Karnival Usahawan Buka Minat Rakyat Kepada Perniagaan

Total Page:16

File Type:pdf, Size:1020Kb

Karnival Usahawan Buka Minat Rakyat Kepada Perniagaan Skuad HOHO MPPP baru pilih cemerlang FAP P.Pinang MS 3 MS 5 MS 24 buletin Cekap Akauntabel Telus www.buletinmutiara.com http:www.facebook.com/buletinmutiara 1– 15 Disember 2014 http:www.facebook.com/cmlimguaneng Elaun tahunan guru agama naik 93 peratus Oleh: ZAINULFAQAR YAACOB keciciran guru-guru daripada Pusat Asuhan Tunas Islam (TADIS) daripada menerima BERTAM – Zakat Pulau Pinang (ZPP) bonus atau elaun tahunan TADIS berjumlah mengagihkan sejumlah RM4,204,872.60 RM200 seorang, sebagaimana diumumkan elaun tahunan kepada guru-buru Sekolah dalam Bajet 2015 Pulau Pinang baru-baru ini. Menengah Agama Rakyat (SMAR) dan "(Guru-guru) PASTI ini sepatutnya Tadika Islam (TADIS) yang berdaftar di didaftar di bawah qaryah macam guru-guru bawah Jabatan Agama Islam Pulau Pinang al-Quran untuk memudahkan kita salurkan (JAIPP). bantuan (elaun TADIS). Yang di-Pertua Majlis Agama Islam "Itu (elaun untuk PASTI) bukan kita tak Negeri Pulau Pinang (MAINPP), Dato' Mohd. beri, tetapi, belum beri lagi," jelasnya yang Salleh Man berkata, jumlah itu menyamai juga Ahli Dewan Undangan Negeri (ADUN) peningkatan hampir 93 peratus berbanding Permatang Pasir kepada wartawan. peruntukan tahun 2014 yang berjumlah Dalam pada itu, Ustaz Abdul Aziz Haji RM2,172,488. Yusoff, 60, Mudir Madrasah Al-Irsyadiah "Maknanya, Zakat Pulau Pinang tak dekat Sungai Bakap, Seberang Perai Selatan pernah lepas pandang," ujarnya pada Majlis (SPS) yang ditemui kemudian menganggap Penyerahan Pakaian Seragam Sekolah Sesi insentif MAINPP melalui ZPP menaikkan 2015 Daripada Sumber Zakat Peringkat gaji guru-guru agama sebagai menghargai Daerah Seberang Perai Utara (SPU) di Dewan sumbangan sekolah aliran agama di negeri Millenium di sini baru-baru ini. ini. Pengurus Besar ZPP, Dr. Azman Abdul "Alhamdulillah, tentulah ini berita Somat turut berucap pada majlis tersebut. gembira untuk kami yang berjuang dalam Hadir sama, Timbalan Yang di-Pertua aliran sekolah agama kerana gaji pokok MAINPP, Dato' Abdul Halim Hussain dan lama sebagai pengetua dalam RM700 sahaja, Ustaz Rosli Othman (Pegawai JAIPP) serta tetapi, naik kepada RM1,600," ujar beliau MOHD. Salleh Man (dua dari kiri) berinteraksi dengan pelajar terpilih dalam Majlis Ahli Lembaga ZPP lain. sambil memberitahu bahawa infrastruktur Penyerahan Pakaian Seragam Sekolah Sesi 2015 Daripada Sumber Zakat Peringkat Difahamkan, seramai 7,458 pelajar terpilih kebanyakan sekolah agama di negeri ini Daerah SPU di sini baru-baru ini. daripada 150 sekolah di sekitar negeri ini memerlukan penaiktarafan berwajib. menerima bantuan pakaian serta kelengkapan Seorang lagi penerima, Ustaz "Alhamdulillah dengan bantuan persekolahan bagi sesi tahun 2015 secara Abdullah Ishak, 67, Mudir Sekolah tambahan berupa (elaun) daripada berperingkat sekarang, disebabkan jumlah Menengah Agama 'Ibroh Tanjong Kerajaan Negeri dan ZPP hari ini, kutipan zakat ZPP kian meningkat saban Putus, dekat Permatang Pauh, Seberang Alhamdulillah kita berjaya meningkatkan tahun. Perai Tengah (SPT). pendapatan guru-guru sekolah agama di Menurut Mohd. Salleh, kali terakhir ZPP "Sebelum ini, hanya lima orang Pulau Pinang. membuat semakan elaun tahunan untuk sahaja mendapat elaun daripada majlis "Kita nak Yayasan Ummah ini boleh guru agama di negeri ini adalah pada tahun agama, tetapi sekarang ini 13 orang berperanan seperti YIK (Yayasan Islam 2001, sebelum memutuskan kenaikan elaun mendapat elaun. Kelantan) yang menjaga hal kebajikan tahunan ini. "Kenaikan ini sangat membantu guru-guru, pencen dan sebagainya Tidak cukup dengan