RCED-96-256R Impacts of Closing Meigs Field Airport

Total Page:16

File Type:pdf, Size:1020Kb

RCED-96-256R Impacts of Closing Meigs Field Airport United States GA O) General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-272873 September 16, 1996 The Honorable Bobby Rush House of Representatives Dear Mr. Rush: Meigs Field is a small airport located near downtown Chicago, Illinois. The airport is situated on land that is adjacent to Lake Michigan and is leased by the City of Chicago from the Chicago Park District. Citing a decline in both commercial and general aviation operations over the past several years, the City of Chicago has announced its intentions to close Meigs Field when the City's lease expires on September 30, 1996. The Park District plans to transform the airport into parkland, which will extend the exhibit space of neighboring museums and expand Chicago's 12th Street Beach. Concerned about the impacts of closing Meigs Field, you asked us to answer the following questions: (1) What is Meigs Field's role in the Chicago-area and national airport systems? (2) What effect will the redistribution of Meigs Field's traffic have on safety, aircraft delays, and noise at other Chicago-area airports? and (3) What are the City of Chicago's obligations under Airport Improvement Program (AIP) grant agreements? The following is our summary: - The Federal Aviation Administration (FAA) has designated Meigs Field as a primary commercial service airport within the National Airport System.' Commercial service at Meigs Field is limited to a few daily scheduled commuter flights and unscheduled air taxis. However, operational constraints, such as limited navigational aids, runway length, and facilities, 'Commercial service airports are publicly owned airports receiving scheduled passenger service and having 10,000 or more enplaned passengers a year. GAOtRCED-96-256R Impacts of Closing Meigs Field Airport 56 vz z //2, B-272873 reduce its utility for commercial aviation. Most traffic is general aviation. and Meigs Field serves as a reliever airport for Chicago Midway Airport.2 - FAA does not have plans for redirecting Meigs Field's traffic to other airports and has not formally evaluated the safety, delay, and noise impacts of closing Meigs Field. The City of Chicago, which has studied the effects of closing Meigs Field, estimates that most of the airport's traffic will shift to Midway Airport and that noise will not significantly increase at this airport. FAA agrees with the City's assessment and believes that Meigs' traffic can be safely accommodated by the current airspace structure, controller workload, and air traffic procedures. FAA believes that delays at Midway Airport may increase slightly during peak periods. - According to FAA, the City of Chicago is not obligated to keep Meigs Field open to satisfy AIP grant agreements because of the expiration of the lease between the City and Park District. The City must reimburse FAA for the remaining useful life of improvements funded by AIP grants awarded from 1986 through 1989. FAA has determined that the City is obligated to repay or reinvest about $288,000 for the 1986 and 1987 grants and that equipment purchased under the 1988 and 1989 grants can be transferred to Midway Airport. FAA did not follow its standard procedure for ensuring that the City had a long- term lease for Meigs Field before awarding AIP grants. Under the Airport and Airway Improvement Act, FAA must satisfy itself that the prospective grantee holds good title to the airport that will receive funding. According to FAA's handbook for AIP implementation, where the grantee's title consists of a long- term lease, the lease must be a minimum of 20 years from the date of the grant. When applying for AIP grants in the late 1980s, the City of Chicago had 7 to 10 years remaining on its lease with the Park District. FAA officials recognized that the City did not have a long-term lease that met its minimum requirements, so they decided to include a "special condition" in the grant agreement that required the City to reimburse FAA for the value of the remaining useful life of the improvements if the City failed to renew the lease. Enclosure I provides you with specific information on each of these areas as discussed with you on August 23, 1996. At our meeting, you also expressed interest in obtaining information on a planned project by the U.S. Army Corps 2Reliever airports reduce congestion at commercial service airports and provide general aviation with greater access to local areas. GAO/RCED-96-256R Impacts of Closing Meigs Field Airport 2 B-272873 of Engineers to repair Chicago's shoreline from erosion and storm damage because the need to protect Meigs Field was part of the project's justification. This project has an estimated total cost of $204 million, of which $110 million represents costs to the federal government. 