Structural Stormwater Best Management Practices

Total Page:16

File Type:pdf, Size:1020Kb

Structural Stormwater Best Management Practices Structural Stormwater Best Management Practices for Small Commercial and Residential Applications Timothy Bruno Watershed Manager PA Department of Environmental Protection What are STRUCTURAL BMPs? Physical features or measures constructed to manage the volume, rate, and water quality of stormwater runoff. What is considered a small development? • Based on Act 167 Stormwater Management municipal ordinances in Northwest Pennsylvania counties, a small development proposing from 2500 to 5000 square feet of impervious surface will be required to implement structural volume control BMPs but will not be required to complete full engineering. • Most developments in this range will consist of small individual commercial and residential properties. The average size single family home ranges from 2000-4000 square feet of impervious surface. • Although convenient for small developments, the following BMPs can be used for any size area of impervious surface when designed properly. What are raingardens? Raingardens are shallow depressions in the ground that contain amended soils that are planted with vegetation. They receive stormwater from impervious surfaces and mitigate it through evapotranspiration and and infiltration into the ground. Raingarden Design Considerations • The type of soils onsite will determine how quickly stormwater will infiltrate into the underlying soils. Many times the native site soils are amended to increase porosity and hydrologic conductivity (ability to infiltrate). • The seasonal groundwater level may affect how you design and build a raingarden. • Raingardens should be placed more than 10 feet from the foundation of any house or structure unless approved by a design professional. • Instead of building one large raingarden for the entire site, consider building 2 or 3 smaller gardens to handle stormwater from areas of the site. • Vegetation should be low-maintenance and tolerant of saturated and dry soil conditions. Native species are preferred. Designing Raingardens • Step 1: Measure the square footage of impervious surface area that will contribute stormwater to the garden. • Step 2: Divide the impervious square footage by 5. This will give the total required surface area of the raingarden at a generally-accepted 5:1 stormwater loading ratio. • For the above calculations to be valid, the raingarden must have a shallow ponding depth of at least 6 inchs, and a 2 to 2.5 feet depth of amended soils. Infiltration should be approximately 1 inch per hour. Constructing a Raingarden • Excavate the area to approximately 1.5 to 2 feet deep being careful not to compact the native underlying soils. • Cover area with 2 inches of compost and 2 inches of sand. Rototill the compost and sand into the native soil layer. • Repeat the gradual addition of compost/sand and rototilling until the soil level is at approximately 6 inches from the surface. • Plant the vegetation. • Top dress with a layer of mulch/compost. • Be sure to water plants immediately, then on a regular basis until the vegetation is self-maintaining. • The raingarden will need regular weeding, maintenance, and watering during the establishment period. Maintenance will significantly decrease over time (2 years). Raingardens in Overflow Poor Soil Structure Conditions Gravel w/geotex • Raingardens can be designed to function in Underdrain many types of soil conditions. Slide Courtesy • C & D type soils may HRG, Inc. require underdraining. Outflow Overflow • High shallow groundwater Original Structure depths require a shallow Ground raingarden bottom as well as underdraining. • These types still provide 8-12” soil water quality improvement depth 12” min and runoff rate reduction. (200 sf raingarden) Slide Courtesy HRG, Inc. Pictures of Raingardens What are drywells and seepage beds? Drywells and seepage beds direct stormwater from roof leaders and downspouts into perforated, pre-cast tanks, or rock-filled holes that infiltrate the water into the ground. Drywell and Seepage Bed Design Considerations • Drywells provide infiltration of a limited roof area, while seepage beds have the potential to accommodate large impervious areas. • Design should have an intermediate “sump” box that allows sediments and solids to settle out prior to entering the drywell and allow cleanout. Also a removable filter with a screened bottom should be placed prior to the sump to filter out leaves and other debris. • Drywells should be placed no closer than 10 feet from the foundation of a structure, unless approved by a professional. • Frost depth should be considered to prevent frost heave. • Gutter guards should be considered when using a drywell. • Drywell should be designed to draw down between 24 and 72 hours, and should be sized in the same manner of infiltration basins. • In less-than-straighforward applications, a design professional should be consulted. Constructing a Simple Drywell • Excavate the area to below