Title: Need to Expedite Construction of New Railway Lines from Tindivanam to Nagari and Tiruvannamalai

Total Page:16

File Type:pdf, Size:1020Kb

Title: Need to Expedite Construction of New Railway Lines from Tindivanam to Nagari and Tiruvannamalai > Title: Need to expedite construction of new railway lines from Tindivanam to Nagari and Tiruvannamalai. SHRI M. KRISHNASSWAMY (ARANI): I would like to draw the attention of the Government to the need for expediting the work for the new railway lines from Tindivanam to Nagari and also from Tindivanam to Tiruvannamalai which were announced in 2006-07 by the then Railway Minister. The route of Tindivanam to Nagari, a distance of 180-kms., would pass through Vandavasi, Cheyyar, Arcot, Pallipattu, districts in Tamil Nadu to reach Nagari station on the Arakkonam-Renigunta section in Chittoor District in Andhra Pradesh. For this Rs.180 crore was allotted to take up the survey works in this route. This new route, which passes through Arani, will also help in the development of the silk industry in Arani and also export. The second route is from Tindivanam to Tiruvannamalai. The idea is to provide a connectivity from Pondicherry to Bengaluru (72 kms.) which would benefit people in Coastal and Northern Tamil Nadu to connect to Bengaluru & beyond. Railways, no doubt, will save funds and also easily provide faster connectivity via Gingee town. Already, around Rs.70 crore was allotted for survey in this route. At present, land acquisition work is going on at a snail's speed. There is administrative delay in the process. The two river projects on Palar River and Cheyyar river come on these routes. Stones have been laid at the Palar river and bridges constructed whereas in the Cheyyar river the concerned authorities have not started the bridge construction and the pace of work is very slow. In this area, there is no land acquisition process in the river. Only in Vellore and Villupuram, the land acquisition is very much slow. To sort out this problem, railway authorities should approach the Revenue Authority of State Government of Tamil Nadu to expedite the matter so that projects will be completed and commissioned as early as possible. Hence, I request the Hon'ble Minister for Railways to kindly intervene in the matter to take necessary steps to expedite the above said two new railway lines in the interest of the general public. .
Recommended publications
  • Tamilnadu.Pdf
    TAKING TAMIL NADU AHEAD TAMIL NADU Andhra Pradesh Karnataka TAMIL NADU Kerala The coastal State of Tamil Nadu has seen rapid progress in road infrastructure development since 2014. The length of National Highways in the State has reached 7,482.87 km in 2018. Over 1,284.78 km of National Highways have been awarded in just four years at a cost of over Rs. 20,729.28 Cr. Benchmark projects such as the 115 km Madurai Ramanathapuram Expressway worth Rs. 1,134.35 Cr, are being built with investments to transform the State’s economy in coming years. “When a network of good roads is created, the economy of the country also picks up pace. Roads are veins and arteries of the nation, which help to transform the pace of development and ensure that prosperity reaches the farthest corners of our nation.” NARENDRA MODI Prime Minister “In the past four years, we have expanded the length of Indian National Highways network to 1,26,350 km. The highway sector in the country has seen a 20% growth between 2014 and 2018. Tourist destinations have come closer. Border, tribal and backward areas are being connected seamlessly. Multimodal integration through road, rail and port connectivity is creating socio economic growth and new opportunities for the people. In the coming years, we have planned projects with investments worth over Rs 6 lakh crore, to further expand the world’s second largest road network.” NITIN GADKARI Union Minister, Ministry of Road Transport & Highways, Shipping and Water Resources, River Development & Ganga Rejuvenation Fast tracking National Highway development in Tamil Nadu NH + IN PRINCIPLE NH LENGTH UPTO YEAR 2018 7,482.87 km NH LENGTH UPTO YEAR 2014 5,006 km Adding new National Highways in Tamil Nadu 2,476.87 143.15 km km Yr 2014 - 2018 Yr 2010 - 2014 New NH New NH & In principle NH length 6 Cost of Road Projects awarded in Tamil Nadu Yr 2010 - 2014 Yr 2014 - 2018 Total Cost Total Cost Rs.
