CONCORD CONST. ɔ BRUCE FREEMAN RAIL TRAIL PHASE 2C

HISTORIC MARKER INVENTORY 7:00 PM

SHEET TOTAL STATE FED. AID PROJ. NO. REFERENCE DESCRIPTION REFERENCE DESCRIPTION REFERENCE DESCRIPTION NO. SHEETS 1 BEGINNING OF EXTANT RAILS AND TIES 17 FOOTING 33 MILE POST MA ---- 245 328

2 RELAY CABINET 18 SWITCH 34 FARM CROSSING PROJECT FILE NO. 605189 26-Jan-2016 3 RELAY BOX ON POLE 19 SWITCH 35 RELAY BOX CONSTRUCTION DETAILS

4 NORTHERLY NASHOBA BROOK BRIDGE 20 WAREHOUSE FOUNDATION 36 WHISTLE POST Plotted on 10' HMA PATH 5 FLANGER SIGN 21 FOOTING 37 CULVERT COBBLESTONE SPLITTER 6 WHISTLE POST 22 FLANGER SIGN 38 FLANGER SIGN R=1.0' 7 WHISTLE POST 23 UNION STATION 39 FLANGER SIGNS 8 MILE POST 24 CONCORD JUNCTION 40 CROSSBUCK SIGN CEMENT 9 SWITCH LEVER 25 BATTERY WELL 41 CROSSBUCK SIGN

10 INTERLOCKING AND TRACK 26 TELEGRAPH POLE 42 FLANGER SIGN 605189_HD(CD).DWG EOP 11 RETAINING WALL 27 FOOTING 43 SEMAPHORE 5.0' 10' 5.0' 12 WHISTLE POST 28 FOOTING 44 TROUGH OR CONDUIT PROP. GRANITE (MEASURED 13 WHISTLE POST 29 ASSABET RIVER NORTH BRIDGE ABUTMENT 45 PRIVATE RESIDENTIAL CROSSING ALONG EDGING TYPE SB BASELINE) 14 COUPLER 30 ASSABET RIVER SOUTH BRIDGE ABUTMENT 46 WARNING SIGN 15 SWITCH LEVER 31 RELAY BOX 47 MILE POST 16 SOUTHERLY NASHOBA BROOK BRIDGE 32 EXTANT RAIL AND TIES 48 FARM CROSSING

CAST IRON X = REFERENCE NUMBER; SEE PLANS FOR LOCATIONS DETECTABLE 2.0'* WARNING PANEL (SEE E 107.6.5R) NOTE: HISTORIC MARKERS 1-7 ARE LOCATED BEYOND THE PROJECT LIMITS IN BFRT PHASE 2B

EXISTING ROADWAY 5.0' STONE FOR PIPE ENDS (TO BE USED ON BOTH INLET AND OUTLET) R=1.0' (TYP) FLARED END STRUCTURES SHALL BE INSTALLED IN LOCATIONS SHOWN ON PLANS AND MORTARED TO CONCRETE CHANNEL OR INSTALLED AS SPECIFIED BY THE MANUFACTURER

*ENTRANCES WHICH CROSS SIDEWALKS SHALL HAVE SPLITTER STONE FOR PIPE END TO MEET SET BEHIND THE SIDEWALK. (SEE SHEET 256 FOR DETAILS) PROPOSED INVERT AS SHOWN ON PLANS MEET PROPOSED GRADING PROP. 2' STONE DUST SHOULDER TO MEET TOP OF AT MAX. 1.5:1 SLOPE CEMENT CONCRETE TRAIL ENTRANCE WITH SPLITTER ISLAND CONCRETE SIDEWALL WHERE SHOWN ON PLANS N.T.S. GALVANIZED IMPACT CHANNEL MOUNTED B ON TOP OF 5000 PSI CONCRETE SIDEWALL

TYPICAL GALVANIZED STEEL LID SECTION 3'-4" TOP OF GRANITE VARIES CURB GUTTER LINE AND EDGE OF ROADWAY A A

1'-11 1/2" 1'-6" 1/4" 5'-11 1/2" 6" REVEAL MEET EXISTING

CUT END TO FIT SQUARELY WIDTH VARIES - SEE PLAN AGAINST ADJOINING CURB PLAN PROP. GRANITE TRANSITION CURB

B MEET PROPOSED GRADING TRANSITION CURB DETAIL AT MAX. 1.5:1 SLOPE N.T.S. TO BE USED AT ALL LOCATIONS WHERE WIDTH VARIES - SEE PLAN VERTICAL GRANITE CURB ENDS

TOP OF STEEL LID TO MATCH CROSS SLOPE OF PROPOSED GALVANIZED IMPACT 1 SHARED USE PATH 1 4"MIN. TO 2" MAX. O.D. GALV. STEEL ELEVATION VARIES (SEE PLAN) CHANNEL POST AND RAILS (BOTH SIDES) H20 RATED GALVANIZED STEEL LID 3 1/2" 1'-6" PROPOSED 12" 30' (MAX.) 12" SHARED USE PATH (MIN.) (MIN.) OR DRIVEWAY 4' (TYP.) 12" (TYP.) GRIND 11' TYP 1% MIN. SLOPE SMOOTH (4' MIN)

ALL WELDS 1'-7 1/2" 6" - 1 1/2" CRUSHED STONE PROVIDE BOTTOM 6" MIN. RAIL FOR EDGE (TYP.) LEVEL 5000 PSI CEMENT CONCRETE 5000 PSI CEMENT CONCRETE

3" MAX. PROTECTION (TYP) 4" LEVEL LANDING 18"-20" 1

34"-38" 6" - 1 2" CRUSHED LANDING 30" RISE (MAX.) AREA NON-WOVEN GEOTEXTILE FABRIC STONE BEDDING 10" NON-WOVEN

34"-38" 12 AREA 1 GEOTEXTILE FABRIC SIDEWALK STONE FOR PIPE ENDS (TYP.) 18"-20" SECTION A-A SECTION B-B COMPACTED PROP. FULL DEPTH HMA BIKE TRAIL End View BORROW NOTE: PREFABRICATED TRENCH SHALL BE A MINIMUM 12" INTERIOR NOTE: DEPTH AND 10" INTERIOR WIDTH TO ENSURE ADEQAUTE CAPACITY. 1. FOR ADDITIONAL DETAIL SEE 521 CMR 24.00 RAMPS. WALL HEIGHTS, THICKNESS, AND GALVANIZED STEEL LID DIMENSIONS COMPACTED SUBGRADE MAY DIFFER FROM DETAIL ONLY IF THE PREFABRICATED TRENCH MEETS H20 LOAD DESIGN STANDARDS. FINAL TRENCH DESIGN SHALL BE SUBMITTED TO THE FOR APPROVAL.