the frost line to avoid frost heave when using pre-cast container or sump. • Size hole corresponding to size of contributing impervious area. • Use straight drainage lines for improved flow. • Line infiltration hole with heavy pervious geotextile fabric. • Fill hole with 1” to 3” stone or utilize pre-cast or pre- constructed plastic tank. • An overflow relief line or several drywells in a series will help to avoid surcharging of the system in soils with lower infiltration. What is a seepage bed? • A seepage bed is a gravel bed that is fed stormwater through distribution lines connected to a cistern. They share much in common with infiltration trenches and can be used successfully in tandem with Water Reuse strategies. • Due to their relative complexity, they are more than likely to be designed and installed by professionals. What is an Infiltration Trench? A linear stormwater BMP consisting of a continuously perforated pipe at a minimum slope in a geotextile-lined, stone-filled trench which allows infiltration to occur. Infiltration Trench Design Considerations • The type of soils onsite will determine how quickly stormwater will infiltrate into the underlying soils and the seasonal groundwater level will affect whether an infiltration trench is appropriate. • Slope can be no greater than 1%, but can be stepped to accommodate sloped sites. • Trenches work well when combined with linear features such as driveways and parking areas that can sheet flow into the BMP. • Trenches should be placed more than 10 feet from the foundation of any house or structure unless approved by a design professional. • Trenches can have vegetated or gravel surfaces, and can even be bricked over to provide useable patio space. • Evenly spaced cleanouts should be installed and an appropriate overflow method established, although pipe-less applications are appropriate for small development. Designing Simple Infiltration Trenches • Step 1: Measure the square footage of impervious surface area that will contribute stormwater to the trench. • Step 2: Divide the impervious square footage by 4. This will give the total required surface area of the raingarden at a generally- accepted 4:1 stormwater loading ratio. • For the above calculations to be valid, the trench must have a 2.5 feet depth of aggregate/gravel. Infiltration should be approximately 1 inch per hour. Constructing a Simple Infiltration Trench • Excavate the required surface area of the trench to 2.5 feet depth. • Line trench with heavy pervious geotextile fabric and position observation pipe. • Fill halfway with 1” to 3” aggregate, level, then install perforated pipe if using. If no pipe, fill entire trench to surface. • Direct downspouts to trench through lines or surface flow. • If connecting directly to downspouts through underground pipe, a sump box with cleanou and a leaf filter are appropriate. What are Green (Vegetative) Roofs? Green roofs consist of a veneer of vegetation on a building that provides roughly the same hydrologic response as the native ground. In most cases, green roofs must be designed into a structure and have a high initial cost. Green Roof Design Considerations • The type of Green Roof generally designed for residential and small commercial applications is an “extensive” design which requires little maintenance except yearly weeding. • They can substantially reduce interior heating and cooling costs. • Not a “do-it-yourself” type of project, although some enterprising home owners have adopted “tray system” green roofs with success. • An integrated green roof will need to have much greater structural strength to support the additional weight of the roof with growing medium and vegetation, in addition to saturated conditions and snow load. • Due to the increased costs to the structure, green roofs are not usually a viable alternative and tend to be either a stormwater management “last resort” or conscious living decision. What is Stormwater Harvesting and Reuse? Stormwater Harvesting includes directing stormwater to storage vessels and reusing the water for flushing toilets and landscape irrigation. Stormwater Harvesting and Reuse Design Considerations • Most appropriate for developments that may have insufficient water access (wells go dry often) or is in an area very high public water rates. • They can substantially reduce toilet flushing and irrigation costs. • Not a “do-it-yourself” type of project. Requires a full plumbing design in new construction, and a full redesign if retrofitting. • Presents a great opportunity to incorporate harvesting as a component in a treatment train (with infiltration trenches,
Recommended publications
  • Urban Flooding Mitigation Techniques: a Systematic Review and Future Studies