    [Show full text]
  • Shankar Ias Academy Test 18 - Geography - Full Test - Answer Key
    SHANKAR IAS ACADEMY TEST 18 - GEOGRAPHY - FULL TEST - ANSWER KEY 1. Ans (a) Explanation: Soil found in Tropical deciduous forest rich in nutrients. 2. Ans (b) Explanation: Sea breeze is caused due to the heating of land and it occurs in the day time 3. Ans (c) Explanation: • Days are hot, and during the hot season, noon temperatures of over 100°F. are quite frequent. When night falls the clear sky which promotes intense heating during the day also causes rapid radiation in the night. Temperatures drop to well below 50°F. and night frosts are not uncommon at this time of the year. This extreme diurnal range of temperature is another characteristic feature of the Sudan type of climate. • The savanna, particularly in Africa, is the home of wild animals. It is known as the ‘big game country. • The leaf and grass-eating animals include the zebra, antelope, giraffe, deer, gazelle, elephant and okapi. • Many are well camouflaged species and their presence amongst the tall greenish-brown grass cannot be easily detected. The giraffe with such a long neck can locate its enemies a great distance away, while the elephant is so huge and strong that few animals will venture to come near it. It is well equipped will tusks and trunk for defence. • The carnivorous animals like the lion, tiger, leopard, hyaena, panther, jaguar, jackal, lynx and puma have powerful jaws and teeth for attacking other animals. 4. Ans (b) Explanation: Rivers of Tamilnadu • The Thamirabarani River (Porunai) is a perennial river that originates from the famous Agastyarkoodam peak of Pothigai hills of the Western Ghats, above Papanasam in the Ambasamudram taluk.
    [Show full text]
  • SNO APP.No Name Contact Address Reason 1 AP-1 K
    SNO APP.No Name Contact Address Reason 1 AP-1 K. Pandeeswaran No.2/545, Then Colony, Vilampatti Post, Intercaste Marriage certificate not enclosed Sivakasi, Virudhunagar – 626 124 2 AP-2 P. Karthigai Selvi No.2/545, Then Colony, Vilampatti Post, Only one ID proof attached. Sivakasi, Virudhunagar – 626 124 3 AP-8 N. Esakkiappan No.37/45E, Nandhagopalapuram, Above age Thoothukudi – 628 002. 4 AP-25 M. Dinesh No.4/133, Kothamalai Road,Vadaku Only one ID proof attached. Street,Vadugam Post,Rasipuram Taluk, Namakkal – 637 407. 5 AP-26 K. Venkatesh No.4/47, Kettupatti, Only one ID proof attached. Dokkupodhanahalli, Dharmapuri – 636 807. 6 AP-28 P. Manipandi 1stStreet, 24thWard, Self attestation not found in the enclosures Sivaji Nagar, and photo Theni – 625 531. 7 AP-49 K. Sobanbabu No.10/4, T.K.Garden, 3rdStreet, Korukkupet, Self attestation not found in the enclosures Chennai – 600 021. and photo 8 AP-58 S. Barkavi No.168, Sivaji Nagar, Veerampattinam, Community Certificate Wrongly enclosed Pondicherry – 605 007. 9 AP-60 V.A.Kishor Kumar No.19, Thilagar nagar, Ist st, Kaladipet, Only one ID proof attached. Thiruvottiyur, Chennai -600 019 10 AP-61 D.Anbalagan No.8/171, Church Street, Only one ID proof attached. Komathimuthupuram Post, Panaiyoor(via) Changarankovil Taluk, Tirunelveli, 627 761. 11 AP-64 S. Arun kannan No. 15D, Poonga Nagar, Kaladipet, Only one ID proof attached. Thiruvottiyur, Ch – 600 019 12 AP-69 K. Lavanya Priyadharshini No, 35, A Block, Nochi Nagar, Mylapore, Only one ID proof attached. Chennai – 600 004 13 AP-70 G.
