Special Secretariat NSRF JANUARY 2011

List of Priority Projects in co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

ENERGY: Integrate and modernize the country’s electricity network in particular reduce the oil dependence of Greece in an environmentally-friendly manner, reinforce and meet the EU targets on the use of renewables so that the Country has a secure energy supply, and ensure and improve its energy efficiency patterns (Projects 1-7); Improve energy efficiency decisive for competitiveness (Project 8), security of supply and for climate change purposes (Projects 1-4, 6,7) (the MOU refers to energy as a policy area where serious delays have occurred).

Ministry of Environment, Central / OP Climate Change and NG Compression Station at Nea Contribution to the energy security of supply; 1 Competitiveness & 23.098.741 3 1 309 3 End 2012 Energy; General Secretary Mesimvria () TENE project (Decision (EC)1364/2006) Enterpreneurship for Energy/ Vice President DESFA

Ministry of Environment, Continental Greece / Climate Change and NG High Pressure Pipeline 2 OP Competitiveness & 24.681.926 Contribution to the energy security of supply; 3 1 267 4 End 2013 Energy; General Secretary towards Aliveri Enterpreneurship for Energy/ Vice President DESFA

West Macedonia / OP Integrated project permiting the transition 3 Energopolis 20.000.000 1 1 158 20 March 2014 Mayor of Kozani Macedonia & Thrace from conventional to green energy

Ministry of Environment, Cogeneration Plant Electricity and / OP Climate Change and the 2nd upgrading of the 4 Competitiveness & 54.962.757 Contribution to the energy security of supply 1 1 1.380 4 Oct. 2014 Energy; General Secretary Terminal station of LNG of Enterpreneurship for Energy/ Vice Revythousa Island (3rd tank) President DESFA

Pilot exploitation of geothermal Eastern Macedonia Pilot action for the exploitation of the 5 field Erateinou of the municipality Thrace / OP Macedonia 5.000.000 1 1 35 25 100 End 2014 Mayor of geothermic field of the Region of Nestos & Thrace

Ministry of Environment, NG High Pressure Pipeline from Attica, Peloponese / OP Climate Change and 6 Agioi Theodoroi towards Competitiveness & 44.670.162 Contribution to the energy security of supply 2 1 638 25 End 2015 Energy; General Secretary Megalopoli Enterpreneurship for Energy/ Vice President DESFA

Ministry of Environment, Islands; Cyclades Islands Energy Inter Contribution to future deployment of Climate Change and Peloponese / OP Cannot be 7 connexion with continental high 127.119.047 Renewable Energy Sources; EU 2020 1 2 10 End 2015 Energy; General Secretary Competitiveness & estimated voltage grid objective of 20/20/20 for Energy/ Vice Enterpreneurship President DEH

Ministry of Environment, All over the country / Up to full use of Climate Change and Operation "Saving Energy at Contribution to promotion of energy 8 OP Competitiveness & 396.000.000 3 2 909 0 the available Energy; General Secretary Housing" efficiency in private dwellings Enterpreneurship allocation of funds for Energy/ President ETEAN

TOTAL 695.532.633 3.696 25 166

1/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

COMPETITIVENESS

INNOVATION AND RTD: Promote innovation and transfer of know-how and technology (Projects 9-14) principally to SMEs through research and technological development (Project 15-18).

Construction of the building / OP Crete & Secretary General for 9 "Artificial Intelligence" for the 3.059.923 Mature project in innovative sector 3 1 34 0 June 2012 Research and Technology Technology Institute

All over the country / Supporting actions towards 250 companies in Ministry of development 10 Digi Content 20.000.000 3 1 not available not available not available End 2012 OP Digital Convergence the publication sector digital aid s.a

All over the country / Supporting actions towards 2.200 companies Ministry of development 11 Digi Retail 100.000.000 3 1 not available not available not available End 2013 OP Digital Convergence in the retail sector. digital aid s.a

The project involves the construction of two Patras / OP Western modern buildings fully equipped to house and Secretary General of New Buildings of technological 12 GreecePelopennese 9.657.025 support the research infrastructure of the 1 1 10 0 End 2015 Research and institute of Patra Ionian islands institute for scientific and technological Development excellence.

Epirus / OP Thessally R&D projects focused to the specific needs of 13 "New Knowledge" for Continental Greece 3.500.000 3 1 146 0 End 2015 Governor of the Region Epirus Epirus

Not West Macedonia / OP Not known.Not Mayor of Denn 14 Astronomy Park of Orliakas 6.000.000 Education & Tourism 1 1 known.Not End 2015 Macedonia & Thrace submitted yet of Thessaloniki University submitted yet

All over the country / Boost innovative entrepreneurship and 24 months from General Secretary of 15 New Innovative Entrepreneurship OP Competitiveness & 30.000.000 improve competitiviness of the Greek 1 2 200 400 500 the approval date Industry Enterpreneurship economy

All over the country / Boost innovation and competitiveness of 1236 months Corallia (microelectronics President of Research 16 OP Competitiveness & 37.700.000 entreprises and employment in cutting 3 2 300 300 500 from the clusters) Centre ATHINA Enterpreneurship edge technology sectors; patents contracting

Boost innovation supported by RTD through cooperation of entreprises and Research All over the country / Cooperation Acte I and II; 1st Institutes; development of new innovative Up to 5 years from General Secretary for 17 OP Competitiveness & 93.620.000 3 2 600 80 160 call, 2009 products; boost employment in cuttingedge the approval date Research & Technology Enterpreneurship and medium technology sectors; boost competitiveness of entreprises

Boost innovation supported by RTD through cooperation of entreprises and Research Cooperation 2011 Clusters All over the country / 2436 months Institutes; boost competitiveness of General Secretary for 18 between productive sector and OP Competitiveness & 68.320.000 3 2 440 60 120 from the approval entreprises in "Green growth" sectors, boost Research & Technology research institutes Enterpreneurship date employment in cuttingedge and medium technology sectors;

TOTAL 371.856.948 1.730 840 1.280

2/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

ENTERPRENEURSHIP FOR SMEs: Boost innovative entrepreneurship and improve competitiveness of the Greek economy (Project 19); Improve the outturn of the Greek economy .

Implementation of Financial Boost innovative entrepreneurship and All over the country / Engineering Instrument to improve competitiviness of the Greek Cannot be Cannot be Cannot be 19 OP Competitiveness & 710.000.000 3 2 End 2015 President ETEAN support SMEs (ETEAN 460M + economy estimated estimated estimated Enterpreneurship JEREMIE 250M)

All over the country / OutturnCompetitiveness of 24 months from General Secretary of 20 OP Competitiveness & 30.000.000 Outturn of the Greek economy 2 2 250 200 300 Entreprises the approval date Industry Enterpreneurship

Modernisation of SME productive base, Manufacturing under new All over the country / 24 months from General Secretary of 21 184.313.675 development of new products and processes, 3 1 600 300 500 conditions OP Competitiveness the approval date Industry outturn, boosting of employment

TOTAL 924.313.675 850 500 800

PUBLIC ADMINISTRATION AND PRODUCTIVITY THROUGH THE USE OF ICT: Improving public administration (Projects 22-28) and productivity through the use of ICT infrastructure.

Development of a National System of Electronic Public All over the country / Requested by MOUImportant for the Not available Not available General Secretary of 22 9.630.422 3 3 111 End 2015 Procurement (ΕΣΗΠ) (e OP Digital Convergence modernisation of Public administration yet yet Commerce procurement)

All over the country / It is considered as a political priority for the Secretary General of 23 Digital School 152.630.000 1 1 558 0 0 End 2013 OP Digital Convergence ICTs in its domain Ministry of Education

All over the country / Not available Not available CEO of Information 24 NATIONAL REGISTRY 44.860.000 Modernisation of Public Administration 1 1 432 End 2015 OP Digital Convergence yet yet Society S.Α.