3 The Corps is studying the potential impact of closing Meigs Field on its shoreline reconstruction plans. We will provide you with the information when the Corps completes its analysis. SCOPE AND METHODOLOGY To develop this information, we interviewed officials from FAA headquarters and Great Lakes Region, the Illinois Department of Transportation, the City and Park District of Chicago, commercial airlines at Meigs and Midway airports, and aviation trade associations and Chicago-area air traffic controllers. We also reviewed Meigs Field's status in FAA's National Plan of Integrated Airport Systems, correspondence between FAA and the City of Chicago regarding the implications of shifting Meigs' traffic to other airports; FAA reports on airport capacity limits, current and projected operations and enplanements, and expected increases in aircraft delays; and the City of Chicago's technical analysis of the impacts of closing Meigs Field. Additionally, we reviewed existing AIP grants, FAA's grant procedures, and FAA's handling of other airport closures. We performed our review from July 1996 through August 1996 in accordance with generally accepted government auditing standards. AGENCY COMMENTS We provided the Department of Transportation with a draft report for its review and comment. We met with FAA officials, including the Deputy Associate Administrator for Airports; the Director, Office of Airport Planning and Programming; and the Manager, Airports Division, of the Great Lakes Region. They generally agreed with the facts as presented, and we made revisions as necessary on the basis of their comments. For example, these officials emphasized that our discussion of the City's obligations regarding Meigs Field should do more to recognize the expiration of the lease. We revised the draft report to incorporate this comment. They also discussed the special condition in the grant agreements calling on the City to reimburse FAA if the City failed to renew the lease. Their major 3As of September 16, 1996, authorization and appropriations bills for the Lake Michigan shoreline protection project were nearing final congressional action. GAO/RCED-96-256R Impacts of Closing Meigs Field Airport 3 B-272873 concern centered on our statement that FAA did not follow its standard procedure of ensuring that a long-term lease was in place before awarding the grants. They stated that an adequate alternative to this standard procedure was written into the grant agreements. We have two main concerns about their position. First, the standard procedure-requiring good title on the grantee's part-has a basis in federal law; it also makes good sense to direct scarce AIP funds to those airport projects where sponsors have made long-term commitments to keep their airports open. Second, because FAA would normally expect such reimbursement under the Department of Transportation's uniform grant procedures in the Code of Federal Regulations (49 C.F.R. § 18), J FAA would, in any case, have been entitled to reimbursement of the remaining value of the grants. We revised the text to reflect that a special condition was added to the grant agreements. We also met with representatives from the City of Chicago and Chicago Park District to brief them on the results of our work but did not provide them with a draft report for review and comment. City officials told us that they agreed with the factual information presented in the briefing covering Meigs' role in the Chicago-area and national airport systems; the effect of the redistribution of Meigs' traffic on safety, aircraft delays, and noise at other Chicago-area airports; and the City of Chicago's obligations under federal AIP grant agreements. As arranged with your office, unless you publicly announce this report's contents earlier, we plan no further distribution until 10 days after the date of this letter. At that time, we will send copies of the report to interested congressional committees; the Secretary of Transportation; and the Administrator, FAA. We will also make copies available to others on request. GAO/RCED-96-256R Impacts of Closing Meigs Field Airport 4 B-272873 If you or your staff have any questions or need additional information, please call me at (202) 512-2834. Major contributors to this report are listed in enclosure II. Sincerely yours, Gerald L. Dillingham Associate Director, Transportation Issues Enclosures - 2 GAO/RCED.96-256R Impacts of Closing Meigs Field Airport 5 ENCLOSURE I ENCLOSURE I INFORLAXTION ON CHICAGO-AREA .AIRPORTS GAD Resources, Community, and Economic Development Division Briefing for Representative Rush 6 GAO)/R('ED-96-256R Impacts of Closing Meigs Field Airport ENCLOSURE I ENCLOSURE I GAjD Primary Research Questions 1. What is Meigs' role in the Chicago- area and national airport systems? 2. What effect will the redistribution of Meigs' traffic have on safety, aircraft delays, and noise at other airports? 3. What are the City of Chicago's obligations under AlP grant agreements? 7 GAO/RCED-96-256R Impacts of Closing Meigs Field Airport ENCLOSURE I ENCLOSURE I GK, Meigs' Role * Meigs is listed as a primary commercial airport in FAA's National Plan of Integrated Airport Systems.