itu, katanya lagi, ZPP perjalanan sekolah agama rakyat kerana dengan sekolah Kerajaan Negeri," ujar turut membayar caruman tahunan sebanyak sebelum ini, pihak pentadbiran sekolah Hazamuddin yang juga Setiausaha RM304,834.20 kepada 1,643 guru agama sendiri terpaksa mencari sumber dana Agung Yayasan Ummah. daripada SMAR, Sekolah Agama Bantuan tambahan selain gigih mendidik anak- HAZAMUDDIN Alang Yayasan Ummah, tambah beliau, kini Kerajaan (SABK), TADIS, Guru Kelas Al- anak di sekolah," katanya. ABDUL Aziz Yusoff. Hamzah. disertai guru-guru daripada lima sekolah Quran dan Fardhu Ain (KAFA) dan Maahad Haji Hazamuddin Alang Hamzah, membantu perkembangan Yayasan Ummah agama, iaitu Madrasah Al-Irsyadiah, Tahfiz berdaftar. 65, Mudir Madrasah Al-Aminiah pula yang ditubuhkan untuk menjaga hal Madrasah Al-Aminiah, Sekolah Rendah Ad- Dalam perkembangan berkaitan, Mohd. memberitahu, pihaknya berharap Kerajaan kebajikan guru-guru sekolah agama berwajib Diniah, Sekolah Menengah Al-Diniah dan Salleh turut memberi penjelasan mengenai isu Negeri melalui MAINPP turut dapat seperti dana pencen dan gaji bulanan mereka. Madrasah Othmaniah. 2 1 – 15 Disember, 2014 KM seru rakyat tidak lupa pengorbanan KALUNGAN-kalungan bunga diletakkan di Tugu Peringatan perwira negara (The Cenotaph), Esplanade di sini. Oleh : WATAWA NATAF ZULKIFLI Gambar: ALISSALA THIAN PADANG KOTA – Sempena Hari Peringatan (Remembrance Day) yang disambut di seluruh dunia pada 11 November setiap tahun, Ketua Menteri, Y.A.B. Tuan Lim Guan Eng mengingatkan supaya masyarakat tidak lupa akan pengorbanan perwira-perwira yang berjuang dalam beberapa siri peperangan Keselamatan (PVA) Pulau Pinang Rhodesia dan Nyasaland dan di negara ini khususnya di Pulau tersebut dihadiri Ketua Menteri, Thailand. Pinang demi mencapai keamanan PARA jemputan yang hadir memberi penghormatan. Y.A.B. Tuan Lim Guan Eng dan Dalam pada itu, Presiden PVA dikecapi hari ini. barisan pimpinan Kerajaan Negeri. Pulau Pinang, Mejar (B) R. Sivarajan Katanya, 'peperangan' kini sambutan ke-100 tahun bermulanya Antaranya, peristiwa Perang Turut serta, pegawai-pegawai dan berkata, masyarakat hari ini perlu bukan lagi berbentuk pembunuhan Perang Dunia Pertama (1914-1918) Dunia I (1914-1918), Perang anggota-anggota pasukan Angkatan menolak apa-apa anasir yang cuba sesama manusia, sebaliknya, 'perang' di Tugu Peringatan (The Cenotaph), Dunia II (1939-1945), Peristiwa Tentera Malaysia (ATM), Tentera merosak dan memecahbelahkan terhadap kejahilan, ketidakadilan, Esplanade di sini baru-baru ini. Landasan Maut Nong Pladuk Siam Laut di-Raja Malaysia (TLDM) masyarakat. kemiskinan, extrimis, wabak Setiap tahun pada 11 November –Thanbyuzayat Burma (1942-1945), dan Tentera Udara di-Raja Malaysia “Konflik dan peperangan yang penyakit, perkauman dan rasuah. merupakan hari memperingati Darurat Tanah Melayu (1948-1960), (TUDM). pernah berlaku sentiasa dikenang dan “Justeru, bersama-samalah kita wira-wira perang dan mereka yang Konfrontasi Indonesia (1962-1965) Hadir sama, pelbagai rejimen diingati, tidak lupa juga pengorbanan 'berperang' menangani permasalahan meninggal dunia dalam peperangan dan Peristiwa Pemberontakan termasuk dari Great Britain, perwira-perwira kita dahulu dalam dunia moden ini,'' katanya pada majlis demi menjaga maruah, daulat dan Komunis (1972-1990). Australia, New Zealand, Singapura, memperjuangkan tanah air untuk berkenaan yang juga merupakan kebebasan bangsa serta negara. Majlis anjuran Persatuan Veteran Kepulauan Fiji, Nepal, Kesatuan kita hari ini,” ujar beliau. Rumah Terbuka Deepavali wujud Kreativiti penjaja perlu suasana harmoni di TMM 2015 – TKM I ZAINULFAQAR YAACOB Gambar : G. REVATIC Oleh: BUTTERWORTH