RAMP WITH HANDRAIL TRENCH DRAIN N.T.S. N.T.S. CONCORD BRUCE FREEMAN RAIL TRAIL PHASE 2C 7:00 PM

SHEET TOTAL STATE FED. AID PROJ. NO. NO. SHEETS MA ---- 246 328

EDGE OF TRAIL PROJECT FILE NO. 605189 26-Jan-2016

PROP 2" x 6" (NOMINAL CONSTRUCTION DETAILS

DIMENSIONS) PRESSURE TREATED Plotted on RAIL

2 FT. (PREFERRED) 1 FT. (MIN.) ȭ POST

BUTT 10 FT. 6" x 6" x 8' PRESSURE TREATED ‘[/21**$/9$1,=(' 605189_HD(CD).DWG POST (SPACED 6' O.C.) 1.5" CARRIAGE BOLT, NUT AND WASHER (TYP.) 1.5" SEE SLEEVE CONNECTION DETAIL BELOW COUNTER SINK CARRIAGE BOLTS.

3 FT. 6" x 6" x 5' GALVANIZED STRUCTURAL TUBING RAIL

FINISHED GROUND ELEVATION 1.5" 1.5" 6" x 6" x 8' PRESSURE TREATED TYPICAL FENCE TRANSITION POST ELEVATION SECTION AT FENCE APPROACHES ALL SIDES OF POST AT TUBE STEEL (TYP.) N.T.S. BUTT JOINT CONNECTION 4.5' MIN. BACKFILL WITH ‘[*$/9$1,=('/$* N.T.S. GRAVEL BORROW SCREW (TYP.)* (TYP.) (M1.03.0 - TYPE b) 1.75" 2.5" ȭ POST

1.75" 2' (PREFERRED), 1' (MIN.) PROPOSED ‘“ FINISHED GROUND 1.5" ‘[/21**$/9$1,=(' EDGE OF 6" x 6" x 5' GALVANIZED TUBE CARRIAGE BOLT, NUT AND WASHER STEEL TIMBER RAIL FENCE TUBE STEEL SLEEVE ȭ RAIL (TYP.) (FOR USE IN SATURATED LOCATIONS AND *SAME SCREWS OPPOSITE SIDE. COUNTER SINK CARRIAGE BOLTS. THROUGH WEST CONCORD CENTER) SLEEVE CONNECTION DETAIL N.T.S. N.T.S.

TIMBER RAIL FENCE ELEVATION SECTION INTERMEDIATE CONNECTION N.T.S.

“ 6 PROP. 2" x 6" 1 (TYP.) CONNECTIONS AND BOLTS PROP. 2" x 6" 6.0' 6.0' TO MATCH STANDARD (NOMINAL (NOMINAL TIMBER RAIL FENCE DIMENSIONS) DIMENSIONS) PRESSURE INTERMEDIATE A ‘[/21**$/9$1,=(' 2 PRESSURE CARRIAGE BOLT, NUT AND TREATED RAIL (MAX. SLOPE) 1 CONNECTION TREATED RAIL (SEE DETAIL) WASHER (TYP.)

“ TRAIL PAVEMENT SECTION 6" x 6" x 8.0' PRESSURE 6" x 6" x 8.0' PRESSURE “ TREATED CONNECTION POST TREATED 4.0' 3.5' “ (TYP.) INTERMEDIATE POST

“ “ 6" x 6" x 8.0' PRESSURE FINISHED GROUND ELEVATION TREATED POST SECTION A-A BUTT JOINT CONNECTION SUGGESTED TIMBER RAIL FENCE CONSTRUCTION SEQUENCE (SEE DETAIL)

1. AUGER OR DIG POST HOLE TO REQUIRED DIMENSIONS. 4.5' MIN. BACKFILL WITH 4.0' MIN. GRAVEL BORROW 2. IF GROUND IS SATURATED, USE TUBE STEEL SLEEVE. SEE DETAIL ON THIS SHEET. (TYP.) (M1.03.0 - TYPE b) 3. %$&.),//%27720“2)+2/(:,7+*5$9(/$1'&203$&77+2528*+/<

4. SET POST AND HOLD PLUMB DURING BACKFILLING.

5. BACKFILL WITH GRAVEL IN 12" LIFTS. COMPACT EACH LIFT THOROUGHLY. ‘“ A 6. CLAMP RAILS TO POSTS AND FIELD DRILL BOLT HOLES. ‘“

7. SET BOLTS, WASHERS AND NUTS. NOTES: 1. FOR RADII LESS THAN 165', USE CONNECTION 8. IF CCA PRESSURE TREATED LUMBER IS NOT READILY AVAILABLE AT THE TIME OF TIMBER RAIL FENCE ELEVATION POSTS SET AT 6.0' O.C. AND SHORTEN RAILS CONSTRUCTION OR IT IS DEEMED ENVIRONMENTALLY UNACCEPTABLE FOR COMMERCIAL USES N.T.S. ACCORDINGLY. BY THE EPA, USE ACQ PRESSURE TREATED LUMBER. SEE PLANS FOR LOCATIONS CONCORD BRUCE FREEMAN RAIL TRAIL PHASE 2C 7:00 PM

SHEET TOTAL STATE FED. AID PROJ. NO. NO. SHEETS MA ---- 247 328

PROJECT FILE NO. 605189 26-Jan-2016

PROP. 2" x 6" (NOMINAL CONSTRUCTION DETAILS DIMENSIONS) PRESSURE C Plotted on TREATED RAIL (TYP.) D REMOVABLE TOP RAIL

E 605189_HD(CD).DWG A B

ƒ

4.0' GRAPHIC PANEL 3.5' (DESIGN TO BE PROVIDED BY THE TOWN OF CONCORD. SEE SPECIAL PROVISIONS FOR DETAILS) 3" MIN.