Integrated Informatics System All over the country / Not available Not available CEO of Information 25 for the (Tax) Control Services 22.826.681 Modernisation of Public Administration 3 2 88 End 2013 OP Digital Convergence yet yet Society S.Α. (ELENXIS)

Development of services and infrastructure on spatial data for All over the country / Modernisation of Public AdministrationLand Non 26 39.000.000 2 1 425 Non applicable End 2013 CEO of Cadastre S.A. the protection of forests and OP Digital Convergence Registry applicable forest lands

Development of an electronic prescribing system and relevant All over the country / Important for the modernisation of Public Not available Not available General Secretary of 27 25.000.010 1 3 287 End 2014 supporting services (e OP Digital Convergence administration yet yet Social Welfare prescription)

All over the country / It is considered as a political priority for the Not available Not available 28 CADASTRE 130.000.000 1 3 1.287 End 2015 CEO of Cadastre S.A. OP Digital Convergence ICTs in its domain yet yet

3/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Integrated Informatics System All over the country / It is considered as a political priority for the 29 for the Manager of the Greek 40.631.000 1 1 443 47 47 End 2015 Secretary General Energy OP Digital Convergence ICTs in its domain Electrical Grid (ΕΣΜΗΕ)

It is considered as a political priority for the Rural Areas / OP Digital Not available Not available CEO of Information 30 Rural broadband 140.000.000 ICTs in its domain ; It completes the MAN for 1 2 880 End 2015 Convergence yet yet Society S.Α. the Rural Areas

Attica / OP Digital It is considered as a political priority for the 31 eticket (OASA) 34.758.000 1 1 652 44 344 End 2015 CEO of OASA Convergence ICTs in its domain

Project of priority importance regarding the Ministry of public Central ERP for the central state All over the country / follow up of the state budget by thecentral Not available Not available Not available 32 9.009.201 3 1 End 2015 adminstration reform account department OP Digital Convergence state account department ( the ministry of yet yet yet information society s.a. finance)

TOTAL 648.345.314 5.163 91 391

TRANSPORT: Tackling inconsistencies in the Trans-European networks; Developing combined transport and reinforcing the intermodality of the transport system; Connecting the various regions of Greece with the trans-European transport networks; Developing and expanding urban transport; Upgrading infrastructure; Promoting institutional and organisational interventions.

CONCESSION ROAD PROJECTS: Concession projects that target to connect Central, South Greece and the Peloponnese to the Egnatia axis.

The project belongs to the TENT and aims at connecting the country with the countries of the rest of Europe while creating the fundamental axes of the country. It is of utmost importance to the facilitation of the country's transportations. Its completion will Construction of OLYMPIA ODOS Secretary General of North Peloponese / OP contribute in the Regional Development of 33 motorway (Elefsina Korinthos 511.399.757 3 2 21.636 322 403 End 2015 Cofinanced Works / Accessibility the areas it serves. It is expected to have an Patra Pyrgos Tsakona) YPYMEDI improvement on the level of road safety and big gains from the part of the users due to the reduction of the transportation time and the increase of road safety. (estimated total cofinancing cost:421.501.427euros).

4/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

The project aims at connecting the country with the countries of the rest of Europe while creating the fundamental axes of the country. It is of utmost importance to the facilitation of the country's transportations. Construction of the MOREAS Its completion will contribute in the Regional Secretary General of ODOS motorway (Korinthos Central Peloponese / Development of the areas it serves. It is 34 296.657.714 3 2 6.076 132 165 End 2015 Cofinanced Works / Tripoli and Lefktro OP Accessibility expected to have an improvement on the YPYMEDI Sparti branch) level of road safety and big gains from the part of the users due to the reduction of the transportation time and the increase of road safety. (estimated total cofinancing cost:249.095.991euros).

The project aims in one hand at connecting the country with the countries of the rest of Europe while creating the fundamental axes of the country. It is of utmost importance to the facilitation of the country's Secretary General of Construction of the Central Continental Greece / transportations. Its completion will contribute 35 455.637.672 3 2 13.770 126 157 End 2015 Cofinanced Works / Greece (E65) motorway OP Accessibility in the Regional Development of the areas it YPYMEDI serves. It is expected to have an improvement on the level of road safety and big gains from the part of the users due to the reduction of the transportation time and the increase of road safety.

The project belongs to the TENT and aims at connecting the country with the countries of the rest of Europe while creating the fundamental axes of the country. It is of Epirus and western utmost importance to the facilitation of the Secretary General of Greece as well as South country's transportations. Its completion will 36 Construction of Ionia odos 183.970.114 3 2 5.716 327 409 End 2015 Cofinanced Works / East continental Greece contribute in the Regional Development of YPYMEDI / OP Accessibility the areas it serves. It is expected to have an improvement on the level of road safety and big gains from the part of the users due to the reduction of the transportation time and the increase of road safety.

5/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

The project belongs to the TENT and aims at connecting the country with the countries of the rest of Europe while creating the fundamental axes of the country. It is of utmost importance to the facilitation of the Unknown, North East Continental Unknown, Secretary General of Construction of the Maliakos country's transportations. Its completion will not Unknown, not 37 Greece / OP 149.545.685 3 2 not submitted End 2015 Cofinanced Works / Kleidi motorway contribute in the Regional Development of submitted submitted yet Accessibility yet YPYMEDI the areas it serves. It is expected to have an yet improvement on the level of road safety and big gains from the part of the users due to the reduction of the transportation time and the increase of road safety.

TOTAL 1.597.210.942 47.198 907 1.134

ROADS: Roads improvements in several Regions; Finalisation of 5 vertical axes of Egnatia Odos (Projects 50, 61, 62, 63, 72); Finalisation of parts of PATHE (Project 70), Aktio (Project 71), as well as the North and south axis of Kriti (Project 68, 69), safety netwotk (76).

Ring of Vathy (bridge North Aegean / OP 38 14.006.224 Reinforcement of accessibility 3 1 50 June 2012 Governor of North Aegean project CSF III) Aegean Crete

Improvements in the national North Aegean / OP 39 10.985.000 Reinforcement of accessibility 3 1 30 June 2012 Governor of North Aegean road of Cardamila Aegean Crete

Local road Kampi Havouna / OP Improve conditions of road transport in 40 3.377.565 3 1 40 0 End 2012 Governor of South Aegean Kato Meria in Aegean Crete tourist areas

Western Greece / OP Paraionia Road Tunnel Junction Reinforcement of competitiveness of the Ministry of Infrastructure, 41 Western Greece & 7.234.646 3 1 60 0 End 2012 St Ilia Region Western Greece Transport and Networks Ionian islands

Thessaly / OP Completion of local road Regional Governor of 42 Continental Greece 23.000.000 Improve conditions of road transport 3 1 144 0 0 End 2012 Thessaly Epirus

Improvement of the local road 40 43 Attica / OP Attica 13.090.000 Improve conditions of road transport 3 1 End 2012 Governor of Attica Paiania Spata Loutsa

Continental Greece / National Road ThivaLivadeia km OP Thessaly Governor of the region of 44 7.880.000 Improving accessibility 3 1 29 0 0 March 2013 position 9+000 to 11+ 600 Continental Greece Continental Greece Epirus

