Faculty Development Program N-IGMA 2K17 the 5Th Endowment
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
07-2019 1.0 IMD Information 1.1 Rainfall Situation 1.1.1 Amount of Rainfall Recorded at 0830 Hours IST of Today (8 Cm Or More) As Per IMD
Central Water Commission Daily Flood Situation Report cum Advisories 23 -07-2019 1.0 IMD information 1.1 Rainfall Situation 1.1.1 Amount of rainfall recorded at 0830 hours IST of today (8 cm or more) as per IMD Name of Place (State) Rainfall (in cm) Gossaigaon (Assam) 34 Kokrajhar (Assam) 32 Mathanguri (Assam) 29 Buxaduar (West Bengal), Ratnagiri (Maharashtra) 28 each Bhatkal (Karnataka) 23 Cherrapunji (Meghalaya), Kollur (Karnataka) 21 each Kumta (Karnataka), AIE NH Xing (Assam) 20 each Barabisha (West Bengal) 19 Shirali (Karnataka) 18 Vadakara (Kerala), Kota & Udupi (Karnataka), Matunga (Assam) 17 each Kundapur (Karnataka) 16 each Gerosoppa & Santeguli (Karnataka), Beki Road Bridge (Assam) 15 each Karwar, Mani & Ankola (Karnataka), Hosdurg (Kerala), Sankalang (Sikkim), Manas N H Crossing, Barpeta 14 each (Assam) Honavar, Siddapura & Bajpe (Karnataka) 13 each Chepan (WB), Mudubidre, Manki, Agumbe & Bantwal (Karnataka), Bahalpur (Assam) 12 each Kannur, Taliparamba & Kudulu (Kerala), Hasimara (West Bengal) 11each Mulki, Uppinangadi, Gokarna, Yennehole & Kadra (Karnataka) 10 each Coochbehar (West Bengal) 9 each Passighat (Arunachal Pradesh), Dhubri (Assam), Harnai (Maharashtra), Mangalore (Karnataka), Irikkur 8 each (Kerala) 1.1.2 Rainfall forecast for next 5 days issued on 23rdJuly, 2019 (Midday) by IMD 2.0 CWC inferences 2.1 Flood Situation 2.1.1 Summary of Flood Situation as per CWC Flood Forecasting network For detail bulletins refer to http://cwc.gov.in/sites/default/files/cfcr-cwcdfb-23072019.pdf 2.2 Flood Situation as per actual/ forecasted rainfall situation IMD has forecasted heavy to Very Heavy rain at a few places with isolated Extremely Heavy rainfall in Sub-Himalayan West Bengal, Sikkim, Assam & Meghalaya and Konkan & Goa on 24th July Heavy to Very Heavy rain at these places on 25th July and slow reduction after 26th July. -
District Disaster Management Plan- Udupi
DISTRICT DISASTER MANAGEMENT PLAN- UDUPI UDUPI DISTRICT 2015-16 -1- -2- Executive Summary The District Disaster Management Plan is a key part of an emergency management. It will play a significant role to address the unexpected disasters that occur in the district effectively. The information available in DDMP is valuable in terms of its use during disaster. Based on the history of various disasters that occur in the district, the plan has been so designed as an action plan rather than a resource book. Utmost attention has been paid to make it handy, precise rather than bulky one. This plan has been prepared which is based on the guidelines from the National Institute of Disaster Management (NIDM). While preparing this plan, most of the issues, relevant to crisis