Recommended publications
  • Calendar No. 414
    1 Calendar No. 414 107th Congress "!REPORT 2d Session SENATE 107–161 NATIONAL AVIATION CAPACITY EXPANSION ACT OF 2002 REPORT OF THE COMMITTEE ON COMMERCE, SCIENCE, AND TRANSPORTATION on S. 2039 JUNE 11, 2002.—Ordered to be printed U.S. GOVERNMENT PRINTING OFFICE 99–010 WASHINGTON : 2002 VerDate 11-MAY-2000 04:54 Jun 12, 2002 Jkt 099010 PO 00000 Frm 00001 Fmt 4012 Sfmt 4012 E:\HR\OC\SR161.XXX pfrm04 PsN: SR161 SENATE COMMITTEE ON COMMERCE, SCIENCE, AND TRANSPORTATION ONE HUNDRED SEVENTH CONGRESS SECOND SESSION ERNEST F. HOLLINGS, South Carolina, Chairman DANIEL K. INOUYE, Hawaii JOHN MCCAIN, Arizona JOHN D. ROCKEFELLER IV, West Virginia TED STEVENS, Alaska JOHN F. KERRY, Massachusetts CONRAD BURNS, Montana JOHN B. BREAUX, Louisiana TRENT LOTT, Mississippi BYRON L. DORGAN, North Dakota KAY BAILEY HUTCHISON, Texas RON WYDEN, Oregon OLYMPIA SNOWE, Maine MAX CLELAND, Georgia SAM BROWNBACK, Kansas BARBARA BOXER, California GORDON SMITH, Oregon JOHN EDWARDS, North Carolina PETER G. FITZGERALD, Illinois JEAN CARNAHAN, Missouri JOHN ENSIGN, Nevada BILL NELSON, Florida GEORGE ALLEN, Virginia KEVIN D. KAYES, Staff Director MOSES BOYD, Chief Counsel GREGG ELIAS, General Counsel JEANNE BUMPUS, Republican Staff Director and General Counsel ANN BEGEMAN, Republican Deputy Staff Director (II) VerDate 11-MAY-2000 04:54 Jun 12, 2002 Jkt 099010 PO 00000 Frm 00002 Fmt 5904 Sfmt 5904 E:\HR\OC\SR161.XXX pfrm04 PsN: SR161 Calendar No. 414 107TH CONGRESS REPORT "! 2d Session SENATE 107–161 NATIONAL AVIATION CAPACITY EXPANSION ACT OF 2002 JUNE 11, 2002.—Ordered to be printed Mr. HOLLINGS, from the Committee on Commerce, Science, and Transportation, submitted the following REPORT [To accompany S.
    [Show full text]
  • H. R. 3479 an ACT to Expand Aviation Capacity
    107TH CONGRESS 2D SESSION H. R. 3479 AN ACT To expand aviation capacity. 107TH CONGRESS 2D SESSION H. R. 3479 AN ACT To expand aviation capacity. 1 Be it enacted by the Senate and House of Representa- 2 tives of the United States of America in Congress assembled, 2 1 TITLE I—NATIONAL AVIATION 2 CAPACITY EXPANSION 3 SEC. 101. SHORT TITLE. 4 This title may be cited as the ‘‘National Aviation Ca- 5 pacity Expansion Act of 2002’’. 6 SEC. 102. FINDINGS. 7 Congress finds the following: 8 (1) O’Hare International Airport consistently 9 ranks as the Nation’s first or second busiest airport 10 with nearly 34,000,000 annual passengers 11 enplanements, almost all of whom travel in inter- 12 state or foreign commerce. The Federal Aviation Ad- 13 ministration’s most recent data, compiled in the Air- 14 port Capacity Benchmark Report 2001, projects de- 15 mand at O’Hare to grow by 18 percent over the next 16 decade. O’Hare handles 72,100,000 passengers an- 17 nually, compared with 64,600,000 at London 18 Heathrow International Airport, Europe’s busiest 19 airport, and 36,700,000 at Kimpo International Air- 20 port, Korea’s busiest airport, 7,400,000 at Narita 21 International Airport, Japan’s busiest airport, 22 23,700,000 at Kingsford-Smith International Air- 23 port, Australia’s busiest airport, and 6,200,000 at 24 Ezeiza International Airport, Argentina’s busiest 25 airport, as well as South America’s busiest airport. •HR 3479 EH 3 1 (2) The Airport Capacity Benchmark Report 2 2001 ranks O’Hare as the third most delayed air- 3 port in the United States.
