MBE // DBE

Aviation & Transportation Qualifications OUR FIRM CERTIFICATIONS & SERVICES

Foit-Albert Associates, , Engineering and Surveying, P.C., is an award-winning, New York State based, multidisciplinary architecture, engineer- CERTIFICATIONS ing, environmental, and land surveying consulting firm with offices in , • SBE Certification – certified by Port Authority of New York and New Jersey Current Staff Manhattan, Buffalo, and Albany. Our projects range from buildings to transporta- • DBE Certification tion and infrastructure. 70 employees • MBE Certification - certified by the New York State Department of Economic Development Division of Minority and Women’s’ Business Development, Dormitory Authority State of New York, County of Erie Foit-Albert Associates has an extensive track record of providing high-quality and City of Buffalo, NYC Small Business Services, NYC School Construction Authority, Port Authority of Locations design and construction contract administration services for aviation and trans- New York and New Jersey, Pennsylvania Small Diverse Business Queens portation projects. Our vast range of capabilities allow us to respond to the needs 89-31 161 St. of the passengers, tenants, employees, owners, and agencies at various scales and levels. Jamaica, NY 11432 CODES (212) 372-4813 The result of our work is a wide-range of aviation and transportation-focused • NAICS 541330 Engineering Services projects. More importantly, these projects have improved the way people do • NAICS 541310 Architectural Services Manhattan business, the way they view their community, the way they live their lives and also • NAICS 541620 Environmental Consulting Services 215 West 94th Street the way they travel. As a firm, Foit-Albert Associates strives to place importance • NAICS 541370 Surveying and Mapping Suite 517 on even the smallest of details in order to achieve outstanding results. Whether • NAICS 236220 Commercial & Institutional Building Construction (for CA/CI0) the job is renovating a baggage claim for the NFTA at the Buffalo Niagara Inter- New York, NY 10025 • NYSDOT Work Codes: 010A, 010B, 010C, 010D, 010E, 010F, 010G, 010H, 010I, 010J, 010K, 010L, 010M, national Airport, or preforming construction overview at the Albany International (212) 372-4813 Airport, Foit-Albert Associates dedicates its attention to the customer and its 010N, 010O, 010P, 010Q, 020A, 040A, 040B, 040C, 050A, 050B, 080B, 080C, 080D, 080H wealth of experience to make the process seamless. Buffalo 295 Main Street, Suite 200 AVIATION & TRANSPORTATION PROJECT EXPERIENCE SERVICES WE PROVIDE Buffalo, New York 14203 Architectural Design (716) 856-3933 • LaGuardia Airport Central Terminal Redevelopment Projects 2016 - Ongoing Site/Civil Engineering ALTA/NSPS Surveys Historic Preservation Bridge Design Horizontal and Vertical • LaGuardia Airport - Delta Airlines, Terminals C-East, C-West & D 2019 - Ongoing Construction Inspection Geodetic Control Albany • JFK Terminal One 2020 - Ongoing Construction Management Topographic Survey and Hanover Square Master Planning Structural Engineering SURVEYING Mapping • MTA LIRR Far Rockaway Station Replacement 2019 - 2019 LEED™ Design 435 New Karner Road ENGINEERING ARCHITECTURE Highway & Road Design FEMA LOMA & LOMR-F Albany, New York 12205 • Buffalo Niagara International Airport Baggage Claim Renovations 2016 - Ongoing Code Review Stormwater Management Applications Building Envelope Analysis SWPPP Design & Inspections Digital Terrain Modeling (518) 452-1037 • Albany International Airport Reconstruction 2018 - 2020 Air Infiltration Analysis Culvert Inspections Right of Way and Easement • Upstate Airport Economic Development 2018 - Ongoing Construction Administration Canal Inspections Surveys Website Construction Management Responsible Project Telecommunication Facility • Niagara Falls International Airport Runway Expansion 2017 - 2017 foit-albert.com Feasibility Studies Management Survey • Buffalo Niagara International Airport Overnight Parking 2017 Owner Representation Planning Board Review Drainage Plans Architect of Record Emergency Response Lot Grading Plans • Buffalo Niagara International Airport Runway Rehabilitation 2017 - Ongoing MBE // DBE NYC Landmarks Preservation GPS Services Commission Compliance • Albany International Airport Boarding Bridge Renovations, Phase I 2017 - 2017 Building & fire code analysis Volumetric Surveys High-Definition Laser Scanning Fire suppression & detection Gas Line Surveys • Albany International Airport Boarding Bridge Renovations, Phase II 2017 - 2017 360 Photography Special hazard fire Forensic Surveys • Buffalo Niagara International Airport Parking Lot Expansion Survey 2013 - 2013 suppression Industrial Surveys Regulatory Compliance FAA 1A and 2C Certifications • Dutchess County Airport 2008 - 2008 Water supply evaluation NEPA Compliance Smoke management GIS • New Yorks State Regional Airports SEQR Compliance Egress analysis High-Definition Laser Scanning & Permitting Hazardous material storage Biological and Natural & classification Resources Mechanical Engineering ENVIRONMENTAL Due Diligence & Real Electrical Engineering Estate Transactions Plumbing Engineering