Continental Greece / OP Thessaly Governor of the region of 45 Road Atalanti Section E 10.000.000 Improving accessibility 3 1 35 0 0 March 2013 Continental Greece Continental Greece Epirus

Upgrade of road sections: Epirus / OP Thessaly interchange Anatoli with Egnatia Regional Governor of 46 Continental Greece 14.540.855 Reinforcement of accessibility 3 1 91 0 0 June 2012 odos of national road Epirus Epirus

6/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Continental Greece / Road project "Raptaioi Road OP Thessally Connection of South Central Evoia & Road 47 19.077.120 3 1 166 0 Sept. 2013 Governor of the Region New Styra Styra" Continental Greece safety Epirus

Epirus / OP Thessaly Upgrade tar coverage from Regional Governor of 48 Continental Greece 9.800.000 Reinforcement of accessibility 3 1 110 0 0 End 2013 interchange Elliniko to Kalentzi Epirus Epirus

Western Greece / OP Improvement of Kylliki Road Reinforcement of competitiveness of the Governor of the Region of 49 Western Greece & 7.796.920 3 1 100 0 End 2013 National Road Patra Pyrgos Region Western Greece Western Greece Ionian islands

The vertical axes of Egnatia are a part of the Transeuropean Transport Network and an end of the Paneuropean Corridors. The completion of the works will have direct and indirect consequences on the social and Finalisation of Egnatia Vertical East Macedonia and President of Egnatia ΑΕ financial upgrade of Northern Greece. It will 50 Axis, Nymfea Greek Thrace / OP 38.722.853 3 2 834 12 15 End 2013 Secretary General of contribute to the national policy on road Bulgarian borders Accessibility Public Works / YPYMEDI transport, on the domain of transfrontier connections and the reinforcement of the local economy and the additional development of the prefectures it runs through.

Link to the major archaeological site of Director for Road projects Completion improvement of the South Aegean / OP 51 13.000.000 Lindos Help to increase the tourist 3 1 81 1 End 2013 in the Ministry of national road Rodos Lindos Crete & Aegean islands attractiveness of the island of Rodos Infrastructures

Improvement of local road Ag. South Aegean / OP 52 4.180.305 Improve conditions of road transport 3 1 61 0 End 2013 Governor of South Aegean Isidoros Laerma of Rodos Aegean Crete

New roadsection of Potamos dam Crete / OP Aegean 53 7.535.000 Improve conditions of road transport 2 1 49 End 2013 Region of Crete Pantanassa Crete

Completion of western regional 54 Attica / OP Attica 17.000.000 Improve conditions of road transport 3 1 End 2013 Governor of Attica road of Egaleo and side networks

North Aegean / OP 55 15th local road of KaloniEressos 5.363.000 Reinforcement of accessibility 3 1 15 June 2014 Governor Aegean Crete

Road project "Construction of Continental Greece / Kanavari road Thespia OP Thessally 56 35.106.274 Tourism & Access to/from industrial zones 2 1 206 0 July 2014 Governor of the Region Domvrena Thisvi Prodromos Continental Greece Crossroad (Domvraina bypass) Epirus

7/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Construction of road Igoumenitsa : sections' upgrade, Epirus / OP Thessaly Ministry of Infrastructure, 57 subsection 4: KarteriGerakari Continental Greece 45.000.000 Reinforcement of accessibility 3 1 300 0 0 End 2014 Transport and Networks from km position 0+000 to Epirus 14+937.20

Central Macedonia / OP Reinforcement of competitiveness of Central Governor of Central 58 Road Axis Amfipoli 21.400.000 3 1 310 End 2014 Macedonia & Thrace Macedonia Macedonia

Ionian Islands / OP Roundabout of airport from ΧΘ 59 Western Greece 2.162.639 Improvement of the accessibility of the town 3 1 16 End 2014 Municipality of Corfou 0+000 to ΧΘ 0+500 Peloponessus Ionian Islands

Access to the landfill is currently via an Improvement of the access road Western Greece / OP existing road which although improved, does to the landfill of the 2nd Western Greece not meet the necessary requirements 60 11.350.000 2 1 157 0 End 2014 Governor of the Region Geographical unity of the PeloponessusIonian (narrow, steep slopes, etc). The project is Perfecture of AitoloAkarnania islands necessary for the operation of the landfill and to complete the management

The vertical axes of Egnatia are a part of the Transeuropean Transport Network and an end of the Paneuropean Corridors. The completion of the works will have direct and Egnatia Vertical Axis, indirect consequences on the social and Thessaloniki (Derveni) Serres President of Egnatia ΑΕ Central Macedonia / OP financial upgrade of Northern Greece. It will 61 Promachin, finalisation of parts 103.077.754 3 2 1.419 17 21 End 2014 Secretary General of Accessibility contribute to the national policy on road Lachanas Α/Κ Christou & Κ. Public Works / YPYMEDI transport, on the domain of transfrontier Ampela –Α/Κ Petritsiou connections and the reinforcement of the local economy and the additional development of the prefectures it runs through.

The vertical axes of Egnatia are a part of the Transeuropean Transport Network and an end of the Paneuropean Corridors. The completion of the works will have direct and indirect consequences on the social and Egnatia Vertical Axis, part President of Egnatia ΑΕ West Macedonia / OP financial upgrade of Northern Greece. It will 62 Koromilia Ieropigi 131.901.159 2 3 1.053 End 2014 Secretary General of Accessibility contribute to the national policy on road Krystallopigi Public Works / YPYMEDI transport, on the domain of transfrontier connections and the reinforcement of the local economy and the additional development of the prefectures it runs through.

8/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

The vertical axes of Egnatia are a part of the Transeuropean Transport Network and an end of the Paneuropean Corridors. The completion of the works will have direct and indirect consequences on the social and President of Egnatia ΑΕ Egnatia Vertical Axis, part West Macedonia / OP financial upgrade of Northern Greece. It will 63 69.000.000 2 3 854 6 7 End 2014 Secretary General of Niki Accessibility contribute to the national policy on road Public Works / YPYMEDI transport, on the domain of transfrontier connections and the reinforcement of the local economy and the additional development of the prefectures it runs through.

Thessaly / OP Thessally 64 Larissa bypass Continental Greece 21.602.000 Decongestion of the city of Larissa 2 1 85 0 End 2014 Governor of the Region Epirus

Construction of road network South Aegean / OP 65 16.500.000 Reduce traffic of settlements of Fira and Oia 2 1 245 0 End 2014 Egnatia Road SA Airport Fira Vourvoulio Oia Aegean Crete

Road Axis Section: Potidaia Department of Public Central Macedonia / OP 66 Cassandreia in Cassandra 64.300.000 Tourism; road safety 3 3 402 0 March 2015 Works Central Macedonia & Thrace () Macedonia Peloponessus / OP Improvement of road Gythio Link to Gythion port Social (road safety) Western Greece 67 AreopoliGerolimenas (in 13.203.000 and economic impact (facilitating trade 1 1 81 0 End 2015 Governor of the Region PeloponessusIonian sections) transport) islands NOAK: Finalisation of the construction of the part Ag. Varvara Ag. Deka (Kastelli) Secretary General of 68 Crete / OP Accessibility 52.146.437 Completion of the vertical axis of Kriti 3 3 464 End 2015 (pos. 22+170 pos. 37+900) of Public Works / YPYMEDI the verical road axis Irakleio Messara BOAK: Finalisation of the construction and upgradee of the Secretary General of 69 Crete / OP Accessibility 72.222.120 Completion of the BOAK axis of Kriti 3 3 441 End 2015 Cretan Northern Road Axis Public Works / YPYMEDI (BOAK)

