Floodplain Restoration and Storm Water Management: Guidance and Case Study

Total Page:16

File Type:pdf, Size:1020Kb

Floodplain Restoration and Storm Water Management: Guidance and Case Study Floodplain Restoration and Storm Water Management: Guidance and Case Study Prepared by: Chagrin River Watershed Partners, Inc. Biohabitats P.O. Box 229 2026 Murray Hill Road, Room 107 Willoughby, Ohio 44094 Cleveland, OH 44106 (440) 975-3870 216.921.4430 (440) 975-3865 (fax) 216.751.2087 (fax) www.biohabitats.com www.crwp.org Floodplain Restoration and Storm Water Management: Guidance and Case Study Page 2 Acknowledgements This report was prepared by the Chagrin River Watershed Partners, Inc. (CRWP) under award LEPF 05 -12 from the Lake Erie Protection Fund, with funding made possible by the sale of the Lake Erie Number Plates. The statements, findings, conclusions and recommendations are those of the author(s) and do not necessarily reflect the views of the Ohio Lake Erie Commission. Additional support for this report was provided by the Members of CRWP through their annual Member dues. CRWP is a non-profit technical organization formed by the townships, villages, cities, counties, and park districts of the Chagrin watershed to develop and implement innovative solutions to address current, and minimize new, flooding, erosion, and water quality costs and to control the increasing infrastructure costs associated with urban/suburban development. CRWP provides Members with advice and assistance on zoning and subdivision codes, implementation of these codes, development plan review, and other best practice implementation at Member direction. Cover Photographs. Top Left: Floodplain Restoration in Germany (Photo by: Unknown from internet website) Top Right: Ditch Improvement (Photo by: Amy Holtshouse Brennan) Bottom Left: Daniels Park (Photo by: Amy Holtshouse Brennan) Bottom Right: Chagrin River in Waite Hill (Photo by: Brian Sherwin) Floodplain Restoration and Storm Water Management: Guidance and Case Study Page 3 TABLE OF CONTENTS Introduction to Floodplain Restoration 4 Storm Water Management Benefits Associated with Floodplains 9 Floodplain Restoration as a Storm Water Practice 11 Floodplain Restoration Tools 12 LIST OF FIGURES Figure 1 Examples of Disconnected Floodplains 4 Figure 2 Examples of Riparian Buffer Enhancement 5 Figure 3 Floodplain Re-vegetation 5 Figure 4 A Stream Restoration Project 5 Figure 5 Examples of a Degraded Stream 6 Figure 6 A Restoration Before and After 6 Figure 7 A Floodplain Restoration Project 7 Figure 8 Cross-section of Floodplain Restoration 8 Figure 9 Schematic of a Reforested Floodplain 16 Figure 10 Cross-section of Reforestation to a Subdivision 17 Figure 11 Detail of Floodplain Benching 22 Figure 12 Cross-section of Floodplain Benching and Bankfull Channel Restoration 23 Figure 13 Profile of a Regenerative Storm Conveyance Project 24 Figure 14 A Regenerative Storm Water Conveyance Project 25 Figure 15 Another Regenerative Storm Water Conveyance Project 26 Figure 16 A Before and After of a Regenerative Storm Water Conveyance Project 27 LIST OF APPENDIXES Appendix 1 Case Studies 30 Floodplain Restoration and Storm Water Management: Guidance and Case Study Page 4 Introduction to Floodplain Restoration A floodplain is a flat or nearly flat lowland bordering a stream or river that experiences occasional or periodic flooding. It includes the floodway, which consists of the stream channel and adjacent areas that carry flood flows, and the flood fringe, which are areas covered by the flood, but which do not experience a strong current. The floodplain corridor acts as the “right-of- way” for a stream and functions as an integral part of the stream ecosystem. Floodplains perform important natural functions, including temporary storage of floodwaters, moderation of peak flows, maintenance of water quality, groundwater recharge, and prevention of erosion. Floodplains also provide habitat for wildlife, recreational opportunities, and aesthetic benefits. Ideal floodplain conditions are rarely encountered in urban or disturbed watersheds; many floodplain functions have been lost to agricultural uses and more recently to urban and suburban development (Figure 1). Floodplain restoration is the process of fully or partially restoring a stream’s access to its floodplain to return those valuable floodplain functions. There are multiple types of floodplain restoration: • Hydrologic. Reconnecting the stream to the floodplain and restoring the stream’s natural hydrology. • Vegetative. Removing invasive species and replanting native plant communities appropriate to the site and conditions. • Habitat Restoration. Installing structures to improve wildlife habitat. Habitat is also gained through re-planting native plant communities. Several examples of restored and reconnected floodplains are displayed in Figures 2 through 8. Figure 1: These are two examples of streams that have been disconnected from their floodplains. On the left, upstream development has increased stream flows, resulting in channel erosion and downcutting. The entrenched stream no longer overflows onto its floodplain. On the right, the floodplain was filled in and raised during development, cutting off the stream’s access to its floodplain. Floodplain Restoration and Storm Water Management: Guidance and Case Study Page 5 Figure 2: Examples of riparian buffer enhancement. In both cases, additional riparian trees and shrubs have been planted to expand the width of the forested buffer. Figure 3: Floodplain re-vegetation, before (left) and after (right). Figure 4: A stream restoration project with floodplain benching. On both sides of the restored stream, a bench has been graded at the bankfull elevation, providing room to dissipate high flow events and opportunities for