Kent County Council, Acting in Exercise of Its Powers Under the Road Traffic Regulation Act 1984, Makes Or Intends to Make the Following Orders

Total Page:16

File Type:pdf, Size:1020Kb

Kent County Council, Acting in Exercise of Its Powers Under the Road Traffic Regulation Act 1984, Makes Or Intends to Make the Following Orders Kent County Council, acting in exercise of its powers under the Road Traffic Regulation Act 1984, makes or intends to make the following Orders. through traffic on partofTinkerpot Lane,West Theroad will be closed in the general vicinityof Because of Openreach works,KentCounty Council Kingsdown, on or after25th August 2021 forupto1 number 1tonumber 3, to theextentindicatedbysigns intends to make an Order to temporarily prohibit dayoruntil the works have been completed. and barriers on site. THESTREET, HARTLIP (PROHIBITION OF DRIVING) through traffic on partofCarriers Road,Cranbrook,on TEMPORARYORDER AUGUST 2021 Theroad will be closed between St ClereHill Road and Thealternativeroutefor anythrough traffic is via Bell or after24thAugust 2021 forupto3days or until the Knatts ValleyRoad. Road,Avenue of Remembrance, Park Road,A2West To allowworks to be carried out to install anew gas works have been completed. service, Kent County Council has made an Order Thealternativerouteisvia Knatts Lane,Knatts Valley Street,StMichaels Road,CrownQuayLane and vice Theroad will be closed outside Old Tithe Barn. versa. prohibiting through traffic on partofThe Street, Road and viceversa. Hartlip,onorafter 9thAugust 2021 forupto9days or Thealternativerouteisvia Carriers Road,Oatfield Drive, until the works have been completed. Wheatfield Way, Wheatfield Drive, High Street and vice versa. VARIOUS ROADS,SEVENOAKS (PROHIBITION OF IWADE ROAD,NEWINGTON (PROHIBITION OF Theroad will be closed in the general vicinityofPope’s DRIVING) TEMPORARY ORDER 2021 DRIVING) TEMPORARYORDER AUGUST 2021 Hall,tothe extent indicatedbysigns and barriers on Because of Highways Englandworks,KentCounty To allowducting repair,distilling &repair works to site. CHANTLER’S HILL,PADDOCK WOOD (PROHIBITION OF Council intends to make an Orderprohibiting through be carried out,KentCounty Council intends to make Thealternativerouteisvia HollowLane,Lower Hartlip DRIVING) TEMPORARYORDER 2021 traffic on Various Roads, Sevenoaks, as per the schedule an Orderprohibiting through traffic on partofIwade Road,Munns Lane,The Street and viceversa. Because of BT works,KentCounty Council has made an below. Road,Newington, on or after16th August 2021 forup Order to temporarily prohibit through traffic on partof to 11 days or until the works have been completed. This Ordertakes effectonorafter 26 August 2021 until Chantler’s Hill,Paddock Wood,onorafter 12th August Theroad will be closed between the junctions with THESTREET, LYNSTED(PROHIBITION OF DRIVING) 2021 forupto1day or until the works have been 4September 2021 between 22.00hrs and 06.00hrs,or TEMPORARYORDER AUGUST 2021 until the works have been completed. Church Lane and Belnor Avenue,tothe extent indicated completed. by signs and barriers on site. To allowhighwaydrainage &repair system works to be A20 London Road,Farningham -Eastbound from M25 Theroad will be closed adjacentto“Highlands”. Thealternativerouteisvia IwadeRoad,School Lane, carried out,KentCounty Council intends to make an Junction 3toTeardrop Centre Order prohibiting through traffic on partofThe Street, Thealternativerouteisvia Chantler’s Hill,B2160 Thealternativerouteisvia Broom Hill Roundabout, Bricklands,Breach Lane,The Street,Sheerness Road, Maidstone Road,Mascalls CourtRoad and viceversa. Basser Hill and viceversa. Lynsted,onorafter 16th August 2021 forupto14days M20 Junction 1ToJunction 2OnSlip,A20 London or until the works have been completed. Road/Gorse Hill/London Road. Theroad will