Completion of the connections of Finalisation of the port facilities of the Patra Western Peloponessus / Secretary General of 70 the PATHE motorway with the 85.877.311 port in order to receive a higher number of 3 3 543 End 2015 OP Accessibility Public Works / YPYMEDI port and the city of Patra boats notably from Italy (TENT)

Construction of road connection Secretary General of 71 of the area of Aktio with the Epirus / OP Accessibility 212.832.896 Vertical axis on the Ionia Odos 3 3 1.079 2 2 End 2015 Public Works / YPYMEDI Western Axis of NorthSouth

Completion of the vertical axis Ardanio Vertical Axis of Egnatia Ardanio East Macedonia & Ormenion for the valorisation of the President of Egnatia ΑΕ 72 Ormenio: Sections Ardanio Thrace / OP East 105.369.105 geographic position of the region which 3 3 1.488 0 21 End 2015 Secretary General of Mandra & Mandra Psathades Macedonia &Thrace constitutes the development target of the Public Works / YPYMEDI region (included in the TEN 9IX)

9/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Road Axis Veria Naoussa Department of Public Central Macedonia / OP Bridge project Decongestion of traffic 73 Skydra : completion of the 19.250.000 3 3 122 0 End 2015 Works Central Macedonia & Thrace (transportation of agricultutal production) section Patrida Naoussa Macedonia

The road axis Larissa is the basic road Thessaly / OP Thessally axis for Thessaly's intra and interregional 74 Narional Road LarissaTrikala Continental Greece 49.312.648 traffic Road safety Gain of time Major 3, 2 3 300 0 End 2015 Governor of the Region Epirus project divided in 2 stages

Improvement and widening of Peloponessus / OP Reinforcement of competitiveness of the Governor of the Region of 75 the local road Belo Stimagka Peloponessus & Ionian 7.000.000 0 1 77 End 2015 Region of Peloponnesus Peloponnesus Nemea Islands

Crete / OP Aegean 76 Safety of road network 35.000.000 Road safety 0 1 End 2015 Governor of Creta Crete

TOTAL 1.400.202.831 11.537 37 67

CLEAN URBAN TRANSPORT: Modernisation of the urban transports of Attica and Thessaloniki; Improve the quality of life of citizens, reduce pollution and increase rapidity of transportation;

The project will bring about the the upgrade of the network according to the contemporary technology demands. The project's completion will have as a result the improvement of the services provided towards the passengers through the increase of the average speed of the trains and the Renovation of under and over safer transportation, the comfort as well as President and Managing 77 structure of the ISAP lines and Attica / OP Accessibility 53.090.542 3 3 1.278 0 End 2012 the improvement of the neighboring areas of Director of StasyΑ.Ε. Omonoia tunnel the network in terms of noise and vibrations. The upgrading of the line will contribute to the increase of the number of passengers with an additional reduction of car usage, something that will contribute to the reduction of atmospheric pollution in the Attiki basin.

Athens metro, extension of line Ministry of Infrastructure, 3, section "EgaleoHaidari", Transport & Attica / OP Maturity & rapid visibility; Environmental 78 depot "Eleonas", transfer station 54.837.993 3 3 3.300 End 2013 Networks/General Environment impact: clean transport "Xaidari, transfer station Secretary of Public Works "Keramikos" / YPYMEDI

The project will contribute to the upgrade of the structure and the traffic conditions and in the reduction of bottlenecks in the Attiki President of Μetro ΑΕ. Extension of line 3 of the 79 Attica / OP Accessibility 414.217.350 basin which faces a sharp traffic problem. In 3 3 5.169 End 2015 Secretary General of Metro, part Chaidari Pireas addition, pollution from the road traffic will Public Works / YPYMEDI be reduced while quality of life will be improved.

10/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Secretary General of 80 New ETHEL buses Attica / OP Accessibility 42.066.205 Renewal of the Athens bus fleet 3 3 0 0 End 2015 Transport / YPYMEDI

President of Μetro ΑΕ. Central Macedonia / 81 Metro of Thessaloniki 323.000.000 Maturity, rapid visibility, green transport 3 3 End 2015 Secretary General of OP Macedonia & Thrace Public Works / YPYMEDI

Westward extension of tram to Athens/Piraeus / OP President and Councillor of 82 120.884.500 Green Transport 2 3 940 98 End 2015 Piraeus Attica TRAM AE

TOTAL 1.008.096.590 10.687 0 98

PORTS: Modernisation of ports; Improve the capacity and quality of services for cargo and passengers.

Continental Greece / Transformation and OP Thessally 83 8.979.000 Tourism; Accessibility to Eastern Evoia 2 1 66 0 Sept. 2012 Governor of the Region modernisation of Kymi port Continental Greece Epirus

Continental Greece / Upgrade and extension of OP Thessaly Upgrading transport infrastructure and Governor of the region of 84 8.100.000 3 1 32 0 0 End 2012 Mantoudi port Continental Greece adequate port facilities Continental Greece Epirus

South Aegean / OP Upgrading transport infrastructure and Municipal Port Fund of 85 Construction of pier in port 5.500.000 2 1 54 0 0 End 2013 Aegean Crete adequate port facilities South Dodecannesus

Peloponessus / OP Infrastructure works for the Western Greece Reinforcement of competitiveness of the Municipality of North 86 protection of the seaside of the 5.340.000 1 1 39 End 2013 Peloponessus Ionian Region of Peloponnesus Kynouria port of Astrous Islands Its completion will bring about positive consequences in the restructuring and the upgrading of shipping, in regional development and the reinforcement of Director of EYDE MEDE New port of Patra. 3rd part, Western Peloponessus / touristic development through the 87 55.406.655 2 3 567 End 2015 Secretary General of phase A OP Accessibility improvement of the infrastructure and the Public Works / YPYMEDI operability of the ports. The ports are the international gates of the country (western entry) and service a significant part of passenger and cargo shipping.

11/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Its completion will bring about positive consequences in the restructuring and the upgrading of shipping, in regional development and the reinforcement of touristic development through the Director of EYDE MEDE New port of Igoumenitsa, phase 88 Epirus / OP Accessibility 53.722.500 improvement of the infrastructure and the 3 3 1.082 34 42 End 2015 Secretary General of C operability of the ports. The ports are the Public Works / YPYMEDI international gates of the country (western entry) and service a significant part of passenger and cargo shipping.

It is a brand new project and the proposal is still under formation. However the project is paramount inportant for the development of tourism in the region of Western Greece. The Peloponessus / OP project concerns the reinforcement of cruises Western Greece Unknown. Not Deputy Governor of the 89 Katakolon port 20.000.000 and connection with acient Olympia. The 0 1 End 2015 PeloponessusIonian submitted yet Region of Western Greece project includes several actions as: islands improvement of port infrastructures, road connection with the natioal road as well as improvement of the already operational railway network.

Gythio / OP Western Economic impact (reinforcement of Gythion Port (Commercial and Region of Peloponnesus/ 90 GreecePelopennese 22.150.000 commerce in Peloponnesus) and beneficial to 1 1 163 0 End 2015 Cruise) ΤΕ Lakonia Ionian islands the touristic development

North Aegean / OP Help to increase the tourist attractiveness of Managing Director of 91 Port of Mytilini 8.000.000 3 1 59 0 End 2015 Crete & Aegean islands the island of Lesvos Egnatia SA

Eastern Attica / OP Important port infrastructure. Completes CF Unknown. Not Secretary General of 92 Port of Lavrio 37.000.000 1 1 End 2015 Attica project. submitted yet Public Works / YPYMEDI

Southern pier Port of Piraeus Regional Governor of Unknown. Not 93 services for cruise ships (1st / OP Attica 6.000.000 Beneficial to tourism and employment sector 3 3 End 2015 Attica, President and submitted yet part) Councillor of OLP

TOTAL 230.198.155 2.062 34 42

AIRPORTS: Modernisation of airports; Create additional capacity and the possibility of having transcontinental flights.