    [Show full text]
  • Lakefront Love Affair Chicago Is Making Its Famous Waterfront Even Better
    Lakefront Love Affair Chicago is making its famous waterfront even better. By Kari Lydersen NorTherly Island, LIKE MUCH of Chicago’S 30-MILE Island in name only lakefront, is a triumph of artifice—created from fill and debris, in- Burnham envisioned one continuous lake- cluding detritus from the city’s devastating (and formative) 1871 front park that could be enjoyed by all fire. It was to be the first in a chain of islands proposed by architect Chicagoans. Northerly Island is a link in Northerly Island’s design uses a Daniel Burnham in his 1909 Plan of Chicago. More than a century that continuous chain, but it is no longer honeycomb shape as an organizing later, Burnham’s vision continues to guide development of the Chi- an island. The federal Works Progress Ad- principle. cago lakefront, and Northerly Island is among the sites undergoing ministration connected it to the mainland renovation. in 1938, after it hosted festivities for the Other projects include a complete overhaul of a former U.S. Steel plant site on the city’s 1933–1934 World’s Fair. Later it served as Southeast Side and yet another makeover of Navy Pier, the centrally located, multipurpose, Meigs Field, a single-strip airport that was Photo by Alex MacLean by Photo 3,300-foot-long pier that is the biggest tourist attraction in Illinois. demolished in 2003, when former Mayor Northerly Island (rendering opposite) is in the midst of a major, much-anticipated renovation. Two miles north, Navy Pier is undergoing NAVY PIER NAVY improvements in anticipation of its centennial.
    [Show full text]
  • Chicago Waterfront, Chicago, IL
    Realizing Burnham’s Vision Chicago’s Public Lakefront in the 21st Century Audrey Maloney, Haruna Nemoto, Michael Ward above: Cloud Gate Sculpture at Millennium Park http://www.flickr.com by: kjellarsen left: View of Chicago Central Area, looking South http://www.smpp.northwestern. edu/ICORR2005/travelinforma- tion.htm “The Lakefront by right be- longs to the people – not a foot of its shores should be appropriated to the exclu- sion of the people…Chicago is one of the world’s most beautiful cities, unequaled among major cities in the Chicago was founded in 1837 along the waterfront of Lake Michigan, and world due to the vision of quickly became an important transportation hub for the entire Midwestern our founding citizens and United States. It was ideally situated for the Illinois & Michigan Canal, built in park advocates.” 1848, which created a water link between the Great Lakes and the Mississippi - Trustees of the Illinois River. Though the canal was quickly rendered obsolete by freight railroad lines, and Michigan Canal the city remained an important center for the movement of goods. Commission, 1836 (http://www.fotp.org) In the 1860s, Chicago became the home of the massive meat industry, representing the first global industry. This expansion contributed to the city’s continued growth as an industrial center, which has defined much of its history. Industry dominated the city’s waterfront, which served as a dumping ground in certain areas and was cut off from people throughout much of the urban area. It was in at the turn of the century when city leaders began to realize the importance of opening up some of the lakefront to public use.
    [Show full text]
  • 1 Ralph H. Burke
    Ralph H. Burke: Early Innovator of Chicago O’Hare International Airport Paul Burley – 3/6/2013 Abstract Ralph H. Burke (1884-1956) was an engineer for the City of Chicago responsible for almost all aspects of the planning and early construction of Chicago O’Hare International Airport until his death in 1956. Burke, who was part of numerous parts of mid-20th century city planning in Chicago, was part of both the land acquisition for O’Hare Airport as well as the planning of the footprint of the airport. Burke’s acquisition of of the large land parcel, his innovations in runway design, and his plans for road and local transit leave a significant legacy in the history of the construction of the airport. Despite these accomplishments and others in Chicago-are transportation planning, his legacy remains almost completely forgotten in the 21st century. Full text Ralph H. Burke (1884-1956) was an engineer for the City of Chicago responsible for almost all aspects of the planning and early construction of Chicago O’Hare International Airport until his death in 1956. He was born to a well-known Chicago-based judge, Edmund W. Burke, and entered Northwestern University to study law, but left after only two years to study engineering at the Massachusetts Institute of Technology, where he graduated in civil engineering in 1906. Burke was part of a group of young engineers hired by Robert R. McCormick (1880–1955) during the mogul’s short tenure in City Hall before becoming the owner and publisher of the Chicago Tribune. Burke worked for the City of Chicago and State of Illinois in 1906 until he opened a private practice in 1946.