be closed between the junctions with CULVERDEN DOWN,TUNBRIDGE WELLS. A20London Road,Farningham -Westbound from MINTCHING WOOD LANE,MILSTEAD (PROHIBITION Ludgate Lane and TheVallance, to theextentindicated (PROHIBITION OF DRIVING) TEMPORARYORDER 2021 Teardrop Centre to M25 Junction 3(M20 J1) OF DRIVING) TEMPORARYORDER AUGUST 2021 by signs and barriers on site. Thealternativerouteisvia A20 London Road/Gorse Because of BT works,KentCounty Council has made an To allowpolereplacementworks to be carried out,Kent Thealternativerouteisvia Lynsted Lane,A2London Order to temporarily prohibit through traffic on part Hill/London Road,M20 Junction 1ToJunction 2OnSlip, County Council has made an Order prohibiting through via Broom Hill Roundabout. Road,Faversham Road,The Street,Doddington Lane, of Culverden Down, Tunbridge Wells,onorafter 11th traffic on partofMintching Wood Lane,Milstead,onor Chequers Hill,Christophers Rowand vice versa. August 2021 forupto1day or until the works have B2173 London Road,Swanley-Westbound from M25 after10th August 2021 forupto3days between the been completed. Junction 3/M20 Junction 1 hours of 08:00 and 18:00, or until the works have been Thealternativerouteisvia Broom Hill Slip Westbound completed. VICARAGELANE,LOWER HALSTOW (PROHIBITION OF Theroad will be closed adjacentto77B A26 St John’s Road. On,A20 Swanley By-Pass/Sidcup By-Pass,A233 Theroad will be closed 50 metres south of the Simel DRIVING) TEMPORARYORDER AUGUST 2021 Edgington Way, B2173 Maidstone Road/Bartholomew House,tothe extent indicatedbysigns and barriers To allowducting works to be carried out,KentCounty Thealternativerouteisvia Culverden Down, Culverden Way/High Street. on site. Council intends to make an Orderprohibiting through Park,A26 St John’s Road and viceversa. SEVENOAKS AND TONBRIDGE AREAS Thealternativerouteisvia Mintching Wood Lane, traffic on partofVicarage Lane,Lower Halstow,onor Rawling Street,Slough Road,SawpitRoad and vice after16thAugust 2021 forupto3days between the GOLFORD ROAD,CRANBROOK.(PROHIBITION OF A20LONDON ROAD &STANSTED LANE,WEST versa. hours of 08:00 and 18:00, or until the works have been DRIVING) TEMPORARYORDER 2021 completed. KINGSDOWN,SEVENOAKS &A20 LONDON ROAD, Becauseofacrash remedialscheme to reconfigurethe STANSTED/WROTHAM, TONBRIDGE &MALLING Theroad will be closed at thejunction with School junction, Kent County Council has made an Orderto TEMPORARYORDER 2021 OADSTREET, STOCKBURY(PROHIBITION OF DRIVING) Lane,tothe extent indicatedbysigns and barriers on TEMPORARYORDER 2021 temporarily prohibit through traffic on partofGolford Forthe safetyofthe public whilst an event is being held site. Road,Cranbrook.The road will be closed forany 2 at London Golf Club,KentCounty Council has made an To allowducting works to be carried out,KentCounty Thealternativerouteisvia School Lane,The Street, nights from 19.30hrs to 05.30hrs between 9th August Order to impose traffic restrictions,asper the schedule Council intends to make an Order prohibiting through Vicarage Lane and viceversa. 2021 and 15th August 2021 or until the works have below. traffic on partofOad Street,Stockbury, on or after been completed. 9th August 2021 forupto3days between the hours TONBRIDGE &MALLING AREA SCHEDULE of 09:30 and 15:00, or until the works have been Theroad will be closed from Tenterden Road for50 metres. 