Invitation for Bids

(Corrigendum 4 IFB, original IFB publication date is 14 July 2020)

Date: 26 January 2021 Loan No. 53326-IND: Bengaluru Metro Rail Project and Title: BMRCL/PHASE 2B /Via &Stns /P1, P2& P3 /69

“Construction of elevated viaduct from Jyothipuram Station (Excluding) to KIA Terminals and fifteen elevated stations viz., Kasturi Nagar, , HRBR Layout, Kalyan Nagar, HBR Layout, Nagawara, Veerannapalya, Kempapura, Hebbal, , Cross, , Bagalur Cross, Bettahalasuru and Doddajala, [excluding Architectural Finishing of Stations], including Road widening, Utility diversion & other allied works of Bengaluru Metro Rail Project, Phase-2B.”

In Three Contract packages

(i) PHASE 2B/P1/69(a): “Construction of elevated structures (Viaduct & Stations) of length 11.003 km (including 281.000 m of Viaduct beyond Phase 2A) from Chainage 0.000 m to 10072.000 m and eight elevated metro stations Contract No. viz, Kasturi Nagar, Horamavu, HRBR Layout, Kalyan Nagar, HBR Layout, and Title: Nagawara, Veerannapalya and Kempapura, including 650.00 m link line connectivity to Baiyappanahalli, Road widening, Utility diversion and allied works of Bengaluru Metro Rail Project Phase-2B”

(ii) PHASE 2B/P2/69(b): “Construction of elevated structures (Viaduct & Stations) of length 11.678 km from Chainage 10072.00 m to 21500.000 m and five elevated metro stations viz, Hebbal, Kodigehalli, Jakkur Cross, Yelahanka, and Bagalur Cross, including 250 m Pocket track, Road widening, Utility diversion and allied works of Bengaluru Metro Rail Project Phase- 2B”

(iii) PHASE 2B/P3/69(c): “Construction of elevated structures (Viaduct & Stations) of length 15.011 km from Chainage 21500.000 m to 36511.000 m and two elevated metro stations viz, Bettahalasuru and Doddajala, including Road widening, Utility diversion and allied works of Bengaluru Metro Rail Project Phase- 2B”. This length includes appox. 718.18 m cut & cover portion in front of Yelahanka Air force station” Deadline for Submission of Extended to 29 June 2021 at 15:00 hours (Indian Standard Time) Bids:

1. The Government of has applied financing from Asian Development Bank (ADB) toward the cost of Bengaluru Metro Rail Project. Part of this financing will be used for

payments under the contracts named above. Bidding is open to Bidders from eligible source countries of the ADB.

2. The Metro Rail Corporation Limited (“the Employer”) invites online bids/tenders from eligible Bidders for the construction and completion of the following works:

Estimated Cost Completion Name of Work of Work Period (in Rs.) PHASE 2B /P1/69 (a): “Construction of elevated structures (Viaduct & Stations) of length 11.003 km (including 281.00 m of Viaduct beyond Phase 2A) from Chainage 0.000 m to 10072.000 m and eight elevated metro stations viz, Kasturi Nagar, Horamavu, HRBR Layout, Kalyan Nagar, HBR Layout, Nagawara, Veerannapalya and Kempapura, including 650.00 m link line connectivity INR 639.95 30 Months to Baiyappanahalli, Road widening, Utility diversion Crores and allied works of Bengaluru Metro Rail Project Phase-2B.”

PHASE 2B /P2/69(b): “Construction of elevated structures (Viaduct & Stations) of length 11.678 km from Chainage 10072.00 m to 21500.000 m and five elevated metro stations viz, Hebbal, Kodigehalli, Jakkur Cross, Yelahanka and Bagalur Cross, including 250 m INR 645.30 27 Months Pocket track, Road widening, Utility diversion and Crores allied works of Bengaluru Metro Rail Project Phase- 2B”.

PHASE 2B /P3/69(c): “Construction of elevated structures (Viaduct & Stations) of length 15.011 km from Chainage 21500.000 m to 36511.000 m and two elevated metro stations viz, Bettahalasuru and Doddajala, INR 620.88 27 Months including Road widening, Utility diversion and allied Crores works of Bengaluru Metro Rail Project Phase- 2B”. This length includes appox. 718.18 m cut & cover portion in front of Yelahanka Air force station”.

Bidders may bid for one or two or all the contracts, as further defined in the Bidding Document.

3. Open Competitive Bidding (OCB) will be conducted in accordance with ADB’s Single- Stage: Two-Envelope bidding procedure and is open to all Bidders from eligible source countries as described in the Bidding Documents.

4. Only eligible Bidders with the following key qualifications should participate in this bidding:

PHASE 2B /P1/69(a) Tender

Historical Submission of audited financial statements or, if not required by the law of the Financial Bidder’s country, other financial statements acceptable to the Employer, for Performance the last 05 (Five) financial years to demonstrate the current soundness of the Bidder’s financial position. Net Worth: As a minimum, the Bidder’s net worth for the last year should be positive. Profitability: Earnings before tax should be positive in at least Two years out of the last five financial years. Current Ratio: In any one year out of last two financial years ending 2019- 20, the Current Ratio should be greater than or equal to ‘1’.