management, have been carefully dealt with. During the time of disaster there will be a delay before outside help arrives. At first, self-help is essential and depends on a prepared community which is alert and informed. Efforts have been made to collect and develop this plan to make it more applicable and effective to handle any type of disaster. The DDMP developed touch upon some significant issues like Incident Command System (ICS), In fact, the response mechanism, an important part of the plan is designed with the ICS. It is obvious that the ICS, a good model of crisis management has been included in the response part for the first time. It has been the most significant tool for the response manager to deal with the crisis within the limited period and to make optimum use of the available resources. -
1 in the High Court of Karnataka at Bengaluru
1 IN THE HIGH COURT OF KARNATAKA AT BENGALURU DATED THIS THE 16 TH DAY OF NOVEMBER, 2015 BEFORE THE HON’BLE MR.JUSTICE ARAVIND KUMAR W.P.NO.30082/2015 ( GM-CPC) BETWEEN: MR. MOHAMMED MEERA Y S/O LATE ABDULLA BEARY AGED ABOUT 53 YEARS R/AT RADHA NAYAK HIGH SCHOOL ROAD, YENNEHOLE POST, MARNE VILLAGE KARKALA TALUK UDUPI DISTRICT. ... PETITIONER (BY SRI.K CHANDRASHEKAR ACHAR, ADVOCATE) AND: 1. MRS. MARIYAMMA W/O M. ABDUL HUSSAIN AGED ABOUT 63 YEARS R/AT NAZIR MANZIL NEAR RADHA NAYAK HIGH SCHOOL MARNE VILLAGE, YENNEHOLE POST, KARKALA TALUK UDUPI DISTRICT. 2. MRS. REHAMATH W/O TAJUDDIN AGED ABOUT 33 YEARS R/AT NAZIR MANZIL NEAR RADHA NAYAK HIGH SCHOOL MARNE VILLAGE, YENNEHOLE POST, 2 KARKALA TALUK UDUPI DISTRICT. 3. MRS. ZINATH W/O IBRAHIM AGED ABOUT 43 YEARS R/AT NABEEL MANZIL NEAR RADHA NAYAK HIGH SCHOOL MARNE VILLAGE, YENNEHOLE POST, KARKALA TALUK UDUPI DISTRICT. 4. STATE OF KARNATAKA REP. BY DEPUTY COMMISSIONER UDUPI DISTRICT, UDUPI-01. 5. THE TAHSILDAR TALUK OFFICE, KARKALA KARKALA TALUK UDUPI DISTRICT-01. 6. THE REVENUE INSPECTOR AJAKAR HOBLI KARKALA TALUK UDUPI DISTRICT-01. ... RESPONDENTS (BY SMT. ANITHA R, HCGP FOR R-4 TO 6) THIS WRIT PETITION IS FILED UNDER ARTICLE 227 OF THE CONSTITUTION OF INDIA, PRAYING TO QUASH THE ORDER DATED 30.04.2015 PASSED ON I.A.NO.9 IN O.S.NO.101/2014 ON THE FILE OF THE PRINCIPAL CIVIL JUDGE & JMFC., KARKALA VIDE ANNEXURE-M. THIS PETITION COMING ON FOR PRELIMINARY HEARING THIS DAY, THE COURT MADE THE FOLLOWING: 3 O R D E R Heard Sri K.Chandrashekar Achar, learned Advocate appearing for petitioner and Smt.Anitha R, learned HCGP appearing for respondents-4 to 6. -
Karnataka Commissioned Projects S.No. Name of Project District Type Capacity(MW) Commissioned Date