By expanding corridor 1028 for take off/landings and the parallel road by 1000 metres towards the sea, transatlantic flights will be possible to land. The project Central Macedonia / OP Director of EYDE of 94 Completion of Makedonia Airport 72.421.368 concludes a series of interventions aiming 3 3 1.169 100 End 2015 Accessibility Northern Greece towards improving security, increasing passenger traffic, improving the level of service and showcasing Thessaloniki as a base of air transport.

TOTAL 72.421.368 1.169 0 100

12/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

RAILWAYS: Construction, finalisation and signalisation of parts of PATHE-P; Improve the desirability of railways as a competitive means of transportation for both passengers and cargo; Reduce travelling time.

The project foresees the completion of the electrification of 105,4 km of the like Ska – Kiato which began in OP Rails, Airports, Urban Transport (bridge project). The suggested project is a part of the broader Finalisation of electrification of programme of renewing the PATHEP railway Attica, Peloponessus / Not available President and Managing 95 double railway line in the part of 27.084.540 axis and in particular the line Ska – Kiato 3 3 3.075 End 2013 OP Accessibility yet Director of Ergose Α.Ε. Ska Kiato which is an important suburban project. It contributes in a big way in the completion of the elimination of network inconsistencies, in the reduction of the time and cost of transportation and in securing interoperability and intermodality.

The project is about the construction of a new double electrified line of 28 km in the part of RododafniRio with signalization and telecommand, as well as the installation of an electrification system in the part of Kiato Rododafni (71 km). The project is indispensable for the completion of the Construction of the new double railway connection of Patra and Western railway line Rododafni Rio and North Peloponessus / Greece to the rest of the country; to that Not available President and Managing 96 429.356.400 1 3 5.344 End 2015 electrification of section Kiato OP Accessibility extent Greece has been bound towards the yet. Director of Ergose Α.Ε. Rododafni EU. The Patra port is a gate of entry of both passengers and cargo to the country. Additionally the line will operate in a big art of its length as a suburban rail towards Athens (it already operates like this until Kiato). The completion of the line to Patra is a strategic part of the Programme, thus the completion of this part is essential.

13/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

The project is a first priority for the completion of the country's railway axis. It is part of PP22 (TENT) and with its completion the line in the whole length of Athina – Thessaloniki will be double and will have been additionally upgraded so as to significantly reduce travelling times (the reduction in this particular part only is expected to be 50 minutes, while the time for the total trip Athina –Thessaloniki is Completion of the new double expected to 3,5 hours). With the completion Continental Greece / Not available President and Managing 97 highspeed railway line Tithorea 474.099.000 of this part the transfer of passengers as well 3 3 7.619 End 2015 OP Accessibility yet Director of Ergose Α.Ε. Lianokladi as cargo is facilitated from and to areas on the length of the Athina – Thessaloniki line. The project contributes towards the following targets: elimination of the railway network inconsistencies, security improvement, reduction of the time and cost of transportation, the elimination of bottleneck points, the reduction of environmental consequences, energy savings, securing interoperability and intermodality, improvement of the service level.

Finalisation of suburban railway Athens / OP Secretary General of 98 74.883.659 Finalisation of the Suburban Railway 3 3 932 End 2015 of Attiki, part: SKATreis Gefyres Accessibility Transport

The project (with a forecasted budget of 90 million euro under planning) is indispensable and should be completed within the NSRF Finalisation of installation of framework since through it the ERTMS modern signalisation, NorthEast Continental Unknown, system will be deployed, thus ensuring the President and Managing 99 telecommand and Greece / OP 90.000.000 3 3 not submitted End 2015 interoperability of the Greek railway network Director of Ergose Α.Ε. telecommunications on the Accessibility yet with the other European ones. The PATHEP axis interoperability is a condition for financing all the NSRF railway projects and its lack can cancel the cofinancing.

This is a part of the PATHEP axis, belonging to DEDM. The project is indispensable for the completion of the railway connection of Construction of the new double Patra and Western Greece with the rest of Unknown, railway line Athens (SKA) North Peloponessus / President and Managing 100 158.850.000 the country; to that extent Greece has been 3 3 not submitted End 2015 Patras in the section Diakopto OP Accessibility Director of Ergose Α.Ε. bound towards the EU. The Patra port is a yet Rododafni gate of entry of both passengers and cargo to the country. The completion of the line to Patra is a strategic part of the Programme.

14/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Construction of the Railway line Department of Public Central Macedonia / OP Not available 101 of Thessaloniki Eidomeni, in 68.841.600 Bridge project part PATHEP railway axis 3 YES (MP) 812 End 2015 Works Central Macedonia & Thrace yet Polykastro (Phase B) Macedonia

Construction of the second operating phase of Thriassio Western Attica / OP Not available President and Managing 102 78.302.200 Phase B of the CF project 2 3 1.170 End 2015 Pedio and contruction of Zefirou Attica yet Director of Ergose Α.Ε. railway station

Suburban train section Piraeus3 Athens/Piraeus / OP Not available President and Managing 103 70.000.000 Green Transport 1 3 932 End 2015 Gefyres Attica yet Director of Ergose Α.Ε.

Upgrade of the railway line East Macedonia & Accessibility & Competitiveness (Connection President and Managing 104 Ormenion, Thrace / OP East 12.986.732 of Alexandroupolis with the Northern Part of 3 239 0 0 End 2015 Director of Ergose Α.Ε. between Didimoteicho & Marasion Macedonia &Thrace the Region)

TOTAL 1.484.404.131 20.123 0 0

ENVIRONMENT: Contribution to the convergence to the "acquis communautaire" in terms of environmental protection has also been decisive and led to the selection of projects on solid waste (Project 111, 113, 130, 132) and waste water management (Projects 109, 115, 118, 120, 122, 123, 128, 129), even if they are less advanced in their implementation than the others. Contibution to the natural environment and drinking water supply (Projects 105, 108, 110, 112, 125, 126); Rehabilitation measures (Project 106, 107, 114, 117, 124, 127, 131, 133); Urban development (Project 119).

Supply & installation of remote Continental Greece / control system management of Municipal Company for OP Thessaly The sustainable management of natural and 105 drinking water Municipal 3.094.000 3 1 25 1 1 End 2011 Water supply and sewage Continental Greece built environment and natural resources Company for Water supply and Lamia Epirus sewage Lamia

Rehabilitation towards the sea of Thessaly / OP 106 2.891.740 Environmental protection 3 1 27 0 0 End 2011 Region of Thessaly Krausidona river (rain water) Environment

Thessaly / OP Thessaly Rehabilitations in different parts 107 Continental Greece 2.584.033 Environmental protection 3 1 48 0 0 March 2012 Region of Thessaly of Pineios river Epirus

Water supply network in Kozani / 108 2.025.210 Environment sustainable development 3 3 22 0 0 June 2012 Municipality of Kozani municipality OP Macedonia & Thrace

Construction of sewage network Epirus / OP Thessally & extension of urban planning of 109 Continental Greece 1.255.600 Quality of life, Environment & Tourism 2 1 12 0 Sept. 2012 Mayor of Preveza Drosia area in Preveza Epirus Municiplaity Western Greece / OP Replacement Extension of water Western Greece 110 supply network of the south 3.000.000 Environment sustainable development 3 1 100 2 End 2012 Patras Municipality Peloponessus Ionian eastern part of Patras Islands