    water Review Urban Flooding Mitigation Techniques: A Systematic Review and Future Studies Yinghong Qin 1,2 1 College of Civil Engineering and Architecture, Guilin University of Technology, Guilin 541004, China; [email protected]; Tel.: +86-0771-323-2464 2 College of Civil Engineering and Architecture, Guangxi University, 100 University Road, Nanning 530004, China Received: 20 November 2020; Accepted: 14 December 2020; Published: 20 December 2020 Abstract: Urbanization has replaced natural permeable surfaces with roofs, roads, and other sealed surfaces, which convert rainfall into runoff that finally is carried away by the local sewage system. High intensity rainfall can cause flooding when the city sewer system fails to carry the amounts of runoff offsite. Although projects, such as low-impact development and water-sensitive urban design, have been proposed to retain, detain, infiltrate, harvest, evaporate, transpire, or re-use rainwater on-site, urban flooding is still a serious, unresolved problem. This review sequentially discusses runoff reduction facilities installed above the ground, at the ground surface, and underground. Mainstream techniques include green roofs, non-vegetated roofs, permeable pavements, water-retaining pavements, infiltration trenches, trees, rainwater harvest, rain garden, vegetated filter strip, swale, and soakaways. While these techniques function differently, they share a common characteristic; that is, they can effectively reduce runoff for small rainfalls but lead to overflow in the case of heavy rainfalls. In addition, most of these techniques require sizable land areas for construction. The end of this review highlights the necessity of developing novel, discharge-controllable facilities that can attenuate the peak flow of urban runoff by extending the duration of the runoff discharge.
    [Show full text]
  • Design Standards for Stormwater Detention and Retention for Pima County
    Pima County Regional Flood Control District Design Standards for Stormwater Detention and Retention Supplement to Title 16, Chapter 16.48, Runoff Detention Systems Floodplain and Erosion Hazard Management Ordinance Pima County Regional Flood Control District 97 E. Congress St., 3rd Floor Tucson, AZ 85701-1791 (520) 724 -4600 June 2014 _________________ Design Standards for Stormwater Detention and Retention for Pima County REVISIONS Because of ongoing regulatory and technical changes in the fields of floodplain and stormwater management, revisions to this manual will be required from time to time. Such revisions will be approved by the Floodplain Administrator. Hard copy (printed) revisions will not be distributed. It is the holder’s responsibility to keep the document current by periodically checking the Regional Flood Control District’s web page for new digital versions. The revision history of the document is listed below. Chronology of Publication, Updates and Revisions Description Date First Edition June 2014 Chapter 6 Revised to Include Benefits of February 2015 Multiple-Use Basins I _________________ Design Standards for Stormwater Detention and Retention for Pima County TABLE OF CONTENTS No. Description Page No. 1. INTRODUCTION ................................................................................................. 1 1.1 Purpose ......................................................................................................................1 1.2 Ordinance Overview and Detention Requirements ..................................................2
    [Show full text]
  • Bmptrains Model
    WHEN ARE HIGHER LEVELS OF STORMWATER LOAD REDUCTIONS REQUIRED AND USING LID BMPs TO ACHIEVE THEM BY: ERIC LIVINGSTON WATERSHED MANAGEMENT SERVICES, LLC Orlando, January 2020 PRESENTATION OVERVIEW WHEN? WHY? HOW? • Florida stormwater program • What and where are impaired waters? • Treatment requirements for impaired waters • Design criteria for Low Impact Design BMPs • LID design and BMPTRAINS load reduction effectiveness THE STORMWATER PROBLEM Humans cause: • Changes in land use, clearing of land • Compaction of soil, imperviousness • Development in floodplains, wetlands • Alteration of natural stormwater systems • Addition of efficient “drainage”systems • Addition of pollutants Resulting in: • Decreased recharge • Increased speed of runoff • Increased volume of runoff • Increased pollutant loads FLORIDA’S STORMWATER RULES 1979 Chapter 17- 4.248, F.A.C. 1982 Chapter 17- 25, F.A.C. 1994 Chapter 62- 25, F.A.C. 2013 Chapter 62-330, F.A.C DEP/WMD Applicant Handbooks ERP TECHNOLOGY BASED • Performance Standard • BMP Design Criteria • Presumption of compliance • Updating of BMP Design Criteria PERFORMANCE STANDARD FOR NEW STORMWATER DISCHARGES (62-40.432, FAC) Stormwater quality – Original Rule • 80% average annual load reduction • 95% average annual load reduction “Of Total Suspended Solids” Stormwater quality – 1990 – 62-40 revised • 80% average annual load reduction • 95% average annual load reduction “Of pollutants that cause or contribute to violations of water quality standards” BUT BMP DESIGN CRITERIA WERE NEVER UPDATED DESIGN CRITERIA PRESUMPTION REBUTTED! “This section provides an analysis of potential modifications to existing stormwater design criteria within the State of Florida to meet the performances objectives outlines in the Water Resource Implementation Rule (Chapter 62-40, FAC).