    [Show full text]
  • Meigs Field Terminal
    Preservation Chicago Unveils The 2009 CHICAGO’s 7 Most Threatened... Meigs Field Terminal Photo: Debbie Dodge Overview: The 1961 Terminal on Northerly Island is one of two reminders of Meigs Field Terminal Northerly Island the Merrill C. Meigs Field Airport that was abruptly closed in 2003. Architect: Consoer & Morgan The delightfully modern airport terminal was completed in 1961 by Date:1961 Consoer & Morgan. The firm also designed Ravenswood Hospital in Chicago and the 1971 Sisters of the Holy Family of Nazareth in Des Plaines. The new terminal building contained waiting areas, offices and counter space and was operated by the Chicago Department of Aviation. The two-story glass, steel and precast masonry building features a taller three-story central structure with an atrium that offered spectacular lake vistas for waiting passengers. The terminal’s brightly colored 1961 interior is mostly intact, including seats for passengers in the gate waiting areas, despite having also been home to a Chicago Police station at one time. The airport was closed on March 30, 2003, when bulldozers working at night gouged large X’s into the runway at the request of Mayor Richard M. Daley. Threat: In the summer, the building currently functions as the Field House for the Chicago Park District’s Northerly Island park. It also houses the Flint Creek Wildlife Rehabilitation Center for injured birds. The Chicago Park District is working with architects on plans for the redevelopment of Northerly Island that include alterations to the historic Terminal building. Northerly Island is also figuring into plans for the 2016 Olympics should Chicago win its bid in October 2009; it is unclear what the impact of the Olympics would be on the Terminal.
    [Show full text]
  • Waterfronts and Open Spaces
    CHAPTER 4 Waterfronts and Open Spaces Chapter 4 : THEME 3 Waterfronts and Open Spaces Expand and connect Waterfronts and Open Spaces to create great public places Final Report CHICAGO CENTRAL AREA PLAN DRAFT June 2003 79 CHAPTER 4 Waterfronts and Open Spaces CENTRAL AREA OPEN SPACE OPPORTUNITIES CENTRAL AREA OPEN SPACE SYSTEMS Figure 4.3.1 Central Area Open Space Open spaces and rich landscaping make the Central Area livable and help to attract business and visitors. Chicago’s lakefront park system is known worldwide. In the 21st century it will also become known for its out- standing continuous riverfront open space. Figure 4.3.2 Strengthen the Lakefront as Figure 4.3.3 Develop the Chicago River Chicago’s great public space as a premier public place and continuous park system Open Space - Existing Open Space - Planned Open Space - Envisioned Vision for Wetlands along the River Landscaped Freeways Landscaped Riverbanks Plazas and Riverwalk Major Landscaped streets 5 minute walk Figure 4.3.4 Create the next generation of Figure 4.3.5 Complete the framework of richly 0 1/4 1/2 1 Mile parks and plazas landscaped streets and boulevards. Final Report June 2003 DRAFT 80 CHAPTER 4 Waterfronts and Open Spaces Theme 3: Waterfronts and Open Spaces Expand and connect Waterfronts and Open Spaces to create great public places. Guiding Principles The City of Chicago’s Cityspace Plan established a hierarchy of varying scales and functions: • THE LAKEFRONT • Magnet parks - lakefront parks attracting people from throughout the metropolitan area. Grant Strengthen the Lakefront - Chicago’s great public space Park and Burnham Park serve this purpose in the Central Area.
