S.NO. PARAMETER Page number PART –A (ii) Operational Phase 1 Condition The installation of sewage treatment plant (STP) and adequacy of 1 no. i disposal system should be certified by Punjab Pollution Control Board and a report in this regard should be submitted to the Ministry of Environment & Forests/State Level Environment Impact Assessment---. Condition Adequate and appropriate pollution control measures should be 1 no. ii provided to control fugitive emissions to be emitted from the shopping and multiplex. Condition Adequate drinking water facility based on Reverse Osmosis treatment 1 no. iii technology be provided. Condition Rainwater harvesting for roof run-off and surface run-off as plan 1 no. iv submitted should be implemented. Before recharging the surface run- off--- Condition The solid waste generated should be properly collected and segregated 1 no. v before disposal to the City Municipal Facility. The in-vessel bio- compost technique should be used for composting the organic waste. Condition Hazardous waste including Biomedical waste should be disposed of as 1 no. vi per applicable Rules and norms with necessary approvals of the Punjab Pollution Control Board. Condition The green belt design along the periphery of the plot shall achieve 1 no. vii attenuation factor conforming to the day and night noise standards prescribed --- Condition Incremental pollution loads on the ambient air quality, noise and 1 no. viii water quality should be periodically monitored after commissioning of the project Condition Application of solar energy should be incorporated for illumination of 1 no. ix common areas, lighting for gardens and street lighting in addition to provision ---- Condition Traffic congestion near the entry and exit points from the roads 2 no. x adjoining the proposed project site must be avoided. Parking --- Condition A report on the energy conservation measures conforming to energy 2 no. xi conservation norms finalized by Bureau of Energy Efficiency should be prepared --- GENERAL CONDITIONS 2 Condition The environmental safeguards contained in the application of the 2 no. i promoter / mentioned during the presentation before State Level ---- Condition The entire cost of the environmental management plan (i.e. capital cost 2 no. ii as well as recurring cost) will continue to be borne by the project proponent ---- Condition Six monthly monitoring reports should be submitted to the Ministry and 2 no. iii its Regional Office, / State Level Environment Impact

SIX MONTHLY COMPLIANCE UPTO DEC- 2016(PARAS DOWNTOWN SQUARE, ZIRAKPUR) Assessment Authority/PPCB. Condition Officials from the Regional Office of Ministry of Environment & 2 no.iv Forests, Chandigarh / State Level Environment Impact Assessment Authority / State Level Expert Appraisal Committee / Punjab Pollution Control Board who would be monitoring the implementation of environmental safeguards---. Condition In the case of any change(s) in the scope of the project, the project 3 no. v would require a fresh appraisal by State Environment Impact Assessment Authority. Condition The State Environment Impact Assessment Authority reserves the right 3 no. vi to add additional safeguard measures subsequently, if found necessary, ---- Condition All other statutory clearances such as the approvals for storage of 3 no. vii diesel from Chief Controller of Explosives, Fire Department, Civil Aviation Department, Forest (Conservation) Act, 1980 and Wildlife (Protection) Act, 1972 etc---- - Condition The project proponent should advertise in at least two local 3 no. viii newspapers widely circulated in the region, one of which shall be in the vernacular language ------Condition These stipulations would be enforced among others under the 3 no. ix provisions of Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, ---- Condition Environmental clearance is subject to final order of the Hon'ble 3 no. x Supreme Court of in the matter of Goa Foundation Vs. Union of India in Writ Petition (Civil) No. 460 of 2004 ----. Condition Any appeal against this environmental clearance shall lie with the 3 no. xi National Environment Appellate Authority, if preferred ----

SIX MONTHLY COMPLIANCE UPTO DEC- 2016(PARAS DOWNTOWN SQUARE, ZIRAKPUR)

Sr. n Compliance Required Action Taken. PART –A (ii) Operational Phase (i) The installation of sewage treatment plant (STP) and STP has been installed adequacy of disposal system should be certified by Punjab at site. Pollution Control Board and a report in this regard should be submitted to the Ministry of Environment & Forests/State Level Environment Impact Assessment Authority before the project is commissioned for operation. The discharge of treated sewage shall conform to the norms and standards prescribed by Punjab Pollution Control Board for such discharges. (ii) Adequate and appropriate pollution control measures should No fugitive emissions be provided to control fugitive emissions to be emitted from emitted from the the shopping and multiplex. complex. (iii) Adequate drinking water facility based on Reverse Osmosis Not required the treatment technology be provided. Ground water is potable. (iv) Rainwater harvesting for roof run-off and surface run-off as Provided as per norms plan submitted should be implemented. Before recharging of CGWA. the surface run-off, pretreatment must be done to remove suspended matter, oil and grease. (v) The solid waste generated should be properly collected and Taken all the segregated before disposal to the City Municipal Facility. The environmentally in-vessel bio-compost technique should be used for friendly steps. composting the organic waste. Arrangement with M.C. (vi) Hazardous waste including Biomedical waste should be Taken all the disposed of as per applicable Rules and norms with environmentally necessary approvals of the Punjab Pollution Control Board. friendly steps. Hazardous waste is stored as per rules. (vii) The green belt design along the periphery of the plot shall Provided as per norms. achieve attenuation factor conforming to the day and night noise standards prescribed for Residential land use. The open spaces inside the plot should be suitably landscaped and covered with vege tation of indigenous variety. (viii) Incremental pollution loads on the ambient air quality, noise No incremental load and water quality should be periodically monitored after analysis reports are commissioning of the project attached. (ix) Application of solar energy should be incorporated for Provided as per norms. illumination of common areas, lighting for gardens and street lighting in addition to provision for solar water heating. A

