Chanctonbury County Local Committee Community Issues List

Cllr Support Work Type Parish Area/ Road Name Proposed Scheme

Speed David Barling Yes Clays Hill gateway signing Management

Additional warning signs for the Canons Safety A283 By-Pass, David Barling Yes Steyning Way junction and vegetation removal to Engineering Canons Way junction the south.

Junction improvements to the Safety A283 Steyning By-Pass, David Barling Yes Steyning Way junction. To include the relocation Engineering Horsham Road junction of the traffic island for safety reasons.

Parking David Barling Yes Steyning Fletchers Croft Car Park Instillation of disabled car parking bays Management

David Barling Yes TRO Steyning Horn Lane Speed limit change

Pedestrian David Barling Yes Steyning Leisure Centre to Mouse Lane Widen footway Improvements

Pedestrian DDA compliant Pedestrian crossing David Barling Yes Steyning Steyning Parish Improvements points within Steyning

Speed David Barling Yes Steyning Steyning Parish Signage in Steyning Management

David Barling Yes School Safety Steyning St Andrews Primary School School Safety Zone 8 No. Item Agenda

Steyning Primary and David Barling Yes School Safety Steyning Safe Routes To School scheme Grammar School

Speed reduction measures inc. Change Speed Upper David Barling Yes A2037 Shoreham Road limit to 30mph on the A2037 from o/s Management Beeding Rising Sun Public House

A 20 mph zone for ; Speed Upper David Barling Yes Bramber / Upper Beeding extending the 20 mph zone into Upper Management Beeding Beeding. Not speed bumps.

Speed Upper Gateway treatment at start of 30mph David Barling Yes Management Beeding limit - small dole

provision of a bridleway as part of the Upper David Barling Yes PROW Link Downs Link South of St Bridge Beeding (Links to 2657 in Adur)

Upper Improvements to the Downs Link from David Barling Yes PROW South Downs Link Beeding Small Dole to

Bridleway scheme opposite the junction David Barling Yes PROW Woodmancote B2116/ Blackstone Lane of the B2116 and Blackstone Lane

A272 through village - wear to surface Safety and ad air quality due to high traffic Lionel Barnard Yes A272 Engineering volume. Consideration to re pitch, Widen carriageway and Verge removal.

Speed limit change eastern end of Lionel Barnard Yes TRO Cowfold A272 Bolney Road village to few houses.

Speed Lionel Barnard Yes Cowfold A281 Southbound entrance to Cowfold Management

Consideration to reduce speed limit

Speed between and Cowfold from 8 No. Item Agenda Lionel Barnard Yes Cowfold Shermanbury to Cowfold Management 60mph to 50mph inc traffic calming measures

Lionel Barnard Yes School Safety Cowfold St Peters CE Primary School School Safety Zone

Safety Lionel Barnard Yes Cowfold Thornden Verge Hardening Engineering

Air Quality / Climate Study to look at means of reducing Lionel Barnard Yes Cowfold Various Change traffic emissions and congestion management

Pedestrian Lionel Barnard Yes Henfield Coopers Way Footpath link. HDC land ownership. Improvements

Bollards and dropped kerb tactile Lionel Barnard Yes School Safety Henfield St Peters CE Primary School crossing points improved in front of the school.

A cycle path from the north of the village and better signage and possibly a Lionel Barnard Yes School Safety Henfield St Peters CE Primary School one way system working in partnership with local residents.

West South of Village. Link Downs link Lionel Barnard Yes Cycle Church Road B2135 Grinstead between either side of B2135

Speed West Lionel Barnard Yes Church Road B2135 30 mph zone at Management Grinstead

Safety West 20mph speed limit by Jolesfiels primary Lionel Barnard Yes Littleworth Lane Engineering Grinstead School Littleworth Lane

Pedestrian West Improvements to parking and Pedestrian Lionel Barnard Yes Oakwood Improvements Grinstead facilities in Oakwood Agenda Item No. 8 No. Item Agenda Pedestrian West a pedestrian crossing Lionel Barnard Yes High Street, Partridge Green Improvements Grinstead

Provision of a pad / cycle route Off Pat Arculus Yes Cycling A29 Road/Footway.