BUILDING SYSTEMS ENGINEERING BUILDING SYSTEMS Refrigeration Engineering Process Piping Engineering Architect of Record, documentation of LAGUARDIA AIRPORT - DELTA AIRLINES as-built conditions, phasing & enabling, New York, New York demolition design & coordination

Foit-Albert Associates is currently providing architectural and construction contract administration services as the Architect of Record for Burns & McDonnell and Delta Airlines for the Demolition & Make Ready work at the existing Terminals C-East, C-West and D.

Project: The project scope includes existing conditions documentation, bid documents for contract procurement, phasing and enabling design & coordination and coordination of the submission for Port Authority approval. This project is being coordinated with the simultaneously occurring LGA Airfield Reconfiguration Program which is a development and reconstruction of the entire LaGuardia Airport in Queens, New York. The extent of the project includes the phased removal and stabilization of approximately 720,000 square feet of Terminal area.

Contact Emanuele Incorvaia Burns & McDonnell 245 5th Ave, Suite 2100 New York, NY 10016 [email protected] Architectural support, coordination with existing systems maintaining operation and Architectural design services, 2-story performance during all phases of the addition, office relocation, renovations projects and baggage handling updates

LAGUARDIA AIRPORT CENTRAL TERMINAL NFTA BUFFALO NIAGARA INTERNATIONAL AIRPORT New York, New York BAGGAGE CLAIM RENOVATIONS Niagara Frontier Transportation Authority

Foit-Albert Associates was selected by Hellmuth, (CTB). Scope of Work included architectural, interior Obata & Kassabaum (HOK) to provide Architectural design, structural engineering (as required), signage Support Services for the Central Terminal Building and wayfinding design, along with coordination Redevelopment Project. and management of: baggage handling, security, mechanical, electrical, plumbing, fire protection, Projects: and fire alarm subconsultants. As this scope of Pier A&B Demolition - Architect of Record work is part of the phasing and enabling works of Foit-Albert and its subconsultant team is providing the project, timely coordination and completion architectural and engineering services through of the design and deliverables was critical to the construction documentation for the demolition of project sequence of work. All existing systems and Piers A&B to allow for the new connecting bridges equipment impacted by this Scope of Work were between the new Head House and Concourses as required to remain operational during the project. well as airplane taxi ways. Central Terminal Building Re-Development West Garage Connector to Foit-Albert is providing embedded dedicated project Central Terminal B - Architect of Record personnel working in HOK’s office. The Focus of the Foit-Albert provided preliminary conceptual design work was on the new Headhouse and Concourses A & B. This included: Shell, Structural and MEP (architectural and structural) and full design for a Foit-Albert Associates is providing architectural design area. Most importantly, these additions make it possible temporary pedestrian connector from the New West Coordination, Exterior Walls Detailing, general services for renovation to the baggage claim area of the to separate passenger arrival and departure traffic for Parking Garage to the existing Central Terminal Construction Administration and the processing Buffalo Niagara International Airport. improved traffic flow, throughput and a better passenger Building. Also prepared the construction documents, submittals. experience. and Construction Administration. (completed) The scope of services for this project include the construction of a 2-story addition adjacent to the east and Foit-Albert is providing Construction Administration Contact west sides of the main entrance of the Buffalo Niagara services under a separate contract. Security Screening Check Point Reconfigure Pier HOK international Airport. The addition will house relocated administration offices, restrooms, baggage offices, A&B - - Architect of Record 1065 Avenue of the Americas, Foit-Albert provided phasing and enabling loading docks, concession space, baggage handling Contact 6th Floor space, and storage. Existing space on the arrivals level Mr. Rob Coan, Project Manager architectural and engineering services through New York, NY 10018 will be renovated to convert baggage claim carousal to Jacobs Civil Consultants, Inc. construction documentation for the Security Jeanette Segal sloped plate type and add a fourth carousel. The project (214) 583-8255 Screening Check Point at Existing Central Terminal B [email protected] also opens up space on the departures level to expand [email protected] the security checkpoint. The addition provides a new covered passageway from the international flight arrival Design & construction services for airport Rehab & replacement of passenger renovations: Terminal rehab, new parking boarding bridges, development of a plaza, third party QAQC and overall project comprehensive safety management coordination strategy