    [Show full text]
  • Michigan LID Case Studies
    Chapter 10 Michigan LID Case Studies This chapter highlights several developments that have Rain gardens and bioswales incorporated numerous LID best management practices The first phase, or neighborhood, of the development into their designs. These best management practices includes 17 homes. Each home has at least one rain help communities meet their land use planning goals of garden that accepts roof-top drainage. During the design protecting public health, safety, and welfare, as well as process, the native topography of the site was retained preserving community character, and making desirable as much as possible to preserve the natural drainage. places for people to live and work. Any stormwater runoff generated from the neighbor- hood is managed by the depressions where infiltration The following case studies showcase the implementa- capacities have been augmented by native vegetation to tion of numerous best management practices working create bioswales. together through integrated systems. Almost all compo- nents of the urban environment have the potential to serve as elements of an integrated stormwater manage- ment system. This includes using open space, as well as rooftops, streetscapes, parking lots, sidewalks, and medians. In addition, these case studies represent various size developments as well as a diverse range of land use types and property ownership. LID is a versatile approach that can be applied equally well to new development, urban redevelopment, and in limited space applications such as along transportation corridors. Pokagonek Edawat Housing Development Bioswale Source: Pokagon Band of Potawatomi Indians The Pokagonek Edawat Housing Development is located in Dowagiac, MI in Cass County. The Dowagiac River Watershed Management Plan was used as the basis for The rain gardens and bioswales required approxi- the design principles in this project, which led to inte- mately two growing seasons to become established.
    [Show full text]
  • 4/25/2018 the Purpose of These Provisional Practices Is to Provide
    4/25/2018 The purpose of these provisional practices is to provide some guidance for new practices or those allowed to be credited by the update of Ohio’s Construction General Permit. These are provided until more fully updated and edited versions can be included in an updated Rainwater and Land Development manual (http://epa.ohio.gov/dsw/storm/technical_guidance.aspx). John Mathews, Ohio EPA, Division of Surface Water The following practices are included in this document: Structural Practices Underground Storage/Detention Infiltration Basin Pretreatment Runoff Reduction Practices Impervious Area Disconnection Sheet Flow to Grass Filter Strip or Conservation Area Grass Swale (for Runoff Reduction versus Conveyance only) Green Roof Rainwater Harvesting RAINWATER AND LAND DEVELOPMENT PROVISIONAL PRACTICE STANDARD #.# UNDERGROUND STORMWATER MANAGEMENT SYSTEMS DATE: 4/20/18 Description Underground stormwater management systems (USMS) are large subsurface reservoirs located under pavement or other open space that manage stormwater runoff through infiltration, detention or a combination of the two. Underground reservoirs may simply be backfilled with stone, but also may utilize specially designed structures (e.g., concrete vaults, large‐diameter pipes, plastic “crates”, or plastic arches) to maximize storage in the space available. USMS must include adequate water quality pretreatment practices. Often, USMS are used to manage larger runoff events to meet local peak discharge requirements and, where site and soil conditions are favorable for infiltration, may be used to reduce runoff volume or meet groundwater recharge requirements. Credits Purpose/Objective Credit Available Requirements and Notes Runoff Reduction Volume (RRv) Underground infiltration systems RRv must fully infiltrate within can receive a runoff reduction 48 hr volume (RRv) credit to reduce the water quality volume (WQv) If the site is capable of requirement.
