Stakeholder and Public Submissions Report
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
NTA Integrated Implementation Plan 2019-2024
Integrated Implementation Plan 2019 - 2024 December 2019 Integrated Implementation Plan 2019 - 2024 Contents 1 Introduction 1 1.1 Introduction 1 1.2 Requirement for an Integrated Implementation Plan 2 1.3 Content of an Implementation Plan 2 1.4 Plan Process 3 2 Background to the Implementation Plan 4 2.1 Congestion 4 2.2 Environment 4 2.3 Spatial Planning 7 3 Scope of the Implementation Plan 9 3.1 Approach 9 4 Overall Infrastructure Investment Programme 11 4.1 Introduction 11 4.2 Available Funding 11 4.3 Priority Investment Areas 12 4.4 Overall Programme Approach 15 4.5 Accessibility Considerations 16 4.6 Environmental Considerations 16 5 Bus Investment 23 5.1 Background 23 5.2 Objectives and Elements 24 5.3 Proposed Investment Areas 24 5.4 Core Bus Corridors – BusConnects Dublin 25 5.5 Bus Fleet 29 5.6 Bus Stops and Shelters 31 6 Light Rail Investment 34 6.1 Background 34 6.2 Objectives 34 6.3 Proposed Investment Areas 35 6.4 MetroLink 36 6.5 Fleet and Network Enhancement 37 6.6 Network Development 38 7 Heavy Rail Investment 39 7.1 Background 39 7.2 Objectives 40 7.3 Proposed Investment Areas 40 7.4 DART Expansion Programme 41 7.5 City Centre Re-signalling Project 42 7.6 National Train Control Centre (NTCC) 43 7.7 Ticketing and Revenue Systems 44 7.8 Station Improvement and Other Enhancements 45 7.9 Non-DART Fleet 45 7.10 Network Development 46 8. Integration Measures and Sustainable Transport Investment 47 8.1 Background 47 8.2 Objectives 47 8.3 Proposed Investment Areas 48 8.4 Cycling / Walking 49 8.5 Traffic Management 51 8.6 Safety -
A Manifesto for Rail Passengers V1.2
A Manifesto for Rail Passengers Are we there yet? Fixing Irish Rail for the post-Celtic Tiger era An efficient public transport system provides access to employment, education, shopping, recreation and health care. It is an enabler of economic growth and development. With the price of oil continuing to rise, public transport services and in particular rail based transport offers the most efficient and sustainable transport means. In these difficult economic times, we are aware that any organisation making demands of the public purse is not likely to get a favourable reception. However, looking through the list of issues we present below, it is clear that we are not looking for money to be thrown at the problem — indeed, that was the tactic deployed over the last ten years to little effect. Instead, what this document is focused on are the simple things, based around the principle that that Irish Rail needs to put aside the petty bickering between government, management and unions, and re-orientate itself around the people that are supposed to be at the centre of it all: the passengers. 1 A Dedicated Transport Police Anti-social behaviour is a serious issue for passengers on all forms of public transport and is, without a doubt, making people think twice of travelling particularly at night. Vandalism, trespass, alcohol & other substance abuse and general hooliganism are serious issues, resulting in delays, cancellations, injuries to staff and passengers, resulting in substantial costs on transport providers and public inconvenience. Rail Users Ireland notes the success of the Garda Traffic Corps and believes a similar dedicated police force suitably trained in matters of rail and tram safety procedures should be provided to restore public confidence in public transport. -
An Bord Pleanála Inspector's Report
An Bord Pleanála Inspector’s Report DETAILS OF THE APPLICATION Case Reference No: 29N.NA0004 Proposed Scheme: St. Stephen’s Green to Broombridge Light Railway – Line BXD Applicant: Railway Procurement Agency (RPA) Planning Authority: Dublin City Council (DCC) Application Type: Railway Order (RO) under Section 37, Transport (Railway Infrastructure) Act 2001 [as amended by the Planning and Development (Strategic Infrastructure) Act 2006]. Submissions/Observations: Yes. Site Inspections: Various dates/times. Inspector: B. Wyse. ___________________________________________________________________________ PL29N.NA0004 An Bord Pleanála Page 1 of 274 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION 3 2.0 PROPOSED SCHEME 3 3.0 THE PLANNING FRAMEWORK 47 4.0 SUBMISSIONS/OBSERVATIONS 49 5.0 ORAL HEARING 119 6.0 ASSESSMENT 217 7.0 RECOMMENDATION 268 ___________________________________________________________________________ PL29N.NA0004 An Bord Pleanála Page 2 of 274 1.0 INTRODUCTION 1.1 The Application This is an application under Section 37 of the Transport (Railway Infrastructure) Act 2001 [as amended by the Planning and Development (Strategic Infrastructure) Act 2006] for a Railway Order (RO) to authorise the Railway Procurement Agency (RPA) to provide for the construction, operation and maintenance of a light railway from St. Stephen’s Green to Broombridge, a distance of approximately 5.6 kilometres. The RO sought would, if granted, have a lifespan of 10 years from the date on which the RO comes into operation except in relation to the possible future stop within the Broadstone Bus Depot where it would have a lifespan of 15 years. The application documentation comprises the following: - • Draft Railway Order (Draft RO) • Plans of the proposed railway works. -
Rail Users Ireland Policy 2020Ed
Are we there yet? Fixing Irish Rail Rail Users Ireland Policy January 2020 Introduction Rail Users Ireland (RUI) is Ireland's official rail passenger body. Since its foundation in 2003, its members have campaigned on behalf of rail users in Ireland. This document briefly outlines the state of Ireland's rail service, what we think is wrong and what we believe should be done. Focusing primarily on Irish Rail rather than Luas, we have selected ten of the most pressing issues that face rail passengers in Ireland and have matched them with simple, practical proposals for addressing them. Despite the improved economic times, we are aware that any organisation making demands of the public purse is not likely to get a favourable reception. However, looking through the list of issues and policies we present below, it is clear that we are not looking for money to be thrown at the problem — indeed, that was the tactic deployed during the Celtic Tiger era with little effect. Instead, what this document is focused on are the simple things, based around the principle that that Irish Rail needs to put aside the petty bickering between government, management and unions, and re-orientate itself around the people that are supposed to be at the centre of it all: the passengers. Rail Users Ireland Committee 2020 Thomas J. Stamp Mark Gleeson Thomas Ralph Colm Moore Published By: Rail Users Ireland C/O Thomas J Stamp Clonboo, Templetouhy, Thurles, Co Tipperary. Further Information: Website: http://www.railusers.ie Email: [email protected] Media Inquiries: Mark Gleeson +353 (0)86 864 2583 [email protected] Thomas J Stamp +353 (0)85 771 4950 [email protected] Executive Summary This document seeks to highlight and address common problems faced by users of rail services in Ireland each day.