ALBANY INTERNATIONAL AIRPORT RECONSTRUCTION Albany County Airport Authority ALBANY INTERNATIONAL AIRPORT PASSENGER BOARDING BRIDGE Albany County Airport Authority

Foit-Albert Associates worked as a subconsultant Foit-Albert also performed Construction on a project for the replacement of passenger Administration services Foit-Albert Associates, as a subconsultant on two separate Contact boarding bridges (PBB) at Gates A4, B11 and C2 with contracts, provided services related to the planning, NYSDOT – owner new PBB, as well as rehabilitation of bridges A5, design and construction of various projects at the Albany Parsons - Prime B5, B7, B8 and B10 at Albany International Airport. International Airport. Howard Ungar 100 Broadway The scope of our services was design, review of plans, Our scope of work (in conjunction with the Prime) New York, NY 10005 coordination of plans, third party QAQC and weekly was the development of a construction phasing Contact 212-266-8573 conference calls. plan which limits interference of the construction Albany County Airport Authority - Owner [email protected] with airline operations and the development of the C&S Engineers, Inc. (Prime) The work at Albany airport consists of rehabilitation of the necessary plan drawings to depict the agreed upon Michael LaMontagne, AIA terminal, building a new parking plaza, improvements to phasing plan in the contract documents. Hazard Managing Architect customer parking access through improved LED signage, car markings, lighting and signage were shown on the 499 Col. Eileen Collins, Blvd. counting devices, access control devices etc. and installation plans as well as proper barricades inside the terminal North Syracuse, NY 13212 of solar panels. area to protect passengers and airport personnel. 315-455-2200 [email protected] Foit-Albert Engineers developed the staging plans for the Also, Foit-Albert with assistance from Prime, developed renovation work inside the airport; reviewed the plan sets at various stages for the parking garage and reviewed the site/ a comprehensive safety management strategy that civil plans. identified and mitigated the risk due to construction activity on the active airfield and inside the terminal for In addition Foit-Albert Associates performed third-party everyone including contractor personnel, passengers, review of other architectural and engineering drawings and construction inspectors, airport operations, and FAA specifications with regards to building code compliance, personnel. The CSPP conforms to AC 150/5370-2. accessibility & constructability review based on our aviation experience. Third party review of: Design & New-build, architectural design, construction, Building code compliance, developed prototype for all similar accessibility & constructability review NYSDOT buildings

THIRD PARTY REVIEW DRAWINGS & SPECIFICATIONS UPSTATE AIRPORT ECONOMIC DEVELOPMENT Ithaca Tompkins Regional Airport NYSDOT

Winner - 2020 Associated General Contractors, New York for Excellence in Partnering Award