30mph Speed Limit –A20 London Road,West completed. PRATLING STREET, AYLESFORD (PROHIBITION OF Kingsdown, Sevenoaksand Stansted/Wrotham, Theroad will be closed from outside Threeways to DRIVING) TEMPORARYORDER AUGUST 2021 Thealternativerouteisvia TenterdenRoad,Cranbrook Tonbridge and Malling –9August 2021 for7days Road,Benenden Road,Goddards GreenRoad,Golford outside Whipstakes Farm, to theextentindicatedby To allowjointbay and road crossing works to be between06.00hrs and 20.00hrs signs and barriers on site. Road,and viceversa. From ForgeLane to M20 Junction 2FromJunction 1 carried out,KentCounty Council has made an Order Off Slip Thealternativeroutefor traffic travelling eastbound prohibiting through traffic on partofPratling Street, is via A249 Sittingbourne Road,M2J5Roundabout, Aylesford, on or after9th August 2021 forupto12days HINKSDEN ROAD,BENENDEN (PROHIBITION OF Prohibit westbound traffic –Stansted Lane,West A249 Maidstone Road,Key Street Slip Northbound off, or until the works have been completed. DRIVING) TEMPORARYORDER 2021 Kingsdown -9August 2021 for7days between KeyStreet Roundabout,A2Key Street,London Road, Theroad will be closed in the general vicinityof Becauseofcarriagewaypatching,KentCounty Council 06.00hrs and 20.00hrs Borden Lane,Bannister Hill,HeartsDelightRoad,Wrens Thealternativerouteisvia AshLane and A20 London number 208, to theextentindicatedbysigns and intendstomakeanOrder to temporarily prohibit Road,SuttonBaron Road,Pond Farm Road and Oad barriers on site. through traffic on Hinksden Road,Benenden, on or Road. Street. Thealternativerouteisvia Pratling Street,Rochester after25th August 2021for up to 1day or until the Thealternativeroutefor traffic travelling westbound Road and viceversa. workshave been completed. is via Oad Street,Pond Farm Road,SuttonBaron Road, PILGRIMS WAY&KEMSING ROAD,KEMSING. Theroad will be closed forits entirelength. (PROHIBITION OF DRIVING) TEMPORARYORDER 2021 Wrens Road,HeartsDelightRoad,Bannister Hill, Borden Lane,A2London Road,Key Street,Key Street TUNBRIDGE WELLS AREA Thealternativerouteisvia Coldharbour Road,Field Because of Openreach works,KentCounty Council Roundabout,Key Street Slip Southbound on, A249 Green, Mill Street,SpondenLaneand viceversa. intends to make an Order to temporarily prohibit B2084 CHEQUERS ROAD,GOUDHURST (PROHIBITION Maidstone Road,M2J5Roundabout and Sittingbourne through traffic on partofPilgrims Wayand Kemsing OF DRIVING) TEMPORARYORDER 2021 Road. Road,Kemsing,onorafter 27th August 2021 forupto Because of BT works,KentCounty Council has made an LOWERGREEN ROAD,SPELDHURST (PROHIBITION OF 1day between 09.30hrs and 15.30hrs or until the works Order to temporarily prohibit through traffic on part DRIVING) TEMPORARYORDER
Recommended publications
  • Sittingbourne Station (June 2019) I Onward Travel Information Buses and Taxis Local Area Map
    Sittingbourne Station (June 2019) i Onward Travel Information Buses and Taxis Local area map Rail replacement buses depart from the bus stops next to the station forecourt. Contains Ordnance Survey data © Crown copyright and database right 2018 & also map data © OpenStreetMap contributors, CC BY-SA Main destinations by bus (Data correct at June 2019) DESTINATION BUS ROUTES BUS STOP DESTINATION BUS ROUTES BUS STOP DESTINATION BUS ROUTES BUS STOP Sittingbourne (Sterling 3X, 333 3 8+, 326, 327 1 9 1 Bapchild Key Street Road) 8+, 345# 1 334 3 Snipeshill (Canterbury 3X, 333 3 334 F Lower Halstow 327 1 Road - for Sittingbourne 8+, 345#, Bobbing Community College) 1 326, 327 1 Lower Rainham 327 1 349 Stockbury 334 3 Borden 8+, 345# 1 Lynsted 345# 1 8+, 345# 1 Bredgar 343+, 345# 1 Maidstone [ 334 3 Swanstree Estate 333 3 Bysing Wood 3X 3 The Meads 334 F 1 8+, 9, 326, 10 minutes walk from this 8+, 345# Teynham ^ 327, 345#, 1 station via High Street 3X, 333 3 Chalkwell 347 Memorial Hospital and Bell Road (see Local Tunstall Village 9, 343+ 1 334 3 area map) 9, 343+ 1 Upchurch 327 1 Danaway (Oad Street) 334 3 8+, 9, 326, Milton Regis 1 Davington 3X 3 327, 347 Notes Detling 334 3 Minster (Isle of Sheppey) 334 F Doddington 345# 1 Murston 349 1 Bus routes 333 and 334 run daily services. Bus routes 3X, 9, 326, 327, 347 and 349 run Mondays to Saturdays Eden Village 9 1 Newington ^ 326, 327 1 services, only. No Sunday services.