riparian habitat creation. Floodplain Restoration and Storm Water Management: Guidance and Case Study Page 6 Figure 5: Severely down-cut banks (left) and compromised riparian vegetation before restoration ensued. Now restored, the stream is a stable, functioning system, reconnected to its floodplains (right). Figure 6: A severely eroded bank caused in part by agricultural activities (left) was restored by regrading the streambank, installing rock grade-control structures (to prevent bed degradation), and establishing riparian buffer (right). Floodplain Restoration and Storm Water Management: Guidance and Case Study Page 7 Figure 7: Evolution of a stream and floodplain restoration project. Floodplain Restoration and Storm Water Management: Guidance and Case Study Page 8 © Biohabitats, Inc. Figure 8: Conceptual cross section of floodplain restoration. The existing grade (dashed line) is lowered along the channel and different levels of floodplain are created, providing opportunities for different hydrologic regimes and resulting vegetative communities. Floodplain Restoration and Storm Water Management: Guidance and Case Study Page 9 Storm Water Management Benefits Associated with Floodplains Floodplains offer a large array of economic, ecological, and sociological benefits to communities. Floodplains can provide flood control, erosion control, storm water management and water quality services. In urban and suburban settings, it can be challenging to balance these benefits with the need for public living spaces and services. Often, engineered solutions to storm water management are pursued that allow for increased development intensity and density adjacent to streams, floodplains, and wetlands. Unfortunately, these expensive structural solutions can have limited effectiveness, can exacerbate undesirable conditions, and may simply transfer a problem to another location. For example, development adds rooftops, driveways, sidewalks, parking lots and roadways to the landscape. These hard surfaces, or impervious surfaces, prevent infiltration of storm water into the ground and produce greater volumes of storm water runoff. The storm water runoff then flows across these impervious surfaces to a curb and gutter system, which efficiently delivers the runoff to a storm drain. This means that more storm water runoff is entering the drainage network at higher velocities than it would have historically. Storm water runoff is then typically directed to a detention pond, which may be designed to prevent increases in peak discharges. However, storm water discharged from the pond may now be flowing into the receiving stream at higher velocities for a longer duration of time. This may result in increased stream channel erosion and down cutting, poor water quality, increased downstream flooding, and more frequent flooding. In the end, the most economical approach may be to preserve or restore the floodplain adjacent to a stream or river. It is helpful to consider the following benefits of floodplains: Flood Control – Flooding is a natural process in stream and river systems that is essential to floodplain health and maintenance. However, human development can increase the occurrence and severity of floods, often causing property damage. Floodplains provide a vegetated, natural area where floodwaters can be slowed, stored and gradually released. Vegetation increases surface roughness of the floodplain and slows the velocity of overland flow while promoting shallow groundwater recharge, depressional surface storage, and vegetative uptake. The reduced velocity and volume of water translates into reduced flood peaks and improved base flows resulting from the slow release of water stored in floodplain soils. The reduced velocity and volume of water can also be linked directly to reduced risk and property damage. Erosion Control – Channel erosion occurs as a result of fast moving and turbulent water coming
Recommended publications
  • Stream Restoration, a Natural Channel Design
    Stream Restoration Prep8AICI by the North Carolina Stream Restonltlon Institute and North Carolina Sea Grant INC STATE UNIVERSITY I North Carolina State University and North Carolina A&T State University commit themselves to positive action to secure equal opportunity regardless of race, color, creed, national origin, religion, sex, age or disability. In addition, the two Universities welcome all persons without regard to sexual orientation. Contents Introduction to Fluvial Processes 1 Stream Assessment and Survey Procedures 2 Rosgen Stream-Classification Systems/ Channel Assessment and Validation Procedures 3 Bankfull Verification and Gage Station Analyses 4 Priority Options for Restoring Incised Streams 5 Reference Reach Survey 6 Design Procedures 7 Structures 8 Vegetation Stabilization and Riparian-Buffer Re-establishment 9 Erosion and Sediment-Control Plan 10 Flood Studies 11 Restoration Evaluation and Monitoring 12 References and Resources 13 Appendices Preface Streams and rivers serve many purposes, including water supply, The authors would like to thank the following people for reviewing wildlife habitat, energy generation, transportation and recreation. the document: A stream is a dynamic, complex system that includes not only Micky Clemmons the active channel but also the floodplain and the vegetation Rockie English, Ph.D. along its edges. A natural stream system remains stable while Chris Estes transporting a wide range of flows and sediment produced in its Angela Jessup, P.E. watershed, maintaining a state of "dynamic equilibrium." When Joseph Mickey changes to the channel, floodplain, vegetation, flow or sediment David Penrose supply significantly affect this equilibrium, the stream may Todd St. John become unstable and start adjusting toward a new equilibrium state.