    [Show full text]
  • Irrigation Projects of Tamil Nadu from 2001-2021
    IRRIGATION PROJECTS OF TAMIL NADU FROM 2001-2021 NAME – VRINDA GUPTA INSTITUTION – K.R. MANGALAM UNIVERSITY 1 ABSTRACT From the ancient times water is always most important for agriculture purpose for growing crops. Since thousand years, humans have relied on agriculture to feed their communities and they have needed irrigation to water their crops. Irrigation includes artificially applying water to the land to enhance the growing of crops. Over the years, irrigation has come in many different forms in countries all over the world. Irrigation projects involves hydraulic structures which collect, convey and deliver water to those areas on which crops are grown. Irrigation projects unit may starts from a small farm unit to those serving extensive areas of millions of hectares. Irrigation projects consist of two types first a small irrigation project and second a large irrigation project. Small irrigation project includes a low diversion or an inexpensive pumping plant along with small channels and some minor control structures. Large irrigation project includes a huge dam, a large storage reservoir, hundreds kilometers of canals, branches and distributaries, control structures and other works. In this paper we discussing about irrigation plan of Tamil Nadu from 2001-2021. INTRODUCTION Water is the important or elixir of life, a precious gift of nature to humans and millions of other species living on the earth. It is hard to find in most part of the world. 4% of India’s land area in Tamil Nadu and inhabited by 6% of India’s population but water resources in India is only 2.5%. In Tamil Nadu, water is a serious limiting factor for agriculture growth which leads to irrigation reduces risk in farming, increases crop productivity, provides higher employment opportunities to the rural areas and increases farmer income.
    [Show full text]
  • A Local Response to Water Scarcity Dug Well Recharging in Saurashtra, Gujarat
    RETHINKING THE MOSAIC RETHINKINGRETHINKING THETHE MOSAICMOSAIC Investigations into Local Water Management Themes from Collaborative Research n Institute of Development Studies, Jaipur n Institute for Social and Environmental Transition, Boulder n Madras Institute of Development Studies, Chennai n Nepal Water Conservation Foundation, Kathmandu n Vikram Sarabhai Centre for Development Interaction, Ahmedabad Edited by Marcus Moench, Elisabeth Caspari and Ajaya Dixit Contributing Authors Paul Appasamy, Sashikant Chopde, Ajaya Dixit, Dipak Gyawali, S. Janakarajan, M. Dinesh Kumar, R. M. Mathur, Marcus Moench, Anjal Prakash, M. S. Rathore, Velayutham Saravanan and Srinivas Mudrakartha RETHINKING THE MOSAIC Investigations into Local Water Management Themes from Collaborative Research n Institute of Development Studies, Jaipur n Institute for Social and Environmental Transition, Boulder n Madras Institute of Development Studies, Chennai n Nepal Water Conservation Foundation, Kathmandu n Vikram Sarabhai Centre for Development Interaction, Ahmedabad Edited by Marcus Moench, Elisabeth Caspari and Ajaya Dixit 1999 1 © Copyright, 1999 Institute of Development Studies (IDS) Institute for Social and Environmental Transition (ISET) Madras Institute of Development Studies (MIDS) Nepal Water Conservation Foundation (NWCF) Vikram Sarabhai Centre for Development Interaction (VIKSAT) No part of this publication may be reproduced nor copied in any form without written permission. Supported by International Development Research Centre (IDRC) Ottawa, Canada and The Ford Foundation, New Delhi, India First Edition: 1000 December, 1999. Price Nepal and India Rs 1000 Foreign US$ 30 Other SAARC countries US$ 25. (Postage charges additional) Published by: Nepal Water Conservation Foundation, Kathmandu, and the Institute for Social and Environmental Transition, Boulder, Colorado, U.S.A. DESIGN AND TYPESETTING GraphicFORMAT, PO Box 38, Naxal, Nepal.