    [Show full text]
  • Swale Infrastructure Delivery Plan
    Swale Local Plan Review INFRASTRUCTURE DELIVERY PLAN Swale Borough Council January 2021 Swale Infrastructure Delivery Plan Contents Swale Infrastructure Delivery Plan 1 Introduction 1 2 Background 2 3 National Context 4 3.1 National Planning Policy Framework 4 3.2 Planning Practice Guidance 4 4 Sub-Regional Context 6 5 Local Plan Context 8 5.1 Scale and Distribution of Growth 8 5.2 Spatial Distribution 8 6 Neighbourhood Plans 12 7 Engagement 13 7.1 Infrastructure and Service Providers 13 7.2 Site Developers/Promoters 14 7.3 Duty to Cooperate 14 8 Document Structure and Infrastructure Delivery Schedule 15 9 Funding and Delivery 16 10 Social Infrastructure 18 10.1 Healthcare 18 10.2 Education 20 10.3 Social Provision 23 11 Physical Infrastructure 24 11.1 Roads 24 11.1.1 Swale Highway Model and Swale Transport Strategy 24 11.1.2 Strategic Highways 25 11.1.3 Local Highways 28 11.2 Public and Sustainable Transport 29 11.2.1 Rail 29 11.2.2 Walking and Cycling 29 11.2.3 Bus Provision 29 11.3 Utilities 30 11.3.1 Electricity 30 Swale Infrastructure Delivery Plan Contents 11.3.2 Gas 30 11.3.3 Water Infrastructure 31 11.3.4 Broadband 32 11.4 Waste 32 12 Appendix 1: Infrastructure Delivery Schedule 34 Swale Infrastructure Delivery Plan 1 Introduction 1 1 Introduction 1.0.1 The Infrastructure Delivery Plan (IDP) establishes what additional infrastructure and service needs are required to support the level of development proposed in the Swale Local Plan over the period to 2038.
    [Show full text]
  • TRADES. FR'c 1045 Lftred William, Crocken Hill, Swan- Ingarfill John, Knockholt, Sevenoaks Osmer Jn
    KENT.) TRADES. FR'C 1045 lftred William, Crocken Hill, Swan- Ingarfill John, Knockholt, Sevenoaks Osmer Jn. jun. Snnnyside, Marden ley Junction Inge Harry, Brook Street farm, Ash, Ounstead Wm. Halstead, Sevenoaks Fielder Harry, Ivy Hatch, Sevenoaks Canterbury Pa.ckham Alfred, Dungate house, Rod- Fielder W. Ivy Hatch, Sevenoaks Jackson Henry & Sons, Hockenden, mersham, Sittingbourne Fill~ess H. Hockenden, St.Mary Cray St. Mary Cray Pain Arnold E. Blackball fm.Svnoaks Foat Thomas, Copp st.Ash,Canterbry Jenner John, Ivy Hatch, Sevenoaks Palmer James Ebenezer, Northumber­ Foreman Robert, Well hill, Chels- Johnston Alexander, Falcon farm, land house, Colyer's lane, Erit.h field, Orpington Leaveland, Faversham Parsons Benjamin, Vale house, Stock­ Fowler E. & S. Ulcombe. Maidstone Jordan Percy, !stead rise, Gravesend bury, Si~ingbourne l'rappell Hy.Westerham ID.Westerhm Kearn Arthur, 'l'he Heath, Wilming­ Parsons Miss Mary, Wilmington, Pry John, Twydale, Gillingham ton, Dartford Dartford k at Stone, Dartford Farner George, Slades green, Erith Keene W. Sole Street, Gravesend Payne William, Pearmaine, Swanley, Gardner H. R. Basted, Platt, Borough Kemp William, Chestnut Street, Swanley Junction Green Borden, Sittingbourne Peckham Mrs.M.Ivy Hatch, Sevenoab Gllbert D. A. Farnborough,Orpington Kemsley Henry, Bredgar, Sittingbrne Pepper Thomas John, Groves, Staple, Gilbert Mrs. Esther, sr Upper Abbey Kitchingham Frank, Bean, Dartford Canterbury road, Belvedere Knell Henry, Broomfield, Maidstone Peto Wm. Bedonwell hill, Belvedere Gillow Fredk. Ivor ho. Worth, Eastry Knight Thomas, Bargain's hill, Rod- Plumbridge Edward & Arthur, Farn­ Goldin~ Chas. E. William st.Rainhm mersham, Sittingbourne borough, Orpington Goodchild F. Farnborough, Orpington Kno1Vles William, Charlton house, Pollock J rum Stanley Hope, Overs­ Goodchild John, FarnborQ', Orpington Bapchild, Sittingbourne land, South Street, Faversham Goodchild R.
