Auction Quarry Mining Plan of HATWAS RIVER SAND Deposit
Total Page:16
File Type:pdf, Size:1020Kb
PRE FEASIBILITY REPORT OF DHAU QUARRY LEASE PRE FEASIBILITY REPORT DHAU CRUSHER STONE QUARRY OF SHRI SUNIL KUMAR MALVIYA AT Khasra No. 268 Village Dhau Tehsil Junnardeo District Chhindwara State Madhya Pradesh Production Capacity 7980 M3/Year Area 1.000 Hectare Proponent Name SHRI SUNIL KUMAR MALVIYA RESI- MU. PO. DAMUA, TEHSIL- JUNNARDEO, District – CHHINDWARA, MADHYA PRADESH 1 PRE FEASIBILITY REPORT OF DHAU QUARRY LEASE 1. EXECUTIVE SUMMARY DHAU Metal Stone mine project covering an area of 1.000 Hectare for mining of minor mineral Metal Stone at village - Dhau, Tehsil - Junnardeo, District - Chhindwara, (M.P.) The mining plan has been approved by Mining, Department (approved Mine Plan enclosed) SALIENT FEATURES OF THE PROJECT: Particulars Details Name of the project DHAU Metal Stone Quarry Mineral Metal Stone Mining Lease area 1.000 Hectare Khasra No. 268 Land Use Govt Land Lease Validity 10 Years Production Capacity Basalt Stone Production: 7980 M3/Year Village Dhau Tehsil Junnardeo District Chhindwara Estimated project cost 12 Lacs EMP Cost 1.30 Lacs Man Power 08 persons Water demand and supply 3.5 KLD water requirement arranged from nearby village 2. INTRODUCTION Proposed production of Metal Stone is 7980 M3/Year, Khasra No.268, Area- 1.000 Hectare at Village - Dhau, Tehsil - Junnardeo, District – Chhindwara (Madhya Pradesh) of SHRI SUNIL KUMAR MALVIYA. 2 PRE FEASIBILITY REPORT OF DHAU QUARRY LEASE (I) Identification of project and project proponent: Name of the Project: Dhau Metal Stone Quarry Location: Near Village –Dhau, Tehsil –Junnardeo, District–Chhindwara, Proposed Production: Metal Stone is 7980 M3/Year Applied Area: 1.000 Hectare Address of the Lessee SHRI SUNIL KUMAR MALVIYA, RESI – MU. PO. DAMUA, TEHSIL- JUNNARDEO, District – CHHINDWARA (MADHYA PRADESH) Individual Owner (II) Brief description of nature of the project: Mining of Metal Stone is proposed in the lease area 1.000 Hectare At village - Dhau, Tehsil – Junnardeo, District – Chhindwara. Mining will be carried out by Semi Mechanized open cast method. Proposed production of Metal Stone is 7980 M3/Year. As per MOEF O.M. No.J-13012/12/2013-IA-II(I) dtd. 24th December 2013 the project comes under B2 Category and Environmental Clearance is required from SEIAA. (III) Need for the project and its importance to the country and or region: The basic objective of the project is to effective utilization of material in the region. Metal Stone is the most commonly used in road, building construction etc. and will be sold to nearby markets to fulfil the requirements of local people. (IV) Demand – Supply gap: Considering the demand of mineral sufficient availability of the mineral in the area, it is essential to have Metal Stone mine to sustain the supply of mineral for various purposes. (V) Imports VS. Indigenous production: This is indigenous production. This will not be neither exported nor imported. (VI) Export Possibility: Not Exported. 3 PRE FEASIBILITY REPORT OF DHAU QUARRY LEASE (VII) Employment Generation (Direct and Indirect) due to the project: The total number of persons engaged in the mining operation will be 08 persons including skilled and unskilled and these are deployed from nearby villages. 3. PROJECT DESCRIPTION (I) Type of project including interlinked and interdependent projects: No Interlinked or Interdependent project. Product from this mine will be used in road, rail or building construction project. (II) Details of Alternate Site Considered and the Basis of Selecting the Proposed Site, Particularly the Environmental Considerations Gone Into Should Be Highlighted: Mining is site specific project hence no alternate site is considered. (III) Size/Magnitude of Operation: It is proposed to produce Metal Stone is 7980 M3/Year from the area of 1.000 Hectares by open cast Semi Mechanized method of mining. Location Map (IV) Geology: Details of regional geology and local geology are given in mining plan. (V) Raw material required along with estimated quantity, likely source, marketing area of final products, mode of transport of raw material and finished product: This is proposed Metal Stone Mining Lease. The mineral will be used for various purposes. No raw material will be required to dependent industries. (VI) Resource optimization/ recycling and reuse envisaged in the project, if any, should be briefly outlined: Not applicable. (VII) Availability of water its source, energy/power requirement and source: The total water requirement for the project is estimated 3.5 KLD for mining, spraying and domestic uses and will be sourced from nearby villages. No electricity is required for mining activity. 4 PRE FEASIBILITY REPORT OF DHAU QUARRY LEASE (VIII) Location Map: Given in mining plan /attach document (IX) Equipment & Machineries: Mining/excavation will be done according to the proposed manner of semi- mechanized workings and some machineries i.e. Hydraulic Excavator, Dumpers, Tractor & Water Tank, Jack Hammer, Wagon Drill will be required to deploy on hire basis for transport purpose. 4 Site analysis Site analysis detail given in mining plan 5 PLANNING BRIEF (I) Planning Concept: It is proposed to produce Metal Stone is 7980 M3/Year materials from the mining area. It is situated in CHHINDWARA District of Madhya Pradesh. (II)Population Projection Man power requirement for mining is estimated to be 08 persons Most of the employees will be recruited from neighbouring village depending upon the availability of skilled & unskilled people. No significant influx of people is anticipated in the area. (III) Land use Planning: The mining lease area is non forest Pvt Land. (IV) Assessment of infrastructure demand (physical and social) Assess the demand of infrastructure (Physical & Social) in nearby area of the proposed mine site and same will be developed under social work. (V) Amenities/Facilities: The mine site office, first aid room & rest shelter are existing in the lease area. Workers are provided with rest shelters and no houses are provided to any worker as they are deployed from nearby village. Clean drinking water is provided. 5 PRE FEASIBILITY REPORT OF DHAU QUARRY LEASE 5. PROPOSED INFRASTRUCTURE Detail information in Mining Plan/EMP. 6. REHABILITATION ANDF RESETTLEMENT (R & R) plan No rehabilitation and resettlement (R& R) proposed. 7. PROJECT SCHEDULE (I) Proposed schedule and approval for implementation The Proposed project shall be established after getting the Environmental Clearance from MPSEIAA and various departmental permission. (II) Project cost estimation Estimated Project Cost for the proposed project is Rs. 12 Lacs. 8. ANALYSIS OF PROPOSAL Project will create direct & indirect employment opportunities within the surrounding region. Unit will use good faith efforts to employ local people from the nearby villages depending upon the availability of skilled & un- skilled man power surrounding the project site. Distribution of plants among the local villagers to plant more and more tree species so, as raised the aesthetic beauty of the area. To provide stationary to the poor or needful children of the area. 6 .