    [Show full text]
  • Santa Cruz County WATER HARVESTING GUIDANCE MANUAL
    Santa Cruz County WATER HARVESTING GUIDANCE MANUAL August 2012 Santa Cruz County WATER HARVESTING GUIDANCE MANUAL August 2012 Adopted August 8, 2012 by Santa Cruz County Board of Supervisors Modified from City of Tucson Water Harvesting Guidance Manual for Santa Cruz County by Sonoran Institute With generous support from U.S. Environmental Protection Agency Targeted Watersheds Grant New Belgium Brewing Environmental Stewardship Grant Prepared for the Santa Cruz County Department of Community Development Santa Cruz County Flood Control District Limited printed copies are available from Santa Cruz County Department of Community Development Planning Division 275 Rio Rico Drive, Rio Rico, Arizona 85648 (520) 375-7930 Digital copies available for download from www.co.santa-cruz.az.us/com_development/index.html www.co.santa-cruz.az.us/public_works/flood/public-info.html COVER: images from left to right include a water harvesting microbasin at the Guy Tobin Memorial Anza Trailhead, a local residential rain garden, and a rain garden at the Santa Cruz County Administration Complex. Santa Cruz County WATER HARVESTING GUIDANCE MANUAL Table of Contents Acknowledgments . iv Glossary . v Introduction . 1 Water Harvesting Principles . 2 Water Harvesting Design Process: Integrated Site Design . 3 Water Harvesting Techniques . 4 Microbasins . 4 Swales On-Contour . 6 Swales Off-Contour . 8 French Drains . 10 Gabions . 12 Water Tanks . 14 Mulch . 15 Water Harvesting Techniques Information Sheet . 16 Design Examples . 18 Subdivision . 18 Commercial Site . 20 Public Building . 22 Public Rights-Of-Way . 24 Appendices . 26 Appendix A. Santa Cruz County Code Requirements . 26 Appendix B. Engineering Considerations for Water Harvesting . 27 Appendix C. Water Harvesting Calculations .
    [Show full text]
  • Indicator and Pathogen Removal by Low Impact Development Best Management Practices
    water Review Indicator and Pathogen Removal by Low Impact Development Best Management Practices Jian Peng 1,*, Yiping Cao 2,*, Megan A. Rippy 3, A. R. M. Nabiul Afrooz 4 and Stanley B. Grant 3 1 Orange County Environmental Resources, Orange, CA 92865, USA 2 Southern California Coastal Water Research Project, Costa Mesa, CA 92626, USA 3 Department of Civil and Environmental Engineering, University of California, Irvine, CA 92697, USA; [email protected] (M.A.R.); [email protected] (S.B.G.) 4 Department of Civil and Environmental Engineering, Stanford University, Stanford, CA 94305, USA; [email protected] * Correspondence: [email protected] (J.P.); [email protected] (Y.C.); Tel.: +1-714-955-0650 (J.P.); +1-714-755-3241 (Y.C.) Academic Editor: Miklas Scholz Received: 25 October 2016; Accepted: 10 December 2016; Published: 16 December 2016 Abstract: Microbial contamination in urban stormwater is one of the most widespread and challenging water quality issues in developed countries. Low impact development (LID) best management practices (BMPs) restore pre-urban hydrology by treating and/or harvesting urban runoff and stormwater, and can be designed to remove many contaminants including pathogens. One particular type of LID BMP, stormwater biofilters (i.e., vegetated media filters, also known as bioinfiltration, bioretention, or rain gardens), is becoming increasingly popular in urban environments due to its multiple co-benefits (e.g., improved hydrology, water quality, local climate and aesthetics). However, increased understanding of the factors influencing microbial removal in biofilters is needed to effectively design and implement biofilters for microbial water quality improvement. This paper aims to provide a holistic view of microbial removal in biofilter systems, and reviews the effects of various design choices such as filter media, vegetation, infauna, submerged zones, and hydraulic retention time on microbial removal.