Karnataka Commissioned Projects S.No. Name of Project District Type Capacity(MW) Commissioned Date 1 T B Dam DB NCL 3x2750 7.950 2 Bhadra LBC CB 2.000 3 Devraya CB 0.500 4 Gokak Fall ROR 2.500 5 Gokak Mills CB 1.500 6 Himpi CB CB 7.200 7 Iruppu fall ROR 5.000 8 Kattepura CB 5.000 9 Kattepura RBC CB 0.500 10 Narayanpur CB 1.200 11 Shri Ramadevaral CB 0.750 12 Subramanya CB 0.500 13 Bhadragiri Shimoga CB M/S Bhadragiri Power 4.500 14 Hemagiri MHS Mandya CB Trishul Power 1x4000 4.000 19.08.2005 15 Kalmala-Koppal Belagavi CB KPCL 1x400 0.400 1990 16 Sirwar Belagavi CB KPCL 1x1000 1.000 24.01.1990 17 Ganekal Belagavi CB KPCL 1x350 0.350 19.11.1993 18 Mallapur Belagavi DB KPCL 2x4500 9.000 29.11.1992 19 Mani dam Raichur DB KPCL 2x4500 9.000 24.12.1993 20 Bhadra RBC Shivamogga CB KPCL 1x6000 6.000 13.10.1997 21 Shivapur Koppal DB BPCL 2x9000 18.000 29.11.1992 22 Shahapur I Yadgir CB BPCL 1x1300 1.300 18.03.1997 23 Shahapur II Yadgir CB BPCL 1x1301 1.300 18.03.1997 24 Shahapur III Yadgir CB BPCL 1x1302 1.300 18.03.1997 25 Shahapur IV Yadgir CB BPCL 1x1303 1.300 18.03.1997 26 Dhupdal Belagavi CB Gokak 2x1400 2.800 04.05.1997 AHEC-IITR/SHP Data Base/July 2016 141 S.No. Name of Project District Type Capacity(MW) Commissioned Date 27 Anwari Shivamogga CB Dandeli Steel 2x750 1.500 04.05.1997 28 Chunchankatte Mysore ROR Graphite India 2x9000 18.000 13.10.1997 Karnataka State 29 Elaneer ROR Council for Science and 1x200 0.200 01.01.2005 Technology 30 Attihalla Mandya CB Yuken 1x350 0.350 03.07.1998 31 Shiva Mandya CB Cauvery 1x3000 3.000 10.09.1998 -
2020-21 Udupi District 500 Eco Club Schools Grant Transferred Details Sl
2020-21 Udupi District 500 Eco club Schools Grant Transferred Details Sl. NEFT Benificiary Date of IFSC Code Benificiary Name Benificiary Address No. Amount Account Transferre GOVERNMENT HIGHER PRIMERY SCHOOL 1 SBIN0014506 5000 32225956509 SDMC HPS KODIKANYANA HUNGARKATTE UDUPI 26-08-2020 576225 GOVERNMENT HIGHER PRIMERY SCHOOL 2 SBIN0040550 5000 64082852986 GHPS AVARSE 26-08-2020 AVARSE UDUPI 576222 GOVERNMENT HIGHER PRIMERY SCHOOL 3 SBIN0040550 5000 64082853060 GOVT HPS HILIYANA 26-08-2020 HILIYANA AVARSE UDUPI 576226 GOVERNMENT HIGHER PRIMERY SCHOOL 4 SBIN0040550 5000 64082852931 GOVT HPS KAKKUNJE 26-08-2020 KAKKUNJE AVARSE UDUPI 576222 GMHPS GOVERNMENT MODEL HIGHER PRIMERY 5 SBIN0040550 5000 64082853796 26-08-2020 BRAHMAVARA SCHOOL BRAHMAVARA UDUPI 576213 GOVERNMENT MODEL HIGHER PRIMERY GOVT MHPS 6 SBIN0040550 5000 64082853763 SCHOOL KUMRAGODU BRAHMAVAR UDUPI 26-08-2020 KUMRAGODU 576213 GOVT MHPS GOVERNMENT MODEL HIGHER PRIMERY 7 SBIN0040550 5000 64082854144 26-08-2020 CHERKADI SCHOOL CHERKADI UDUPI 576215 GOVT HPS GOVERNMENT HIGHER PRIMERY SCHOOL 8 SBIN0040550 5000 64082855079 26-08-2020 BALEBAILU PERDOOR BALEBILU DOOPADAKATTE UDUPI 576124 GOVERNMENT MODEL HIGHER PRIMERY 9 SBIN0040550 5000 64082850626 GHPS GARADIMAJAL 26-08-2020 SCHOOL GARADIMAJALU UDUPI 576116 BLOCK EDUCATION GOVERNMENT HIGHER PRIMERY SCHOOL 10 SBIN0040550 5000 64082852034 26-08-2020 OFFICER AND BRC GUNDMI HUNGARKATTE UDUPI 576226 GMHPS GOVERNMENT MODEL HIGHER PRIMERY 11 SBIN0040550 5000 64082850795 HANUMANTHANAGA SCHOOL HANUMANTHANAGARA UDUPI 26-08-2020 R 576105 -
Pearl-Feb-2016-1