Foit-Albert Associates, as a subconsultant, was Working in conjunction with the record architect and Foit-Albert Associates, as a subconsultant under a In addition, a salt barn, cold storage pole barn and tasked with the independent third-party review engineers on a tight time schedule for deliverables, NYSDOT Term (RDSA) contract, was charged with fuel tank system was designed for the site. of other architect and engineering drawings and Foit-Albert Associates was able to deliver appropriate designing a new esthetically pleasing sub-residency specifications in the interest of building code comments for review and response at each phase building as part of the Upstate Airport Economic The initial design was acknowledged to the extent compliance, accessibility & constructability review of the design process, thus providing valuable Development and Revitalization at the Ithaca Airport. that it will be the prototype for all similar for state grant renovations at Ithaca Airport and the insight into the current design and allowing overall NYSDOT buildings. Ithaca Airport Customs Building. improvements to the deliverables for bidding, permit The scope of our services centered on architectural and construction. design, structural foundation, steel and wood frame The scope of our services centered on reviewing design, including survey. those drawings and specifications for accuracy, coordination, and completeness. This review was The building has adequate vehicle storage for 10 conducted to improve the outcome of the project as trucks, loader and tow plow, with one additional a whole through the design and construction process. double mechanical bay and truck washing bay. It Our expertise in airport design matters, as well as also includes an office area, Lunch/break room (30 having licensed building inspectors on staff, made people), toilet/shower/locker rooms, storage rooms our team an appropriate value-add to the review and mechanical/electrical rooms. Work included group to provide these document review services providing parking for 40 vehicles. in the Architecture, Structural and Civil Engineering capacities. Design of a prototype pre-engineered Surveying to support runway, taxiway, park- building ing and facility design for aviation projects Extensive Code Research due to aircraft hangers

ALBANY INTERNATIONAL AIRPORT SURVEY AIRPORT EXPERIENCE Albany County Airport Authority

Foit-Albert Associates Survey Crews have general Niagara Falls International Airport Runway aviation land surveying and land acquisition Expansion experience involving design and engineering of Layout and as-built drawings in association with the runways, terminals and support building projects rehabilitation of runway. and site/civil work, such as drainage, parking lots and Foit-Albert Associates, as a subconsultant, was Challenge/Solution This construction took place at lighting and pavement rehabilitations and upgrades. responsible services related to the design of new the Albany Airport and must not interrupt the regular Buffalo Niagara International Airport Overnight Parking Facility aircraft hangars at the Albany International Airport. airport operations. There are also height restrictions Projects: for the hangars and cranes used to construct them Topographical survey in association with an Foit-Albert’s architects designed a hangar for because of the planes landing and taking off. additional overnight parking facility. helicopters using a pre-engineered metal building. This Genesee County Airport Hangar Demolition prototype was then used for 3 additional buildings. Site Survey Buffalo Niagara International Airport Baggage The hangars each house 2 Blackhawk helicopters and Claim it is for DMNA (Division of Military and Naval Af-fairs). Painted Post Airport Project Topographic surveying services in support of the They are 160’ wide by 80’ deep and 34’ high. Each Site Survey, Topographic Survey, Excavation Stakeout Baggage Claim Expansion project helicopter hangar door weighs 9,000 lbs. and has a clear opening of 19’ high. Niagara Falls International Airport – Taxiway D Topographic Survey services to support the Foit-Albert also performed code review on the Rehabilitation and Reconstruction of Taxiway D project which involved looking into more fire codes and special items that pertain to aircraft hangars. Buffalo Niagara International Airport Parking Lot Foit-Albert provided construction administration Topographic and Utility Survey and Mapping services services. The hangars were completed in December to support the design of Parking Lot “B” expansion 2020 in time for January 1st delivery of 8 new Blackhawk helicopters. The schedule was tight with Buffalo Niagara International Airport Runway Layout no room for errors in maintaining the deadline. Layout for the rehabilitation of runway 14-32. GREGORY CARBALLADA, AIA, LEED AP Gregory R. Carballada, RA, LEED AP has been practicing ar- BRYCE BIXBY, AIA Mr. Bixby is a Senior Team Leader in the architectural depart- President, Principal-in-Charge chitecture for 40 years. As the current President of Foit-Al- bert Associates, Greg is a hands-on leader, managing sever- Senior Team Leader ment and has almost 30 years of professional experience. As al projects which range in size and complexity. He blends Senior Team Leader, he is responsible for project management his experience as an architect and project manager with an and architectural design in addition to quality assurance and effective mentoring style to bring teams together, working quality control for projects as the firm’s Quality Associate. His for the common goals of clients, and in effect, driving the experience includes design, programming, bid assistance, con- success of the firm and the projects. Under his direction, struction administration as well as acting as Owner’s Represen- the firm provides architectural, engineering, surveying & en- tative in Design-Build scenarios vironmental services for Federal, State, Municipal and Pri- vate Clients.

