4605.00 School Math and KGEI Hostel Math under Bishnupur Sub-Division PHE Dte. Temporary sanitary and water spreading arrangement at Bishnupur High 2 School Math and K G E I Hostel Math for 33rd Bishnupur Mela, 2020 under 275497.00 10 (ten) days 5510.00 Bishnupur Sub-Division P.H.E. Dte. Sinking of 1 no. Tube-Well 150 mm X 100 mm X 60 meter Deep by water Jet system and supply, delivery and installation of submersible pump for 3 263424.00 10 (ten) days 5269.00 temporary water supply arrangement at High School Math for 33rd Bishnupur Mela, 2020 under Bishnupur Sub-Division P.H.E. Dte. Supervision of Distribution & Risin Main, Pipe line (CI/DI/AC/UPVC), Street Stand Post of Nabakishore Water supply scheme including operation of 181 (one eighty 4 208813.00 4177.00 sluice valve under Bishnupur Sub-Division of Bankura Division P.H.E. Dte. one) days w.e.f. 01/01/2021 to 30/06/2021 i.e. 181 days Construction of boundary wall 59.5 mtr. long with barbed wire and 5 development of land at Rejuvenation of Indas water supply scheme (pump 440772.00 30 (thirty days) 8816.00 house no.3) under Bishnupur Sub Division of Bankura Division, PHE Dte. Construction of boundary wall 70 mtr. long with barbed wire and allied work of pump house of proposed OHR campus at Rejuvenation of Indas 6 477984.00 30 (thirty days) 9560.00 water supply scheme under Bishnupur Sub Division of Bankura Division, PHE Dte. Laying of UPVC pipeline at village Shantashram damaged due to 7 construction of school building under Amrul Zone-A water supply scheme 377498.00 30 (thirty days) 7550.00 of Indas BRGF under Bishnupur Sub-Division of Bankura Division, PHE Dte. Restoration by laying of new UPVC pipe line in place of AC pipe line at Balsi Paschim Para due to widening of road by PWD at Balsi Lagar Pukur More 8 (near Pump House No. 1) & Community Tank Connection and allied works 497939.00 30 (thirty days) 9959.00 within Nabakishore water supply scheme under Bishnupur Sub-Division of Bankura Division P.H.E. Dte. 6. Attachments Sl No File Name 1 Schedule-4.pdf 2 Schedule-7.pdf 3 Schedule-5.pdf 4 Schedule-6.pdf 5 Schedule-1.pdf 6 Schedule-2.pdf 7 Schedule-3.pdf 8 Tender notice & list of work upload.pdf 9 Schedule-8.pdf 10 2911 (new 28 pages).pdf.