Arnside and Silverdale Aonb Draft Development Plan Document

Total Page:16

File Type:pdf, Size:1020Kb

Arnside and Silverdale Aonb Draft Development Plan Document ARNSIDE AND SILVERDALE AONB DRAFT DEVELOPMENT PLAN DOCUMENT Sustainability Appraisal Report DRAFT FOR CONSULTATION OCTOBER 2016 CONTACTS SCOTT JOHNSON Principal Environmental Consultant Arcadis. 401 Faraday Street Birchwood Park Warrington WA3 6GA United Kingdom Arcadis (UK) Limited is a private limited company registered in England registration number: 1093549. Registered office, Arcadis House, 34 York Way, London, N1 9AB. Part of the Arcadis Group of Companies along with other entities in the UK. Regulated by RICS. Copyright © 2015 Arcadis. All rights reserved. arcadis.com VERSION CONTROL Version Date Author Changes 01 10-10-2916 S Johnson First Draft 02 21-10-2016 S Johnson Client and AONB Unit comments addressed This report dated 19 September 2016 has been prepared for Lancaster City and South Lakeland District Councils (the “Client”) in accordance with the terms and conditions of appointment dated 12 February 2015(the “Appointment”) between the Client and Arcadis (UK) Limited (“Arcadis”) for the purposes specified in the Appointment. For avoidance of doubt, no other person(s) may use or rely upon this report or its contents, and Arcadis accepts no responsibility for any such use or reliance thereon by any other third party. CONTENTS 1 INTRODUCTION ....................................................................................................... 2 1.1 Introduction to and Purpose of this Report................................................................................... 2 1.2 What is SA? .................................................................................................................................... 2 1.3 Habitats Regulations Assessment ................................................................................................. 4 2 INTRODUCTION TO THE AONB AND THE DPD .................................................... 5 2.1 Introduction to the AONB ............................................................................................................... 5 AONB Designation ........................................................................................................................... 5 Natural Beauty and Special Qualities ................................................................................................ 6 Pressures ......................................................................................................................................... 9 2.2 Background to and purpose of the AONB DPD ............................................................................ 9 2.3 Pre-existing Plans & Strategies ................................................................................................... 10 The Arnside & Silverdale AONB Management Plan ........................................................................ 10 The Lancaster District Local Plan .................................................................................................... 10 The South Lakeland Local Plan ...................................................................................................... 11 2.4 Outline of the Draft DPD ............................................................................................................... 11 DPD Vision and Objectives ............................................................................................................. 11 Policy Issues .................................................................................................................................. 12 Proposed Development Allocations................................................................................................. 12 3 THE SA PROCESS................................................................................................. 14 3.1 Stages in the SA Process ............................................................................................................. 14 3.2 Stage A: Setting the Context and Objectives, Establishing the Baseline and Deciding on the Scope ............................................................................................................................................ 16 Geographical Scope of the SA ........................................................................................................ 16 Temporal Scope of the SA .............................................................................................................. 16 Review of Relevant Plans, Programmes and Environmental Objectives........................................... 16 The Sustainability Baseline and Key Sustainability Issues ............................................................... 19 SA Framework ................................................................................................................................ 25 The SA Scoping Consultation ......................................................................................................... 28 3.3 Stage B: Developing and Refining Options and Assessing Effects ........................................... 29 Appraisal of Reasonable Alternatives .............................................................................................. 29 Assessment of Proposed Allocations .............................................................................................. 30 Assessment of Policies ................................................................................................................... 31 3.4 Technical Limitations and Uncertainties ..................................................................................... 33 4 SA OF ISSUES AND OPTIONS (2015) .................................................................. 34 4.1 SA of Spatial Distribution Options ............................................................................................... 34 Commentary on Social Effects of Options ....................................................................................... 35 Commentary on Economic Effects of Options ................................................................................. 36 Commentary on Environmental Effects of Options .......................................................................... 37 4.2 SA of Policy Area Options............................................................................................................ 