1 2 ISSN: 2394-0352 PEARL Multidisciplinary Journal Volume 2, No. 1, February 2016 Terrestrial Radio Nuclides in the Soil of Udupi District and Gamma 3 Dose Rate for the People Gerald Pinto Legal and Policy Framework on Women Welfare: An Inclusive 8 Growth Strategy M D Pradeep WTO and India – Agreements and Arguments 19 V Basil Hans Appraisal of Janani Suraksha Yojana (JSY) in Bidar District 29 (Karnataka): Knowledge, Attitude and Utilization Pattern of the Beneficiaries Devajana Chinnappa Nanjunda Female Child Trafficking and Social Work Intervention 38 M Sujatha, Kumudini Achchi Social Innovation in the Community Rehabilitation of the People 50 with Mental Illness: Cases of Faith Based Initiatives C P Prince, P K Shajahan 3 4 Terrestrial Radio Nuclides in the Soil of Udupi District and Gamma Dose Rate for the People Gerald Pinto Milagres College Kallianpur, Udupi E-mail: [email protected] Abstract: The paper discusses the results of detailed studies on gamma radiation levels, 226Ra, 232Th and 40K concentrations in soils of Udupi, Kundapur and Karkala Taluks of Coastal Karnataka region of India. The gamma absorbed dose rates were measured using portable GM survey meter and soil radioactivity was by gamma spectrometry method using an HPGe detector. The results show that the 226Ra concentration varies in the range 1.2 –78.0 Bq kg-1 with a mean of 30Bq kg-1, 232Th in the range of 1.6 - 166Bq kg-1 with a mean of 56Bq kg-1 and 40K in the range 12 – 477Bq kg-1 with a mean of 189Bq kg-1 in the 0-5 cm soil profile. -
Formation Already Provided in E‐Form IEPF‐1 CIN/BCIN L99999MH1988PLC047408 Prefill Company/Bank Name MAN INDUSTRIES (INDIA) LIMITED
Note: This sheet is applicable for uploading the particulars related to the amount credited to Investor Education and Protection Fund. Make sure that the details are in accordance with the information already provided in e‐form IEPF‐1 CIN/BCIN L99999MH1988PLC047408 Prefill Company/Bank Name MAN INDUSTRIES (INDIA) LIMITED Sum of unpaid and unclaimed dividend 1809434.00 Sum of interest on matured debentures 0.00 Validate Sum of matured deposit 0.00 Sum of interest on matured deposit 0.00 Sum of matured debentures 0.00 Clear Sum of interest on application money due for refund 0.00 Sum of application money due for refund 0.00 Redemption amount of preference shares 0.00 Sales proceed for fractional shares 0.00 Sum of Other Investment Types 0.00 Date of event (date of declaration of dividend/redemption date Is the of preference shares/date Date of Birth(DD‐MON‐ Investment Investor First Investor Middle Investor Last Father/Husband Father/Husband Father/Husband Last DP Id‐Client Id‐ Amount of maturity of Joint Holder Address Country State District Pin Code Folio Number Investment Type PAN YYYY) Aadhar Number Nominee Name Remarks (amount / Name Name Name First Name Middle Name Name Account Number transferred bonds/debentures/applica Name shares )under tion money any litigation. refundable/interest thereon (DD‐MON‐YYYY) C/O MAIDEEN BATCHA JAYA RICE