    [Show full text]
  • Swale Borough Council Settlement Hierarchy Study
    Swale Borough Council Settlement Hierarchy Study Draft Report August 2020 1 1. Background and national policy context 1.1 The Council is currently undertaking a Local Plan Review (LPR) and, as per paragraphs 15 and 20 of the National Planning Policy Framework (NPPF), will need to provide a positive vision for the future of Swale and set out a strategy for the pattern, scale and quality of development. This must be done with the objective of contributing to the achievement of sustainable development. 1.2 With regards to urban areas, planning policies should seek to ensure the vitality of main centres. For rural areas, they should identify opportunities for villages to grow and thrive, especially where this would support local services. Where there are smaller groups of smaller settlements, development in one village may support services in a village nearby. 1.3 Significant development should be focused in locations which are, or can be made, sustainable through limiting the need to travel and offering a genuine choice of transport modes. 2. Local policy context and purpose of study 2.1 Several pieces of evidence have already been prepared, or are being prepared, in consideration of the above. However, there is a need to assess the sustainability of the settlements within the Borough to understand how our towns, villages and smaller settlements function at the moment. This will contribute to the wider decision to be made regarding the LPR’s settlement strategy. 2.2 Bearing Fruits 2031, The Swale Borough Local Plan (the adopted Local Plan) identifies 34 towns and villages within the Borough which are defined by built-up area boundaries and within which, the principle of development is broadly accepted.
    [Show full text]
  • Schedule of Decision Notices Issued by the Head of Development Services
    SCHEDULE OF DECISION NOTICES ISSUED BY THE HEAD OF DEVELOPMENT SERVICES APRIL 2006 Application Applicant Proposed Development Planning Decision Decision Date SW/06/0156 Park Resorts Group Ltd C/o Advertisement consent for free standing sign, EXPRESS 03.04.06 (C1104) A & M Architectural Services Shurland Dale Holiday Park, Warden Road, CONSENT Ltd Eastchurch, Sheppey. GRANTED SW/06/0162 Mr & Mrs Holiday C/o Nigel Side dormer and alterations to provide bedroom REFUSED 03.04.06 (C15477) Sands & Assoc in roof space. 32 First Avenue, Eastchurch. SW/06/0177 Mr V Mangal Demolition of existing cottages and erection of REFUSED 03.04.06 (C21554) 2 replacement dwellings and garages. Woodgate Cottages, Oad Street, Borden, Nr Sittingbourne. SW/06/0155 Mr G Dunn Certificate of Lawfulness of Proposed Use or GRANTED 03.04.06 (C21846) Development - Loft conversion and associated works. 165 Kent Avenue, Minster, Sheppey. TC/06/0017 Mr G Singh C/o Richard L Removal of tree and roots. 55 High Street, APPROVED 03.04.06 (C2526) Baker Sittingbourne. TP/06/0016 Duncan Macrae C/o J Dowle Reduce size of tree by 30%, 46 Blandford CONSENT 03.04.06 (C14218) Gardens, Sittingbourne. GRANTED SW/06/0172 Mr and Mrs Gardiner Detached garage/store with pitched roof. Little APPROVED with 03.04.06 (C21848) Brook Manor, Vicarage Road, Ospringe. conditions SW/06/0154 Messrs Clements Wildish 2 detached chalets to replace bungalow. 30 APPROVED with 03.04.06 (C9635) C/o D J Hobbs Princes Avenue, Minster, Sheerness. conditions SW/06/0021 E Batten Esq Eight 12 metre high floodlight poles to football APPROVED with 03.04.06 (C13123) C/o D J Hobbs pitch C/o-Steel Sports Ground, Queenborough conditions Road, Halfway, Sheerness.