Average Annual INR 426.63 Crores Construction

Turnover (AACT)

Financial INR 94.81 Crores. Resources

Contracts of (i) Participation as a contractor or JV partner in One Contract where the Similar Size and value of the Bidder’s participation meets or exceeds INR 511.96 crores Nature for Infrastructure Projects in Buildings/ Airport/ Road/ Metro Railways/High Speed Railways/Light Railways/ Railways/ Dams/ Tunnel/Power Sector/Elevated Aqueduct that has been completed or substantially completed within the last 7 (Seven) years ending the last day of the month previous to the month of bid submission. OR (ii) Participation as a contractor or JV partner in Two Contracts where the value of the Bidder’s participation in each of the contracts meets or exceeds INR 319.98 crores for Infrastructure Projects in Buildings/ Airport/ Road/ Metro Railways/High Speed Railways/Light Railways/ Railways/ Dams/Tunnel/ Power Sector/Elevated Aqueduct that has been completed or substantially completed within the last 7 (Seven) years ending the last day of the month previous to the month of bid submission.

Experience in (i) Completed Construction of Elevated Viaduct / flyover / bridge having sub- Key Activities structure with pile/well/ open foundations and RCC piers and superstructure with pre-stressed concrete for a length of 11.00 Km or more (including station length in case the contract includes elevated station also) for Metro Railway/ Railway/ High Speed Railway /Regional Railway/ Light Railway/ Road Project.

PHASE 2B /P1/69(a) Tender (ii) Completed construction of at least ONE Elevated Station building or UG station for a Metro railway/ Railways/ High Speed Railway/Regional Railway/ Light Railway project.

(iii) Completion of at least one bridge/ viaduct involving launching of steel/ pre-cast concrete girder for at least one span of 40 m or more for a Metro Railway/ Railway/ Regional Railway/ Light Railway/ Road.

PHASE 2B /P2/69(b) Tender

Historical Financial Submission of audited financial statements or, if not required by the law Performance of the Bidder’s country, other financial statements acceptable to the Employer, for the last 05 (Five) financial years to demonstrate the current soundness of the Bidder’s financial position. Net Worth: As a minimum, the Bidder’s net worth for the last year should be positive. Profitability: Earnings before tax should be positive in at least Two years out of the last five financial years. Current Ratio: In any one year out of last two financial years ending 2019-20, the Current Ratio should be greater than or equal to ‘1’.

Average Annual INR 483.98 Crores Construction

Turnover (AACT)

Financial INR 107.55 Crores. Resources

Contracts of Similar (i) Participation as a contractor or JV partner in One Contract where the Size and Nature value of the Bidder’s participation meets or exceeds INR 516.24 crores for Infrastructure Projects in Buildings/ Airport/ Road/ Metro Railways/High Speed Railways/Light Railways/ Railways/ Dams/ Tunnel/Power Sector/Elevated Aqueduct that has been completed or substantially completed within the last 7 (Seven) years ending the last day of the month previous to the month of bid submission, OR (ii) Participation as a contractor or JV partner in Two Contracts where the value of the Bidder’s participation in each of the contracts meets or exceeds INR 322.65 crores for Infrastructure Projects in Buildings/ Airport/ Road/ Metro Railways/High Speed Railways/Light Railways/ Railways/ Dams/Tunnel/ Power Sector/Elevated Aqueduct that has been completed or substantially completed within the last 7 (Seven)

PHASE 2B /P2/69(b) Tender years ending the last day of the month previous to the month of bid submission.

Experience in Key (i) Completed Construction of Elevated Viaduct / flyover / bridge having Activities sub-structure with pile/well/ open foundations and RCC piers and superstructure with pre-stressed concrete for a length of 11.68Km or more (including station length in case the contract includes elevated station also) for Metro Railway/ Railway/ High Speed Railway /Regional Railway/ Light Railway/ Road Project.

(ii) Completed construction of at least ONE Elevated Station building or UG station for a Metro railway/ Railways/ High Speed Railway/Regional Railway/ Light Railway project.

(iii) Completion of at least one bridge/ viaduct involving launching of steel/ pre-cast concrete girder for at least one span of 40 m or more for a Metro Railway/ Railway/ Regional Railway/ Light Railway/ Road

PHASE 2B /P3/69(c) Tender

Historical Financial Submission of audited financial statements or, if not required by the law Performance of the Bidder’s country, other financial statements acceptable to the Employer, for the last 05 (Five) financial years to demonstrate the current soundness of the Bidder’s financial position. Net Worth: As a minimum, the Bidder’s net worth for the last year should be positive. Profitability: Earnings before tax should be positive in at least Two years out of the last five financial years. Current Ratio: In any one year out of last two financial years ending 2019-20, the Current Ratio should be greater than or equal to ‘1’.