39 Questions Not Appraised ................................................................................................................ 40 5 SA OF THE DRAFT AONB DPD ............................................................................ 41 5.1 Introduction .................................................................................................................................. 41 5.2 Assessment of Site Allocations ................................................................................................... 41 Housing, Health, Education, Access and Economic SA Objectives .................................................. 42 Air Quality, Climate Change / Energy, Water ................................................................................... 42 Bio- / Geo-diversity, Land / Sea-scape and Character and Minerals and Waste............................... 42 Community and Heritage ................................................................................................................ 43 5.3 Summary of the Initial Filter of Policies ...................................................................................... 43 5.4 Assessment of Policies ................................................................................................................ 44 SA of DPD Policies: Housing .......................................................................................................... 44 SA of DPD Policies: Health ............................................................................................................. 46 SA of DPD Policies: Education ....................................................................................................... 49 SA of DPD Policies: Sustainable Access ......................................................................................... 50 SA of DPD Policies: Local Economy ............................................................................................... 52 SA of DPD Policies: Retention and Creation of jobs ........................................................................ 54 SA of DPD Policies: Economic Inclusion and Access to Jobs .......................................................... 55 SA of DPD Policies: Air Quality ....................................................................................................... 56 SA of DPD Policies: Climate Change and Energy Efficiency ........................................................... 57 SA of DPD Policies: Water Quality .................................................................................................. 59 SA of DPD Policies: Biodiversity and Geodiversity .......................................................................... 61 SA of DPD Policies: Landscape, Seascape and Settlement Character and Quality.......................... 63 SA of DPD Policies: Land and Soil .................................................................................................. 65 SA of DPD Policies: Mineral Resources .......................................................................................... 66 SA of DPD Policies: Heritage and the Community ..........................................................................
Recommended publications
  • North West Inshore and Offshore Marine Plan Areas
    Seascape Character Assessment for the North West Inshore and Offshore marine plan areas MMO 1134: Seascape Character Assessment for the North West Inshore and Offshore marine plan areas September 2018 Report prepared by: Land Use Consultants (LUC) Project funded by: European Maritime Fisheries Fund (ENG1595) and the Department for Environment, Food and Rural Affairs Version Author Note 0.1 Sally First draft desk-based report completed May 2015 Marshall Paul Macrae 1.0 Paul Macrae Updated draft final report following stakeholder consultation, August 2018 1.1 Chris MMO Comments Graham, David Hutchinson 2.0 Paul Macrae Final report, September 2018 2.1 Chris Independent QA Sweeting © Marine Management Organisation 2018 You may use and re-use the information featured on this website (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. Visit www.nationalarchives.gov.uk/doc/open-government- licence/ to view the licence or write to: Information Policy Team The National Archives Kew London TW9 4DU Email: [email protected] Information about this publication and further copies are available from: Marine Management Organisation Lancaster House Hampshire Court Newcastle upon Tyne NE4 7YH Tel: 0300 123 1032 Email: [email protected] Website: www.gov.uk/mmo Disclaimer This report contributes to the Marine Management Organisation (MMO) evidence base which is a resource developed through a large range of research activity and methods carried out by both MMO and external experts. The opinions expressed in this report do not necessarily reflect the views of MMO nor are they intended to indicate how MMO will act on a given set of facts or signify any preference for one research activity or method over another.
    [Show full text]
  • “Long Orchard”
    BEETHAM PARISH COUNCIL MINUTES of a meeting of Beetham Parish Council held at 7.00pm on Monday 4th June 2018 at Storth School. Present were - Cllrs Brian Meakin (Chair), Ken Blenkharn, Chris Noble, Bob Pickup and Ian Stewart. Also D Cllr P McSweeney, D Cllr R Audland (item 8 onwards), Parish Clerk John Scargill. Four members of the public. 1.0 Apologies for absence – Cllrs Clark, Knowles (holiday) and Yates (holiday). 2.0 The minutes of the previous meeting, held on 14th May 2018, had been circulated by email, were APPROVED by the meeting as a correct record and signed by Cllr Noble. 3.0 Declarations of interest by members present in respect of items on this agenda – none. 4.0 Announcements by the Chair – none. 5.0 Matters arising from the minutes 14th May 2018 and not included elsewhere on the agenda. 5.1 Village map boards (12.1) – had now been finalised and cleared for production and installation as soon as possible. 5.2 ‘Smiley’-type speed indicator sign (12.2) – Storth School/Jessica Harvey had now responded and willing to examine SID data with a view to school’s involvement in its utilisation, but unable to download from SID. Clerk to ask Milnthorpe PC if they could help with this as part of their equivalent routine with Milnthorpe SIDs. 5.3 Replacement of Carr Bank bus shelter (12.3) – the stability of the shelter had been checked by the suppliers, accompanied by Cllr Noble, and found to be within acceptable engineering tolerances. 5.4 Four Lane Ends, Storth signpost (12.4) – Cllr Pickup explained the work involved, which was cleared to proceed.