    [Show full text]
  • Economic Outcomes of Urban Floodplain Restoration
    ECONOMIC OUTCOMES OF URBAN FLOODPLAIN RESTORATION IMPLICATIONS FOR PUGET SOUND JUNE 2020 PREPARED BY BRANDON PARSONS American Rivers LAURA MARSHALL ECONorthwest MARK BUCKLEY ECONorthwest Lower Snoqualmie Valley near Duvall,WA, JONATHON LOOS December 9, 2015 fl ood Dartmouth College Source: King County, WA A Acknowledgments For over 40 years ECONorthwest has helped its clients make sound decisions based on rigorous economic, planning, and fi nancial analysis. For more information about ECONorthwest: www.econw.com. ECONorthwest prepared this report for American Rivers. We received substantial assistance and contributions to the report from Brandon Parsons, PLA with American Rivers, Jonathon Loos (Ph.D. Candidate, Dartmouth College), as well as Spencer Easton and Susan O’Neil with Environmental Science Associates. Other fi rms, agencies, and staff contributed to other research that this report relied on. Signifi cant input and review was provided by the steering committee members, who include: • Doug Osterman, WRIA 9 Salmon Recovery Manager • Jason Mulvihill-Kuntz, WRIA 8 Salmon Recovery • Suzanna Smith, WRIA 9 Habitat Projects Coordinator Manager • Matt Goehring, WRIA 9 Planning and Technical • Weston Brinkley, Principal, Street Sounds Ecology Coordinator • Tracy Stanton, Executive Director, The Emerald Alliance We specifi cally want to acknowledge the former Chair of the WRIA 9 Management Committee and Tukwila City Council Member - Dennis Robertson for his years of service. Dennis has devoted himself to restoring the Green-Duwamish River to benefi t the salmon and people that rely on it. Dennis is a strong proponent of healthy rivers that support healthy communities and tirelessly works to improve the environment for future generations which helped inspire this project.