    [Show full text]
  • Letter Reso 1..2
    *LRB09623966GRL43363r* SR1021 LRB096 23966 GRL 43363 r 1 SENATE RESOLUTION 2 WHEREAS, The Merrill C. Meigs Field Airport was a 3 single-strip airport on Northerly Island in Chicago that began 4 operation on December 10, 1948; by 1955, Meigs Field became the 5 country's busiest single-strip airport, generating 40,000 6 flights every year and earning over $450,000,000 annually; and 7 WHEREAS, On March 31, 2003, Chicago Mayor Richard J. Daley 8 ordered private crews to destroy the Meigs Field runway in the 9 middle of the night, bulldozing large X-shaped gouges into the 10 runway surface and rendering the airstrip unusable; and 11 WHEREAS, Repairing and reopening Meigs Field could spur 12 great economic growth in the City of Chicago and State of 13 Illinois; advances in technology and proper administration 14 could increase traffic at Meigs to over 50,000 flights every 15 year and bring in over $600,000,000 annually, which would serve 16 as a great boon to the people of this State during these 17 sagging economic times; and 18 WHEREAS, Reopening Meigs Field would also relieve the 19 congestion problems routinely seen at Midway Airport and O'Hare 20 International Airport and would lead to the creation of many 21 jobs; and -2-SR1021LRB096 23966 GRL 43363 r 1 WHEREAS, Most people who traveled to Meigs Field came to 2 the City of Chicago to conduct business or to attend 3 conventions within the city; reopening the airport would 4 reestablish this economic opportunity and aid the various 5 convention centers throughout Chicago, including McCormick
    [Show full text]
  • History of Merrill C. Meigs Field Airport, Chicago, IL
    Living History of Illinois and Chicago® Living History of Illinois and Chicago® – Facebook Group. Digital Research Library of Illinois History® Living History of Illinois Gazette - The Free Daily Illinois Newspaper. Illinois History Store® – Vintage Illinois and Chicago logo products. The History of Merrill C. Meigs Field Airport, Chicago, IL. Merrill C. Meigs Field Airport (IATA: CGX / ICAO: KCGX) was a single strip airport that was built on Northerly Island, the man-made peninsula that was also the site of the 1933–1934 Century of Progress in Chicago. The airport opened on December 10, 1948, and became the country's busiest single-strip airport by 1955. The latest air traffic tower was built in 1952 and the terminal was dedicated in 1961. The airfield was named for Merrill C. Meigs, publisher of the Chicago Herald and Examiner and an aviation advocate. Northerly Island, owned by the Chicago Park District, is the only lakefront structure to be built based on Daniel Burnham's 1909 Plan of Chicago. The island was to be populated by trees and grass for the public enjoyment by all. However, drafted less than six years after the Wright brothers' historic flight, the 1909 plan did not envision any airports for Chicago. The formal dedication of Merrill C. Meigs Field took place on June 30, 1950 at the lakefront. Although the airport has been open since December 10, 1948, it carried no name. Speaking from prepared notes, Meigs, who had served as the head of the city’s Aero Commission, said, “When my name was brought up last year before the city council, there were objections that no airport should be named for a living person.
    [Show full text]
  • Airfield Manual: Field Guide to the Transformation of Abandoned Airports
    Airfield Manual: Field Guide to the Transformation of Abandoned AirportsAirfield Field Guide to the Transformation Manual: RESEARCH REPORT Airfield Manual: Field Guide to the Transformation of Abandoned Airports EDITION 2017 AIRFIELD MANUAL Field Guide to the Transformation of Abandoned Airports Airfield Manual: Field Guide to the Transformation of Abandoned Airports Principal Investigator Charles Waldheim Lead Researcher Sara Favargiotti Project Team Pedro Aparicio Llorente, Mariano Gomez Luque, Matthew Moffitt, Lane Raffaldini Rubin, Ruben Segovia, Dana Shaikh Solaiman, Ximena de Villafranca, Jessy Yang, and David Zielnicki. Editors Sara Favargiotti Jessy Yang Copy Editor Lane Raffaldini Rubin Printer blurb.com This research report documents a research project sponsored by the Inter-American Development Bank Emerging and Sustainable Cities Initiative. Additional support for the investigation was generously provided by the David Rockefeller Center for Latin American Studies at Harvard University and the Adolfo Ibañez University, Santiago de Chile. All drawings courtesy Harvard GSD Office for Urbanization. Harvard University Graduate School of Design Office for Urbanization Mohsen Mostafavi, Dean Charles Waldheim, Director The Harvard University Graduate School of Design is dedicated to the education and development of design professionals in architecture, landscape architecture, urban planning, and urban design. With a commitment to design excellence that demands the skillful manipulation of form and technology and draws inspiration from a broad range of social, environmental, and cultural issues, the Harvard GSD provides leadership for shaping the built environment of the twenty-first century. AIRFIELD MANUAL The Harvard GSD Office for Urbanization draws upon the School’s history of design innovation to address societal and cultural conditions associated with contemporary urbanization.