PADANG KOTA – Kreativiti dan inovasi dalam – Sambutan Majlis aktiviti penjajaan di negeri ini, sekaligus mampu Rumah Terbuka mewujudkan jenama perniagaan tersendiri sempena kempen Tahun Melawat Malaysia (TMM) 2015 Deepavali Peringkat ANTARA penjaja dengan pelbagai jualan makanan Kerajaan Negeri yang turut giat dipopularkan Kerajaan Negeri.. Timbalan Ketua Menteri I, Dato' Mohd. Rashid yang mengambil bahagian pada Majlis Sambutan Hari Pulau Pinang yang Penjaja dan Komuniti Peniaga 2014 anjuran MPPP di Hasnon berkata demikian pada Majlis Sambutan diadakan setiap tahun sini baru-baru ini. Hari Penjaja dan Komuniti Peniaga 2014 anjuran secara tidak langsung Majlis Perbandaran Pulau Pinang (MPPP) di sini kerana dikatakan merupakan satu-satunya mewujudkan suasana baru-baru ini. pihak berkuasa tempatan (PBT) yang masih serasi dan harmoni "Dalam usaha memastikan negeri Pulau Pinang menganjurkan Hari Penjaja saban tahun. dalam kalangan telah memimpin dalam semua aspek, kita (Kerajaan "Penganjuran sambutan kali ini tidak lagi di masyarakat pelbagai Negeri) memerlukan peniaga-peniaga yang kreatif hotel, tetapi secara terbuka di sini (Padang Kota kaum di negeri ini. dan inovatif dalam mencari satu mekanisme baru Lama) menjadi suatu kelainan yang sebenarnya Ketua Menteri, supaya ia menjadi trademark penjaja di negeri sesuai dengan realiti kaum penjaja berniaga secara Y.A.B. Tuan Lim ini," katanya mewakili Ketua Menteri Y.A.B. Tuan terbuka di gerai-gerai disediakan MPPP di negeri Guan Eng berkata, Lim Guan Eng semasa menyampaikan ucapan ini. perayaan Deepavali KETIBAAN Dr. Abdul Rahman Abbas (tengah) disambut Ketua perasmian majlis berkenaan. "Syabas kepada MPPP kerana terus secara simboliknya Menteri dan barisan kepimpinan Kerajaan Negeri. Exco Kerajaan Tempatan, Pengurusan komited menghargai sumbangan penjaja untuk menandakan dicapai semua,” ucapnya pada Majlis Lalulintas dan Tebatan Banjir, Chow Kon Yeow pembangunan ekonomi Pulau Pinang," tambahnya permulaan baru dalam semua aspek Rumah Terbuka Deepavali Peringkat dan Dato' Patahiyah Ismail (Yang di-Pertua MPPP) yang juga Ahli Dewan Undangan Negeri (ADUN) kehidupan. Negeri Pulau Pinang 2014 di sini baru- turut berucap pada majlis yang disertai hampir Padang Kota. “Inilah masanya kita bermaaf- baru ini. 1,000 tetamu itu. Dalam pada itu, Patahiyah dalam ucapannya maafan sesama saudara-mara dan Majlis tersebut
Recommended publications
  • Penang Page 1 Area Location State Outskirt ODA 10990 Penang Yes
    Penang Post Major code Area Location State Town Outskirt ODA Delivery Day Delivery Delivery Day - 1 to 2 Day - 1 to 7 - 3 to 4 working working working days days days 10990 Pulau Pinang - Beg berkunci Pulau Pinang Penang Yes 11000 Focus Heights Balik Pulau Penang Yes 11000 Jalan Pinang Nirai Balik Pulau Penang Yes 11000 Kampung Kuala Muda Balik Pulau Penang Yes 11000 Kebun Besar Balik Pulau Penang Yes 11000 Kuala Muda Balik Pulau Penang Yes 11000 Padang Kemunting Mk. E Balik Pulau Penang Yes 11000 Padang Kemunting Balik Pulau Penang Yes 10000 Bangunan Komtar Pulau Pinang Penang Yes 10000 Jalan Gladstone Pulau Pinang Penang Yes 10000 Jalan Magazine (No Genap) Pulau Pinang Penang Yes 10000 Kompleks Tun Abdul Razak Pulau Pinang Penang Yes 10000 Lebuh Tek Soon Pulau Pinang Penang Yes 10000 Prangin Mall Pulau Pinang Penang Yes 10050 Jalan Argyll Pulau Pinang Penang Yes 10050 Jalan Ariffin Pulau Pinang Penang Yes 10050 Jalan Arratoon Pulau Pinang Penang Yes 10050 Jalan Bawasah Pulau Pinang Penang Yes 10050 Jalan Burma (1 - 237 & 2 - 184) Pulau Pinang Penang Yes 10050 Jalan Chow Thye Pulau Pinang Penang Yes 10050 Jalan Clove Hall Pulau Pinang Penang Yes 10050 Jalan Dato Koyah Pulau Pinang Penang Yes 10050 Jalan Dinding Pulau Pinang Penang Yes 10050 Jalan Gudwara Pulau Pinang Penang Yes 10050 Jalan Hutton Pulau Pinang Penang Yes 10050 Jalan Irawadi Pulau Pinang Penang Yes 10050 Jalan Khoo Sian Ewe Pulau Pinang Penang Yes 10050 Jalan Larut Pulau Pinang Penang Yes 10050 Jalan Nagore Pulau Pinang Penang Yes 10050 Jalan Pangkor Pulau Pinang Penang