    [Show full text]
  • Johnson Creek Restoration Project Effectiveness Monitoring
    Bureau of Environmental Services • City of Portland Johnson Creek Restoration Projects Effectiveness Monitoring Reporting on data collected from 1997 through 2010 DECEMBER 2012 Dan Saltzman, Commissioner Dean Marriott, Director Dan Saltzman, Commissioner • Dean Marriott, Director Acknowledgements Implementation of the effectiveness monitoring program for restoration projects in the Johnson Creek Watershed has drawn on the expertise, support, and dedication of a number of individuals. We thank them for making this report possible. City of Portland, Environmental Services Staff Jennifer Antak, Johnson Creek Effectiveness Monitoring Program Lead Sean Bistoff Trevor Diemer Mathew Dorfman Steven Kass Theophilus Malone Chris Prescott Gregory Savage Wendy Sletten Maggie Skenderian Ali Young Supporting Organizations and Consultants Oregon Watershed Enhancement Board Salmon River Engineering ‐ Janet Corsale, PE CPESC Portland State University ‐ Denisse Fisher Contents Introduction .........................................................................................................................1 Johnson Creek Overview ...................................................................................................1 Project Effectiveness Monitoring Program....................................................................12 Overview ........................................................................................................................12 Monitoring Methods.....................................................................................................13
    [Show full text]
  • Fluvial Geomorphic Assessment of the South River Watershed, MA
    Fluvial Geomorphic Assessment of the South River Watershed, MA Prepared for Franklin Regional Council of Governments Greenfield, MA South River Prepared by John Field Field Geology Services Farmington, ME February 2013 South River geomorphic assessment - February 2013 Page 2 of 108 Table of Contents EXECUTIVE SUMMARY ................................................................................................ 6 1.0 INTRODUCTION ........................................................................................................ 8 2.0 FLUVIAL GEOMORPHIC ASSESSMENT ............................................................... 8 2.1 Reach and segment delineation ................................................................................. 9 2.2 Review of existing studies ...................................................................................... 10 2.3 Watershed characterization ..................................................................................... 11 2.4 Historical aerial photographs and topographic maps .............................................. 12 2.5 Mapping of channel features ................................................................................... 13 2.5a Mill dams and impoundment sediments ............................................................ 14 2.5b Bar deposition ................................................................................................... 15 2.5c Bank erosion, mass wasting, and bank armoring ............................................. 15 2.5c Wood
    [Show full text]
  • A Geomorphic Monitoring and Adaptive Assessment Framework to Assess the Effect of Lowland Floodplain River Restoration on Channel–Floodplain Sediment Continuity
    RIVER RESEARCH AND APPLICATIONS River Res. Applic. (in press) Published online in Wiley InterScience (www.interscience.wiley.com). DOI: 10.1002/rra.911 A GEOMORPHIC MONITORING AND ADAPTIVE ASSESSMENT FRAMEWORK TO ASSESS THE EFFECT OF LOWLAND FLOODPLAIN RIVER RESTORATION ON CHANNEL–FLOODPLAIN SEDIMENT CONTINUITY J. L. FLORSHEIM,a* J. F. MOUNTa and C. R. CONSTANTINEb a Geology Department and Center for Integrated Watershed Science and Management, University of California, One Shields Avenue, Davis, CA 95616, USA b Now at Department of Geological Sciences, University of California, Santa Barbara, CA 93106, USA ABSTRACT The state of the science of lowland river floodplain restoration reflects the relatively new and experimental nature of large river floodplain rehabilitation efforts. Based on results of a case study of floodplain restoration at the lowland Cosumnes River, California, we present a geomorphic monitoring and adaptive assessment framework that addresses the need to inform and utilize scientific knowledge in lowland floodplain river restoration activities. Highlighting hydrogeomorphic processes that lead to habitat creation, we identify a discharge threshold for connectivity and sediment transfer from the channel to the floodplain and integrate discharge magnitude and duration to quantify a threshold to aid determination of when geomorphic monitoring is warranted. Using floodplain sand deposition volume in splay complexes as one indicator of dynamic floodplain habitat, we develop a model to aid prediction of the sand deposition volume as an assessment tool to use to analyze future monitoring data. Because geomorphic processes that form the physical structure of a habitat are dynamic, and because the most successful restoration projects accommodate this fundamental characteristic of ecosystems, monitoring designs must both identify trends and be adapted iteratively so that relevant features continue to be measured.
    [Show full text]
  • Restoration Opportunities at Tributary Confluences: Critical Habitat Assessment of the Big Chico Creek/Mud Creek/Sacramento River Confluence Area
    Restoration Opportunities at Tributary Confluences: Critical Habitat Assessment of the Big Chico Creek/Mud Creek/Sacramento River Confluence Area A report to: The Nature Conservancy, Sacramento River Project1 By: Eric M. Ginney2 Bidwell Environmental Institute, California State University, Chico December 2001. 1Please direct correspondence to: TNC, Sac. River Project Attn: D. Peterson 505 Main Street, Chico CA 95928 [email protected] 2Bidwell Environmental Institute CSU, Chico, Chico, CA 95929-0555 [email protected] Cover: An abstract view of the Sacramento River, looking upstream. Big Chico Creek enters from the east, in the lower portion of the image. Photograph and image manipulation by the author. Table of Contents Section I Study Purpose, Methods, and Objectives 1 Purpose 1 Methods and Objectives 2 Section II Tributary Confluences: Restoration 3 Opportunities Waiting to Happen Ecological Importance of Tributary Confluences and 3 Adjacent Floodplain Importance of Sacramento River Confluence Areas in 5 Collaborative Restoration Efforts Conservation by Design 7 Site-Specific Planning 8 Section III Critical Habitat Identification and Analysis 10 of Physical Processes Location and Description of Study Area 10 Landscape Level 10 Historic Conditions of Study Area and Changes 10 Through Time Current Conditions and Identification of Critical Habitat 16 Hydrologic Data 16 Soils 17 Hydro-geomorphic Processes 17 Site-Level Description: Singh Orchard Parcel 18 On-The-Ground Observations: Singh Parcel 19 Critical Habitat for Species of Concern
    [Show full text]
  • Wallooskee-Youngs Confluence Restoration Project
    B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Wallooskee-Youngs Confluence Restoration Project Draft Environmental Assessment December 2014 DOE/EA-1974 This page left intentionally blank � Contents Contents .............................................................................................................................................................. i � Tables v � Figures ............................................................................................................................................................... vi � Appendices ....................................................................................................................................................... vi � Chapter 1 ......................................................................................................................................................... 1-1 � Purpose of and Need for Action ............................................................................................................. 1-1 � 1.1 Need for Action .................................................................................................................................. 1-3 ­ 1.2 Purposes ............................................................................................................................................... 1-3 ­ 1.3 Background ......................................................................................................................................... 1-4 ­ 1.3.1 Statutory Context .............................................................................................................