MILL,MADATHU KULAM P.O UDUMAL PET [T.K] COIMBATORE MAN00000000000A Amount for unclaimed and A ALI NA [DT.] INDIA Tamil Nadu 642113 02394 unpaid dividend 1200.00 30‐Oct‐2013 No 140 M T H ROAD MANAVALA NAGAR,CHINGAI M G R DIST MAN00000000000A Amount for unclaimed and A ARUMUGHAM NSLSRIDHARAN NA TAMIL NADU INDIA Tamil Nadu 602002 25009 unpaid dividend 400.00 30‐Oct‐2013 NSLSRIDHARAN No PLOT NO 15 ALAGAR NAGAR K MAN00000000000A Amount for unclaimed and A ARUNACHALAM NA PUDUR MADURAI TAMILNADU INDIA Tamil Nadu 625007 25011 unpaid dividend 400.00 30‐Oct‐2013 No C/O. -
Unclaimed Deposits Transferred to RBI During Aug 2020
Unclaimed Deposits Transferred to RBI During Aug 2020 AC_NAME AC_NAME2 AC_ADDR1 AC_ADDR2 AC_ADDR3 ANIL KUMAR M P MARIKKAL HOUSE KALLOOR P O ANNAMANADA NOBY XAVIER S/O XAVIER 193/1 KOOTALAPARAMBIL ,NEAR CHAPEL BHARGAVAN E V THAYYATH HOUSE VANKULATHVAYAL AZHIKODE MARIAMMA P V W/O PAUL K L KAITHARATH HOUSE VETTUKADAVU RD CHALAKUDY CHERU P T PAVNAN HOUSE P O CHALISSERY JOHN G LOBO PUTHENPARAMBIL HOUSE CHANGANACHERY VARGHESE T G THEKKEPUTHENPURAKKAL MADAPPALLY P.O. VENKOTTA, CHANGANASERRY AKBAR K K . 4/144 KSHEMA BAVA RD KARIPALAM VOTERS ID ADDRESS- 4/245 MARTIN SEBASTIAN MATTAMMAL HOUSE BMC PO ERNAKULAM BHUPAL U K P 102,ABIRAMI APPARTMENT KUMILANKUTTAI,KCP THOTTAM ERODE 638011 RATHNA SUNDER SUNDER COTTAGE 4/16A UPPER GUDALLUR NILGIRIS NARAYANAN M MAILAKODATHU HOUSE KADAPPURAM CHAVAKKAD JANAKIAMMA PARAMESWARAN PILLAI PANTHAPLAVIL VADAKKATHIL BHARANIKKAVU S PALLICKAL P O KALA PRADEEP PERRUVALLY THEKKATHIL KANNAMPILLY BHAGOM KAYAMKULAM BINU VARGHESE KOCHADATHIL HOUSE KEERAMPARA NAJUMUDEEN H PANDARATHUMVILA PUTHEN VEEDU KALLUMTHAZHAM P O KILIKOLLUR KOLLAM ARUNPRAKASH E S/O.P ELANGOVAN 3/92,NATHAMEDU KODUMUDI B KOKILAMBAL 66/34,EAST AGRAHARAM KODUMUDI ERODE DT ABDUL NAZAR E N XI/313, AISWARYA COLONY PUDUNAGARAM P.O. ANWAR M H S/O HAMEED MALIAKKAL HOUSE THOZIYOOR PRADEEP KUMAR.V VADAKKAYIL HOUSE O.K.ROAD THIRUVANNUR ASHARAF K A S/O ABDULRAHIMAN KULANGARA VEETTIL VELLARAKKAD P O NISHA V R VADASSEERY HOUSE, KANIPPAYYOOR P O KUNNAMKULAM GEETHA A A CHETTIKATTIL HOUSE P O ARIMPOOR M.JEEVAN BABU,ANUSHA 10/16 KULANDAI GRAMANI STREET CHENNAI ALIYAMMA THOMAS -
1. Sri. K. Jeevandhar Adhikari, S/O. Late Jinaraj Adhikari, Aged About 58 Years, Bus Operator, Shanthi Mahal, Ajekar, Karkala – 574 101, Udupi District
1 IN THE HIGH COURT OF KARNATAKA AT BENGALURU DATED THIS THE 10 TH DAY OF FEBRUARY, 2016 BEFORE THE HON’BLE MR. JUSTICE A.S. BOPANNA WRIT PETITION NOS.6597-6599/2016 Between: 1. Sri. K. Jeevandhar Adhikari, S/o. Late Jinaraj Adhikari, Aged about 58 years, Bus Operator, Shanthi Mahal, Ajekar, Karkala – 574 101, Udupi District. 2. Smt. Roopa J. Adhikari, W/o. Sri. K. Jeevandhar Adhikari, Aged about 50 years, Bus Operator, Shanthi Mahal, Ajekar, Karkala – 574 101, Udupi District. ….PETITIONERS (By Sri. A.S. Parasara Kumar, Adv.) And: 1. The Regional Transport Authority, Rajathadri, Manipal, Udupi – 576 101. Represented by its Chairman. 