    [Show full text]
  • ZON BATU MAUNG Nama Syarikat ERA BUMIWAY SDN. BHD
    KUTIPAN SAMPAH PUKAL DAN KEBUN ZON BATU MAUNG Nama Syarikat ERA BUMIWAY SDN. BHD. G10 SAMPAH KEBUN SAMPAH PUKAL TRIP NAMA JALAN NAMA TAMAN NAMA KAMPUNG HARI WAKTU HARI WAKTU LENGKOK BATU MAUNG 3 KAWASAN PERUMAHAN TAMAN IPING LORONG TELUK TEMPOYAK 1-3 LORONG BATU NILAM 1-6 PERUMAHAN BATU NILAM JALAN BIDARA 1-5 PERUMAHAN JALAN BIDARA JALAN JELITI 1 PERUMAHAN JALAN JELITI LORONG JELITI 2 LORONG JELITI 1 135 7:00-10:00 PAGI 246 7:00-10:00 PAGI 1 JALAN JELITI JALAN KEKABU LORONG KEKABU SOLOK KEKABU SEK KEB PERMATANG DAMAR LAUT JLN KEKABU 1-8 PERUMAHAN JALAN KEKABU LORONG KEKABU 1-2 PERMATANG DAMAR LAUT ZON 8 KG CINA PERMATANG DAMAR LAUT PERMATANG DAMAR LAUT ZON 6 KG PERMATANG DAMAR LAUT LINTANG DAMAR LAUT KG DAMAR LAUT 135 10:00-12:00 T/HARI 246 10:00-12:00 T/HARI 2 LINTANG DAMAR LAUT 1-7 PERUMAHAN JALAN DAMAR MEDAN BATU MAUNG 1-8 TAMAN BATU MAUNG KG NARAN TAMAN IPING KG NARAN Astaka Seagate Restorent Telok Tempoyak Perkampungan Telok Tempoyak KG TELUK TEMPOYAK Kepok Teluk Tempoyak Sek Keb Batu Maung Rumah Kedai 2 Tingkat, Lebuh raya Batu Maung Block 71, Desa Mutiara Indah Block 73, Desa Mutiara Indah 3 135 12:00-2:00 PETANG 246 12:00-2:00 PETANG Lengkok Batu Maung 1 Flat Muhibbah, Lengkok Batu Maung 1 Flat Taman Indah,Fasa 4 3 Flat Taman Indah,Fasa 7 135 12:00-2:00 PETANG 246 12:00-2:00 PETANG Block 34/36 Taman Mewah Block 54/57 Taman Mewah Main Road Batu Maung SJKK Weng Kai Astaka dan Pasar Batu Maung Mukim 12 Jln Batu Maung Astaka Lintang Bayan Lepas 2 Lintang Beringin 1-11 Hala beringin Jln Beringin Lintang Beingin 6 Rumah Kedai 2 Tingkat
    [Show full text]
  • Chapter 4: Environment
    Penang Economic and Development Report 153 2019/2020 4. Environment Environmental quality is considered to be a public levels of up to 50 are considered good, between 51 good. It affects the public and the community in and 100 moderate, 101 and 200 unhealthy, 201 and terms of economic, social welfare, and quality of 300 very unhealthy, and 300 and above hazardous. life. Ecological sustainability is a key factor for An API system includes the major air pollutants sustainable economic and social development. which may cause potential harm to human health if The most pressing environmental issues in Penang they reach unsafe levels. The air pollutants included are air and water pollution, flash floods, waste in Malaysia’s API are ozone (O3), carbon monoxide management, and landslides. Short-term action is (CO), nitrogen dioxide (NO2), sulphur dioxide (SO2), needed while maintaining a long-term perspective. suspended particulate matter of less than 10 microns in size (PM10) and suspended particulate matter of less than 2.5 microns in size (PM2.5) (Department of 4.1 Pollution Environment Malaysia, 2018). Different types of environmental pollution have The air quality of Penang is monitored at four been reported in Penang, the major ones being open stations, Seberang Jaya, Seberang Perai, Balik burning, air pollution, and water pollution. These Pulau, and Minden. In 2019, the overall air quality in pose serious risks to the environment, public health, Penang worsened as the number of days with good and even the economy. API levels decreased and the number of unhealthy days increased compared with 2018 (Table 4.1).