Average Annual INR 465.66 Crores Construction

Turnover (AACT)

Financial INR 103.48 Crores. Resources

Contracts of Similar (i) Participation as a contractor or JV partner in one Contract where the Size and Nature value of the Bidder’s participation meets or exceeds INR 496.70crores for Infrastructure Projects in Buildings/ Airport/ Road/ Metro Railways/High Speed Railways/Light Railways/ Railways/ Dams/

PHASE 2B /P3/69(c) Tender Tunnel/Power Sector/Elevated Aqueduct that has been completed or substantially completed within the last 7 (Seven) years ending the last day of the month previous to the month of bid submission, OR (ii) Participation as a contractor or JV partner in Two Contracts where the value of the Bidder’s participation in each of the contracts meets or exceeds INR 310.44crores for Infrastructure Projects in Buildings/ Airport/ Road/ Metro Railways/High Speed Railways/Light Railways/ Railways/ Dams/Tunnel/ Power Sector/Elevated Aqueduct that has been completed or substantially completed within the last 7 (Seven) years ending the last day of the month previous to the month of bid submission.

Experience in Key (i) Completed Construction of Elevated Viaduct / flyover / bridge having Activities sub-structure with pile/well/ open foundations and RCC piers and superstructure with pre-stressed concrete for a length of 15.01 Km or more (including station length in case the contract includes elevated station also) for Metro Railway/ Railway/ High Speed Railway /Regional Railway/ Light Railway/ Road Project.

(ii) Completed construction of at least ONE Elevated Station building or UG station for a Metro railway/ Railways/ High Speed Railway/Regional Railway/ Light Railway project.

(iii) Completion of at least one bridge/ viaduct involving launching of steel/ pre-cast concrete girder for at least one span of 40 m or more for a Metro Railway/ Railway/ Regional Railway/ Light Railway/ Road.

For detailed qualification criteria, please refer to Section 3 (Evaluation and Qualification Criteria) of the Bidding Document.

5. To purchase the Bidding documents, eligible bidders should visit our web site www.bmrc.co.in.

• Bidders can download Bid document against online payment for INR 56,000/- inclusive of GST, from BMRCL website www.bmrc.co.in from 14 July 2020 until midnight of 22 June 2021.The procedure for online download is available in our webpage: www.bmrc.co.in.

Procedure for Bidders opting for online purchase of Bidding Documents: 1. Visit web site: www.bmrc.co.in 2. Register online (one-time process) 3. Make payment through Gate Way as available on the website

4. Download complete Bidding Document 5. Frequently check website and also registered mail for any Addendum/Corrigendum/Answered Pre-bid queries.

• Alternatively, Bidders can also obtain login password on all working days between 11:00 to 17:00 hours (IST) from 14 July 2020 to 22 June 2021 from the Registered Office of BMRCL, BMTC Complex, Shanthinagar, Bengaluru-560027 on submission of a requisition letter and a non-refundable fee of INR 56,000/- in the form of Crossed Demand Draft issued by an Indian Scheduled /Nationalized Bank or from a Scheduled Foreign Bank as defined in Section 2(e) of RBI Act 1934 read with Second Schedule drawn in favor of ‘Bangalore Metro Rail Corporation Limited’, payable at Bengaluru.

Procedure for Bidders opting for downloading of Bidding Documents using Login password against DD: 1. Visit web site: www.bmrc.co.in 2. Enter login password obtained from BMRCL on submission of DD 3. Download complete Bidding Document 4. Frequently check website and registered mail for any Addendum/Corrigendum/ Answered Pre bid queries.

6. The pre-bid meeting shall be conducted at time and place as indicated below:

Date: 4 August 2020 Time: 11:30 hours (IST)

Contact person and Place for: General Manager (Contracts), Office of the Bangalore Metro Rail (a) Pre bid Meeting Corporation Limited, (b) Seeking clarifications & 3rd Floor, BMTC Complex, Submission of bid KH Road, Shantinagar, Bengaluru-560027, , India Tele: +91-80-22969300/301

7. Deliver bids:

• To the address above in Para. 6 • During the period: From 21 June 2021 to 28 June 2021 on all working days and during working hours only (From 10:00 hours to 17:30 hours (IST)) and on 29 June 2021 from 10:00 hours to 15:00 hours (IST). • Together with a Bid Securing Declaration as described in the Bidding Document.

8. Technical bids will be opened on 29 June 2021 at 15:30 hours (IST) in the presence of Bidders’ representatives who choose to attend, whereas the Financial Bids shall remain sealed and unopened and shall be placed locked. The Financial Bids of only Technically Responsive and Qualified Bidders shall be opened after Technical Bid Evaluation, whereas, the Financial Bids of those Bidders whose Technical Bids are not responsive and qualified shall be returned unopened. General Manager (Contracts) (On behalf of Managing Director) Bangalore Metro Rail Corporation Ltd