    [Show full text]
  • How Should We Plan for Our District's Future?
    Local Plan Consulatation 2015 Plan Consulatation Local People, Homes & Jobs How should we plan for our district’s future? Developing a Local Plan for Lancaster District 2011–2031 Public consultation: Monday 19 October to 30 November 2015 People, Homes and Jobs – How can we meet our future development needs? To support the needs of a growing and changing community The overall strategy to meet these needs and provide opportunities for economic growth, Lancaster City Council must prepare a local plan. A lot of development is to continue with an urban-focussed activity is already happening locally. However, there is a approach to development that is great potential to create more jobs and successful businesses through continued growth at Lancaster University, investment supplemented with additional new large in the energy sector and opportunities created by completion strategic development sites that can be of the Heysham to M6 link road. developed for housing and employment. The latest evidence on the potential for new jobs and the housing needed to provide for a growing community suggests In 2014, the council consulted on five options for new a need to plan for around 9,500 jobs and 13,000-14,000 new strategic development sites. Following the consideration of homes for the years up to 2031. these options the council is proposing a hybrid approach with The evidence also suggests that the economic sustainability a number of additional strategic sites as the district’s needs of this area could become vulnerable due to falling numbers cannot be met by one single option. This approach has been in the working age population as older workers retire and they developed based on your views from the consultation last are not being replaced by enough new workers.
    [Show full text]
  • Arnside and Silverdale Milnthorpe Hollins 3 Deer Well Park Area of Outstanding Natural Beauty Dallam Tower Sandside Quarry Kent Channel 2 Sandside
    Arnside and Silverdale Milnthorpe Hollins 3 Deer Well Park Area of Outstanding Natural Beauty Dallam Tower Sandside Quarry Kent Channel 2 Sandside Beetham Storth Fiery House Underlaid Teddy Wood Heights Beetham Fairy Steps Hall 7 Farm Hazelslack Tower Carr Bank Slackhead Beetham Fell Beetham Park Wood Edge 1 Arnside Moss 110m Ashmeadow Coastguard Lookout Arnside Major Marble Leighton Beck Woods Quarry Hale Fell Beachwood New Dobshall Barns Grubbins Wood Red Bay Wood Hills Leighton Wood Coldwell Furnace Parrock Bridge Hale Moss Blackstone Copridding Silverdale Moss Point Wood Arnside Knott 11 Nature Reserve 159m Brackenthwaite White Creek Gait Barrows National Nature Reserve Heathwaite Arnside Arnside Tower Point Little Hawes White Moss Water Thrang End Hawes Water Middlebarrow Yealand Plain Eaves Hawes Water Storrs Far Arnside Wood Moss Jubilee Mon 6 10 Pepperpot Trowbarrow 12 8 Local Nature Reserve Round Yealand Silverdale To p Redmayne The Cove Bank House Hogg Bank Well Leighton Moss Farm Wood RSPB Cringlebarrow Wood Bottoms Burton Well 5 Wood Deepdale Pond The Lots The Green Leighton Moss RSPB Know Hill Fleagarth Woodwell Know End Wood Point Summerhouse Hill 4 Heald Brow Gibraltar 9 Tower Yealand Jack Scout Crag Foot Conyers Chimney Hyning Scout Jenny Brown’s Wood Jenny Brown’s Cottages Point Barrow Scout Three RSPB Brothers Shore Hides RSPB Strickland Wood Potts Wood N Bride’s Chair Warton Crag 125m Warton Crag Disclaimer: The representation on this map of Local Nature Reserve any other road, track or path is no evidence of Morecambe Bay a right of way. Map accuracy reflects current by Absolute. 2k by the Arnside and Silverdale April 2007.