    [Show full text]
  • Press Statement @ Yb Dato Sri Dr Hj Wan Junaidi Tuanku
    PRESS STATEMENT YB DATO SRI DR. HJ WAN JUNAIDI TUANKU JAAFAR MINISTER ENTREPRENEUR DEVELOPMENT AND COOPERATIVES (MEDAC) ON THE PENANG SOUTH RECLAMATION PROJECT ___________________________________________________________________ Putrajaya, 3 Jun 2021 - The Penang South Reclamation Project (Projek Tambakan Laut Selatan Pulau Pinang) -PSR which will take up the size of almost 17 sq km, involves the development of three artificial islands with a land mass of 1,700 hectares in the waters of Permatang Damar Laut near Bayan Lepas in Penang. This proposed development under the Environmental Quality Act 1974 requires an Environmental Impact Assessment Report that needs to be approved by the Department of environment (DOE) which was previously under my charge as the Minister of Natural Resources and Environment (NRE). During this time in 2017 when the matter was brought forth to my attention, I was totally against the project development and even though now the report has been approved on 25 June 2019 by the Department I am still in disagreement with the approval and I wholly support for the project to be cancelled. On this note I have made strong criticisms, substantiated with facts and data, that the project would have serious negative socio-economic and environmental impacts. First and foremost, the EIA report stated that there will be a permanent destruction to the site which will have a significant negative impact on fisheries resources, fishermen and the security of the country’s food supply by affecting the breeding ground for fish, prawns and crabs. The ecosystem of the coast to be reclaimed and the fisheries resources would be permanently destroyed, and the fishing community exposed to grave hardship.
    [Show full text]
  • Rapid Penang Sdn
    RAPID PENANG SDN BHD PANDUAN UMUM WAKTU OPERASI & KEKERAPAN BAS WAKTU OPERASI WAKTU OPERASI KEKERAPAN NO LALUAN ORIGIN END POINT MULA TAMAT (MIN) Weld Quay Teluk Bahang 5.30 AM 11.30 PM 1 101 7 Teluk Bahang Weld Quay 5.30 AM 10.30 PM Airport Teluk Bahang 6.00 AM 11.00 PM 2 102 45 Teluk Bahang Airport 6.00 AM 11.00 PM Weld Quay Tanjung Bungah via Jln Kelawai 6.00 AM 10.00 PM 3 103 30 Tanjung Bungah via Jln Kelawai Weld Quay 6.00 AM 10.50 PM Weld Quay Tanjung Bungah via Jln Gajah 5.40 AM 10.30 PM 4 104 30 Tanjung Bungah via Jln Gajah Weld Quay 5.40 AM 9.15 PM Weld Quay Pekan Air Itam - Tgk Paya Terubong 5.30 AM 11.30 PM 5 201 10 Pekan Air Itam - Tgk Paya Terubong Weld Quay 5.30 AM 10.30 PM Weld Quay Paya Terubong via Farlim 5.20 AM 11.30 PM 6 202 10 Paya Terubong via Farlim Weld Quay 5.20 AM 10.30 PM Weld Quay Pekan Air Itam via Farlim 5.30 AM 11.30 PM 7 203 10 Pekan Air Itam via Farlim Weld Quay 5.30 AM 10.30 PM Weld Quay Pekan Air Itam 5.40 AM 11.30 PM 8 204 20 Pekan Air Itam Weld Quay 5.40 AM 10.30 PM Jetty Tesco 6.00 AM 10.30 PM 9 206 30 Tesco Jetty 6.00 AM 10.30 PM 10 CAT Weld Quay Weld Quay 6.00 AM 11.40 PM 20 Weld Quay Botanical Garden 6.30 AM 10.40 PM 11 10 30 Botanical Garden Weld Quay 6.30 AM 10.30 PM Weld Quay Jln Tan Sri The Ewe Lim via Jln Perak 6.30 AM 10.30 PM 12 11 15 Jln Tan Sri The Ewe Lim via Jln Perak Weld Quay 6.30 AM 10.30 PM Weld Quay Relau 5.30 AM 11.30 PM 13 301 15 Relau Weld Quay 5.30 AM 10.30 PM Weld Quay Batu Maung via Jln Bukit Gambir 5.30 AM 11.30 PM 14 302 15-20mins Batu Maung via Jln Bukit Gambir Weld Quay 5.30 AM 10.30 PM Weld Quay Bukit Gedung 5.40 AM 11.30 PM 15 303 10-15mins Bukit Gedung Weld Quay 5.40 AM 10.30 PM Gurney Bukit Gedung 5.30 AM 10.30 PM 16 304 30 Bukit Gedung Gurney 5.30 AM 10.30 PM Terminal Bus Sg.