15/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Closure and rehabilitation of All over Greece / OP Environmental and positive social impact 111 150.000.000 3 1 900 End 2012 MunicipalitiesRegions remaining illegal landfills Environment public health

Construction of new telecontrol /teleremote stations of water Central Macedonia / OP Reinforcement of competitiveness of Central 112 1.980.000 3 1 27 End 2012 Municipality of Serres supply of the Municipality of Macedonia & Thrace Macedonia Serres

Waste Management Station in Central Macedonia / OP 113 the Northwest part of 12.213.215 EnvironmentQuality of life 3 1 45 95 End 2012 Technical Services OTA Macedonia & Thrace Thessaloniki

Ministry of Infrastructure Rehabilitation of Eshatia torrent 114 Attica / OP Attica 9.550.000 Environmental protection 3 1 End 2012 Sectretary general for next to Fleva street public works (D10)

Western Macedonia / 115 Sewage Networks Vatero Kozani 3.319.328 Environment Quality of Life 3 1 30 0 0 Jan. 2013 Municipality of Kozani OP Macedonia & Thrace

Epirus / OP Thessally Extension and modernisation of 116 Continental Greece 4.500.000 Quality of life, Environment & Tourism 1 1 41 0 March 2013 Mayor of Ioannina sewage system of the lake zone Epirus

Thessaly / OP Thessaly Urgent antiflood works of Xiria 117 Continental Greece 17.460.000 Environmental protection 3 1 109 0 0 June 2013 Region of Thessaly river Epirus

Sewage network in the Western Macedonia / 118 5.869.328 Environment Quality of Life 3 1 54 1 2 June 2013 Municipality of Kozani municipality of Kozani OP Macedonia & Thrace

Regeneration of the nea seaside Head of Unit Department Urban project Attractiveness of Thessaloniki of Thessaloniki Section from Central Macedonia / OP of Architectural Projects 119 44.100.000 Quality of life Started in the previous 3 1 745 20 End 2013 Vassiliko Theatre to Sea Sport Macedonia & Thrace Municipality of programming period Club Thessaloniki

Sewage system in Plaka Crete / OP Crete & Improvement of environment in one of the President of DEYA Ag. 120 2.589.150 1 1 24 0 End 2013 Elounda Aegean islands major tourist centres of Greece Nikolaos

Construction of rainwater Attica / OP 121 22.150.000 Environmental protection 3 1 End 2013 Region of Attica pipelines of Paiania Environment

Peloponessus / OP Completion of the intra sewage Western Greece Reinforcement of competitiveness of the 122 network of the municipality 1.700.000 1 1 23 End 2013 Municipality of Nafplion Peloponessus Ionian Region of Peloponnesus Leukanion Pirgiotikon Exosi Islands

16/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Epirus / OP Thessally 123 Sewage of Igoumenitsa Continental Greece 4.500.000 Quality of life, Environment & Tourism 3 1 41 0 March 2014 Mayor of Igoumenitsa Epirus

West Macedonia / OP Environmental protection, adduction of water 124 Rehabilitation of River Soulou 36.000.000 1 1 260 15 End 2014 Mayor of Macedonia & Thrace to Thessaloniki, tourim

Zakynthos island / OP Public corporation for Replacement of the central water Western Greece Economic and social impact and beneficial to Unknown. Not 125 8.500.000 0 1 End 2014 water supply and sewage supply pipeline in PelopenneseIonian environmental and tourism sector. submitted yet in Zakynthos Islands

Peloponessus / OP Completion of water supply in Western Greece Reinforcement of competitiveness of the 126 3.500.000 1 1 47 End 2014 Municipality of Nafplion Nafplion Peloponessus Ionian Region of Peloponnesus Islands

Ministry of Infrastructure, Maturity & rapid visibility, environmental Transport & Thessaly / OP 127 Rehabilitation of Karla lake 50.000.000 impact (protected area), economic and social 3 3 450 End 2015 Networks/General Environment impact (drinking water for ) Secretariat of Public Works

Efficient management of waste water in 120 small All over Greece / OP Important job creation, social impact, public 128 1.050.000.000 1, 2, 3 3 12.500 End 2015 MunicipalitiesRegions agglomerations, priority C (2.000 Environment health and environmental impact 15.000 inhabitants)

Collection, transfer, treatment Eastern Attica / OP Regional Governor of 129 and disposal of waste water in 124.890.213 Quality of life 2 3 1.540 10 20 End 2015 Attica Attica KoropiPeania

Good territorial spread since located in all Not available Regional Governor of 130 Solid waste managment facilities Attica / OP Attica 120.000.000 1 1 2.000 End 2015 parts of the region yet Attica

West Macedonia / OP Governor of West 131 Valorisation of Polyphytos lake 35.000.000 Environmental protection and tourism 1 1 276 40 End 2015 Macedonia & Thrace Macedonia

Equipment for pretreatment and Eastern Macedonia The pretreatment and recycling of urban recycling of urban solid waste for Department of Public 132 Thrace / OP Macedonia 12.000.000 solid waste contributes to the development of 1 1 49 69 End 2015 the Region of Eastern Macedonia Works of the Region & Thrace the Region with jobs creation Thrace

Works for the protection of West Macedonia / OP Governor of West 133 10.000.000 Environmental protection 0 1 92 End 2015 lake Macedonia & Thrace Macedonia

TOTAL 1.744.671.817 19.438 61 264

17/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

CULTURE AND TOURISM

Valorisation and restoration of Crete / OP Aegean Protection and valorisation of cultural Ministry of Culture and 134 the regional archeological 1.400.000 3 1 31 Oct. 2013 Crete heritage Tourism monuments of Palace

President and Councillor of Conservation and reconstruction Centre of Athens / OP 135 8.000.000 Visible touristic project 3 1 150 45 End 2013 the Organisation of the of monuments of the Acropolis Attica New Acropolis Museum

Lefkada island / OP Decentralised Widening the interconnection Western Greece Beneficial to tourism sector (crossing yatches Administration of 136 22.631.000 1 1 135 0 June 2014 channel in PelopenneseIonian via the channel) Peloponnesus, Western islands Greece and Ionian Islands

Rehabilitation of monuments in North Aegean / OP Protection and valorisation of cultural Region of Northern 137 2.300.000 3 1 50 June 2014 Castro Mytilinis Aegean Crete heritage Aegean

Regeneration Valorisation of the Central Macedonia / OP Ministry of Culture and 138 royal necropolis and the palace of 7.000.000 3 1 160 End 2014 Macedonia & Thrace Tourism Aigon Phase IIΙ

Ionian Islands / OP Western Greece 139 Theatre of Zante 5.643.286 Creation of cultural economy 3 1 50 5 8 End 2014 Municipality of Zante Peloponessus Ionian Islands Rehabilitation of the former Not known. custom office of and Crete / OP Crete & Urban rehabilitation project helping to 140 7.600.000 1 1 84 Not submitted End 2014 Deputy Mayor of Chania transformation into a cultural Aegean islands increase the tourist attractiveness of Chania yet center

Β΄ Phase of organisation and Continental Greece / Director of the exhibition of prehistorical, OP Thessally 141 4.500.000 Culture & Tourism 3 1 52 0 End 2014 Archelogical Service or classical and Byzantine findings Continental Greece Minsiter of Culrture? in Thebes Archeological Museum Epirus