    [Show full text]
  • North West England and North Wales Shoreline Management Plan 2
    North West England and North Wales Shoreline Management Plan 2 North West & North Wales Coastal Group North West England and North Wales Shoreline Management Plan SMP2 Main SMP2 Document North West England and North Wales Shoreline Management Plan 2 Contents Amendment Record This report has been issued and amended as follows: Issue Revision Description Date Approved by 14 th September 1 0 1st Working Draft – for PMB Review A Parsons 2009 1st October 1 1 Consultation Draft A Parsons 2009 2 0 Draft Final 9th July 2010 A Parsons Minor edits for QRG comments of 3 rd 9th September 2 1 A Parsons August 2010 2010 Minor amendment in Section 2.6 and 12 th November 2 2 A Parsons Table 3 2010 18 th February 3 0 Final A Parsons 2011 Halcrow Group Limited Burderop Park, Swindon, Wiltshire SN4 0QD Tel +44 (0)1793 812479 Fax +44 (0)1793 812089 www.halcrow.com Halcrow Group Limited has prepared this report in accordance with the instructions of their client, Blackpool Council, for their sole and specific use. Any other persons who use any information contained herein do so at their own risk. © Halcrow Group Limited 2011 North West England and North Wales Shoreline Management Plan 2 Table of Contents 1 INTRODUCTION .........................................................................................................................2 1.1 NORTH WEST ENGLAND AND NORTH WALES SHORELINE MANAGEMENT PLAN 2 ......................................... 2 1.2 THE ROLE OF THE NORTH WEST ENGLAND AND NORTH WALES SHORELINE MANAGEMENT PLAN 2......... 3 1.3 THE OBJECTIVES OF THE SHORELINE MANAGEMENT PLAN 2 ................................................................................. 5 1.4 SHORELINE MANAGEMENT PLAN 2 REPORT STRUCTURE .......................................................................................
    [Show full text]
  • Activities and Groups What's on In...Arnside, Storth, Sandside
    01539 728118 What’s On in..... Arnside, Storth, Sandside, Holme, Beetham, Heversham, Burton, Milnthorpe, Levens & Natland Activities and Groups Our groups offer a wide range of activities. Come along to stay healthy, make new friends or even learn a new skill. Gentle Exercises, Natland & Oxenholme Village Every Monday Hall, 2.00 - 3.00pm* (Not 3rd Monday) Gentle Exercises, Arnside Methodist Church Hall, Every Tuesday 9.30 - 10.30am* Gentle Exercises, Arnside Methodist Church Hall, Every Friday 10.30am -12noon* Gentle Exercises, Christ the King Catholic Church, Every Tuesday Milnthorpe, 10.30 - 11.30am* Gentle Exercises, Holme Parish Hall, Every Wednesday 11.00am - 12noon* Gentle Exercises, Levens Methodist Church, Every Wednesday 10.30 - 11.30am* Gentle Exercises, The Athenaeum, Leasgill, Every Thursday 1.30 - 2.30pm* Walking Football, Dallam School 3G Pitch, Every Thursday 6.50 - 7.50pm* (From Sept to March) (From April) Holme Crafters, Holme Parish Hall, 2.30pm* 17 Mar, 21 Apr, 19 May www.ageuk.org.uk/southlakeland/ Mar, April & May 2020 IT Drop-In Sessions, Arnside Educational Every Tuesday Institute, 2.00 - 4.30pm (There will be a donation for the Arnside Educational Institute of £2 for members or £3 for non members) IT Drop In Point, Milnthorpe Library, 3rd Friday 2.00 - 3.30pm IT Drop In Point, Burton Memorial Hall, 1st & 3rd Monday 10.00 - 11.00am Falls Prevention Drop In, Milnthorpe Library, 24 April 10.00am - 12noon Tinnitus Drop In, Age UK South Lakeland, Finkle Every Wednesday Street, Kendal, 10.00am - 12noon Tinnitus Support
    [Show full text]
  • Heversham Conservation Area Character Appraisal – Approved 8 April 2009
    Heversham Conservation Area Character Appraisal – Approved 8 April 2009 www.southlakeland.gov.uk Contents 1.0 Introduction & legislative background ............................................................................. 3 2.0 The Location & Demography of the Village ..................................................................... 4 3.0 Geology, Morphology & Landscape Character ............................................................... 4 4.0 Archaeologoical Significance & Potential ........................................................................ 6 5.0 The Origins & Historic Development of the Village ......................................................... 