Safety Mini roundabouts at the bottom of Pat Arculus Yes Pulborough Church Hill Engineering Church Hill in Pulborough.

Pat Arculus Yes TRO Pulborough O/s Co op 15 min waiting restrictions

Extend 30mph speed limit west along Pat Arculus Yes TRO Pulborough Stopham Road A283

Pat Arculus Yes TRO Pulborough Swan Bridge Waiting restrictions

Provision of additional parking and Pat Arculus Yes TRO Pulborough Swan Close / Station Road relocation of give way line for Swan Close.

Pedestrian Pat Arculus Yes Pulborough A29 London Road Improvements to pedestrian accessibility Improvements

Route safety scheme extension of Speed Pat Arculus Yes Pulborough A29 London Road 30mph limit northwards on A29 London Management Road

PROW scheme - install kissing gate in Pat Arculus Yes PROW Pulborough Barnhouse Lane Barnhouse lane leading to the Wild Brooks

resurface existing public footpath FP3500 Pocket Park between New Place Pat Arculus Yes PROW Pulborough New Park Road Road and Rec Ground and provide raised Pedestrian walkway

Parking Pat Arculus Yes Pulborough Pulborough Road Parking Controls in lay-by near the coop Management Agenda Item No. 8 No. Item Agenda Parking Parking review within settlement area to Pat Arculus Yes Pulborough Pulborough Village Management be identified

Speed Extension of 30mph limit to Codmore Pat Arculus Yes Pulborough Stain Street Management Hill

Pat Arculus Yes Pedestrian Pulborough Swan Corner Removal of exising lay-by at Swan

Improvements Corner and relocation of bollards

Pat Arculus Yes TRO Road / Jackets Hill Speed limit change

provide a safe and direct off road alternative commuter route for Pedestrian Pat Arculus Yes Thakeham pedestrians and cyclists between Improvements Storrington and Abingworth to avoid B2139 and Jackets Hill

West Community SSZ West Chiltington Community First Pat Arculus Yes School Safety Chiltington First School School

More information is being sought on the following proposals prior to inclusion in the Community Issues List:

Cllr Support Work Type Parish Area/ Road Name Proposed Scheme

Provision of footway horn lane (Oreham Pedestrian David Barling Steyning Horn Lane common junction to Woods Mill bus Improvements stop)

Bramber Road Penlands Way junction Safety Bramber Road / Penlands entrance too straight and too narrow for David Barling Steyning Engineering Way usage. Penlands way by church often obstructed by vehicles

Traffic Upper request for more parking to replace David Barling Monks Walk Management Beeding currently disused grassed area

Waiting restrictions at junction of 8 No. Item Agenda Parking Upper Tottington Drive/ Shoreham David Barling Tottington Drive and Shoreham Road in Management Beeding Road Small Dole

Pedestrian A281/230 footway north of Lionel Barnard Cowfold New or Improved footway Improvements the village

Lionel Barnard TRO Henfield West End Lane Speed limit change

Pat Arculus School Safety St James Primary School School Safety Zone

verge overrun - request for verge Safety Pat Arculus Pulborough The Spinney reinstatement or provision of additional Engineering parking

Pat Arculus PROW Pulborough Bridleway and footway improvements

Pedestrian Footbridge on eastern side of railway Pat Arculus Pulborough at railway crossing Improvements below riverside concrete development

Provision of pedestrian in road warning Pedestrian Pat Arculus Pulborough Brinsbury College signs and VAS. Bus Laybys and waiting Improvements facilities

Pedestrian improve footway by retaining Pat Arculus Pulborough Church Hill / Sopers Hill Improvements embankment church Hill / Sopers Hill

Pedestrian New or improved footways- gay street Pat Arculus Pulborough Gay Street / Improvements to Adversane

Pedestrian London Road near New Place Pat Arculus Pulborough London Road near New Place Road Improvements Road