    [Show full text]
  • N 10.10.2018 Uploaded O
    Uploaded On 10.10.2018 RATE TO BE COLLECTED BY THE LICENSEE AT VEHICLE PARKING STANDS : : CAR PARK AT : [ CHENNAI CENTRAL ] – [ CHENNAI EGMORE ] – [ KATPADI ] . [ 3 – STATION SITE ] Rate Rs. 25/- for first 2 hours Rs. 35/- for next 2 hours Rs. 70/- for every subsequent 2 hours thereafter. PREMIUM CAR PARK AT : [ CHENNAI CENTRAL ] – [ TAMBARAM ] . [ 2 – STATION SITE ] Rate Rs. 50/- for every hour CYCLE/SCOOTER STAND AT : [ CHENNAI CENTRAL ] – [ CHENNAI EGMORE ] . [ 2 – STATION SITE ] For 4 For 8 For 12 Beyond 12hrs - Subsequent Monthly VEHICLE hrs. Rs. hrs. Rs. hrs. upto 24 hrs. Rs. days Rs. Rs. Cycles 2.00 5.00 10.00 15.00 15.00 200.00 2 wheelers 5.00 10.00 15.00 20.00 25.00 400.00 CYCLE/SCOOTER STAND AT : [ CHENGALPATTU ] – [ CHENGALPATTU – SITE 2 ] – [ ARAKKONAM ] – [ ARAKKONAM – NORTH ] – [ KATPADI ] – [ JOLARPETTAI ] – [ TAMBARAM – EAST ] – [ TAMBARAM – WEST ] – [ TAMBARAM – WEST SITE 2 ]. [ 9 – STATION SITE ]. Rs. 5.00 per cycle every 12 hours or part thereof. Rs.125.00 per cycle per month. Rs. 10.00 per Motor Cycle/Scooter (with or without helmet) Every 12 hours or part thereof. Rs. 300.00 per Motor Cycle /Scooter (with or without helmet) per month. CYCLE/SCOOTER STAND AT : [ CHINTHADRIPET ] – [ CHEPAUK – Area A ] – [ CHEPAUK – Area B ] – [ TRIPLICANE ] – [ LIGHT HOUSE ] – [ MUNDAKAKANNI AMMAN KOIL ] – [ THIRUMAYILAI ] - [ MANDAIVELI ] – [ GREENWAYS ROAD ] – [ KOTTURPURAM ] – [ KASTHURIBAI NAGAR ] – [ TIRUVANMIYUR ] – [ TARAMANI ] – [ PERUNGUDI ] – [ VELACHERY - MEDAVAKKAM SIDE ] . [ 15 – STATION SITE ] Rs. 5.00 per cycle for 12 hrs or part thereof. Rs. 125.00 per cycle per month. Rs. 10.00 per Motor Cycle/Scooter (with or without helmet) for 12 hrs or part thereof.