7 6.0 Conservation Area Analysis and Evaluation ................................................................... 9 6.0.1 How the Appraisal is Organised ........................................................................ 9 6.0.4 Character and Appearance - Influences .............................................................. 10 6.0.7 The Evaluation of Architectural Quality ................................................................ 11 6.1 Conservation Area Appraisal – Spatial Structure ................................................ 13 6.2 Conservation Area Appraisal, Townscape Character ......................................... 14 6.3 Conservation Area Appraisal - Architectural Quality ........................................... 16 Maps Appendices: Map Appendix 1: Architectural Quality Map Appendix 2: Townscape and Spatial Character 2 1.0 Introduction
    [Show full text]
  • Landscape Architecture Landscape a Guide for Clients
    Landscape Architecture Landscape A guide for clients Find a landscape architect: Architecture www.landscapeinstitute.org A guide for clients Landscape Institute Inspiring great places Cover image View of the North Park Making great landscape and Velodrome building from bridge F03. LDA Design.Hargreaves places Associates, Arup, Atkins and Aecom This page View of the Queen Elizabeth Olympic Park looking south towards the Stadium Olympic Delivery We face the need for radical changes in the way we live, work Authority/Anthony Charlton and interact with the environment. Much of our national infrastructure for water, waste, transport and energy requires a fundamental rethink. We need to regenerate urban and rural communities, build more homes, strengthen social cohesion and establish food security; but all at a time when capital investment is very limited, the UK economy is fragile, the global market place is increasingly competitive and climate change is a growing concern. There is a false perception that good design is an expensive luxury. Now is precisely the time to focus on utility and function put together beautifully. Any action that changes the appearance and condition of a place must consider its effect on the wider landscape. It is vital to see the bigger picture. This is the role of landscape architecture. Landscape architecture is rooted in an understanding of how the environment works and what makes each place unique. It is a blend of science and art, vision and thought. It is a creative profession skilled in strategic planning, delivery and management. Landscape architects bring knowledge of natural sciences, environmental law and planning policy.
    [Show full text]
  • HERITAGE at RISK REGISTER 2009 / NORTH WEST Contents
    HERITAGE AT RISK REGISTER 2009 / NORTH WEST Contents HERITAGEContents AT RISK 2 Buildings atHERITAGE Risk AT RISK 6 2 MonumentsBuildings at Risk at Risk 8 6 Parks and GardensMonuments at Risk at Risk 10 8 Battlefields Parksat Risk and Gardens at Risk 12 11 ShipwrecksBattlefields at Risk and Shipwrecks at Risk13 12 ConservationConservation Areas at Risk Areas at Risk 14 14 The 2009 ConservationThe 2009 CAARs Areas Survey Survey 16 16 Reducing thePublications risks and guidance 18 20 PublicationsTHE and REGISTERguidance 2008 20 21 The register – content and 22 THE REGISTERassessment 2009 criteria 21 Contents Key to the entries 21 25 The registerHeritage – content at Riskand listings 22 26 assessment criteria Key to the entries 24 Heritage at Risk entries 26 HERITAGE AT RISK 2009 / NORTH WEST HERITAGE AT RISK IN THE NORTH WEST Registered Battlefields at Risk Listed Buildings at Risk Scheduled Monuments at Risk Registered Parks and Gardens at Risk Protected Wrecks at Risk Local Planning Authority 2 HERITAGE AT RISK 2009 / NORTH WEST We are all justly proud of England’s historic buildings, monuments, parks, gardens and designed landscapes, battlefields and shipwrecks. But too many of them are suffering from neglect, decay and pressure from development. Heritage at Risk is a national project to identify these endangered places and then help secure their future. In 2008 English Heritage published its first register of Heritage at Risk – a region-by-region list of all the Grade I and II* listed buildings (and Grade II listed buildings in London), structural scheduled monuments, registered battlefields and protected wreck sites in England known to be ‘at risk’.
