To Be Substituted with Same Number & Date Government
Total Page:16
File Type:pdf, Size:1020Kb
TO BE SUBSTITUTED WITH SAME NUMBER & DATE GOVERNMENT OF KHYBER PAKHTUNKHWA COMMUNICATION & WORKS DEPARTMENT No. SOR/V-39/W&S/03/Vol-II Dated: 12/11/2019 To. The Chief Engineer (East), Communication & Works, Abbottabad. SUBJECT: 3rd REVISED ADMINISTRATIVE APPROVAL FOR THE SCHEME "CONSTRUCTION/ IMPROVEMENT / REHABILITATION/ WIDENING OF 16 DIFFERENT ROADS (20 KM) IN UCs BANDAS, PIR KHAN, MIR PURE, KAKUL, SHEIKHUL BAND!, NAWANSHER, KEYAL, CENTRAL URBAN, MALIK PURA AND WARD 1 TO 15 CANTT: ABBOTTABAD", ADP NO. 896/140981 (201.9-20)" In exercise of the powers delegated vide Part-I Serial No.5 Second Schedule of the Delegation of Powers under the Financial Rules and Powers of Re-appropriation Rules, 2018, the Khyber Pakhtunkhwa Provincial Government is pleased to accord the 31d Revised Administrative Approval for the implementation of the scheme under ADP No 896/140981 (2019-20) "Construction/ Improvement / Rehabilitation/ Widening of 16 different roads (20 Km) in UCs Bandas Pir Khan, Mir Pure, Kakul, Sheikul Bandi, Nawanshehr, Keyal, Central Urban, Malik Pura & Ward 1 to 15 Cantt Abbottabad" for the period of 36 months from (2018-19) to (2020-21) at a total cost of Rs.400.000 million (Rupees four hundred million only) as per detail given below:- S.No. Description Cost (Rs. in Million) i 1 Constn; of road from near Modern Public School (Banda Dilazak road (1-Km) 7.280 2 Sir Syed colony road Street No. 08 & 09 3.130 3 Shahzada Masjid to Banda Sinjlian 12.430 4 Sarban Kothera road 37.00 5 Karbala chowk Kehal to Usmania Masjid 5.501 6 Narduba road 7.003 7 Bani to Maira Mandroch road 8.737 8 Township Basali road 8.050 9 Lambi Dheri to Banda Dilazak road 9.350 10 Sheikhul Bandi road 6.431 11 Kala Pul to Chona road 30.505 12 Main link road Dhamtour 33.232 13 Gore Maira road (Mir Pur Maira road) 8.380 14 Hassa Zai, Mansoor road Oresh colony road 5.040 15 Main link road Pul to Masjid Narrian 8.302 16 Kunj Mirpur road 3.874 17 PCC with Sewerage Line Oresh colony road 7.001 18 PCC with Sewerage Line Jogan road 2.983 19 PCC with Sewerage Line Dhodial road (changed as) rehabilitation of Dhodial 12.634 road UC Nawansher 20 Constn: of Comsats University road 5.001 21 PCC with Sewerage Line Kehal Ward 10 to 15 Kehal (changed as) !mpvt: & Reh: 4.00 of road Aram Bagh to Muhallah Kothera UC Kehal 22 PCC with Sewerage Line from Kehal chowk to Qabristan (changed as). 8.598 rehabilitation of lqbal Khan road UC Kehal 23 lmpvt: & Reh: of Murda Pattian Boji road UC Banda Pir Khan 12.757 24 Impvt: & Reh: of Basali road via Township UC Kakul • 29.576 25 Impvt: & Reh: of Naarian road UC Kakul 11.690 26 lmpvt: & Reh: of Thanda Choya road UC Nawansher 6.00 27 Impvt: & Reh: of road Khalid Shaheed chowk to Hujra Moosa Zai i/c Piyari 20.755 Masjid UC Mir Pur –r- 28 Impvt: & Reh: of road Tube Well to Modern School UC Mir Pur 8.730 29 lmpvt: & Reh: of road Lambi Dheri to Retiera chowk UC Sheikhul Bandi 8 101 30 lmpvt: & Reh: of Narri road Banda Ali Khan 12.090 31 Impvt; & Reh: of road Kohisar Town UC Nawansher 7.684 32 Impvt: & Reh: of Maira Tall road UC Mir Pur 32.542 33 Impvt: & Reh: of road Chashma chowk to Mir Pur 15.606 Total 400.00 1 The scheme was approved by the PDWP meeting held on 17-09-2019. Minutes forwarded by P&D Department letter No. Chief/INF/P&D/170-01/2019/4069-82 dated 24.09.2019. Approved summary was circulated vide this office letter No. SOR/1-13/A.Abad/W&S/2018 dated 27.08.2019. Corrigendum issued by P&D Department vide No. Chief/INF/P&D/170-01/19/4539-40 dated 04.11.2019. 7 The expenditure involved will be met out from the Sanctioned budget under the function cum- object classification 04-Economic Affairs-045-Construction & Transport-0452-Road Transport- 045202-Highways Road & Bridges (NC 12064) under Grant 56 during current financial year (2019-20). 3 The Administrative Approval does not constitute any sanction to design rates provided in the rough cost estimate. The suitability of design & financial responsibility of the rates rests with the authority competent to accord technical sanction to the cost estimate. The sanctioning authority shall allow appropriate rates after observing all codal formalities/ standing instructions regarding schedule of rates and financial regularity. The work shall be taken in hand after release of funds and proper technical sanction of the cost estimate. As per decision of the Competent Authority dated 22-09-2015 that Road should not have less than 18 feet width except in built-up area or in the area where R.O.W is restricted and require acquisition of land. Secretary C&W Department Copy to the: 1. Additional Chief Secretary P&D Department Khyber Pakhtunkhwa Peshawar. 2 Secretary to Government of Khyber Pakhtunkhwa , Finance Department Peshawar. 3. Accountant General Khyber Pakhtunkhwa, Peshawar. 4 Director Planning & Monitoring Cell C&W Department Peshawar 5. Accounts Officer (Local) C&W Department Khyber Pakhtunkhwa, Peshawar. 6 Superintending Engineer C&W circle Abbottabad. 7 Executive Engineer C&W Division Abbottabad. ,8. Deputy Director (IT) C&W Department, Peshawar. (Engfi. an Meeb) Section 'Office Roads) .