    [Show full text]
  • Local Brewery Invests in Its Heritage
    Swale Ale The FREE magazine of the Swale branch of CAMRA The Campaign for Real Ale Local brewery invests in its heritage s many Swale Ale readers will be aware the A largest brewery in our area, and in Kent, is Shepherd Neame. As well as its major brewing arm, Shepherd Neame also own and operate a total estate of 354 pubs, comprising 44 managed pubs and 310 tenanted and leased pubs. With many of its competitors failing to invest in their tied estate and with vast numbers of pub closures nationally, it is interesting that we are currently seeing Shepherd Neame invest heavily in the refurbishment of many of its pubs. Swale Ale has reported on the great work completed at The Fountain, Sittingbourne and The Bear in Faversham to name a few. Pubs The Three Horseshoes, have been given traditional new hand painted Staple Street signage by Eric Pollard, and often sympathetic restoration of their interiors, which is a far cry the brewery announced the sale and/or closure from the ‘Irish’ style pub chains of the 1990s. of 35 pubs over a two year period, and in our This investment in its tied and managed pub own area we have already had to say goodbye chain is always welcome, particularly at a time of to the Mechanics Arms in September 2012 and national belt tightening, and shows a The Windmill on January 2nd 2011. commitment to local communities. The question lies in what Shepherd In the past year the brewery has Neame will decide to do next.
    [Show full text]
  • EQUALITY IMPACT SCREENING and ASSESSMENT Name of M2 Junction 5 Proposed Or Current Proposed Practice/Policy Improvements
    EQUALITY IMPACT SCREENING AND ASSESSMENT Name of M2 Junction 5 Proposed or Current Proposed Practice/Policy Improvements Person Completing the Assessment Originated: Rebecca McClenaghan Reviewed: Bryn Jones Directorate Major Projects Date December 2018; Reference No MPS41 Updated February 2019; Updated March 2020; Updated May 2020 A: The aims, purpose, desired benefits and expected outcomes of the practice/policy, identifying the customers, staff or stakeholders involved or affected. Scheme Background The M2 Junction 5/A249 Stockbury Roundabout is located within Kent and is an important corridor linking Dover with London. The M2 Junction 5/A249 Stockbury Roundabout improvement scheme forms part of the Highways England £15 billion investment on major roads and motorways and Highways England’s Delivery Plan 2015-2025. The scheme is in Highways England’s PCF Stage 5 - Construction Preparation (Detailed Design). The M2 Junction 5/A249 Stockbury Roundabout scheme was identified for improvements as it is unable to cope with existing traffic flows. There has been notable congestion and delay on the A249 southbound and northbound and on the exit slip road from the M2 westbound. Road users have been using alternative rural routes to avoid congestion, increasing local safety risks. The Public Local Inquiry is scheduled to commence on 28th August 2020 and continue until 14th September 2020.The Secretary of State (SOS) decision is anticipated by 19th February 2021, followed by the final stage gate assessment review (SGAR5) on 25th February 2021. The scheme will aim to reduce congestion in the area, improving journeys for those travelling north east to Sittingbourne, the Isle of Sheppey and the Port of Sheerness.