    [Show full text]
  • NAAONB Annual General Meeting Business Meeting Agenda Thursday 19Th November 2020 10.30-11.30 A.M
    NAAONB Annual General Meeting Business Meeting Agenda Thursday 19th November 2020 10.30-11.30 a.m. Meeting to be held by videoconference 01584 892112 (Clare Elbourne) Item 1 Apologies Item 2 Introduction of current NAAONB Board members (verbal) for information Item 3 AGM November 28th, 2019 - Minutes and matters arising for agreement Item 4 Art in the Landscape National Strategy (Kate Wood, Activate) for information Item 5 Chairman’s Annual Report 2019-20 for information. Item 6 Financial Report 2019-20 for agreement Item 7 CEO’s Report of work completed for NAAONB Business Plan Oct 2019 - Oct 2020 for information. Item 8 Review of Memorandum and Articles of Association for agreement Item 9 Membership Rates for Individual Lifetime Membership for agreement Item 10 Election of Trustees and appointment of auditors for agreement Item 11 AOB The National Association for Areas of Outstanding Natural Beauty Belmont House, Shrewsbury Business Park Shrewsbury, Shropshire, SY2 6LG 01584 892112 [email protected] Twitter @NAAONB A company limited by guarantee no: 4729800 1 Charity Number: 1158871 Registered office as above Item 3 - AGM November 28th 2019 - Minutes and matters arising Report to The Annual General Meeting of the National Association for AONBs Subject AGM November 28th 2019 - Minutes and matters arising Date 19th November 2020 Purpose For agreement MINUTES OF THE NAAONB ANNUAL GENERAL MEETING 2019 Thursday 28th November 2019 3.15 - 5.00pm Broadway House, Tothill Street, London, SW1H 9NQ Attendees Blackdown Hills
    [Show full text]
  • Kendal - Sedbergh - Arnside Drive
    Kendal - Sedbergh - Arnside drive A drive around south east Cumbria which includes a number of interesting old market towns, picturesque rivers and valleys within the Yorkshire Dales National Park and an Area of Outstanding Natural Beauty around Arnside. Arnside Route Map Summary of main attractions on route (click on name for detail) Distance Attraction Car Park Coordinates 0 miles Kendal N 54.33013, W 2.74567 9.1 miles Killington New Bridge N 54.31136, W 2.58144 10.8 miles Brigflatts Meeting House N 54.31638, W 2.55374 12.1 miles Sedbergh N 54.32403, W 2.52606 17.8 miles Dent Village N 54.27835, W 2.45568 22.2 miles Barbondale N 54.24257, W 2.52481 27.7 miles Kirkby Lonsdale N 54.20185, W 2.59654 32.5 miles Hutton Roof Crags N 54.17892, W 2.68776 36.8 miles Lakeland Wildlife Oasis N 54.19400, W 2.75384 38.4 miles Heron Corn Mill N 54.21264, W 2.77482 42.4 miles Arnside Village N 54.20388, W 2.83102 48.2 miles Levens Hall & Gardens N 54.25987, W 2.77526 50.5 miles Sizergh Castle & Gardens N 54.27951, W 2.76822 55.9 miles Kendal N 54.33013, W 2.74567 The Drive Distance: 0 miles Location: Kendal, Westmorland Shopping Centre car park Coordinates: N 54.33013, W 2.74567 The historic market town of Kendal, located at the south east Lake District boundary, is often referred to as ‘the gateway to the Lakes’ due to its position, or ‘the auld grey town’ due to the many old limestone buildings (rather than the climate!).
    [Show full text]
  • Local Plan (2006)
    & Alterations (Final Composite Plan) This document combines the South Lakeland Local Plan (adopted in 1997) and the Alterations to the Local Plan (adopted in March 2006) Lawrence Conway Strategic Director Customer Services Published September 2007 he South Lakeland Local Plan and Alterations (Final Composite Plan) T March 2007) brings together in a single document: • the South Lakeland Local Plan, adopted in 1997 • the Alterations to the Local Plan, adopted in March 2006 All three documents and further information on the Local Plan can be viewed or downloaded from the Council's website at www.southlakeland.gov.uk/planning This combined document brings together the relevant polices and supporting text from both the South Lakeland Local Plan and Local Plan Alterations for the convenience of readers, who previously had to refer to two separate documents. PREFACE It is important to note that the Council has not amended the contents of either document - both of which contain references, which while correct at the time of PREFACE their respective adoptions, but may now be dated. The Local Plan policies and text which have been added or altered (in whole or part) through the Local Plan Alterations are shown within grey shaded boxes. The Development Plan The South Lakeland Local Plan and Alterations to the Local Plan form part of the statutory Development Plan for South Lakeland District, outside the Lake District and Yorkshire Dales National Parks. It sets out land use policies to guide new development through granting of planning permission. The Development Plan also comprises the Cumbria and Lake District Joint Structure Plan, adopted in April 2006.
    [Show full text]