    [Show full text]
  • Northerly Island Began Its Transformation NORTHERLY ISLAND of Chicago, Called for the Creation of a Series Back Into Parkland
    Daniel H. Burnham, in his seminal 1909 Plan In 2004, Northerly Island began its transformation NORTHERLY ISLAND of Chicago, called for the creation of a series back into parkland. Its design is still being worked of islands stretching between Grant and Jackson out, but it's likely the site will retain an environ- Site No 65 Parks and extending into Lake Michigan. Northerly mental focus as plans evolve. Twenty-four acres Island was the only one to be developed. In 1933 have already been drill-seeded with native prairie and 1934, the island was expanded to accommo- grasses and flowers. date part of the grounds for the World’s Fair. Though this is an urban preserve with spectacular “A Century of Progress” included tall, futuristic views of the city skyline, the landscape has the buildings made of what were then unconventional feel and function of a wide open grassland. materials like plywood and masonite. (AIA Guide to Chicago, edited by Alice Sinkevitch.) In 1938, Even when Meigs Field was functioning as the bridge that connected the island was replaced an airport, birders relied on Northerly Island as with fill, creating a causeway that now makes the a place to find snowy owls in winter. Short-eared site a peninsula rather than an island. Beginning owls, horned larks, and snow buntings can also in 1947, and through the rest of the 20th century, be found here, according to Birder's Guide to Northerly Island was home to Merrill C. Meigs the Chicago Region. (Lynne Carpenter and Joel Field, a small airport.
    [Show full text]
  • Unconstrained Demand Analysis I March 6, 2003 DRAFT O’Hare International Airport II-3 Comparison of Top U.S
    DRAFT Unconstrained O’HareModernizationProgram DemandAnalysis February2003 SubmittedtoFAAforReviewandComment DRAFT O’Hare International Airport Table of Contents I. Introduction 1 II. Airport Overview 1 III. Historical Airport Activity 7 3.1 Passenger Activity 7 3.2 Aircraft Operations 12 3.3 Adjustments to Historical Activity Statistics 15 IV. Airline Activity (Pre- and Post-September 11, 2001) 15 V. Demand Analysis Overview 25 5.1 Factors Affecting Airport Activity and Demand Profiles 26 5.2 Adopted Forecast Sources 31 5.3 Summary of 2001 FAA TAF Projections 32 VI. Derivative Demand Profiles – Passenger Enplanements 32 6.1 Origin and Destination (O&D)/Connecting Passenger Splits 38 6.2 Peak Month and Peak Month Average Day (PMAD) Passengers 40 VII. Derivative Demand Profiles – Aircraft Operations 42 7.1 Domestic Air Carrier and Commuter – Annual Departures 43 7.2 Domestic Air Carrier and Commuter – Peak Month/PMAD Departures 48 7.3 Annual International Departures 50 7.4 International Air Carrier Peak Month/PMAD Departure 50 7.5 Annual All-cargo Operations 52 7.6 Peak Month and PMAD All-cargo Operations 52 7.7 Annual General Aviation/Miscellaneous and Military Operations 52 7.8 Peak Month and PMAD General Aviation/Miscellaneous Operations 52 VIII. Design Day Schedule 53 8.1 Assumptions and Methodology 55 8.2 Future Domestic Flight Activity 58 8.3 Future International Flight Activity 60 8.4 Calibration of the Design Day Schedules 65 8.5 Peaking Characteristics 70 8.6 Non-Commercial Activity 70 8.7 Fleet Mix 70 List of Tables II-1 Historical Enplanements – Chicago O’Hare International and Midway Airports 2 II-2 Historical Domestic O&D Passengers 4 Unconstrained Demand Analysis i March 6, 2003 DRAFT O’Hare International Airport II-3 Comparison of Top U.S.
    [Show full text]