2 2. The Secretary, Regional Transport Authority, Rajathadri, Manipal, Udupi – 576 101. ….RESPONDENTS (By Sri. T.S. Mahantesh, AGA.) These Writ Petitions are filed under Articles 226 and 227 of the Constitution of India praying to direct the 2nd respondent to consider the representation dated 22.01.2016 received by the 2 nd respondent on 23.01.2016 in Inward Nos. 8553, 8554 & 8555 vide Annexures D, E and F, within 30 days from the date of the order of this Hon’ble Court. These Writ Petitions coming on for preliminary hearing, this day, the Court made the following: ORDER The petitioners have filed application for grant of stage carriage permits, which has been considered by proceedings dated 17.10.2015 at Annexures A to C. 2. The 1st respondent has thereafter directed the 2nd respondent to take note of the said proceedings and assign timings in respect of the permit granted. Since, 3 the same had not been considered within time frame as indicated, the petitioners have made the representations as at Annexures D, E and F. -
Full of Dr Eams Fo 01
Newsletter of the Bethany Educational Society ® Mangalore Vol. 13 April-June 2019 No. 2 Full of Dr eam s f or 2 0 1 9 -2 0 News News IMAX Trains KG Teachers IMAX Teachers' Training Programme was held Editorial for the KG teachers of St Theresa's School, Bendur, Mangalore on 4 April 2019. Mr After the cumbersome summer this year, the portals of our institutions are opened again to Hinesh Shankar, Programme Success welcome the academic year 2019-20 with much excitement and exuberance. I am sure that Manager of IMAX spoke on IMAX the Heads of the institutions are adequately equipped and teachers are sufficiently oriented to make the journey of our students smooth and pleasant who are stepping into the year with curriculum based on internationally great expectations and deep aspirations. At this juncture it is to be remembered that our task as recommended multiple training pathways. the educators is to lead them towards fullness of life that can transform them to be great, noble, The training included, Early Childhood honourable, and upright citizens of India. Care Education (ECCE), planning, When Pope Francis met the students and teachers from Italian and Albanian Jesuit schools in Rome in June 2013, he said, teaching and assessment. The aim of this “May I speak directly for a moment to our educators – Jesuits, teachers, school staff and parents? Do not be discouraged programme was to provide teachers with by the difficulties that the educational challenge presents. Educating is not a job but an attitude. It is a way of being. -
Police Station List