Not known. Central Macedonia / Culture Tourism Important archeological Not known. Not 142 New Vergina Museum 24.000.000 1 1 Not submitted End 2015 Head of Unit EPKA OP Macedonia & Thrace site submitted yet yet

Head of the Directorate Construction of the Crete / OP Crete & for Museums and Cultural 143 Archaeological museum of 5.861.254 Creation of a new tourist pole in central Crete 2 1 133 0 End 2015 Aegean islands buildings in the Ministry of Messara Culture

Thessaly / OP Thessally Submarine museums and diving Sustainable tourism; promotion of 144 Continental Greece 1.500.000 0 1 18 5 End 2015 Governor of the Region parks in ans submarine cultural assets Epirus

18/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Touristic presentation of the 145 Attica / OP Attica 8.500.000 Beneficial to tourism and employment sector 3 1 45 End 2015 Governor of the Region Region of Attica 20072013

Rehabilitation of historic centre of Not known. Not 146 Athens and connection of Attica / OP Attica 20.000.000 Beneficial to tourism and employment sector 0 1 End 2015 Governor of the Region submitted yet archeological sites

Peloponessus / OP Valorisation works of Karytainas Western Greece Reinforcement of competitiveness of the Ministry of Culture and 147 1.300.000 1 1 33 End 2015 Castle Peloponessus Ionian Region of Peloponnesus Tourism (25th EBA) Islands

All over the country / Modernisation extension of activities for (1) 18 months from General Secretary for 148 Alternative Tourism OP Competitiveness & 20.000.000 entreprises actives in supplying services of 2 150 200 300 Call ongoing the approval date Culture and Tourism Enterpreneurship alternative tourism

TOTAL 140.235.540 1.091 205 358

HEALTH AND EDUCATION INFRASTRUCTURE

Construction of a kindergraden in Western Macedonia / Region of Western 149 1.215.000 Social solidarity 3 1 13 3 3 End 2011 St Athanasios area Kozani OP Macedonia & Thrace Macedonia

Construction of primary school in Western Macedonia / Region of Western 150 2.100.000 Upgrading of the educational conditions 3 1 23 6 6 April 2012 Chiliodentri Poria OP Macedonia & Thrace Macedonia

Thessaly / OP Thessaly Construction of 15th High School 151 Continental Greece 3.145.773 Upgrading of the educational conditions 3 1 35 0 0 May 2012 Municipality of Larissa Larissa Epirus

Primary school in Kallikrateia Central Macedonia / OP Region of Central 152 3.460.000 Upgrading of the educational conditions 3 1 38 End 2012 Municipality Macedonia & Thrace Macedonia

Ionian Islands / OP Construction of a building for the Western Greece 153 Faculty of ecology and 5.222.755 Upgrading of the educational conditions 3 1 47 End 2012 Ministry of Education Peloponessus Ionian environment in Zante Islands

Construction of Technical South Aegean / OP Student housing in modern facilities and 154 4.286.918 3 1 245 30 End 2012 Region of South Aegean Professional School of Aegean Crete improving social infrastructures

South Aegean / OP Student housing in modern facilities and 155 2nd high school of 2.180.000 3 1 27 2 End 2012 Region of South Aegean Aegean Crete improving social infrastructures

Construction of a new building and modernisation of existing North Aegean / OP 156 8.897.673 Enhancement of health infrastructure 3 1 90 End 2012 Region of Northen Aegean infrastructure of Chios General Aegean Crete Hospital

19/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Continental Greece / School complex (secondary OP Thessaly Regional of Continental 157 10.902.800 The development of human resourse 3 1 57 1 1 August 2013 education) in Lamia Continental Greece Greece Epirus

Construction of the new building Central Macedonia / OP Region of Central 158 5.082.022 Health social solidarity 3 1 56 End 2013 of the General Hospital of Edessa Macedonia & Thrace Macedonia

Technical Univercity of Crete. Crete / OP Aegean Technical Univercity of 159 Environmental Engineering dept. 7.825.555 Enhancement of education infrastructure 3 1 86 End 2013 Crete Crete facilities(B Part)

Western Greece / OP Completion of the General Western Greece 160 58.560.071 Health social solidarity 3 1 404 0 End 2013 Depanom A.E Hospital of Agrinio Peloponessus Ionian Islands Construction & supply installation of equipement Epirus / OP Thessaly 161 "Hatzikosta" hospital, Ioannina, Continental Greece 9.316.773 Enhancement of health infrastructure 3 1 101 0 60 End 2013 Depanom A.E Department for alcoholic and Epirus drug user treatment

Creation of a new emergency Epirus / OP Thessaly 162 Department General Hospital Continental Greece 10.375.770 Enhancement of health infrastructure 3 1 115 0 60 End 2013 Depanom A.E Filiata, Igoumenitsa Epirus

Rehabilitation of the building of South Aegean / OP 163 9.458.244 Improving education services 2 1 140 0 End 2013 University of Aegean Aegean University in Rodos Aegean Crete

The project involves the final restoration of the main building of the General Hopspital of Patras "Aghios Andreas" which was struck by an earthquake in 2008. The implementation Upgrade of the central building of Western Greece / OP of the project will decongest the University Patras General HospitalAgios Western Greece Hospital of Rio, and will improve the service 164 Andreas and the 20.739.217 2 1 202 0 End 2014 Depanom A.E PeloponessusIonian provided. The project also concerns the provision/installation of medical islands supply of necessary equipment to overcome and hotel equipment the shortcomings of that already integrated and in use in the new wing of the General Hosiptal of Patras "Aghios Andreas" and essentially complete the construction.

Allday primary school Gennadiou South Aegean / OP Student housing in modern facilities and 165 4.534.000 2 1 45 2 End 2014 Municipality of Rodos in Rodos Aegean Crete improving social infrastructures

Construction and Equipment of Eastern Macedonia The new hospital of Komotini is the most 166 Komotini Hospital in new building Thrace / OP Macedonia 50.000.000 0 3 46 n/a n/a End 2015 Depanom A.E important intervention in the region with 200 beds & Thrace

TOTAL: 217.302.571 1.770 44 130

GRAND TOTAL cost (euros): 10.534.792.517 TOTAL job creation: 126.514 2.744 4.830

20/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

EUROPEAN SOCIAL FUND (ESF)

HUMAN RESOURCES DEVELOPMENT OP (ESF)

Systemic intervention aiming at Upgrading of labour inspection Ministry of Labour; strengthening the mechanisms to supervise 1 mechanisms to fight undeclared All over the country 7.197.231 2 3 End 2015 General Secretary for the labour market in order among others to work, budget Labour ensure a reduction in undeclared work

The already approved and ongoing actions aim at increasing the employability and equal participation of women in the labour market Ministry of Labour; through the delivery of care and 2 Reconciling work and family life All over the country 384.660.000 3 1 83.000 70.000 83.000 End 2015 General Secretary for accommodation of infants, toddlers, children Community & other Funds and adolescents. Thereby achieve a substantial facility for women to meet their complex and demanding role.

Systemic intervention aiming at developing Establishment of an institutional, social economy and more particularly social regulatory, administrative and enterprises and cooperatives which can play Ministry of Labour; fiscal framework in order to a key role in social cohesion and in the 3 All over the country 60.000.000 1 1 End 2015 General Secretary for promote social economy and integration of persons from vulnerable Labour facilitate the establishment and population groups, supplementing the basic operation of social enterprises policies for economic development and employment

The actions aim at creating new jobs, based on local labour market needs and conditions Ministry of Labour; Local employment plans, of full employment (multiple employment, 4 All over the country 140.000.000 2 1 36.000 20.000 25.000 End 2015 General Secretary for adjusted to local labour markets additional employment, etc.) especially in Community & other Funds areas with declining industries facing restructuring problems.