2" MIN. 32" 6" x 6" x 8.0' PRESSURE TREATED POST CONT. PROP. HMA SHARED FINISHED GROUND ELEVATION FINISH USE PATH TO 2" GRAVEL GRADE POST

2" GRAVEL 18"

CONCRETE CONCRETE REBAR (PER MANUFACTURER)

GRAVEL GRAVEL

INTERPRETIVE SIGN N.T.S.

DIMENSION TABLE SIGN TYPE HEIGHT WIDTH DEPTH A B C D E 26" x 38" 26" 23" 38" 35" 26.5"

43"

+,1*(3267‘ BARRIER GATE: 36" SCHED. 40 SLEEVE ‘6&+('3,3( PIPE WITH 1/2" THICK CL 4 7/16" ‘/2&.,1*3267 STEEL CAP WITH 1/2" 16'-0" CL RADIUS EDGE LOCK BOX, SEE ‘*$7(3,3( 9'-0" LOCK BOX DETAIL END PLATE: 6 7/8" 3"X 3/8" STEEL 6 7/8" WITH 2"x2" HOLE CL CL 48" 56" HINGE POST TOP BENT STEEL LOCK GRAPHIC PANEL PROP. FULL DEPTH HMA “ :,7+“6/27$7 (DESIGN TO BE PROVIDED BY SHARED USE PATH CENTERLINE GRIND THE RIVER STEWARDSHIP 96" 3'-0" SMOOTH COUNCIL. SEE SPECIAL TOP OF FOOTING AT HINGE POST BASE 1 1/2" (TYP.) 3 3/4" PROVISIONS FOR DETAILS) 6" 2% 2% 2% SLOPE, TO MEET FINISH GRADE 4"x4" PRESSURE 4"x4" PRESSURE 1 3/4" TREATED POST (TYP.) TREATED POST (TYP.) 4 1/4" 40"

3'-6" 4000 PSI CONCRETE FOOTING, PROP. PERVIOUS PAVERS 4'-0" SLOPE TOP OF FOOTING AWAY (SEE SHEET 251 FOR DETAILS) )5203267‘6&+('3267

1" 1" 8" COMPACTED 4 9/16" 8" GRAVEL BORROW COMPACTED OR LOCK BOX DETAIL CUT HOLE IN PROP. FILTER UNDISTURBED SUBGRADE N.T.S. 3'-0" 3'-0" 4.0' MIN. 4.0' MIN. FABRIC FOR NOTES: POST

1. ALL STEEL SHALL BE GALVANIZED INSIDE AND OUT.

3529,'(‘:((3+2/(6$7:(/'('&211(&7,216 3/$&(6  STEEL PIPE ACCESS GATE EXTEND PERVIOUS N.T.S. 3. INSTALL BRASS BUSHINGS AFTER GALVANIZING. PAVER GRAVEL ‘“ BORROW FOR RIVER STEWARDSHIP COUNCIL (RSC) SIGN POST FOUNDATION N.T.S. CONCORD BRUCE FREEMAN RAIL TRAIL PHASE 2C 7:00 PM

SHEET TOTAL STATE FED. AID PROJ. NO. NO. SHEETS MA ---- 248 328

PROJECT FILE NO. 605189 26-Jan-2016

CONSTRUCTION DETAILS Plotted on 24" 72"

1' 605189_HD(CD).DWG BIKE STORAGE

30" (TYP.) 24" LOW MODULAR BLOCK WALL TO BE DESIGNED BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER CONCRETE BASE SLAB FOR APPROVAL. EXCAVATION AND REPLACEMENT OF BIKE RACK ELEMENT (TYP.) 6 X 6 W2.9 X W2.9 WELDED WIRE MESH, 3 IN. ANY UNSUITABLE MATERIALS BELOW THE LOW SEE DETAIL BELOW 1.5% (MAX.) CLEARANCE (TYP.) MODULAR BLOCK WALL LIMITS AS DIRECTED BY THE ENGINEER, WILL BE MEASURED AND PAID FOR AS DEFINED IN SECTIONS 120, 140, AND 150. 3' (MAX.) EXIST. GROUND 6" CEMENT CONCRETE SURFACE

48" 8" COMPACTED GRAVEL BORROW TYPE C 8" CLEAR SPACE EDGE OF TRAIL COMPACTED SUBGRADE

1.5% (MAX.) BACKFILL AND DRAINAGE AS NOTES: REQURIED BY WALL MANUFACTURER 1' (MIN.) x ALL DIMENSIONS MINIMUM FINISHED GROUND x SEE PLANS FOR QUANTITY OF BIKE RACK ELEMENTS BICYCLE RACK PLACEMENT CEMENT CONCRETE FOUNDATION BASE UNITS TO BE INSTALLED ON LEVEL GRADE (MATERIAL AS 24" REQUIRED BY WALL MANUFACTURER)

R=10.25" LASER-CUT LOGO. LOGO DETAIL TO BE PROVIDED LOW MODULAR BLOCK WALL SEE INSET DETAIL FOR BY THE TOWN OF LOGO REQUIREMENTS CONCORD (STA. 129+32 TO 129+79) 3 APPROX. 8" WEEP HOLE N.T.S. 1 1 12"- 8" THICK BLACK (EITHER SIDE) POLYETHYLENE TUBE SPLIT ALONG BOTTOM, RIVETED ALONG BOTH SIDES OF SPLIT 1.5" O.D. PIPE (MIN.) MITER TUBE (LEANING BAR) FOR WELDING