    [Show full text]
  • Dredging Impact Towards Marine Ecosystem and Fisheries Activity at Penang Coastal Area
    International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-8 Issue-1S, May 2019 Dredging Impact towards Marine Ecosystem and Fisheries Activity at Penang Coastal Area Fauziah Ab Rahman, Nor Amira Hassan, Azman Ismail, Bakhtiar Ariff Baharudin purpose. Abstract: The increase of land reclamation project in Penang A dredge machine working is required in the water or due to interest for advancement and frameworks of housing, floating on water. So when it is operated, the physical businesses, and commercials. However, from the dredging removal of materials including plants, sand, debris, rocks, activities and reclaimed land will affect the angler’s livelihood in term of their economy, activities, environment, and health. bottom sediments, and refuse from the bed of a water body to Therefore, this research was conducted to analyse fisher’s excavate, cleaning, deepening, widening, or lengthening the perspective about dredging problems. Besides, the researcher water body. Marine dredging activities can be for the most wants to identify from anglers perception on how far the dredging part described as one or the other colossal scale development activities will affect the ecosystem at surrounding area. Data were dredging for the formation of new ventures or developing taken by using questionnaire instrument that was distributed to waterways or periodic maintenance dredging that helps to five areas in Penang. The questionnaire was classified into various factors including the factor of development, economy, keep up current facilities and support existing hydrologic living organism and plant, production, authority, air, and water features. pollution. Data has been analysed by using IBM SPSS to know An increase of development projects involving the work of the strength relation under each part of the questionnaire in both land reclamation and dredging the seabed in some waters, variables.
    [Show full text]
  • Executive Summary
    EXECUTIVE SUMMARY 1.0 Introduction The Penang State Government (hereafter referred to as the “Project Proponent”) intends to undertake land reclamation activities to create three man -made islands at the south coast of Penang Island. SRS Consortium will be the Penang State Government’s “Project Delivery Partner” (PDP). Its role is to ensure smooth implementation of the entire project delivery success. The three man -made islands are intended to be developed as a part of the expansion of Bayan Lepas Free Industrial Zone (FIZ) and Penang International Airport; as well as mixed development comprising residential and commercial areas. The project for which this Environmental Impact Assessment (EIA) (Second Schedule) report is prepared is titled “The Proposed Reclamation and Dredging Works for the Penang South Reclamation (PSR), Penang” (hereafter referred to as “the Project”). 2.0 Legal Requirement As stipulated under the Environmental Quality Act 1974 (Amendment 2012) and the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 2015, any activity which may have significant environmental impact is categorised as “Prescribed Activity” with an Environmental Impact Assessment (EIA) as the prerequisite component for an approval. T.1 tabulates the multi -prescribed activities of the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 2015 pertaining to the proposed development. The proposed Project consists of multi -prescribed activities, but this EIA study shall only address land reclamation and dredging. 3.0 EIA Study Approach The EIA study involves the collection and analyses of primary and secondary data related to the Project site and its surroundings. The scope of work of this EIA study follows the requirements of relevant framework, policies, conditions and guidelines.
    [Show full text]
  • 05 Project Description
    PROJECT 05 DESCRIPTION This chapter covers the details of the proposed Project which includes the following: a) Project site description; b) Project concept; c) Project components; d) Project activities and phasing; e) Top -side development land use; and f) Project implementation schedule. 5.1 Introduction The proposed Project location stretches across the south coast of Penang Island along the coastline of Permatang Damar Laut to Gertak Sanggul from the east to the west. The site description of the Penang south coast is addressed according to the headlands namely Tanjung Teluk Tempoyak, Tanjung Chut, Tanjung Bongkok and Tanjung Gertak Sanggul (F5.1). F5.1 Headlands along the south coast of Penang Island 5-1 Proposed Reclamation & Dredging Works for the Penang South Reclamation (PSR) Environmental Impact Assessment (2nd Schedule) Study These headlands are rocky and stable - making it resistant to erosion which creates log - spiral bays in between the headlands. Log -spiral bays normally emerge along an active coast with strong longshore currents. The coastlines here consist of rocky and sandy beaches. The main features and land use are described in the following sub -sections. 5.1.1 Batu Maung to Tanjung Teluk Tempoyak The distance from Batu Maung to Tanjung Teluk Tempoyak along the coastline is about 3.6 km. Pulau Rimau is located approximately 830 m away from the tip of Tanjung Teluk Tempoyak. The coastal erosion category of the coastline from Batu Maung to Tanjung Teluk Tempoyak falls under Category 3 (“Acceptable”) based on the National Coastal Erosion Study (NCES) (DID, 2015) as shown in F5.2. Details of the erosion categorisation are tabulated in T5.1.