    [Show full text]
  • City of Tucson Water Harvesting Guidance Manual CITY of TUCSON WATER HARVESTING GUIDANCE MANUAL
    City of Tucson Water Harvesting Guidance Manual CITY OF TUCSON WATER HARVESTING GUIDANCE MANUAL October 2005 Ordinance Number 10210 Edited and illustrated by Ann Audrey Phillips Prepared for the City of Tucson, Department of Transportation, Stormwater Management Section Copies are available from City of Tucson, Department of Transportation, Stormwater Management Section PO Box 27210, Tucson, Arizona 85726-7210 (520) 791-4251 Cover Design by Michaela Slattery City of Tucson, Citigraphics, Information Technology Department ii City of Tucson Water Harvesting Guidance Manual City of Tucson WATER HARVESTING GUIDANCE MANUAL TABLE OF CONTENTS ACKNOWLEDGMENTS ............ IV GLOSSARY ............. V INTRODUCTION ............. 1 WATER HARVESTING PRINCIPLES .......... 2 WATER HARVESTING DESIGN PROCESS: INTEGRATED SITE DESIGN ...... 3 WATER HARVESTING TECHNIQUES .......... 4 MICROBASINS ............ 4 SWALES ON-CONTOUR ........... 6 SWALES OFF-CONTOUR........... 8 FRENCH DRAINS ........... 10 GABIONS ............ 12 WATER TANKS ............ 14 MULCH ............ 15 WATER HARVESTING TECHNIQUES INFORMATION SHEET ....... 16 DESIGN EXAMPLES ............ 18 SUBDIVISION ............ 18 COMMERCIAL SITE ........... 20 PUBLIC BUILDING ........... 22 PUBLIC RIGHTS-OF-WAY .......... 24 APPENDICES ............. 26 APPENDIX A. TUCSON CODE REQUIREMENTS FOR WATER HARVESTING .... 26 APPENDIX B. ENGINEERING CONSIDERATIONS FOR WATER HARVESTING .... 27 APPENDIX C. WATER HARVESTING CALCULATIONS ....... 28 APPENDIX D. XERISCAPE LANDSCAPING FOR WATER HARVESTING ....
    [Show full text]
  • Analysis of Alternatives for Sustainable Stormwater Management in Small Developments of Polish Urban Catchments
    sustainability Article Analysis of Alternatives for Sustainable Stormwater Management in Small Developments of Polish Urban Catchments Joanna Boguniewicz-Zabłocka 1 and Andrea G. Capodaglio 2,* 1 Department of Thermal Engineering and Industrial Facilities, Faculty of Mechanical Engineering, Opole University of Technology, 45040 Opole, Poland; [email protected] 2 Department of Civil Engineering and Architecture, University of Pavia, 27100 Pavia, Italy * Correspondence: [email protected] Received: 20 November 2020; Accepted: 4 December 2020; Published: 6 December 2020 Abstract: Sustainable stormwater management approaches in accordance with the EU Water Framework Directive (WFD) allow a source control to handle the quality and quantity of the runoff at local level or near the source. The most popular technologies applied in Europe are green roofs, porous pavements, retention basins and bioswales/raingardens. In this article, two of these solutions (retention tank with reuse, and rain garden, respectively), applied to single dwelling case studies in a suburban area in the Silesia Region (Poland), are illustrated and analyzed. The selected cases consider technical and economic aspects as the most important factors for decision on the selection of onsite stormwater management approach. Both systems have been operational for approximately two years. The retention tank proved a good solution, reducing stormwater overflows and allowing local water reuse for lawn irrigation; however, investment and maintenance costs in this case are relatively higher. The raingarden proved to work efficiently in this small scale implementation and implied much lower initial investment and costs. The economic sustainability of these interventions at single dwelling scale was analyzed, showing interesting returns, with outcome depending on the degree of possible water reuse (lower water bills) and availability of fiscal or fee incentives.