    [Show full text]
  • Name of the District : Tiruvannamalai 1 J. Thiviyananthan Anitha Crafts Centre, 216&217, SHO,Kilnachipattu Thindivanam R
    Name of the District : Tiruvannamalai Sl. Name & Address of Training Type of Skill Qualification Minimum Course Fee Accommodation Duration No Institute trainings offered required age (Rs.) availability 1 J. Thiviyananthan Anitha Crafts Centre, 216&217, SHO ,Kilnachipattu 7000+ Wood and Stone Thindivanam Road, 8th 18 years 1 year 300 No Carving Tiruvannamalai-606611 Material Ph. No.: 04175-224615 9443421343 2 S.Kumar, GRRC Herbal - Herbal Medicine, Alampoondi-604101 3 Month Rs. 50 Only accommodation Spirulina 10 th 18 years Ph. No. : 04145-231252 Spirulina- /day available Cultivation Cell : 9444857770 1 month Amstrong Garments Rs2400- Accommodation 3 No.61c,Saminathapuram II Tailoring-Export 3rd -10 th 18 years 3 months 4500 available with street,Anupoorpalayam, quality pass/fail Salary subsidized food. Thirupoor.Pin;641652 4 N.Kandhasamy Sri Arunai Garments 3000 to No.48 Chinnakadai St. Tailoring - Export 3rd -10 th 5000 Munnupillai Complex 18 years 6 month No quality pass/fail Material T.V.malai cost Cell: 9244511132 9444171109 5 Mr. Luban Kumar SC –No age Dutch Carpenter training Carpenter 8 to 10 limit Free centre, Tiruvannamalai 1 year No Tailoring passed BC-25 training Ph. No.: 9443815444 years Accommodati Sl. Name & Address of Training Qualification Type of Skill trainings offered Minimum age Duration Course Fee on No Institute required availability Apollo Computer Education, Near Gandhi Statue, 10 TH -12 4-6 No 6 MS Office, Tally 16 4500 Tiruvannamalai pass months Ph;9786398327 New Sampath Raj Driving School,Tiruvannamalai 3500 No 7 Light vehicle Driving 8th Passed 18 years 40 Days Phone : 9443272630 9842365180 Ganesh Institute of Hotel Managemant & Catering Hotel Management and 10 th Pass No 8 16 6 months 5200 Industrial School, Catering Technology 12 th Pass Tiruvannamalai Air conditioning and th Refrigeration 10 16 2 months 1600 No SRI Polytechnic College, Bridhur, Vandavasi.
    [Show full text]
  • Public Works Department Irrigation Policy Note for the Year 2008-2009
    Public Works Department Irrigation Policy Note for the year 2008-2009 Contents PREAMBLE 1. Water Resources Department (WRD) 2. Irrigated Agriculture Modernisation And Water Bodies Restoration 3. Dam Rehabilitation And Improvement Project (DRIP) 4. Hydrology Project-Ii 5. Cauvery-Modernisation Project 6. Irrigation Schemes 7. Flood Mitigation Schemes 8. Anti Sea Erosion Works 9. Emergency Tsunami Reconstruction Project (ETRP) 10. Chennai City Waterways 11. Artificial Recharge Of Groundwater Through Check Dams 12. Krishna Water Supply Project (KWSP) 13. Tamil Nadu Protection Of Tanks And Eviction Of Encroachment Act, 2007 14. Linking Of Rivers Within The State 15. Inter State Subjects 16. Ground Water - State Ground And Surface Water Resources Data Centre (SG&SWRDC) 17. Institute For Water Studies (IWS) 18. Irrigation Management Training Institute (IMTI) 19. Directorate Of Boilers 20. Sand Quarry PREAMBLE The Public Works Department has turned 150 years. The Department which was established in the year 1858 with just - • 1 Chief Engineer • 20 District Engineers • 3 Inspecting Engineers • 78 Executive and Assistant Engineers • 204 Upper Subordinates and • 714 Lower Subordinates has grown manifold and now functions with a strong network of • 1 Engineer-in-Chief, • 10 Chief Engineers, • 59 Superintending Engineers, • 212 Executive Engineers, • 816 Assistant Executive Engineers, • 2366 Assistant / Junior Engineers, • 1305 Technical Personnel and • 14670 Administrative Officers and staff Members • totaling 19439 employees The Public Works Department is not only 150 years, but has also earned reputation for its excellent service to the people and the State. The then Chennai Presidency had its territorial control spread over today’s Tamil Nadu, parts of Andhra Pradesh, and the Kerala State excluding the then Travancore and Kochi Princely parts.