    [Show full text]
  • Floodplain Restoration
    Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs Evolution of floodplain restoration design approach Floodplain restoration planning for the Upper Clark Fork River—example of design criteria Riparian and floodplain restoration – Creating conditions that will sustain natural processes and support floodplain functions The following floodplains attributes reflect how we think about natural processes and floodplain functions to support designing floodplain restoration projects Disturbance regime Hydrologic connectivity Nutrient transport and storage Substrate Topographic diversity Biological interactions Light regime Frequent, low-intensity disturbances such as livestock grazing, haying, and weed control prevent plant communities from progressing to later successional stages Initially, we were designing restoration treatments to address the existing static condition based on a modified disturbance regime Our response was to address the local symptoms of this modified disturbance regime: restore organic matter, limit weed competition and facilitate establishing native woody riparian vegetation in the floodplain no modification of topography or substrate Experimental treatments addressed soil moisture, temperature, and competition from other plants Total Survival by Species for Each Treatment (N=794) 100% 80% 60% BP CM 40% CO MO 20% 0% BP = Black plastic, woven polyethylene
    [Show full text]
  • Driving Forces in a Floodplain Restoration Project: Interaction Between Surface Water, Groundwater and Morphodynamic Processes During an Ecological Flooding
    146 Erosion and Sediment Yields in the Changing Environment (Proceedings of a symposium held at the Institute of Mountain Hazards and Environment, CAS-Chengdu, China, 11–15 October 2012) (IAHS Publ. 356, 2012). Driving forces in a floodplain restoration project: interaction between surface water, groundwater and morphodynamic processes during an ecological flooding PETER FISCHER1, FLORIAN HAAS1,2 & BERND CYFFKA1,2 1 Catholic University of Eichstaett-Ingolstadt, Applied Physical Geography; 85072 Eichstaett, Germany [email protected] 2 Floodplain Institute Neuburg, Germany Abstract Erosion, transport and deposition of sediment play a major role in restoration projects and sustainable river management. The main driving variables, water and sediment dynamics resurrect the natural processes in “riverscapes” and floodplains. After the first flooding of a new river course in the flood- plain along the River Danube between Neuburg and Ingolstadt (Germany) in 2010 (up to 5 m3/sec), new morphological activity started instantly. However, intensive erosion rates were measured during the first two controlled ecological flood events with water discharges of 10 m3 s-1 and 20 m3 s-1. The relatively new river banks are prone to lateral erosion and during bankfull stages new undercut slopes have developed. To understand the processes in this new river channel, its development is being recorded by a package of methods such as terrestrial laser scanning (TLS) measurements. Key words river restoration; floodplain; ground-based LiDAR; hydromorphology; monitoring INTRODUCTION Varying water levels and changing discharges with different flow conditions and directions are characteristic of floodplains. All these hydrological conditions directly influence the morphological processes in rivers, but also they have an effect on the riverine landscapes and their biocenoses.