    [Show full text]
  • Appendix a Compliance Calculations and Design Examples
    Appendix A Compliance Calculations and Design Examples A.1 General Retention Compliance Calculator The General Retention Compliance Calculator is an Excel file located on the DDOE website at http://ddoe.dc.gov/swregs. Each regulated project must use the General Retention Compliance Calculator to demonstrate proper BMP selection and sizing to achieve the required amount of stormwater retention and/or water quality treatment. The completed worksheets from this calculator must be submitted with the Stormwater Management Plan (SWMP). All major regulated projects are required to address the Stormwater Retention Volume (SWRv), and major regulated projects in the Anacostia Waterfront Development Zone (AWDZ) are required to address the Water Quality Treatment Volume (WQTv), as described in Chapter 2. The General Retention Compliance Calculator can also be used, in addition to other hydrologic methods and models, to demonstrate compliance with detention obligations (see Section 2.6 and Appendix H). A.2 Instructions for Compliance Calculations The following guidance explains how to use each of the worksheet tabs in the General Retention Compliance Calculator. Note: All cells highlighted in blue are user input cells. Cells highlighted in gray are calculation cells, and cells highlighted in yellow are constant values that generally should not be changed. Site Data Sheet 1. Input the name of the proposed project on line 9. 2. Determine if the site is located in the AWDZ and note in cell E13. 3. Determine if the site is located in the MS4 and note in cell E14. 4. The regulatory rain event for calculation of the SWRv varies depending upon the type of development.
    [Show full text]
  • Managing Urban Stormwater
    MANAGING URBAN STORMWATER Harvesting and Reuse MANAGING URBAN STORMWATER Harvesting and Reuse Disclaimer: The Department of Environment and Conservation has prepared this document in good faith exercising all due care and attention, but no representation or warranty, express or implied, is made as to the relevance, accuracy, completeness or fi tness for purpose of this document in respect of any particular user’s circumstances. Users of this document should satisfy themselves concerning its application to, and where necessary seek expert advice in respect of, their situation. This material may be reproduced in whole or in part, provided the meaning is unchanged and the source is acknowledged. Published by: Department of Environment and Conservation NSW 59–61 Goulburn Street PO Box A290 Sydney South 1232 Phone: (02) 9995 5000 (switchboard) Phone: 131 555 (environment information and publications requests) Phone: 1300 361 967 (national parks information and publications requests) Fax: (02) 9995 5999 TTY: (02) 9211 4723 Email: [email protected] Website: www.environment.nsw.gov.au This report may be cited as Managing urban stormwater: harvesting and reuse ISBN 1 74137 875 3 DEC 2006/137 April 2006 Cover photo of stormwater harvesting and reuse at Sydney Olympic Park, courtesy J Dahlenburg, wsud.org Printed on recycled paper ii Foreword The recent drought and concerns about climate change have all highlighted the need to manage our water resources more sustainably. Expanding the use of stormwater runoff to add to our water supply and reduce water pollution are important objectives for the NSW Government. Stormwater is now recognised as a valuable resource, rather than a nuisance to be disposed of quickly, especially in large urban centres.
    [Show full text]
  • Constructed Wetland Suitability Analysis in Oregon
    Constructed Wetland Suitability Analysis in Oregon AN AUTOMATED GIS STANDARD & PROJECT FEASIBILITY APPROACHES Terminal Project at the University of Oregon Prepared for: The University of Oregon Department of Planning Public Policy and Management Prepared by: Kyle Collins Master of Community and Regional Planning Candidate June 2017 Acknowledgments The University of Oregon Department of Planning Public Policy and Management The Community Service Center The City of Eugene Special Thanks: Rich Margerum Josh Bruce Nick Kohler Page | 1 Oregon Constructed Wetland Suitability Analysis June 2017 Table of Contents Executive Summary ................................................................................................................................. 4 Introduction ............................................................................................................................................... 5 Research Context ...................................................................................................................................... 6 Barriers to Implementation ............................................................................................................ 6 Research Questions .................................................................................................................................. 7 Existing Literature ...................................................................................................................................... 8 Green Infrastructure Planning .................................................................................................................
    [Show full text]