    [Show full text]
  • Kent-Science-Park.Pdf
    An environment for success 2 Welcome. Kent Science Park is an award winning science park with a developing cluster of science and technology companies. The park has a history of innovation Set in 65 acres of beautifully – including Nobel Prize winning manicured grounds, Kent Science Park discoveries – and was awarded the boasts high specification laboratories UKSPA Best Life Science Research and business accommodation across Facility in South East England in 2016. 47 buildings. Why us? Location Services, facilities The Park Knowledge Factory Contact details and amenities and network Page 3 Page 5 Page 7 Page 9 Page 11 Page 13 3 4 Why us. We foster innovation, support growth and facilitate expansion. Kent Science Park was inspired by the We work hard to make your life easier and leaders and support the UK’s innovation design of the university campuses of to make the park an enjoyable place to community. Our site teams also provide Oxford and Cambridge. It provides a work. We host regular technical and social guidance and support throughout a unique environment for your team to work events that bring together scientific and company’s growth journey, to help and relax, and for your business to grow. business leaders. We connect start-ups, minimise risks and maximise your chances established businesses and industry of success. Onsite catering Onsite Connectivity Flexible facilities management accommodation service Managed solutions available 5 6 Gatwick Airport Location. 1 hour 10 minutes By Rail. By Road. Well connected to London and Europe. Sittingbourne has direct connections to Coming from London on the M2 take J5 then London St.
    [Show full text]
  • The Highways England (A249 Trunk Road Stockbury Roundabout Improvements) Compulsory Purchase Order 2019
    THE HIGHWAYS ACT 1980 AND THE ACQUISITION OF LAND ACT 1981 THE HIGHWAYS ENGLAND (A249 TRUNK ROAD STOCKBURY ROUNDABOUT IMPROVEMENTS) COMPULSORY PURCHASE ORDER 2019 COMPULSORY PURCHASE OF LAND IN THE PARISHES OF STOCKBURY, BREDGAR, NEWINGTON AND BORDEN IN THE BOROUGHS OF SWALE AND MAIDSTONE IN THE COUNTY OF KENT. 1. Notice is hereby given that Highways England Company Limited (“Highways England”), a strategic highways company, has made ‘The Highways England (A249 Trunk Road Stockbury Roundabout Improvements) Compulsory Purchase Order 2019’ (“the Order”), under Sections 239, 240, 246, 249 and 250 of the Highways Act 1980, and under Section 2 of the Acquisition of Land Act 1981. It is about to submit this Order to the Secretary of State for Transport for confirmation, and if confirmed, the Order will authorise Highways England to purchase compulsorily the land in the Parishes of Stockbury, Bredgar, Newington and Borden, in the Boroughs of Swale and Maidstone in the County of Kent which is described in the Schedule below and delineated and shown coloured pink on the Map to the Order for the purposes of:- (a) the construction of highways which shall become trunk road in pursuance of The A249 Trunk Road (Stockbury Roundabout Improvements) Order 20..; (b) the improvement of the A249 Trunk Road; (c) the improvement of slip roads connecting the M2 special road to the A249 Stockbury Roundabout; (d) the construction and improvement of highways to connect the above mentioned Trunk Road with the existing road system at Stockbury Roundabout; (e) the construction and improvement of highways and the provision of new means of access to premises in pursuance of The Highways England (A249 Trunk Road Stockbury Roundabout Improvements) (Side Roads) Order 2019; (f) use by the acquiring authority in connection with the construction and improvement of highways and the provision of private means of access to premises as aforesaid; and (g) mitigating the adverse effect which the existence or use of the highways proposed to be constructed or improved will have on the surroundings thereof.