PROP APEX LOGO TEXT TOP 2" 36" WIDE HEAD TAMPER RESISTANT RIVETS (TYP) INSET DETAIL

3 APPROX. 8" WEEP HOLE (EITHER SIDE) ENGRAVED TEXT SHALL BE 2.5" HIGH, M TAHOMA FONT PAINTED BLACK OR 22" 1.9" O.D. PIPE (MIN.) APPROVED EQUIVALENT 1 8" THICKNESS I 3'-10" THERMAL FINISH (OPPOSITE SIDES) WITH ROUGH CUT FINISH ENGRAVED TEXT AS SHOWN ON PLAN L (OPPOSITE SIDES) FRONT VIEW E 5/8" EDGE OF BIKEWAY PROPOSED FINISHED X.X GRADE EDGE OF SHOULDER 3'-0" MIN 3" CONCORD

1" 1.5" MILE POST NUMBER 3'-6" NOTES: 3 AS SHOWN ON PLAN APPROX. 8" WEEP HOLE (TYP) ALIGN WITH INSIDE OPENING ENGRAVED TEXT SHALL BE 1. EACH BIKE RACK SHALL INCLUDE A OF PIPE LASER-CUT LOGO. LOGO DETAIL TO BE 0.75" HIGH, TAHOMA FONT PAINTED BLACK OR APPROVED

PROVIDED BY THE TOWN OF CONCORD. 6" 9 EQUIVALENT 16" DIA. 2. DIMENSIONS ARE APPROXIMATE AND WILL 6" 6" BE DETERMINED IN COORDINATION WITH THE MANUFACTURER. BIKE RACK ELEMENTS TO BE TOP VIEW OF THE INVERTED "U" OR "A" TYPE AS DEFINED IN "BICYCLE PARKING GUIDELINES" BY ASSOCIATION OF PEDESTRIAN AND BICYCLE PROFESSIONALS. BICYCLE RACK ELEMENT DETAIL GRANITE MARKER 3. EACH BIKE RACK SHALL ACCOMMODATE N.T.S. TWO BICYCLES. N.T.S. CONCORD BRUCE FREEMAN RAIL TRAIL PHASE 2C 7:00 PM

SHEET TOTAL STATE FED. AID PROJ. NO. NO. SHEETS MA ---- 249 328

PROJECT FILE NO. 605189 26-Jan-2016

CONSTRUCTION DETAILS 5'-6" CEDAR SHINGLES Plotted on 6"X10"

A 6"X8" 2'-10"

CUT DRAINAGE HINGES (GALV.) BEAD TO KEEP SIGN 6"X6"

WEATHERTIGHT 605189_HD(CD).DWG 2"X2" 1 1 1" WOODEN (1 2"X1 2" ACTUAL)

2"X2" 6" SPACER 6"X10" BETWEEN SIGNS 8" 6'-2" BRUCE FREEMAN RAIL TRAIL DISPLAY BOARD 1 3 (ACTUAL SIGN AREA 40 4"x62 4") ECG SIGNS 3'-7 1/4" ATTACHED TO SIGN PANEL "A" SIGN PANEL "B" SIGN PANEL "C" PLYWOOD

1 1 1 1 1 1 3'-7 1/4" (20 4"x40 4" (20 4"x40 4" (20 4"x40 4" BRUCE FREEMAN RAIL TRAIL SIGN

1 4 3 " PLEXIGLASS 4" PLYWOOD OR (ATTACHED TO 2"X2" TOP PARTICLE BOARD AND BOTTOM ONLY, AND NAILED TO 2"X2" COVERS 2"X2" EDGING)

EDGING 6'-6" 3'-7 1/4" A

5'-7 1/4" 6"X10"

MEET PROP. CONCRETE BASE OF 10" X 10" COLUMN FOOTING WITH PROP. HMA

1.5% MAX. SLOPE SHARED USE PATH 10"X10" 1" LOCK OR FASTEN 2"X2" EDGING NAILED SIGN COVER AS TO END PANEL DESIRED

2"X2" 2"X2"

OPTIONAL SLOPE FOR DRAINAGE 48"

PROP. FOOTING SEE DETAIL 2 FOR CONNECTION 6"X10" DETAIL

PROP. #4 BARS SPACED 9" CENTER PROP. 20" DIAMETER CONCRETE 20" SECTION A-A TO CENTER FOOTING. SEE DETAIL 1 FOR CONNECTION DETAIL DISPLAY BOARD DETAILS N.T.S.

PROP. 10" X 10" COLUMN PROP. 10" X 10" COLUMN 3 PROP. 4" DIA. BOLTS 1 3 1 2" PROP. 4" DIA. BOLTS PROP. COLUMN BOTTOM 1 3" 1 2" 1 PROP. COLUMN BOTTOM PROP. FINISHED GRADE 5 4" 3" 1 PROP. FINISHED GRADE 5 4" 8" 8"

3" PROP. 4000 PSI CONCRETE FOOTING PROP. 4000 PSI PROP. COLUMN CONCRETE FOOTING CONNECTOR PROP. COLUMN PROP. #4 BAR CONNECTOR SPACED 9" CENTER PROP. #4 BAR TO CENTER SPACED 9" CENTER TO CENTER

COLUMN BASE - DETAIL 1 N.T.S. COLUMN BASE - DETAIL 2 N.T.S. CONCORD BRUCE FREEMAN RAIL TRAIL PHASE 2C 7:00 PM

SHEET TOTAL STATE FED. AID PROJ. NO. NO. SHEETS MA ---- 250 328

PROJECT FILE NO. 605189 26-Jan-2016

6" ENGRAVED MASON GRANITE INSERT CONSTRUCTION DETAILS

(SEE SPECIAL PROVISIONS FOR DETAILS) Plotted on

GRANITE PIER 5'-6" (16" SQUARE) PREFABRICATED BENCH - SEE SPEC. REFLECTORIZED PANEL) FOR TYPE AND MANUFACTURER

FINISHED GRADE 605189_HD(CD).DWG EDGE OF SEE PLAN FOR MATERIALS TRAIL 3.0' (MIN.)