Air Quality / Climate Pat Arculus Pulborough Pulborough Village Traffic Signal optimisation Change management Agenda Item No. 8 No. Item Agenda Air Quality / Speed limit changes Climate Pat Arculus Pulborough Pulborough Village Change management

Air Quality / Pat Arculus Climate Pulborough Pulborough Village Public transport improvements - RTI Change

management

Air Quality / Climate Pat Arculus Pulborough Pulborough Village Low emission vehicle promotion Change management

Parking Parking controls in Rectory Close at Pat Arculus Pulborough Rectory Close Management entrance to rec ground CP

Speed Route safety scheme possible home Pat Arculus Pulborough Rectory Lane Management zone scheme for rectory Lane

Pedestrian New or improved footway - Rock road Pat Arculus Thakeham Rock Road to Merrywood Lane Improvements from Bracken Lane to Merrywood Lane

Pat Arculus School Safety Thakeham Thakeham First School Thakeham first school

West Pat Arculus TRO East Street / First School Waiting restrictions Chiltington

Pedestrian West Improvements to footpath from Mill Pat Arculus Mill Lane Improvements Chiltington Lane / Martlets to Church Street

Consideration for upgrade to bridleway West Pat Arculus Cycling Mill Road and East Street 2412/1 and 2412 mill road and east Chiltington street

Safety West Pat Arculus Stream Lane HGV damaging house Engineering Chiltington Agenda Item No. 8 No. Item Agenda Pedestrian West The Hollows to the Old Coal Footpath improvements from the steps Pat Arculus Improvements Chiltington Yard in The Hollows to the Old Coal Yard

West Pat Arculus TRO West Chiltington Lane Waiting restrictions Chiltington

Various Speed Trans- A2037 A2037 Henfield to Upper Beeding

Management boundary

Speed Trans- Various A24 A24 Washington to Management boundary

Speed Trans- Various A24 A24 Findon to Washington Management boundary

Trans- Provision of safe crossing for downs link Various PROW A281 boundary users of A281 south of Bramber

Speed Trans- Various A281 A281 to Cowfold Management boundary

Speed Trans- Various A281 A281 Little Parkminster to Henfield Management boundary

Speed Trans- Various A283 A283 Upper Beeding to A27 Management boundary

Speed Trans- Various A283 A283 Storrington to Washington Management boundary

Speed Trans- Various A283 A283 Pulborough to Storrington Management boundary

Speed Trans- Various A283 A283 Petworth to Pulborough Management boundary

Speed Trans- A29 to Pulborough Various A29 8 No. Item Agenda Management boundary

Speed Trans- Various A29 A29 Pulborough to Management boundary

Speed Trans- Various B2133 B2133 Broadbridge to Ashington Management boundary

Speed Trans- Various B2138 B2138 Watersfield to Fittleworth Management boundary

Implement in full with hard waterproof surface the recommendations of the Trans- Various Cycling Downs Link 2004 Sustrans report Guildford to the boundary sea - The Downs Link path between Shoreham and Guildford

Trans- Provision of bridleways around Henfield Various PROW boundary particularly Woodmancote Village

Provision of Bridleway linking Trans- Various PROW Storrington - West Chiltington and boundary Pulborough

Trans- Provision of bridleway linking Ashington Various PROW boundary - Storrington and Thakeham

Provision of railway station access improvements identified through Public Trans- Various partnership working where applicable Transport boundary e.g. Pedestrian cycle motor access and cycle storage

Provision of new bus infrastructure facilities identified by the Bus quality/ Public Trans- Punctuality Improvement Partnerships Various Transport boundary where applicable e.g. hard standing areas, signage, shelters, seating and 8 No. Item Agenda PRTI

The introduction of a 20mph speed limit, Speed Trans- subject to public consultation within Various Management boundary various settlements across the Chanctonbury CLC area

The following schemes have been identified for the Storrington Ward but no further work has been progressed:

Cllr Support Work Type Parish Area/ Road Name Proposed Scheme Storrington Yes TRO Storrington Spierbridge Road Waiting restrictions Ward Frank has recently put in a request for Storrington Safety Water Lane / reflective bollards where Water Lane Yes Wiston Ward Engineering Crossroads meets Buncton Crossroads. The turning is very difficult to find in the dark. Storrington School Safety Amberley Amberley C of E First School School Safety Zone Ward Air Quality / Storrington Climate Bus Service improvements and quality to Amberley Amberley Railway Station Ward Change Amberley Station management Storrington Parking Amberley Amberley Railway Station Car Parking review Ward Management Storrington Parking Amberley Amberley Village Parking review within settlement Ward Management Storrington Speed Removal of rumble strips and possible Amberley B2139 Newlands Gardens Ward Management white lines and colouring Storrington PROW Amberley Ruffs Path PROW Upgrade Ward Storrington Noise Ashington A24 Resurface with Noise Reducing Tarmac Ward

Storrington Speed ? 8 No. Item Agenda Ashington A24 South of Ashington Ward Management Storrington School Safety Ashington Ashington First School School Safety Zone Ward Storrington Pedestrian Ashington Ashington to Spring Gardens New or Improved footpath or cyclepath Ward Improvements Storrington Parking Review parking issues and put together Ashington Church Lane / Foster Lane Ward Management scheme to improve

Storrington Speed Ashington Hole Street / A24 Slip Road AIP Scheme Ward Management Storrington Pedestrian Ashington Hole Street and London Road New or Improved Footpath Ward Improvements Storrington Safety Ashington Meiros Way / Rectory Lane review junction priorities Ward Engineering Storrington Environmental Ashington Spring Gardens ? Ward Improvements Storrington Safety The Sands, Rectory Lane & Excessive ramping on speed humps and Ashington Ward Engineering Church Lane poor drainage Storrington New bridleway from Ashington village to PROW Ashington Ward bridleway Storrington Improvements to the bridleway route to PROW Ashington Ward Storrington Storrington Pedestrian safety improvements - crossing point on Parham B2139 Ward Improvements B2139 Junction improvements at Rackham Street Junction with B2139 Low cost Storrington Safety scheme as reported at CCLC for the Parham B2139 Ward Engineering westbound carriageway of the B2139 – ie double white lines, infilling of lines with red surfacing, vehicle activated sign Storrington Pedestrian Parham Rackham Street Improvements for walkers and cyclists Ward Improvements Storrington TRO Storrington North Street Waiting restrictions Ward Storrington Storrington and Hormare Estate to Rydon Provision of a cycle route Off Cycling

Ward School Road/Footway. 8 No. Item Agenda Storrington Speed Storrington and Additional eastbound VAS on Amberley Amberley Road Ward Management Sullington road Storrington Pedestrian Storrington and pavement or speed reduction on Fryern Fryern Road Ward Improvements Sullington Road Storrington Storrington and Upgrade footpath to allow horse riders to PROW Fryern Road Ward Sullington avoid busy Fryern Road Storrington Safety Storrington and Fryern Road Junction improvements

Ward Engineering Sullington Storrington Storrington and Cycle route off road Hormare estate to Cycling Hormare Estate Ward Sullington Rydon School Storrington Pedestrian Storrington and Manleys Hill Footpath os Byne House, Manleys Hill Ward Improvements Sullington Storrington Pedestrian Storrington and Monastery Lane Footpath Monastery Lane Ward Improvements Sullington Storrington Safety Storrington and North Road DYL request Ward Engineering Sullington Storrington Parking Storrington and Old Mill Drive To address Waitrose development Ward Management Sullington Traffic calming at junction to the rugby Storrington Safety Storrington and Pulborough Road club. To prevent overtaking at this Ward Engineering Sullington location 20mph speed limit Pulborough road Storrington Speed Storrington and Pulborough Road between junction with Clay Lane and Ward Management Sullington Newton Road/Hurston Lane Storrington Pedestrian Storrington and Zebra Crossing from Storrington First Spierbridge Road Ward Improvements Sullington School to Chanctonbury Leisure Centre Air Quality / Storrington Climate Storrington and AQ public transport improvements such Storrington A283 / B2139 Ward Change Sullington as RTI management Air Quality / Storrington Climate Storrington and AQ Promoting local use of cleaner Storrington A283 / B2139 Ward Change Sullington vehicles and fuels

management No Item Agenda Air Quality / AQ possible changes to the road network Storrington Climate Storrington and Storrington A283 / B2139 Ward Change Sullington management Air Quality / Storrington Climate Storrington and Storrington A283 / B2139 AQ Speed limit changes Ward Change Sullington management 8 .