    [Show full text]
  • 05 July 2010 Swale Borough Council List of Current Applications Received
    05 July 2010 Swale Borough Council List of current applications received by Swale Borough Council for determination which are available for inspection at the Planning Services, East Street, Sittingbourne, Kent. Copies of applications are also available for inspection at the appropriate District Office (Please see notes). You may also view planning applications via our partnership with the UK Planning website (www.ukplanning.com/swale), but this may take up to 7 days to be completed. You may submit any observations on any application via the website. Please note that any observations that you wish to make on applications should be received either in writing (at the above address) or via e-mail to [email protected] within three weeks of the date of this list (please quote the full application reference in any correspondence or e-mail). In the interests of economy an acknowledgement will not be sent. If you do write to express an interest in an application, you will be informed of the decision in due course. On certain applications it may be some time before a decision is reached. Sittingbourne Application Ref SW/10/0511 EE Case No. 10164 Case Officer Emma Eisinger Location 185 London Road, Sittingbourne, Kent, ME10 1PA Proposal Change of use of existing care home (use class C2) to a single dwelling (use class C3). Applicants Name Mr Phil Wisson Agent Mr Simon Tuddenham, GVA Grimley Ltd, 10 Stratton Street, London, W1J 8JR Borden Application Ref SW/10/0626 ME Case No. 13873 Case Officer Martin Evans Location The Studio,Oad Street,Borden,Sittingbourne,Kent,ME9 8JX Proposal Manege Applicants Name Mr C Scurfield Agent Mr Bernard Cullen, Kent Drawing, Office 1, 1st Floor, 25 High Street, Gillingham, Kent, ME8 7HX Stalisfield Application Ref SW/10/0726 TD Case No.
    [Show full text]
  • Forward Works Programme
    A safer, more sustainable and more resilient highway network Appendix C Forward Works Programme 2021/22 to 2025/26 1 Introduction This document sets out our five-year Forward Works Programme for the years 2021/22 to 2025/26. It reflects the need to move away from annual programmes and to consider asset management activity a multi-year one. It is in two parts: the first concerns the next two years (2021/22 - 2022/23), and most of the sites included have already been verified by our engineers. The second part relates to years three to five of our five-year programme (2023/24 - 2025/26), and is largely based on data from our asset management systems, so may be subject to more changes as the schemes are verified. Any schemes involving the potential use of non-standard materials, such as those in conservation areas, or requiring detailed design will remain in the second part until those elements have been resolved and agreed, so that there is cost certainty prior to any commitment to deliver on the ground. This programme is subject to regular review and may change for a number of reasons including budget allocation, contract rate changes, conflicting works and to reflect our changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase, and additional sites may be added or others advanced if their condition deteriorates rapidly so that we need to react in order to keep the highway in a safe and serviceable condition.
    [Show full text]
  • M2 Junction 5 Improvements
    M2 JUNCTION 5 IMPROVEMENTS DETAILED MODIFICATION MOD-1 Amendments required to the Made Side Roads Order and Made Compulsory Purchase Order THE HIGHWAYS ENGLAND (A249 TRUNK ROAD STOCKBURY ROUNDABOUT IMPROVEMENTS) (SIDE ROADS) ORDER 2019 THE HIGHWAYS ENGLAND (A249 TRUNK ROAD STOCKBURY ROUNDABOUT IMPROVEMENTS) COMPULSORY PURCHASE ORDER 2019 JANUARY 2020 HE551521-ATK-LHA-XX-LN-ZL-000020 C01 DETAILED MODIFICATION No.1 Details of Modification Engineering Changes A 4m wide field access would be provided on the same line as the existing access to be stopped up by the published SRO, referenced as 1/4. The proposed infiltration pond would be reconfigured in a northerly direction to enable the replacement field access to be provided along the same line as the original access. The extent of the eastern tie-in works to Oad Street would be reduced by 20m. The reduction in the scheme boundary along the Oad Street widening section between approximate Chainages 50m to 200m to minimise land take impacts. The layout of the proposals at Oad Street as per the preliminary design is shown in Figure 1 below. Figure 1: Extract from PCF Stage 3 Preliminary Design – Engineering General arrangement, ref. HE551521-ATK-HGN-XX_ML-DR-CH-000102_C04 HE551521-ATK-LHA-XX-LN-ZL-000020 C01 The modified layout of the proposals at Oad Street is shown in Figure 2 (also refer to Appendix A). Figure 2: Extract from sketch with ref. HE551521-ATK-HGN-XX_ML-SK-CH-001005_C04 Further details of the proposals and its environmental assessment are located in the Environmental Statement Addendum ref. HE551521-ATK-EGN-XX-RP-LM-000002.
    [Show full text]