9"

PITCH TOP OF 3.0' (MIN.) 3.0' (MIN.) 3.0' (MIN.) CONCRETE FOOTING EMBEDMENT POST- SEE SPEC. FOR TYPE AND MANUFACTURER 3.0' (MIN.)

4000 PSI, 1.5 INCH, 1.5% (MAX.) 17" MIN. -19" MAX. 1.5% (MAX.) 4" CEMENT CONCRETE PAVEMENT FINISHED GRADE 4' 565 CEMENT CONCRETE FOR POST FOUNDATION

COMPACTED GRAVEL BORROW TYPE C

1' COMPACTED CRUSHED STONE BASE

2.0' EDGE OF TRAIL 1' COMPACTED SUBGRADE

CONCRETE GRANITE PIER 1.0' FOOTING N.T.S.

BENCH N.T.S.

ANGLE CUT PROP. 4" COMPOST TOP SURFACE MOUNTED TOPSOIL & SEED OR HMA FOR SIGN PER PLAN INFORMATIONAL VISIBILITY CEM. CONC. COLLAR 8" THICK MIN. 4000 SIGN 1 PSI, 1 2", 565 LB. CEMENT CONCRETE ƒ EXISTING SURFACE PROP. FRAME

1/2" & COVER 2'

3'-10" SUITABLE MATERIAL ROUGH CUT FINISH (OPPOSITE SIDES) 10" DIP, SEE PLANS FOR INVERTS

PROPOSED FINISHED 5' GRADE

5.5' GEOTEXTILE FABRIC

3'-6" 4" THICK

3 1 4" TO 1 2" CRUSHED 18" 1' STONE 6"

2' 6' 2'

NOTES: GRANITE INFORMATIONAL SIGN LEACHING BASIN 1. CEMENT CONCRETE FOR LEACHING BASIN SHALL BE 1 N.T.S. N.T.S. 4000 PSI, 1 2", 565 LB. 2. IF CONCRETE BLOCK, WALL THICKNESS = 6" 3. IF REINFORCED/PRECAST, WALL THICKNESS = 5" MIN. 18" SOLDIER COURSE OF PAVERS CONCORD GRANITE CURB TYPE VB, (SEE NOTE 1) BRUCE FREEMAN RAIL TRAIL PHASE 2C INSTALLED FLUSH (SEE NOTE 2) 7:00 PM

SHEET TOTAL STATE FED. AID PROJ. NO. SURFACE WATER FLOWS THROUGH NO. SHEETS OPENINGS IN PAVERS. 3' MIN. CLEAR MA ---- 251 328

6" 10' MIN. PATH WIDTH WIDTH PROJECT FILE NO. 605189 26-Jan-2016

1 6" 18" - 1" TO 12" DBL WASHED CRUSHED STONE CONSTRUCTION DETAILS Plotted on 3 4" - DOUBLE WASHED 4" STONE

1 2" - DOUBLE WASHED 4" LEVELING STONE 18" SOLDIER COURSE OF 18" GRASS PAVERS (SEE NOTE 1) VARIES POROUS PAVER (SEE NOTE) AREA PROP. 3/4" CRUSHED PROP. HMA TRAIL STONE

PROP. GRAN. CURB 605189_HD(CD).DWG TYPE VB 18" PROP. STONEDUST MIN. 1.0' OVERLAP SHOULDER WIDTH VARIES, SEE PLANS PROP. HMA PARKING LOT

GRAVEL BACKFILL FILTER FABRIC AS DIRECTED GRAN. CURB TYPE VB PITCH PAVERS TO BY ENGINEER INSTALLED FLUSH DRAIN PER PLAN (SEE NOTE 2) OVER-DIG GRAN. CURB TYPE VB UNSUITABLE SOIL INSTALLED FLUSH 3 1 (SEE NOTE 2) 4" TO 1 2" CRUSHED

NOTE: STONE 3.0' 1. THE EXACT COLOR AND LAYOUT PATTERN SHALL MATCH EXISTING PAVERS LOCATED IN JUNCTION PARK (APPROX. STA. 125+20 TO STA. 126+50). COLOR AND PATTERN SHALL BE VERIFIED BY TOWN OFFICIALS, SEE SPECIAL PROVISIONS. 2. GRANITE CURB INSTALLED ON THE EXISTING BRIDGE DECK OVER NASHOBA BROOK SHALL BE CUT DOWN TO A HEIGHT OF 4". GEOTEXTILE FABRIC PERVIOUS PAVER TYPICAL SECTION PAVER LAYOUT DETAIL NOT TO SCALE NOT TO SCALE

2.0'

DRAINAGE TRENCH DETAIL (STA. 131+35 - 133+33) N.T.S. RAIL REMOVED & RESET IN CONCRETE IN REST AREA (SEE SHEET 56 FOR LOCATION) CEMENT CONC. FOR SETTING EXIST. SWITCH PERVIOUS PAVER REST AREA (TYP.)

12"

PROP. GRAN. CURB PROP. HMA TRAIL TYPE VB MIN. 1.0' OVERLAP

4" (MIN.) (TYP.) FROG SWITCH PROP. HMA PARKING LOT

FROG SWITCH & RAILS N.T.S. CEM. CONC. CEMENT CONC. FOR DEPTH OF SWITCH GEAR REMOVED FROM 4" (MIN.) (TYP.) SETTING EXIST. TRACK UNKNOWN EXIST. RAILROAD TRACK AND RESET SWITCH GEAR REMOVED SWITCH GEAR 1/4" (MAX.) PERVIOUS PAVER IN CONCRETE ON BRIDGE REST AREA CEM. CONC. AND RESET REST AREA (SEE SHEET 56 FOR LOCATION) 3/4" TO 1 1/2" CRUSHED STONE DEPTH OF 6" (MIN.) (TYP.) SWITCH GEAR PERVIOUS PAVER

UNKNOWN REST AREA 4.0' CRUSHED STONE DEPTH VARIES 4 6" PERF. SUBDRAIN “ - 2" CRUSHED STONE DEPTH VARIES MEMBRANE 6" (MIN.) WATERPROOFING RAIL REMOVED (TYP.) (SPRAY APPLIED) PERVIOUS PAVER 2" SAND GEOTEXTILE FABRIC EXIST. 8" AND RESET REST AREA