SIX MONTHLY COMPLIANCE UPTO DEC- 2016(PARAS DOWNTOWN SQUARE, ZIRAKPUR) hybrid system or fully solar system for a portion of the apart ments should be provided. (x) Traffic congestion near the entry and exit points from the No Traffic congestion roads adjoining the proposed project site must be avoided. near the entry and exit Parking should be fully internalized and no public space points. should be utilized. (xi) A report on the energy conservation measures conforming to Already submitted with energy conservation norms finalized by Bureau of Energy MoEF. Efficiency should be prepared incorporating details about machinery of air conditioning, lifts, lighting, building materials, R & U Factors etc. and submitted to the Ministry of Environment & Forests in three months time.

GENERAL CONDITIONS: (i) The environmental safeguards contained in the application of Agreed. the promoter / mentioned during the presentation before State Level Environment Impact Assessment Authority/State Expert Appraisal Committee should be implemented in letter and spirit. (ii) The entire cost of the environmental management plan (i.e. Agreed. capital cost as well as recurring cost) will continue to be borne by the project proponent until the responsibility of environmental management plan is transferred to the occupier/residents society under proper MOU after obtaining prior permission of the Punjab Pollution Control Board. (iii) Six monthly monitoring reports should be submitted to the We are submitting six Ministry and its Regional Office, Chandigarh/ State Level monthly compliance Environment Impact Assessment Authority/PPCB. reports regularly. (iv) Officials from the Regional Office of Ministry of Environment Full cooperation, & Forests, Chandigarh / State Level Environment Impact facilities & documents/ Assessment Authority / State Level Expert Appraisal data will be provided Committee / Punjab Pollution Control Board who would be to the officials of monitoring the implementation of environmental safeguards Regional office of Should be given full cooperation, facilities and documents / MoEF Chandigarh/ data by the project proponents during their inspection. A SEAC/ PPCB. complete set of all the documents submitted to State Environment Impact Assessment Authority Should be forwarded to the CCF, Regional Office of Ministry of Environment & Forests, and Chandigarh/State Level Environment Impact Assessment Authority. (v) In the case of any change(s) in the scope of the project, the Agreed if any changes project would require a fresh appraisal by State Environment we will apply for fresh Impact Assessment Authority. appraisal .

SIX MONTHLY COMPLIANCE UPTO DEC- 2016(PARAS DOWNTOWN SQUARE, ZIRAKPUR) (vi) The State Environment Impact Assessment Authority reserves Agreed, it shall be the right to add additional safeguard measures subsequently, done. if found necessary, and to take action including revoking of the environmental clearance under the provisions of the Environmental (Protection) Act, 1986, to ensure effective implementation of the suggested safeguard measures in a time bound and satisfactory manner. (vii) All other statutory clearances such as the approvals for Agreed, it shall be storage of diesel from Chief Controller of Explosives, Fire done. Department, Civil Aviation Department, Forest (Conservation) Act, 1980 and Wildlife (Protection) Act, 1972 etc. shall be obtained, by project proponents from the competent authorities including Punjab Pollution Control Board and from other statutory bodies as applicable. The project proponent shall also obtain permission from the NBWL, if applicable. (viii) The project proponent should advertise in at least two local Complied, the cutting newspapers widely circulated in the region, one of which shall of the newspaper has be in the vernacular language informing that the project has already been been accorded environmental clearance and copies of submitted with MoEF. clearance letters are available with the Punjab Pollution Control Board. The advertisement should be made within seven days from the day of issue of the clearance letter and a copy of the same should be forwarded to the Regional Office, Ministry of Environment & Forests, Chandigarh. (ix) These stipulations would be enforced among others under the Agreed provisions of Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, Environmental (Protection) Act, 1986, the Public Liability (Insurance) Act, 1991 and EIA Notification, 2006. (x) Environmental clearance is subject to final order of the Agreed. Hon'ble Supreme Court of India in the matter of Goa Foundation Vs. Union of India in Writ Petition (Civil) No. 460 of 2004 as may be applicable to this project and decisions of any competent court, to the extent applicable. (xi) Any appeal against this environmental clearance shall lie with Agreed. the National Environment Appellate Authority, if preferred within a period of 30 days as prescribed under Section 11 of the National Environment Appellate Authority Act, 1997.

SIX MONTHLY COMPLIANCE UPTO DEC- 2016(PARAS DOWNTOWN SQUARE, ZIRAKPUR) SIX MONTHLY COMPLIANCE UPTO DEC- 2016(PARAS DOWNTOWN SQUARE, ZIRAKPUR) SIX MONTHLY COMPLIANCE UPTO DEC- 2016(PARAS DOWNTOWN SQUARE, ZIRAKPUR) SIX MONTHLY COMPLIANCE UPTO DEC- 2016(PARAS DOWNTOWN SQUARE, ZIRAKPUR)

SIX MONTHLY COMPLIANCE UPTO DEC- 2016(PARAS DOWNTOWN SQUARE, ZIRAKPUR)