    [Show full text]
  • 6.3 Existing Biological Environment This Section Presents the Findings from Terrestrial and Marine Biology Study at the Project
    Volume 2: Main Report Chapter 6 | Existing Environment F6.49 Existing PM peak hour junction performance 6.3 Existing Biological Environment This section presents the findings from terrestrial and marine biology study at the Project site within the study area. 6.3.1 Terrestrial Biology The terrestrial biology study covers the flora and fauna components as explained in the next sections. 6.3.1.1 Coastal Flora The coastal flora surveys will involve identifying the plant species and mangrove current condition. The plant species identified are then listed. Pilot surveys have been done to familiarize with the sites and routes. Pictures of plants and sites are taken for reference. 6.3.1.1.1 Methodology The survey on coastal flora of South Penang was undertaken from 2 nd to 5 th February 2016. General surveys of the coastal vegetation had covered from the Batu Maung area in the east of Penang along the south Penang coastline up to Sungai Pulau Betung in the Balik Pulau area (F6.50). A total of eight (8) sampling stations were marked along the south Penang coastline plus three (3) more at Pulau Rimau and Pulau Kendi (T6.28). 6-74 Proposed Reclamation & Dredging Works for the Penang South Reclamation (PSR) Environmental Impact Assessment (2 nd Schedule) Study F6.50 Coastal flora survey locations Station Location Coordinates T6.28 ST1 Batu Maung 5° 17.739' N,100° 17.685' E Coordinates of the coastal flora survey ST2 Teluk Tempoyak 5° 15.929' N, 100° 16.867' E locations ST3 Permatang Damar Laut 5° 16.424' N, 100° 15.966' E ST4 Permatang Tepi Laut 5° 16.835' N, 100° 15.379' E ST5 Sungai Batu 5° 16.740' N, 100° 14.490' E ST6 Gertak Sanggul 5° 16.924' N, 100° 11.834' E ST7 End survey Gertak Sanggul 5° 16.886' N, 100° 11.391' E ST8 Sungai Pulau Betung 5° 18.392' N, 100° 11.700' E ST9 Pulau Kendi 5° 14.195' N, 100° 10.880' E ST10 Pulau Rimau 5° 14.767' N, 100° 16.402' E ST11 Pulau Rimau 5° 14.963' N, 100° 16.317' E For this study, three plots of 100 m x 20 m (10 subplots of 20 m x 10 m) and one plot of 30 m x 20 m (three subplots of 20 m x 10 m) are established.
    [Show full text]
  • (Kb) Spt Spu (Bw) Dbd
    SPU SPU SPT DTL DBD SPS (KB) (BW ) Tasek Gelugor Bagan Ajam Machang Bubok Bandaraya A Haji Musa Bin Hamsan Bayan Lepas Simpang Ampat Mohd Fadli Zolkefli Bin Said Anas Bin Ahmad Kampung Banggol, Haji Ahmad Fuad Hassan Bin Haji Ismail Machang Bubok, Taman Machang Bubok, Sungai Gelugor, At-Taqwa, Kampung Aman, Bin Ab. Hamid Bin Abdul Hamid Masjid Simpang Ampat, Bukit Teh, To' Kun Atas (Kampung Telok), Al-Malik Khalid USM, Kampung Permatang Kerai Bagan Dalam, Kongsi, Pondok Upeh, Padang Lalang, Kuala Tasek, Tasik Junjong Mk 16, Alma, Batu Uban, Besar Dan Kecil, Bagan Tuan Kecil, Simpang Empat, Genting, Tasek Cempedak, Kampung, Baru Alma, Taman Alma Jaya, Sungai Nibong Kecil, Pokok Machang, Lahar Tembun, Kubang Buaya, Telaga Air, Kampung Terang, Bukit Tambun, Taman Impian, Taman Selamat, Sungai Nibong Besar , Pokok Tampang, Tasek Gelugor, Bagan Jermal, Bagan Ajam, Teluk Kumbar, Batu Kawan, Taman Permata, Taman Perwira, Al-Soghir Taman Pekaka . Tok Bedu, Kubang Menerong, Mak Mandin. Permatang Damar Laut, Pulau Aman. Taman Sri Kijang, Kampong Selamat, Bayan Lepas. Kampung Baru, Pongsu Seribu, Simpang Empat (Tasik Junjong). Bertam Putra. Padang Menora Bandaraya B Sungai Acheh Kepala Batas Nuhairi Bin Hamdan Bukit Mertajam Norhisyam Bin Ibrahim Titi Teras Haji Ahmad Humaidi Jamal Bin Darus Merbau Kudung, Harudin Bin Mohd Mydin Jelutong, Sungai Pinang, Haji Benjamen@ Bin Haji Omar Nyior Sebatang, Padang Hashim Yahya, Jamiul Badawi, Kampung Padang, Sungai Rambai, Permatang Batu, Padang Mahyuddin Bin Indanan Masjid Permatang Tok Menora, Jarak Atas, Kampung Rawa, Mahat, Lahar Kepar, Lahat Tabut, Lalang, Jalan Tengah Berapit, Tanah Liat, Kampung Seronok, Binjai, Ara Kuda, Lahar Yooi , Lebuh Acheh, Batu Tiga, Pajak Song, Permatang Bogak, Kubang Semang, Permatang Nibong, Sungai Batu, Batu Maung,, Padang Cempedak.