JFK Airport Redevelopment - Terminal One JFK Airport Redevelopment - Terminal One PGAL PGAL • Role: Principal-in-Charge • Role: Sr. Team Leader • Responsibilities: overseeing the firm’s dedicated project • Responsibilities: handling the coordination and design personnel for design services • Key elements: Coordination & design of waterproofing • Key elements: Coordination & design of waterproofing LaGuardia Airport Redevelopment Project - Demolition of Piers A&B Years of Experience HOK LaGuardia Airport Redevelopment Project - Demolition of Piers A&B Years of Experience Total Years Experience: 40 HOK • Role: Sr. Team Leader Years with Foit-Albert: 20 Total Years Experience: 29 • Responsibilities: handling the coordination and design • Role: Principal-in-Charge Years with Foit-Albert: 13 • Responsibilities: overseeing the firm’s dedicated project • Key elements: phased demolition for the replacement of personnel for design services Concourse A & B Education • Key elements: phased demolition for the replacement of Education B.A., Architecture, State University of New LaGuardia Airport Redevelopment Projects Concourse A & B M. Arch, School of Architecture & York at Buffalo, 1981 Reconfiguration of Security Screening Checkpoint Planning, State University of New York HOK LaGuardia Central Terminal at Buffalo, 1993 • Role: Sr. Team Leader LaGuardia Gateway Partners B.S., Psychology with honors, Syracuse Registration/Certification • Responsibilities: handling the coordination of the • Role: Principal-in-Charge University, 1989 1991, Architecture, NY #022435 • Responsibilities: overseeing the firm’s dedicated project architectural, interior design and mechanical, electrical, 2009, LEED AP New Construction personnel for design services plumbing, fire protection, and fire alarm teams Accredited Professional • Key elements: replacement of LaGuardia Airport Terminals • Key elements: temporary Security Screening NYSDOL Asbestos Project Designer Registration/Certification Checkpoint at the existing central terminal B, C and D with a new unified Central Terminal Building 1998, Architecture, NY #026982 LaGuardia Airport Redevelopment Projects Buffalo Niagara International Airport Baggage Claim Affiliations Reconfiguration of Security Screening Checkpoint Niagara Frontier Transportation Authority • Graduate School of Affiliations • Role: Sr. Team Leader HOK • Rotary Club of Buffalo Business Latino Entrepreneurship Initiative • Role: Principal-in-Charge • Responsibilities: currently overseeing the CM staff for • Goldman Sachs 10,000 Small Businesses • American Horticultural Society construction of the project under a separate contract • Responsibilities: overseeing the firm’s dedicated project • Parkside Community Association Program personnel for design services • Key elements: new baggage claim carousel, • Inner City Capital Connections • Key elements: temporary Security Screening Checkpoint administrative offices & security checkpoint Executive Education program at the existing central terminal • Port Authority of New York & Buffalo Amtrak Train Station New Jersey Principals Academy Buffalo Niagara International Airport Baggage Claim NYSDOT • American Institute of Architects Niagara Frontier Transportation Authority • Role: Sr. Team Leader • Latino Business Action Network • Role: Principal-in-Charge • Responsibilities: reviewed standards and project • Hispanic Chamber of • Responsibilities: overseeing internal team for the requirements & coordinated input from consultants Commerce construction of a 2-story addition • Key elements: the design and construction of a new • Society of Hispanic Professional • Key elements: new baggage claim carousel, administrative train station Engineers New York City offices & security checkpoint • Association of Latino Professionals for Main Street Multi-Modal Access America New York Long Island Railroad Far Rockaway Station Replacement City of Buffalo • New York City Building Congress Metropolitan Transportation Authority • Role: Sr. Team Leader • Latino American Who’s Who • Role: Principal-in-Charge • Responsibilities: oversight, design & coordination of • Chairman, Episcopal Church Home & • Responsibilities: overseeing the firm’s dedicated project presentations with clients & stakeholders Affiliates, Canterbury Woods Board of personnel for design services • Key elements: rehabilitation of the light-rail service Directors • Key elements: replacement of an abandoned small station stations to restore 2-way traffic building with a new sheltering enclosure, & the redesign of the site and associated electrical/plumbing infrastructure JOSHUA GARDNER, RA Mr. Gardner has over 10 years of experience in project manage- DAVID MARCOUX, RA Mr. Marcoux brings 14 years of experience in a broad range of proj- Project Manager ment, architectural design, detailing and construction administra- Project Architect ects, with extensive knowledge of NYS Building Codes, construc- tion services. He also acted as the full-time on-site Architectural tion administration and document review. He has led Foit-Albert representative performing construction administration services for teams providing architectural services on both large and small the design of a new 620,000 sf LEED building for the University at projects and is adept in managing the details of a project from Buffalo School of Medicine. Since the successful completion of that design through construction, including coordination with exter- large project, Mr. Gardner has been providing both design and con- nal agencies and the community. struction administration services for projects at LaGuardia Airport, JFK and Buffalo Niagara