    [Show full text]
  • Government of India Ministry of Railways Lok Sabha
    GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA UNSTARRED QUESTION NO. 4046 TO BE ANSWERED ON 18.03.2020 TINDIVANAM – THIRUVANNAMALAI RAILWAY PROJECT 4046. DR. VISHNU PRASAD M.K.: Will the Minister of RAILWAYS be pleased to state: (a) whether the Government proposes to complete the Tindivanam- Nagari and Tindivanam to Thiruvannamalai Railway project in Arni Parliamentary Constituency of Tamil Nadu; (b) if so, the details thereof; (c) whether the all formalities like environment clearance and acquisition of land has been completed for the above said project; (d) if so, the details thereof; and (e) the time likely to be taken in the completion of the above said project? ANSWER MINISTER OF RAILWAYS AND COMMERCE & INDUSTRY (SHRI PIYUSH GOYAL) (a) to (e): A Statement is laid on the Table of the House. ***** STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (e) OF UNSTARRED QUESTION NO. 4046 BY DR. VISHNU PRASAD M.K. TO BE ANSWERED IN LOK SABHA ON 18.03.2020 REGARDING TINDIVANAM – THIRUVANNAMALAI RAILWAY PROJECT (a) to (e): The new line project between Tindivanam and Tiruvannamalai for a length of 71 Km was sanctioned in 2006-07, anticipated cost of project is ` 900 crore, so far, an expenditure of ` 63.28 crore has been incurred on the project. Total requirement of land for the project is 662 acre. Land acquition was initiated in 2010. An amount of ` 14.49 crore has been deposited as an advance payment towards land acquisition to Tamil Nadu State Government during 2011, 2012 & 2017. So far, only 65 acre land is handed over to Railway.
    [Show full text]
  • Officials from the State of Tamil Nadu Trained by NIDM During the Year 209-10 to 2014-15
    Officials from the state of Tamil Nadu trained by NIDM during the year 209-10 to 2014-15 S.No. Name Designation & Address City & State Department 1 Shri G. Sivakumar Superintending National Highways 260 / N Jawaharlal Nehru Salai, Chennai, Tamil Engineer, Roads & Jaynagar - Arumbakkam, Chennai - 600166, Tamil Nadu Bridges Nadu, Ph. : 044-24751123 (O), 044-26154947 (R), 9443345414 (M) 2 Dr. N. Cithirai Regional Joint Director Animal Husbandry Department, Government of Tamil Chennai, Tamil (AH), Animal husbandry Nadu, Chennai, Tamil Nadu, Ph. : 044-27665287 (O), Nadu 044-23612710 (R), 9445001133 (M) 3 Shri Maheswar Dayal SSP, Police Superintending of Police, Nagapattinam District, Tamil Nagapattinam, Nadu, Ph. : 04365-242888 (O), 04365-248777 (R), Tamil Nadu 9868959868 (M), 04365-242999 (Fax), Email : [email protected] 4 Dr. P. Gunasekaran Joint Director, Animal Animal Husbandary, Thiruvaruru, Tamil Nadu, Ph. : Thiruvarur, Tamil husbandary 04366-205946 (O), 9445001125 (M), 04366-205946 Nadu (Fax) 5 Shri S. Rajendran Dy. Director of Department of Agriculture, O/o Joint Director of Ramanakapuram, Agriculture, Agriculture Agriculture, Ramanakapuram (Disa), Tamil Nadu, Ph. : Tamil Nadu 04567-230387 (O), 04566-225389 (R), 9894387255 (M) 6 Shri R. Nanda Kumar Dy. Director of Statistics, Department of Economics & Statistics, DMS Chennai, Tamil Economics & Statistics Compound, Thenampet, Chennai - 600006, Tamil Nadu Nadu, Ph. : 044-24327001 (O), 044-22230032 (R), 9865548578 (M), 044-24341929 (Fax), Email : [email protected] 7 Shri U. Perumal Executive Engineer, Corporation of Chennai, Rippon Building, Chennai - Chennai, Tamil Municipal Corporation 600003, Ph. : 044-25361225 (O), 044-65687366 (R), Nadu 9444009009 (M), Email : [email protected] National Institute of Disaster Management (NIDM) Trainee Database is available at http://nidm.gov.in/trainee2.asp 58 Officials from the state of Tamil Nadu trained by NIDM during the year 209-10 to 2014-15 8 Shri M.