REINF. CONC. 0.5'  “ DECK TO REMAIN 2" (MIN.) CONC. COVER MEMBRANE WATERPROOFING 2" (MIN.) CONC. COVER 4.00' EXIST. 8" REINF. (SPRAY APPLIED) SECTION 3 SWITCH GEAR CONC. DECK TO REMAIN N.T.S. N.T.S. SECTION 4 NOTES: N.T.S. 1. DIMENSIONS OF EXISTING RAILS AND SWITCH GEAR ARE TO BE FIELD VERIFIED PRIOR TO PLACEMENT IN CONCRETE. 3 2. RAILS AND SWITCH GEAR SHALL BE RESET IN 4000 PSI, 4", 610 CEMENT CONCRETE AND ANCHORED AS DIRECTED BY THE ENGINEER. DRAINAGE TRENCH DETAIL (STA. 133+33 - 135+90) TRACK SWITCH REMOVE & RESET N.T.S. N.T.S. CONCORD BRUCE FREEMAN RAIL TRAIL PHASE 2C 7:01 PM

SHEET TOTAL STATE FED. AID PROJ. NO. NO. SHEETS MA ---- 252 328

BEE-HIVE FRAME & GRATE PROJECT FILE NO. 605189 26-Jan-2016 STANDPIPE RIM ELEV. = 126.27 CONSTRUCTION DETAILS 9' (TYP) STAND PIPE RIM=126.27

CURB SET FLUSH Plotted on ALL AROUND 8" FREE BOARD TOP COAT A PLANT TYPE AND LOCATION AS DIRECTED BINDER 24" A ELEV. VARIES ELEV. = C (SEE GRADING PLANS) B DECORATIVE SLOPE ANCHOR GEOTEXTILE ELEV. = D 605189_HD(IB).DWG STABILIZATION STONES

ON 2:1 SLOPE ELEV. 125.60 1 ELEV. = E

2"MULCH 3 BTM. OF BIO-RET AREA ELEV. = F SPECIAL SOIL 2:1 SLOPE ELEV=125.60 FOREBAY WEIR STONE 6" OF 3/4" CRUSHED STONE MIX (SEE NOTE) SIZE D50= G 8-OZ NON-WOVEN FILTER FABRIC 18" 12" DIP TO DMH SOIL 12" STONE MEDIUM 12" CRUSHED STONE A 24" HDPE PIPE PERFORATED INV=123.90 ‘3(5)25$7('+'3( (SEE STANDPIPE OVERFLOW BTM ELEV. 124.10 DETAIL) 18" MIN. OUTLET THRU HDPE FITTING 3'-0" 12" PERFORATED PVC CORE 12" OPENING PIPE IN 3'x4' STONE TRENCH 3 3 HDPE FITTING (BOTH SIDES) BASIN BOTTOM (TYP.) 1 1 3' 12" PERF. HDPE PIPE 1'-0" INV=122.10 TOP STONE= 4' 6" RIPRAP 124.10 8-OZ NON-WOVEN 12" OVERFLOW STONE FILTER FABRIC INV=123.90 SECTION 3' 12" PER. HDPE PIPE 12" PER. HDPE PIPE NOTES: INV.= INV.= 3' SECTION A-A 1.SNOW SHOULD NEVER BE STORED IN BIO-RETENTION AREAS. 122.10 122.10 2.THE SOIL MIX FOR BIO-RETENTION AREAS SHOULD BE A MIX 4" OF SAND, COMPOST, AND SOIL. BTM STONE= -40% SAND FOREBAY WEIR DESIGN TABLE 121.10 BTM=121.10 -20 TO 30% TOPSOIL AND, A B C D E F G -30 TO 40% COMPOST 6" IB-1 12' 6' 126.60 126.10 125.10 124.60 6" AND SHOULD CONFORM TO THE SPECIFICATIONS IN THE STORM- BTM EXCAVATION= WATER HANDBOOK ('08) VOL. 2 CH. 2 PAGE 26. “ CONCRETE FOREBAY RIPRAP WEIR (TYP.) BIO-RETENTION DETAIL NOTES: NOT SUBJECT TO VEHICLE LOADING. NTS NTS

BIO-RETENTION DESIGN ELEVATIONS STANDPIPE OVERFLOW DETAIL WQV 2-YR 10-YR 25-YR 100-YR NTS BIO-1 126.16 126.36 126.39 126.40 126.42 PAVERS TO MATCH SELECTION OF PAVERS BY TOWN OFFICIALS FOR USE IN OTHER PROJECT AREAS. SEE NOTE 1

1 2" - 4" LEVELING STONE

136 137 8" COMPACTED GRAVEL BORROW TYPE C COMPACTED PROP. 10.0' FULL DEPTH PROP. HMA SUBGRADE HMA SHARED USE PATH PARKING SURFACE PROP. GRAN. 602 BOTTOM OF FOREBAY CURB 0" REVEAL 601 PROP. GRAN. CURB TYPE VB (TYP.) NOTES: 1. PAVERS SHALL MATCH THE TYPE SELECTED BY TOWN OFFICIALS FOR USE IN AREAS WHERE PERVIOUS PAVERS ARE PROPOSED. INSTALLATION OF PAVERS IN SEDIMENT FOREBAY IS NOT INTENDED TO BE PERVIOUS. SPACING BETWEEN PAVERS NOT REQUIRED. PROP. SEDIMENT FOREBAY WITH PAVERS AT BOTTOM PROP. 34'-12" DIP 2:1 SLOPES (SEE NOTE) BOTTOM ELEV.=125.10 R&R VGC (REQ. VOLUME=69 CF) PROP. PERF. HDPE PIPE (PROP. VOLUME=75 CF)

NOTE: SEE SHEET 75 FOR CLOSED DRAINAGE PLAN VIEW SYSTEM AND UTILITY INFORMATION 1" = 20' SEE SHEET 240 FOR LANDSCAPE PLANS