Air Quality / Storrington Climate Storrington and Storrington A283 / B2139 AQ traffic signal optimisation Ward Change Sullington management Air Quality / Storrington Climate Storrington and Storrington A283 / B2139 AQ VMS Ward Change Sullington management Storrington Parking Storrington and Storrington and Sullington Parking Review within Settlement area Ward Management Sullington Villages Storrington Pedestrian Storrington and Pedestrian enhancements Thakeham Thakeham Road Ward Improvements Sullington Road near village hall Storrington Pedestrian Storrington and New or Improved Footway Water lane Water Lane Ward Improvements Sullington South End Storrington Safety Storrington and Water lane HVG restriction Ward Engineering Sullington Storrington Safety Storrington and Water lane HVG restriction inc parking Ward Engineering Sullington Storrington Speed Storrington and request for traffic calming due to Water lane Ward Management Sullington increase in traffic Storrington Traffic Strategic Variable Message Sign giving Washington ? Ward Management travel information Storrington Pedestrian Washington A24 A24 Bus Crossing Gap Ward Improvements Storrington Safety Closure of bus turning on A24 onto Washington A24 Ward Engineering Washington Bostal Storrington Speed A283 Crossing Point – VAS Washington A283 Ward Management 8 No. Item Agenda Storrington Pedestrian Washington Dingley Dell Pedestrian crossing A283 Dingley Dell Ward Improvements Storrington Safety Washington London Road Poor road surface in London Road Ward Engineering Storrington Safety Washington Rock Road / Newhouse Lane Rock Road / Newhouse Lane junction Ward Engineering Storrington Drainage Washington School Hill Flooding at the bottom of school hill

Ward Storrington Pedestrian Washington Spring Gardens Footbridge over A24 near spring gardens Ward Improvements Storrington School Safety Washington St Marys CoE First School school Safety Zone Ward New or improved footway - Storrington Storrington Pedestrian Washington Storrington Road Road from Washington RoB to Barns Ward Improvements Farm Lane Storrington Pedestrian Pedestrian crossing on A283 The Pike Washington The Pike A283 Ward Improvements just west of junction with London Road Storrington Speed Washington Washington Village Washington Speed Survey Ward Management Storrington Speed Illuminated sign / lighting at the village Washington Washington Village Ward Management entrance Storrington Pedestrian Issues of speeding traffic and lack of a Wiston Hole Street Ward Improvements footpath in Hole Street Storrington Pedestrian Wiston Hole Street Request for footway Ward Improvements Storrington Safety Wiston Hole Street Village Gateway features on Hole Street Ward Engineering Storrington Speed Wiston Hole Street and Water Lane Request for speed limit reduction Ward Management Chevrons outside Longbacks Cottages Storrington Safety Wiston Longbanks Cottages would help protect residents whose front Ward Engineering gates are inches away from the highway. Additional gritbins - Councillors would Storrington Winter like to place an additional grit bin at the Wiston Spithandle Lane Ward Maintenance bottom of Spithandle Lane, outside Stocksfield Cottages. 8 No. Item Agenda I have asked for School Coaches not to use the village, since there is a width Storrington Safety restriction in place and they are not Wiston Various Ward Engineering collecting children, only using the village as a short cut. School transport advise that there is a TRO in place that cannot

be lifted. They suggested that next time the contract goes out for tender they will request that the village is not used, but currently, our narrow lanes are constantly by vehicles that take up the entire highway. Storrington Speed Wiston Wiston Village gateway features Ward Management

No Background Papers Agenda Item No. 8 No. Item Agenda