    [Show full text]
  • Birch Creek Floodplain Restoration Project (Draft
    Birch Creek Floodplain Restoration Project Draft Environmental Assessment August 2020 DOE/EA-2135 This page left blank intentionally Birch Creek Floodplain Restoration Project Draft Environmental Assessment TABLE OF CONTENTS Acronyms vi Chapter 1 Introduction 1-1 Background ................................................................................................................. 1-1 Purpose and Need ....................................................................................................... 1-3 Public Scoping and Key Issues ................................................................................... 1-3 Chapter 2 Alternatives 2-1 Proposed Action .......................................................................................................... 2-1 2.1.1 Main-Channel Realignment and Restoration ............................................................. 2-1 2.1.2 Improve Secondary Channel and Floodplain Interactions ......................................... 2-2 2.1.2.1 Install Habitat-Forming In-Stream Large-Wood Structures ...................................... 2-2 2.1.3 Wetland Creation ........................................................................................................ 2-3 2.1.4 Riparian and Upland Vegetation Planting ................................................................. 2-3 2.1.5 Temporary Staging Areas, Access Roads, and Water Crossings ................................ 2-4 2.1.6 New Groundwater Well and Removal of Existing Infrastructure ..............................
    [Show full text]
  • FINAL Consensus Recommendations to Improve Protocols 2 and 3 For
    FINAL Approved by WQGIT: October 26, 2020 Consensus Recommendations to Improve Protocols 2 and 3 for Defining Stream Restoration Pollutant Removal Credits Photo Courtesy: Joe Berg Drew Altland, Chris Becraft, Joe Berg, Ted Brown, Josh Burch, Denise Clearwater, Jason Coleman, Sean Crawford, Barbara Doll, Jens Geratz, Jeremy Hanson, Jeff Hartranft, John Hottenstein, Sujay Kaushal, Scott Lowe, Paul Mayer, Greg Noe, Ward Oberholzer, Art Parola, Durelle Scott, Bill Stack, Joe Sweeney, and Jeff White October 27, 2020 Prepared by: David Wood and Tom Schueler, Chesapeake Stormwater Network Recommendations to Improve the Floodplain Restoration Protocols in the Chesapeake Bay Watershed Executive Summary Two groups of more than 25 stream experts have worked over the last year on how to better apply protocols 2 and 3 to integrated stream and floodplain restoration projects (FR) (Section 1). Floodplain restoration can be achieved using two basic techniques to reconnect incised streams to their floodplains. The first approach, termed legacy sediment removal (FR- LSR), removes sediments to lower the floodplain surfaces, increasing out-of-bank flow and re-establishing the hyporheic exchange zone by reconnecting the floodplain with the hyporheic aquifer. The second approach, known as raising the stream bed (RSB), involves several techniques to raise the elevation of an incised stream channel and shallow groundwater, thereby increasing the volume of runoff diverted into the floodplain for treatment. These two approaches are often used in combination. The group came to consensus on the key terms, definitions and qualifying conditions for both floodplain restoration design approaches (Section 3). The groups reviewed the considerable research conducted over the last decade on the sediment and nutrient dynamics associated with FR projects (Section 4) and concluded that: Denitrification can be enhanced when the hyporheic exchange zone is expanded, floodplains are connected to hyporheic aquifers and runoff, and roots and other organic matter provide a carbon source.
    [Show full text]
  • Quantifying Flooding Regime in Floodplain Forests to Guide River
    Quantifying f looding regime in f loodplain forests to guide river restoration Christian O. Marks1* • Keith H. Nislow2 • Francis J. Magilligan3 1Connecticut River Program, The Nature Conservancy, Northampton, Massachusetts, United States 2USDA Forest Service Northern Research Station, Amherst, Massachusetts, United States 3Department of Geography, Dartmouth College, Hanover, New Hampshire, United States *[email protected] Domain Editor-in-Chief Abstract Donald R. Zak, University of Michigan Determining the flooding regime needed to support distinctive floodplain forests is essential for effective river conservation under the ubiquitous human alteration of river flows characteristic of the Anthropocene Associate Editor Era. At over 100 sites throughout the Connecticut River basin, the largest river system in New England, we Peter M. Groffman, Cary characterized species composition, valley and channel morphology, and hydrologic regime to define conditions Institute of Ecosystem Studies, promoting distinct floodplain forest assemblages. Species assemblages were dominated by floodplain-associated New York trees on surfaces experiencing flood durations between 4.5 and 91 days/year, which were generally well be- Knowledge Domain low the stage of the two-year recurrence interval flood, a widely-used benchmark for floodplain restoration. Ecology These tree species rarely occurred on surfaces that flooded less than 1 day/year. By contrast abundance of most woody invasive species decreased with flooding. Such flood-prone surfaces were jointly determined
    [Show full text]