0 20 50 100

SCALE: 1" = 20' CONCORD 6" COMPOST TOPSOIL BRUCE FREEMAN RAIL TRAIL PHASE 2C 7:01 PM

TOP OF EMERGENCY SPILLWAY SHEET TOTAL STATE FED. AID PROJ. NO. ELEV. "F" NO. SHEETS MA ---- 253 328

PROJECT FILE NO. 605189 26-Jan-2016 4" COMPOST VARIES 100-YR. ELEV. "C" 10-YR. ELEV. "B" TOPSOIL & SEED CONSTRUCTION DETAILS 2-YR. ELEV. "A" TOP OF PAVERS TO MATCH FOREBAY Plotted on "C" SELECTION OF PAVERS BY TOWN OFFICIALS FOR USE "B" 3 VARIES IN OTHER PROJECT "A" 1 AREAS. SEE NOTE 1 A

A 2" - 1" LEVELING PAVERS AT BOTTOM OF 4 ELEV. = C FOREBAY. SEE DETAIL THIS STONE B BOTTOM OF BASIN SHEET ANCHOR GEOTEXTILE 605189_HD(IB).DWG ELEV. "E" ELEV. = D 12" COMPOST MIXED 1 ELEV. = E

3 WITH NATIVE SOILS 8" COMPACTED ELEV. = F GRAVEL BORROW FOREBAY WEIR STONE 6" OF 3/4" CRUSHED STONE TYPE C SIZE D50= G 8-OZ NON-WOVEN FILTER FABRIC 12" RIPRAP STONE COMPACTED A SUBGRADE

TYPICAL INFILTRATION BASIN CROSS-SECTION BOTTOM OF SEDIMENT FOREBAY NTS 3'-0" 3 3 NOTES: BASIN BOTTOM (TYP.) 1 1 1. PAVERS SHALL MATCH THE TYPE SELECTED BY TOWN OFFICIALS FOR USE IN AREAS WHERE PERVIOUS PAVERS 1'-0" ARE PROPOSED. INSTALLATION OF PAVERS IN SEDIMENT 6" RIPRAP FOREBAY IS NOT INTENDED TO BE PERVIOUS. SPACING STONE 8-OZ NON-WOVEN BETWEEN PAVERS NOT REQUIRED. 8" COMPACTED GRAVEL FILTER FABRIC BORROW TYPE C SECTION A-A

FOREBAY WEIR DESIGN TABLE A B C D E F G IB-1 12' 6' 136.20 135.70 134.70 134.20 6"

FOREBAY RIPRAP WEIR (TYP.) NTS

PROP. 10.0' FULL DEPTH HMA SHARED USE PATH (TYP.) PROP. INFILTRATION BASIN

BOTTOM OF POND ELEV. 133.60 T-2 PROP. 2' STONE DUST SHOULDER (TYP.) 160 161 164

162 163 T-1 PROP. SWALE (TYP.)

PROP. 10.0' HMA SHARED COMMONWEALTH AVENUE USE PATH (TYP.)

401 402 PROP. 2' STONE PROP. FULL DUST SHOULDER DEPTH HMA (TYP.) (PUBLIC) PARKING LOT

0 20 50 100

SCALE: 1" = 20' PLAN VIEW 1" = 20' CONCORD BRUCE FREEMAN RAIL TRAIL PHASE 2C 7:03 PM

SHEET TOTAL STATE FED. AID PROJ. NO. NO. SHEETS MA ---- 254 328

PROJECT FILE NO. 605189 26-Jan-2016

CULVERT DETAILS Plotted on 605189ACOE_CULV.DWG

PROP. HEADWALL E 206.6.0 TEMP. WETLAND PROP. TRAIL GRADE 81+10 IMPACTS 252 SF PROP. TIMBER RAIL FENCE LIMIT OF (STA. 78+16 TO STA. 82+86 LT) TRAIL PAVEMENT BORDERING (SEE SHEET 246 FOR DETAILS) VEGETATED PROP. COMPOST 136 136 -30 PROPOSED TRAIL GRADE WETLAND FILTER TUBES EXISTING 81+10 (TYP.) GRADE EXISTING EX. 30" RCP HEADWALL CULVERT 132 132 TEMP. LAND UNDER OHW WATER IMPACTS 112 SF PROP. EXISTING 30" PROP. 48" HEADWALL RCP PROP. 48" RCP FILL FOR NATURAL RCP PIPE PROPOSED CULVERT STREAM BOTTOM 81 82 GRADE 128 128

EARTH FILL FOR NATURAL PROP. CONCRETE AND STREAM BOTTOM MASONRY HEADWALL APPROXIMATE LIMITS 124 124 (2.0' DEPTH) OF EXCAVATION 2.0' PROPOSED

30 GRADE EXISTING PROP. TIMBER RAIL FENCE PROP. PIPE PROP. HEADWALL GROUND (STA. 80+66 TO STA. 84+86 RT INVERT=123.20 120 120 E 206.6.0 (SEE SHEET 246 FOR DETAILS) PROP. PIPE INVERT 118 118 TEMP. WETLAND INVERT=121.80 IN=123.20 LIMIT OF BORDERING -30 -20 -10 0 10 20 30 IMPACTS 21 SF CRUSHED STONE VEGETATED WETLAND

LIMIT OF 100' BUFFER

PLAN PROFILE SECTION

SCALE: 1" = 20' SCALE: 1" = 20' (HORIZONAL) SCALE: 1" = 4' 1" = 4' (VERTICAL)

CONCRETE CULVERT REPLACEMENT STA 81+10

SCALE: AS NOTED CONCORD BRUCE FREEMAN RAIL TRAIL PHASE 2C 7:05 PM

100 FT BVW SHEET TOTAL STATE FED. AID PROJ. NO. BUFFER ZONE NO. SHEETS MA ---- 255 328

PROJECT FILE NO. 605189 26-Jan-2016

CONSTRUCTION DETAILS

PROP. COMPOST STAGING PLAN Plotted on FILTER TUBES (TYP.) POWDER MILL ROAD ɔ STA. 206+13.50, 22.65' R = AROUND STOCKPILE POWDER MILL ROAD ACCESS PATH ɔ STA. 301+62.31

PC +24.87 AREAS

PROP. PERM. EASE (TYP.)