EDUCATION AND LIFELONG LEARNING OP (ESF)

New school (school in the 21th Ministry of Education; Reforming, modernising and decentralising century) transition phase in General Secretary for the educational system. The New School 5 primary education (creative All over the country 69.000.000 3 1 2.450 End 2015 Education Special serves both social and educational needs activities, integration of pupils Secretary for the through its new reformed curriculum from vulnerable groups) Education OP Ministry of Education; General Secretary for Development of a digital school Accelerating the rhythm of integrating new Education Special 6 platform and digital learning All over the country 9.000.000 Information and Communication 3 1 End 2015 Secretary for the materials Technologies (ICTs) in the education process Education OP Pedagogical Institute

21/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Enhancing the system and the services of lifelong education and promoting equal access.The Second Chance Schools are for those who have not completed nine year Ministry of Education; compulsory education, and are therefore at General Secretary for risk of social exclusion and marginalisation. 7 Second Chance Schools All over the country 25.000.000 3 1 End 2015 Education Special They provide these individuals with the Secretary for the possibility of acquiring a lower secondary Education OP education certificate, in order to integrate with existing social, financial and professional structures and to continue their education

More effective links between the educational Ministry of Education; system and the labour market. Apprentiship General Secretary for Apprenticeship programs in training for students of universities aims at 8 All over the country 35.000.000 3 1 End 2015 Education Special Tertiary Education (Universities) preparing them and providing them with Secretary for the work experience for entering the labour Education OP market

Strengthening of human capital for promotion of research and innovation aims at Ministry of Education; attracting new reasearchers and promoting General Secretary for Promotion of basic and applied 9 All over the country 120.000.000 basic and applied research programmes, so 2 1 3.000 End 2015 Education Special research (Thales programme) that they contribute to generating and Secretary for the disseminating new knowledge with emphasis Education OP on sciences and ICT

ADMINISTRATIVE REFORM OP (ESF)

The reorganisation of the state aims at establishing a more citizen and business friendly administration that will lead to a more productive and competitive economy Reorganisation of the State and promote job creation and social towards a more policy oriented integration. Ministry of Administrative State (Inserted in the OP in 2010 The project concerns the 1st phase of Reform; General as a project implementing the reorganisation: Secretary for 10 All over the country 1.500.000 1 3 11 End 2012 MoU provision on the "Functional "White Paper" of the reorganisation of the Administrative Reform Review of the Central state Special Secretary for the Government") Legislation Recording and evaluating the existing AROP framework situation Draft Law for the executive State and the new governance model preparation the legislation framework

22/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

The reorganisation of the General Accounting Office of Greece aims at establishing a modern, reliable and efficient expenditure control system in line with the ordinary state Ministry of Finance budget and the multiannual budget of line Ministry of Administrative Reorganisation of the General ministries and other entities of the Greek Reform; General 11 Accounting Office of Greece and All over the country 45.000.000 state, leading to a more effective use of 1 3 321 End 2015 Secretary for established ERPs in all Ministries national resources Administrative Reform The establishment, organisation and Special Secretary for the operation of "Units for Planning and AROP All Ministries Budgeting" in the ministries aims at a more efficient use of resources by ministries for applying effectively their policies

The project concerns the creation of an ad hoc structure, composed of members of contactor and officials of the Ministry. This will be incorporated in the new reorganized Ministry of Finance structure of the Ministry. Consultant for the Ministry of Administrative The project is expected to achieve the implementation of measures Reform; General following five priorities of the Action Plan to 12 against tax evasion and the All over the country 2.675.250 2 3 19 End 2014 Secretary for fight tax evasion: achievement of sustainable tax Administrative Reform 1. Implementation of Tax Reform compliance Special Secretary for the 2. Revenue Recovery AROP 3. Handling Large Taxpayers 4. Managing Great Property & High Income 5. Return withholding taxes and Tax Compliance

The reduction of administrative burdens and costs aims at establishing a more business Ministry of Administrative friendly environment leading to an increase Reform Ministry of of productivity and competitiveness, as well Development General 3 9 as to an attarction foreign investment in Secretary for Greece. Administrative Reform The project concerns: Special Secretary for the Study and proposed new the development of metholodology for the AROP procedures for the reduction of 6.000.000 measuring of administrative burdens and Ministry of Culture & 13 All over the country 3 End 2013 administrative burdens and costs costs. Tourism in five areas the measures of administrative burdens and Ministry of Development, costs in five areas (Tourism, Company Law, Shipping Affairs and Public Procurement, Agricultural Subsidies, Competitiveness Food Safety) Ministry of Infrastructure, proposals to reduction of the administrative 2 34 Transport and Networks burdens and costs by means of Ministry of Agricultural simplified procedures Development and Food

23/24 Special Secretariat NSRF JANUARY 2011

List of Priority Projects in Greece co-funded by the Structural Funds and Cohesion Fund in NSRF 2007-2013

This is an updated list of priority projects to be co-funded by the European Commission, initially presented during the visit of European Commissioner for Regional Policy Johannes Hahn on September 28th, 2011. The 181 projects have been selected by the Greek Authorities in collaboration with the Commission Services, on the basis of criteria related to maturity, size and high social and economic impact and will be updated when necessary. See here the evolution of the Projects.

CRITERIA (1) JOB CREATION

After implem. ESTIMATED LOCATION / TOTAL COST During After implem. N° NAME OF PROJECT Min. forecast COMPLETION RESPONSIBLE PROGRAMME (CO-FINANCED) Link with implementation Max. forecast Economic and social impact (a) Maturity (b) (gross number MOU (c) (in equivalent (gross number DATE of jobs man-years) of jobs created) created)

Ministry of Health and The overall improvement of the management 2 44 Reform of budgeting systems, Social Solidarity, Ministry of hospitals aims at reducing and systems management, account of Administrative Reform; rationalising expenditure of all public 14 management (including double All over the country 7.300.000 3 End 2014 General Secretary for hospitals in Greece leading to the entry accounting) and financial Administrative Reform improvement of the quality of services management of hospitals Special Secretary for the provided to the residents of Greece 3 8 AROP

CONTINGENCY RESERVE OP (ESF)

Stimulation of job access and perpetual integration to labour market of those seeking employment and of inactive individuals. Support of new enterprises, in order to foster their adaptability to the new crisis conditions Integrated plan for the support of affecting the economy and the labour entrepreneurial activities and of market. Within the above context two actions the associated employability 2.000 jobs are envisaged: ACTION 1: Plan supporting Ministry of through consulting and training Convergence and Cannot be depending on 15 72.000.000 entrepreneurial initiatives by jobless people 3 1 End 2014 Competitiveness,Develop actions and the support of phasing out regions estimated the business and new entrepreneurs (in startup status). ment and Shipping employment in areas suffering plan proposal ACTION 2: Integrated plan for the support of from the consequences of the entrepreneurial activities and of the economic crisis . associated employability through consulting and training and the provision of incentives for accessing and encouraging active labour market participation.

TOTAL ESF cost (euros): 984.332.481 Total job creation: 124.896 90.000 108.000

(1) This column will be completed according to the following criteria fulfilled: a) Economic and social impact: (1) none; (2) small; (3) medium; (4) high b) Stade of project Maturity/Implementation: (0) Project immature (1) Preparation of award procedure-draft of tender docs (2) Contracting phase (3) Implementation phase c) Link with MOU: (1) no link; (2) limited link; (3) strong link

24/24