    [Show full text]
  • Jkr Road Upgrading Works: 12-Hour Scheduled Water Supply Interruption in 6 Areas in Batu Maung and Teluk Tempoyak on 26/8/2017
    nd 22 August 2017 PRESS STATEMENT by Dato’ Ir. Jaseni Maidinsa, Chief Executive Officer, PBA Holdings Bhd (PBAHB) and Perbadanan Bekalan Air Pulau Pinang Sdn Bhd (PBAPP) JKR ROAD UPGRADING WORKS: 12-HOUR SCHEDULED WATER SUPPLY INTERRUPTION IN 6 AREAS IN BATU MAUNG AND TELUK TEMPOYAK ON 26/8/2017. Duration: 9.00am – 9.00pm on Saturday, 26/8/2017. Affected: About 4,500 people in Batu Maung and Teluk Tempoyak. Reason: Shutting down of a section of a 900mm water supply pipeline to facilitate 2 pipeline diversion connections at Lebuhraya Tun Dr. Lim Chong Eu. PENANG, Tuesday (22/8/2017): A section of an existing 900mm water supply pipeline along Lebuhraya Tun Dr. Lim Chong Eu will be temporarily “shut down” this Saturday to enable pipeline diversions related to the on- going JKR road upgrading works from Batu Maung to the Penang International Airport. The pipeline shutdown is necessary to enable 2 mild steel (MS) pipeline connections at the following locations along Lebuhraya Tun Dr. Lim Chong Eu: 1. 900mm x 900mm connection near the Ken Keong factory; and 2. 900mm x 900mm connection near the Pen Mutiara restaurant. The shutdown will cause a 12-hour scheduled water supply interruption, from 9.00am – 9.00pm on Saturday, 26/8/2017, in some areas in Batu Maung and Teluk Tempoyak. This supply interruption will affect about 4,500 people in the following 6 areas: 1 Southbay Plaza 4 Limbongan Batu Maung 2 Lagenda Southbay 5 Muzium Perang Batu Maung 3 Kawasan Solok Teluk Tempoyak 6 Kampung Teluk Tempoyak Please refer to the map in ‘Appendix A’ that indicates all affected areas.
    [Show full text]
  • The Distribution of Macaranga Genus (Family Euphorbiaceae) in Penang Island, Peninsular Malaysia
    Journal of Bioscience, 19(2), 91–99, 2008 THE DISTRIBUTION OF MACARANGA, GENUS (FAMILY EUPHORBIACEAE) IN PENANG ISLAND, PENINSULAR MALAYSIA 1Rahmad Zakaria*, 1Nik Fadzly Nik Rosely, 1Mashhor Mansor and 2Mohd Yunus Zakaria 1 School of Biological Sciences, Universiti Sains Malaysia, 11800 USM Pulau Pinang, Malaysia 2 Unit Antarabangsa dan Keurusetiaan, Ibu Pejabat Perhutanan, Semenanjung Malaysia, Jalan Sultan Salahuddin, 50660 Kuala Lumpur, Malaysia Abstrak: Sejumlah lapan spesies Macaranga telah dikenal pasti dalam kajian yang dilakukan dari bulan Mac sehingga Disember 2005. Spesies yang paling biasa direkod adalah Macaranga tanarius, ditemui di semua habitat terganggu kecuali di dalam hutan primer. Tidak seperti M. tanarius, spesies kedua tersebar luas, iaitu M. javanica juga dapat ditemui di semua jenis habitat, kecuali di kawasan yang berpenduduk padat. Taburan enam spesies lain tidak menunjukkan pola yang jelas. Pembukaan hutan adalah faktor utama yang dijangkakan merangsang pertumbuhan populasi M. tanarius dan M. javanica, maka tidak hairanlah ia tersebar dengan luas dan berjaya di kebanyakan kawasan kajian berbanding spesies lain. Kata kunci: Macaranga tanarius, M. javanica, Taburan, Kawasan Terganggu Abstract: A total of eight species of Macaranga are identified in this study, which were carried out from March to December 2005 in Penang Island. The most common species recorded is Macaranga tanarius which is found in almost every disturbed habitats, except for primary forested area. Unlike M. tanarius, M. javanica (the second most common species) are also well distributed except in highly populated human inhabitation areas. The other six species are scattered without any clear distributing pattern. Land clearings by human activities are likely the main cause that triggers the spread of M.
    [Show full text]