TEMP. EASEMENT

EXISTING 12" PT +16.71 302

206 RCP DRAINAGE 605189_HD(STAGING).DWG PIPE

LIMITS OF FULL DEPTH ROADWAY CONSTRUCTION PC +69.76 PC +45.46 AVAILABLE CUT 12" WATER LINE PRCSTOCKPILE +66.93 PT +32.60 PROP. 12" DI CAP WITH THRUST BLOCKS AREA

PROP. PERM. PT +29.76 DRAINAGE SEE SHEET 66 301

PROPERTY LINE 304 TEMP. EASEMENT PC +72.60 PC +50.98

APPROXIMATE LIMITS OF PT +19.82 305 EXCAVATION FOR TUNNEL 303 CONSTRUCTION PRC +13.84 APPROXIMATE LIMITS OF RIPRAP ENERGY EXCAVATION FOR DISSIPATOR AT OUTLET PT +35.43 PT +32.45 BFRT 2C CONST. ɔ STA. 28+83.23 = TUNNEL CONSTRUCTION ELEV.=162.00 POWDER MILL ROAD CONST. ɔ STA. 204+69.20 205 REM EXIST. 24" RCP & PRC +76.70 PROP. COMPOST REM EXIST. 24" RCP & FES (BOTH SIDES) FILTER TUBES (TYP.) TEMP. 12" FES FES (BOTH SIDES) INV.=162.80

28 29 30 31 STOCKPILE ALONG PATH TEMP. RIPRAP LINED 32 STOCKPILE ALONG PATH 33 CONVEYANCE SWALE

130'-12" PVC RIPRAP OUTLET PROTECTION AT PIPE OUTLET PROP. COMPOST INV.=169.60 TEMP. CATCH BASIN FILTER TUBES (TYP.) PROP. BRIDGE RIM=166.00 AROUND STOCKPILE NO. C-19-015 2' EMBANKMENT INV.OUT=163.50 AREAS 100 FT BVW PROPERTY LINE SEE BRIDGE BUFFER ZONE PLANS FOR DETAILS

TEMP. EASEMENT PROPERTY LINE AVAILABLE 204 50'-12" PVC STOCKPILE TEMP. HMA BERM AREA 60'-12" PVC TEMP. DRAIN MANHOLE CUT 12" WATER LINE TEMP. WITH FRAME AND COVER NOTES PROP. 12" DI CAP WITH THRUST BLOCKS EASEMENT RIM=188.5 INV.IN=186.00 1. STOCKPILE AREAS SHOWN HEREIN REFLECT LOCATIONS OF TOWN-OWNED LAND AVAILABLE FOR USE AS STOCKPILE INV.OUT=185.90 AREAS AND ARE PROVIDED AS SUGGESTED LOCATIONS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ABUTTER DRIVEWAY STOCKPILE LOCATIONS AND MATERIAL LAYDOWN AREAS WITHIN THEIR LIMITS OF WORK ADEQUATE FOR THE SCOPE OF WORK AND CONSTRUCTION SCHEDULE PROPOSED. CONTRACTOR IS RESPONSIBLE FOR ALL CLEARING, GRUBBING, AND STABILIZATION OF STOCKPILE AND LAYDOWN AREAS AND RESTORATION OF THESE AREAS PRIOR TO PROJECT PROP. DMH (PERMANENT) COMPLETION. WITH TEMP. FRAME AND GRATE TEMP. INV. OUT=193.00 2. A TEMPORARY DRAINAGE DIVERSION SYSTEM IS REQUIRED DURING INSTALLATION OF THE POWDERMILL TUNNEL TO LIMITS OF FULL DEPTH SEE SHEET 63 FOR DRAINAGE ROADWAY DIVERT RUNOFF FROM THE EXISTING ROADWAY AROUND THE EXCAVATION. A SCHEMATIC DRAINAGE DIVERSION PLAN AND UTILITY PLAN CONSTRUCTION IS SHOWN HEREIN. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A SYSTEM WHICH CONVEYS THE DRAINAGE TEMPORARILY IN ACCORDANCE WITH THIS PLAN, OR THROUGH USE OF AN ALTERNATIVE METHOD THAT PREVENTS EROSION AND SEDIMENTATION AND DISSIPATES RUNOFF ENERGY PRIOR TO REACHING THE EXISTING WETLANDS. THE

EXISTING 12" RCP POWDER MILL ROAD MILL POWDER CONTRACTOR SHALL SUBMIT A TEMPORARY DRAINAGE DIVERSION PLAN FOR APPROVAL BY THE ENGINEER AND THE DRAINAGE PIPE CONCORD NATURAL RESOURCES COMMISSION.

3. STOCKPILES ARE REQUIRED TO BE LOCATED OUTSIDE OF ALL BVW BUFFER ZONES AND ARE TO BE COVERED. COMPOST FILTER TUBES SHALL BE INSTALLED ALONG THE PERIMETER OF ALL MATERIAL STOCKPILES AND SHALL BE

CONSIDERED INCIDENTAL TO THE WORK. (PUBLIC ) (PUBLIC

203 4. TEMPORARY CONVEYANCE SWALES SHALL BE LINED WITH RIPRAP TO PREVENT EROSION AND MIGRATION OF PC +95.18 . ALL RIPRAP PLACED TEMPORARILY SHALL BE UNDERLAIN WITH FILTER FABRIC AND BE REMOVED UPON COMPLETION OF THE CULVERT REPLACEMENT AND CONNECTION OF PERMANENT DRAINAGE SYSTEM.

5. EXISTING VEGETATION SHALL BE MAINTAINED TO THE EXTENT POSSIBLE. AREAS THAT ARE DISTURBED OUTSIDE OF THE AREAS SHOWN IN THE PLANS SHALL BE RESTORED AT THE DISCRETION OF THE ENGINEER AND LANDSCAPE ARCHITECT. SEE SPECIAL PROVISIONS FOR DETAILS.

0 20 50 100