    [Show full text]
  • District Survey Report Sand Vellore District Tamilnadu
    VELLORE DISTRICT TAMILNADU DISTRICT SURVEY REPORT SAND As per notification No. S.O. 3611 (E) New Delhi, The 25th July 2018 of Ministry of Environment, Forest and Climate Change, Govt. of India INDEX DISTRICT SURVEY REPORT-VELLORE S.No. Particulars Page no 1. Preface 3 2. Introduction 4 3. Overview of mining activities in the district 4 4. List of mining leases in the district 5 5. Details of royalty or revenue received in vellore district 11-12 Quarry wise sand revenue details of Vellore district for the year 2015- 2016 Quarry wise sand revenue details of Vellore district for the year 2016- 13-16 2017 Quarry wise sand revenue details of Vellore district for the year 2017- 16-17 2018 Quarry wise sand revenue details of Vellore district for the year 2018- 17-19 2019 Quarry wise sand sale details of Vellore district for the year 2015-2016 19-22 Quarry wise sand sale details of Vellore district for the year 2016-2017 22-25 Quarry wise sand sale details of Vellore district for the year 2017-2018 25-26 Quarry wise sand sale details of Vellore district for the year 2018-2019 27-28 6. Process of deposition of sediments in the rivers of the district 28 6.a. Location Map of Irrigation structures 29 6.b. Palar in Tamilnadu 30 6.c. Palar River Line diagram 31 6.d. Palar river basin 32 6.e. Reservoirs along palar river basin 36 Page | 1 6.f .Shoaling in River bed 38 6.g. Reduction of River carrying capacity by shoal formation 38 6.h.
    [Show full text]
  • Soiled Agriculture and Spoiled Environment: Socio-Economic Impact of Groundwater Pollution in Tamilnadu
    Working Paper No. 175 Soiled Agriculture and spoiled environment: Socio-economic impact of groundwater pollution in Tamilnadu by S. Janakarajan Madras Institute of Development Studies 79, Second Main Road, Gandhi Nagar Adyar, Chennai 600 020 September 2002 SOILED AGRICULTUREAND SPOILED ENVIRONMENT: • •SOCIO-ECONOMIC IMPACT OF· GROUNDWATER• POLLUTION IN TAMILNADU• S.JANAKARAJAN Madras Institute of Development Studies Abstract The problem of water pollution• poses a great threat to basic human living. The ramification of pollution is indeed more• severe in the less developed countries that are afflictedwith chronic problems of political instability, lack of political will, high• level of illiteracy, unceasing poverty, increasing degree• of urbanization, lack of basic needs• and basic• infrastructureand women subordination• . The subject matter of groundwater and surfacewater pollution gains further significance due to• economic • .liberaliz.ation policy, to which most underdeveloped countries have been subjected. In other words, the phrase, "sustainable development" emphasized in many international fora, has seemingly no meaning in many underdeveloped countries. • Most river basins, in particular India, are heavily• polluted. In addition, the river basins are stressed due to competing demand for water across different uses and users; there is an intense competition in tapping the good quality water among the sectors such as agriculture, industry and domestic. In the process, milUons of gallons• of good quality water• is transported~ ' from rural to urban areas everyday; the• net result• is the flourishing water trade• and the depletion of• groundwater potential. It causes more anxiety not only because a huge quantity of • water is transported from rural to urban areas,• but also because of the release of comparable quantity of water • as effluent.
    [Show full text]