PS CODE POLOCE STATION NAME ADDRESS DIST CODEDIST NAME TK CODETALUKA NAME 1 YESHWANTHPUR PS BANGALORE 20 BANGALORE 1 Bangalore North 2 JALAHALLI PS BANGALORE 20 BANGALORE 1 Bangalore North 3 RMC YARD PS BANGALORE 20 BANGALORE 1 Bangalore North 4 PEENYA PS BANGALORE 20 BANGALORE 1 Bangalore North 5 GANGAMMAGUDI PS BANGALORE 20 BANGALORE 1 Bangalore North 6 SOLADEVANAHALLI PS BANGALORE 20 BANGALORE 1 Bangalore North 7 MALLESWARAM PS BANGALORE 20 BANGALORE 1 Bangalore North 8 SRIRAMPURAM PS BANGALORE 20 BANGALORE 1 Bangalore North 9 RAJAJINAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 10 MAHALAXMILAYOUT PS BANGALORE 20 BANGALORE 1 Bangalore North 11 SUBRAMANYANAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 12 RAJAGOPALNAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 13 NANDINI LAYOUT PS BANGALORE 20 BANGALORE 1 Bangalore North 14 J C NAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 15 HEBBAL PS BANGALORE 20 BANGALORE 1 Bangalore North 16 R T NAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 17 YELAHANKA PS BANGALORE 20 BANGALORE 1 Bangalore North 18 VIDYARANYAPURA PS BANGALORE 20 BANGALORE 1 Bangalore North 19 SANJAYNAGAR PS BANGALORE 20 BANGALORE 1 Bangalore North 20 YELAHANKA NEWTOWN PS BANGALORE 20 BANGALORE 1 Bangalore North 21 CENTRAL PS BANGALORE 20 BANGALORE 2 Bangalore South 22 CHAMARAJPET PS BANGALORE 20 BANGALORE 2 Bangalore South 23 VICTORIA HOSPITAL PS BANGALORE 20 BANGALORE 2 Bangalore South 24 SHANKARPURA PS BANGALORE 20 BANGALORE 2 Bangalore South 25 RPF MANDYA MANDYA 22 MANDYA 5 Mandya 26 HANUMANTHANAGAR PS BANGALORE -
Mangalore Electricity Supply Company Limited
Mangalore Electricity Supply Company Limited Scheduled Outage Information Details of Power Shut Down due to maintenance of Distribution System from 03.05.2020 to 09.05.2020 Division: UDUPI RAPDRP FROM TO APPROXIMATE DIVISION SUBDIVISION SUBSTATION FEEDER_NAME SECTION DURATION OF POWER AREA EFFECTED REASON FOR POWER OUTAGE DATE TIME DATE TIME OUTAGE D.C Office Premises, Rto Office, Perampalli, Moodusagri, Sagri Udupi Manipal 110/33/11Kv Manipal Vp Nagar Manipal 04.05.2020 10:00 04.05.2020 14:00 4:00 Maintenance Work Nole, And Near By Places D.C Office Premises, Rto Office, Perampalli, Moodusagri, Sagri Udupi Manipal 110/33/11Kv Manipal Vr Nagar Manipal 04.05.2020 10:00 04.05.2020 14:00 4:00 Perampalli Road Widening Work Nole, And Near By Places Maintenance Work And New Ht Line Execution Udupi Manipal 110/33/11Kv Manipal Industrial Manipal 04.05.2020 10:00 04.05.2020 14:00 4:00 Shivalli Industrial Area Work Anantha Nagar, Indrali Railway Station, Paniyadi, Indira Nagar, Udupi Manipal 110/33/11Kv Manipal Indrali Manipal 04.05.2020 10:00 04.05.2020 14:00 4:00 Chitapady, Diana Theater, Kunjibettu, Hayagrivanagar, Kukkitte, Maintenance Work Mig Hudco Colony Laxmindra Nagar Udupi Manipal 110/33/11Kv Manipal Kmc Manipal 04.05.2020 10:00 04.05.2020 14:00 4:00 Kmc Maintenance Work Udupi Manipal 110/33/11Kv Manipal Mit Manipal 04.05.2020 10:00 04.05.2020 14:00 4:00 Mit Maintenance Work Udupi Manipal 110/33/11Kv Manipal Manipal Town Manipal 04.05.2020 10:00 04.05.2020 14:00 4:00 Manipal Town Maintenance Work Udupi Manipal 110/33/11Kv Manipal Moodubelle