Denis Cederburg MEMORANDUM Director Department of Public Works TO: FOR THE RECORD FROM: KATHLEEN KINGSTON, PRINCIPAL CIVIL ENGINEER, DESIGN ENGINEERING DIVISION SUBJECT: “NO CUT” STREETS DATE: June 12, 2020 Per Title 30, Clark County Code Section 30.32.110, the County has excavation restrictions on some roadways which have been paved or resurfaced. The excavation restrictions are for the 5-year period following completed construction on the roadways. Attached is an updated list of street improvement projects which have been accepted within the last five (5) years, are under construction, or are soon to be under construction. Notifications were sent to utility companies and/or property owners of record prior to construction, unless otherwise noted. If you have any questions, or to update contacts that need to receive updates of this “No Cut Streets” list, please call Kathleen Kingston at (702) 455-6043 or email at
[email protected]. Thank you. Enclosure cc/enc: CC Water Reclamation District; Carlos Espinoza RTC of So NV; John Penuelas CC Water Reclamation District; Rick Donahue RTC of So NV; Chris Schwartz, Julia Uravich CC Water Reclamation District; Scott Hansen City of Henderson; Scott Jarvis CenturyLink, Raquel Butler, updated May 2020 City of Las Vegas, Michael Cunningham (updated May 2020) CenturyLink;
[email protected] Karen Mulcahy, Dist. A, Comm. and Mgr. (Michael Naft) Cox Communications; Tony Ebersole (updated 2020) Gina Stroughter, Dist. B, Comm and Mgr. ( Marilyn Kirkpatrick) Crown Castle; Nicholas Belinsky Donna Rainone, Dist. C, Comm. and Mgr. (Larry Brown) ExteNet;
[email protected] Monique Perkins, Dist. D, Comm and Mgr (Lawrence Weekly) Imperial Wireless Networks, Travis Bozzano (2020) Gloria Wells, Dist.