International Airport. JFK Airport Redevelopment - Terminal One JFK Airport Redevelopment - Terminal One PGAL PGAL • Role: Project Architect • Role: Project Manager • Responsibilities: Material research and evaluation for use • Responsibilities: Coordination with all disciplines, review of • Key elements: Coordination & design of waterproofing waterproofing scope with phased construction • Key elements: Coordination & design of waterproofing LaGuardia Airport Redevelopment - Delta Terminals: Demolition & Make Ready LaGuardia Airport Redevelopment - Delta Terminals: Demolition & Make Burns & McDonnell with Corgan • Project Architect Years of Experience Ready Years of Experience Role: • Responsibilities: assisting team with document review and Total Years Experience: 11 Burns & McDonnell with Corgan Total Years Experience: 14 existing conditions Years with Foit-Albert: 8 • Role: Project Manager Years with Foit-Albert: 9 • Responsibilities: reviewing and documenting • Key elements: preparation of documents and a RFP existing conditions, phasing and enabling, egress, for a Demolition & Make Ready Design-Build project Education code analysis, QAQC Education LaGuardia Airport Redevelopment Projects M.Arch. and B.P.S., State University of • Key elements: preparation of documents and a RFP M. Arch., State University of New York for a Demolition & Make Ready Design-Build project at Buffalo, 2007 Reconfiguration of Security Screening Checkpoint New York at Buffalo, 2010 HOK B.S., Architecture, State University of (Cum Laude Scholarship) • Role: Project Architect LaGuardia Airport Redevelopment Projects New York at Buffalo, 2005 Reconfiguration of Security Screening Checkpoint • Responsibilities: field investigations, analysis to ensure HOK compliance for egress and occupancy loading, Registration/Certification construction documents • Role: Project Manager Registration/Certification 2020, Architecture, NY #042765 • Responsibilities: coordination and providing • Key elements: temporary Security Screening Check NCARB Certification #98347 2014 Architecture, NY, #036855 point at the existing central terminal quality assurance / quality control oversight 2020 Architecture, NJ, 21AI02162500 • Key elements: temporary Security Screening Check NCARB Certification #97018 Affiliations point at the existing central terminal Buffalo Niagara International Airport Baggage Claim • ACE Mentoring Western New York Niagara Frontier Transportation Authority • ACE Mentoring NYC Buffalo Niagara International Airport Baggage Claim • Role:Project Architect • Chautauqua Leadership Network Niagara Frontier Transportation Authority Affiliations • Responsibilities: preparing the egress, occupancy • Special Spaces Buffalo • Role: Project Manager • Buffalo/WNY AIA and code calculations • Responsibilities: code planning, modeling & drafting, • Buffalo Niagara Partnership • Key elements: new baggage claim carousel, construction administration administrative offices & security checkpoint • Key elements: new baggage claim carousel, administrative offices & security checkpoint LaGuardia Airport West Connector HOK LaGuardia Airport West Connector • Role: Project Architect HOK • Responsibilities: prepared documents & oversaw • Role: Project Manager bridge & sign consultants • Responsibilities: responded to RFI’s, prepared site • Key elements: construction of bridge to west garage reports and provided modeling and sketches and part of the new airport • Key elements: construction of bridge to west garage and part of the new airport Long Island Railroad Far Rockaway Station Replacement Metropolitan Transportation Authority Buffalo Amtrak Train Station • Role: Project Architect NYSDOT • Responsibilities: assisted team with associated • Role: Project Manager architectural services • Responsibilities: reviewed RFP including site selection, existing • Key elements: replacement of an abandoned small conditions, program directives & provided design concepts, station building with a new sheltering enclosure, & the modeling & detailing redesign of the site and associated electrical & • Key elements: the design and construction of a new plumbing infrastructure train station MICHAEL J. POHL, PLS Mr. Pohl is Vice President of Survey and has over 40 years of GERARD J. SENTZ, PE Gerard J. Sentz, PE (Jerry) is Vice President of Engineering Chief of Survey field and office experience with ROW and easement surveys, managing all transportation, site/civil, environmental, inspec- high-definition laser scanning, cadastral/ boundary surveys, Vice President, Engineering tion and emergency management staff in all offices to assure GPS/GIS control surveys, hydraulic and bathymetric sur- that clients are given the best uniform service and product veys, photogrammetric control surveys, hazardous waste/ across the State. Mr. Sentz brings over 30 years of engineering landfill construction and monitoring, topographic surveys, experience in both public and private practice including elev- construction layout, subdivision/map cover preparation and ALTA/NSPS Land Title surveys. en years as Commissioner of the Erie County Department of Public Works. There he managed a staff of more than 300 indi- viduals, including over 175 people in the Division of Highways, Genesee County Airport Hangar Demo Genesee County Airport consisting of five districts covering more than 2,450 miles of • Role: Chief of Survey County roads. • Responsibilities: oversaw the firm’s dedicated project personnel for survey services • Key elements: Site Survey Albany Airport Renovations Albany County Airport Authority and NYSDOT • Role: Principal-in-Charge Painted Post Airport Years of