Mullupura Molga Barrage
Total Page:16
File Type:pdf, Size:1020Kb
http://eims1.mpwrd.gov.in/smreport/control/schemeReport Date Time : 30/09/2021 [17:35] WATER RESOURCES DEPARTMENT, MADHYA PRADESH Feasibility Report of Pin-Pointed Scheme 1. Name of Proposed Scheme Mullupura Molga Barrage 2. Project Type BARRAGE 3. Name of River Local River 4. Name of Vidhan Sabha 5. District Ujjain 6. Block Tarana 7. Grant / Block NORMAL 9. Proposed (who Suggested the scheme) MLA (a) Name of MLA Shri Anil Firojiya (b) Area 214 Tarana 10. Proposed Rabi Irrigation Area (in ha) 202 11. Benificiary cultivators in Nos. 120 12. Estimated Total Cost (in Rs. Lakhs) 343.5 (a) Construction Cost 343.5 (b) Land Area Cost 0 (i) Irrigated Cost 0 (ii) Unirrigated Cost 0 (iii) Forest Cost 0 (c) Properties Cost under Submergence 0 (d) R and R Cost 0 (e) Other Cost 0 (f) Cost per ha (Rs. In Lakhs) 1.7 (g) Percentage of Submergence Area, with 9.9 reference to Total Irrigation area (h) Percentage of Private Land Area, with 0 reference to Total Submergence area (i) Percentage of Land for canal with 0 reference to Total Irrigation area 13. Submergence Area total (in Ha) 20 (a) Government Land Area 20 Page 1 of 2 http://eims1.mpwrd.gov.in/smreport/control/schemeReport Date Time : 30/09/2021 [17:35] WATER RESOURCES DEPARTMENT, MADHYA PRADESH Feasibility Report of Pin-Pointed Scheme (b) Forest Land Area 0 (c) Private Irrigated Land Area 0 (d) Private Unirrigated Land Area 0 14. Land Needed for Canals 0 (a) Government Land Area 0 (b) Forest Land Area 0.00 (c) Private Land Irrigation Area 0 (d) Private Unirrigation Land Irrigation 0.00 Area 15. Catchment Area (in Sq.Km) 293 Surface Water Quantity (in MCM) 16. 0.56 17. Live Storage Capacity (in MCM) 0.56 18. Name of Officer who inspected the Mr. MUKUL JAIN proposed site 19. Date of inspection 17/02/2018 20. Whether Officer certifies that he has Viable, Information given is true and Fair personally verified above information and he certifies the same to be true and fair 21. Remark old outflanked stop dam situated about 60 m in d/s from proposed site. 22. Signature with date Page 2 of 2.