Experience • coordinated all plan set reviews amongst Corning-Painted Post Airport Total Years Experience: 38 Responsibilities: the consultant team and participated in three different • Role: Chief of Survey Years with Foit-Albert: 7 Years of Experience conference calls each week • Responsibilities: oversaw the firm’s dedicated project Total Years Experience: 44 • services related to the planning, design and personnel for survey services Education Key elements: Years with Foit-Albert: 24 construction of various projects on two separate contracts • Key elements: Full Site Survey, Topographic Survey, Excavation M.S., Civil Engineering, SUNY at Buffalo, Stakeout 1982 B.S., Civil Engineering, SUNY at Buffalo, Albany Airport Passenger Boarding Bridge Improvements, Phase I Education Albany County Airport Authority Buffalo Niagara International Airport Baggage Claim 1981 AAS, Forestry, Surveying, Paul Smith’s Principal-in-Charge Niagara Frontier Transportation Authority • Role: College, 1977 • Responsibilities: led the Foit-Albert team in providing • Role: Chief of Survey Registration/Certification engineering services as a subconsultant for the replacement • Responsibilities: oversaw the firm’s dedicated project 1986, Engineer, NYS #062576 of existing passenger boarding bridges A4, B9, B11 and C2, personnel for survey services 1995, Engineer, PA #PE049522E Registration/Certification as well as the rehabilitation of bridges A5, B5, B7, B8 and • Key elements: horizontal and vertical control relative to the 1995, Engineer, Ohio, PE.59239 1992, Professional Land Surveyor, B10 airport PAC and SAC monumentation, Topographic Survey NY # 049978 development of drawings, preparation of and Mapping, and utility location at SUE Quality Levels A, B Affiliations • Key elements: 1996, Professional Land Surveyor, the Construction Safety and Phasing Plan (CSPP) and PA SU051250E & C • American Society of Civil Engineers • National Society of Professional completion of Part 77 Aeronautical Evaluation (Notice OSHA 29 CFR 1910 40-hour Health and of Proposed Construction or Alteration Form 7460-1) for Buffalo Niagara International Airport Runway Layout Engineers Safety Training for Hazardous Waste Site submission to the Federal Aviation Administration. Operations Niagara Frontier Transportation Authority • American Public Works Association Fall Protection Training • Role: Chief of Survey • SUNY Buffalo Department of Civil, • Responsibilities: oversaw the firm’s dedicated project Structural & Environmental Engineering Albany Airport Passenger Boarding Bridge Improvements, Phase II Albany County Airport Authority personnel for survey services Advisory Panel • Role: Principal-in-Charge • Key elements: horizontal and vertical control, developed Affiliations Sentz led the Foit-Albert team in providing the 3D Automated Machine Control model, maintained the Appointments & Awards • Responsibilities: • NYS Association of Professional Land engineering services as a subconsultant for the replacement control network for the Automated paving machine, provided • Emergency Management A.S. Degree Surveyors of existing passenger boarding bridge B9. layout of the runway striping and provided intermediate and Program Advisory Council – Erie • Niagara Frontier Land Surveyors • Key elements: development of a construction phasing Association (Past Board Member) final As-builts of the runway repaving project Community College 1/1/16-12/31/18 • Member of University of Buffalo CSEE plan which limited interference of construction with airline • American Congress on Surveying and operations, and review of the Construction Safety and Niagara Falls International Airport Runway Expansion Advisory Panel Mapping Phasing Plan (CSPP) to provide coordination with the Niagara Falls International Airport • NSPE, Engineering Manager of the Year, construction phasing plan. • Role: Chief of Survey 2009 • Responsibilities: oversaw the firm’s dedicated project • APWA, Management Innovation Award personnel for survey services -- October Storm Response Efforts, • Key elements: layout and as-built drawings in association March 2007 with the rehabilitation of a runway • APWA, Public Works Leader of Year Award, March 2006 Airport Overnight Parking Facility • APWA, Technical Innovation Award Niagara Frontier Transportation Authority -- Peak Load Reduction Project, March • Role: Chief of Survey 2005 • Responsibilities: oversaw the firm’s dedicated project • Sterling Who’s Who, 1996 personnel for survey services • Who’s Who of Business Leaders, • Key elements: Topographic and Utility Survey and Mapping 1994/1995 • NSPE, Engineer of the Year, 1993 JUAN SANTOS Mr. Santos is a design professional with an array of ex- MARISA CABAN, RA Ms. Caban has over ten years of experience in her field. Senior Design Professional perience in architecture, adept at managing projects and Project Architect She assists in multiple parts of the process from concept ensuring design services are following approved budgets to construction which includes working with clients and and schedules to deliver innovative design solutions with contractors to reach deadlines and project goals. She BIM integration of different disciplines for all phases of regularly works with senior architects to understand code services. Projects experience varies from aviation, educa- requirements and impacts of the design ideas. Ms. Caban tional (primary, secondary, and higher education), retail, provides support for the code compliance review and residential, health care, and corporate interiors projects. documentation for multiple projects. In addition, she is the firm’s chief laboratory designer.

JFK Airport Redevelopment - Terminal One Delta Airlines LaGuardia Reconfiguration Project - PGAL Demolition of Terminal C • Sr. Design Professional Role: LaGuardia Airport • Responsibilities: providing design services • Role: Project Architect • Key elements: Coordination & design of waterproofing • Responsibilities: reviewed existing conditions and detailed phasing for demolition LaGuardia Airport Redevelopment - Delta Terminals: Years of Experience • Key elements: development of documents for bid Years of Experience Demolition & Make Ready Total Years Experience: 14 demolition project terminal C Total Years Experience: 24 Burns & McDonnell with Corgan Years with Foit-Albert: 2 Years with Foit-Albert: 3 • Role: Sr. Design Professional Buffalo Niagara International Airport Baggage Claim • Responsibilities: architectural design support, Support Services construction administration & existing conditions Education Education Niagara Frontier Transportation Authority B.A., Architecture, New York Institute of documentation B.A., Architectural Technology, New York • Role: Project Architect Technology, 1995 • Key elements: preparation of documents and a RFP Institute of Technology, 2010 • Responsibilities: provided architectural support for a Demolition & Make Ready Design-Build project services B.A., Science in Business Management, • Key elements: new baggage claim carousel, administrative offices & security checkpoint LaGuardia Central Terminal, Terminal B Fairfield University, 2005 Owner Registration/Certification LaGuardia Airport Redevelopment - Delta Terminals: • Role: Sr. Design Professional 2020, Architecture, NY #043015 Demolition & Make Ready • Responsibilities: architectural design support Burns & McDonnell with Corgan and construction documents Affiliations • Role: Project Architect • Key elements: concourses, headhouse & TSA upgrades • Professional Women in Construction • Responsibilities: assisting team with document • AIA Emerging Architects Committee review and existing conditions LaGuardia Central Terminal, Terminal B • PUSH Buffalo • Key elements: preparation of documents and a RFP Owner • ACE Mentoring Western New York for a Demolition & Make Ready Design-Build project • Role: Sr. Design Professional • ACE Mentoring NYC • Responsibilities: architectural design support • ACE Mentoring Philadelphia and construction documents for LGP • Key elements: assisted HOK & LGP in special design projects and project closeout