Karnataka Integrated Urban Water Management Investment Program (Tranche 2)
Total Page:16
File Type:pdf, Size:1020Kb
Environmental Monitoring Report Project Number: 43253-027 Semestral Report (February–July 2019) July 2019 INDIA: Karnataka Integrated Urban Water Management Investment Program (Tranche 2) Appendices (PART A) Prepared by Karnataka Urban Infrastructure Development and Finance Corporation, Government of Karnataka for the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. APPENDIXES Appendix 1 Photo Illustration Caution is provided on Banner near Deredaval Diversion board provided at Ashok Nagar, Konchadi near Kavoor STP Mangalore Mangalore First aid box available at site is but not PPE is provided by contractor Kavadi STP adequate Kavadi STP Mangalore Mangalore Emergency and for public complacence Project Consultation for the affected people at information board provided and EMP Ashoke Conducted. information board in Kannada can also be provided at Ashok Nagar site Mangalore. 120 Drinking Water Provided at work site Ashoke DI pipe stored at work site beside the road Nagar with soft barricading which may cause risk for road users. Material should not be at work site for long time. Deredaval Konchadi near Kavoor STP Mangalore PPE’s provided at Work site Ashok Nagar OHT site at Kodi beach Kundapura is kept helmets vests. Hand gloves should be provided. open barricading not provided, Contact and noses masks should be available at site in number must be provided for emergency and emergency. for public complacence Project information board and EMP information board not provided Material storage to be improved at Kodi beach, Scaffolding must be improved at Hilkote Kundapura site, Kundapura 121 Hard barricading provided with single entry point Safety information provided on banners, to but barricading to be improved for works at be improved by using wooden board at Hilkote site , Kundapura Hilkote site , Kundapura As per IFC guidelines, facilities must be Extinguisher provided at WTP Kundapura. improved at workers camp at Hilkote site , Deep hole near Extinguisher may cause injury Kundapura Safety to be improved Asbestos sheet usage is found at WTP Puttur Electrical safety measure to be improved and access control in transformers to be provided at WTP, Puttur 122 Chemical room to be improved with proper Chlorine storage to be improved by Standards measures at WTP Puttur contractor at WTP Puttur Water and toilet facility at Mangalore UGD workers camp Workers Camp 123 Appendix 2 Monitoring Budget Sr. no. Package Tentative Monitoring budget (in Rs.) 1 Replacement of pumping mains Mangalore, ₹17,59,000 Mangalore, Package No 02MNG02 2 Construction of 24X7 & Distribution Network -Operator ₹3,196,000 assisted in Kundapura, Kundapura, Package No 02KDP01 3 Construction of 24X7 & Distribution Network -Operator ₹2,715,500 assisted in Puttur, Puttur, Package No 02PTR01 4 Construction of Distribution Network -Operator assisted ₹3,054,000. in Udupi, Udupi. Package No 02UDP01 124 .MANGALI.JRU CITY CORI'ORA'I-ION l)osl llttr No.75(r ( orrr)tssl()ncr Lalbagh. Nlangalrrlrr-i 7 i(t0.1 ('iLr ( orirrlrittitrtt. '['elcplronc No: 0[124-22]0lll ll8 \lartgaluru, ijax: 0824- 2220310, Website: www,nlangaloreci tt'. gov i rr l.-rtrail : illlU. lllgc ll,glllilll ('r)llr l)n(c: ll-()-l-l(ll9 llc'l' N.: M C(l/M N (;/K tJ I I) F C/l'u m pi ng nrai n/20 I ?-20 I 8 / t55- i'hc I)rojct:t l)irecLor, National Iiighwav Authoritv of India, - ['r r).r i)r't lrnplcrnt<:ntalton Urrit Mangalttru lJc'tht'1.'l'hetrclftota Near [\mpwell, Miurgnluru ':>75005, )t r, l(() clltss iL Swi> f)rrrrrrission ior laying sowcr pumpinlq matn <tf'I lOOmrn <tiit I)l PrPt for rl lt'tirr,Lli L;1 Krrrrtrkana senrice roarJ frorn Km 371.845 to km 372.325 on l(llS 4g0m with I No. of crossing on NI-{.66 - Re- submission of bnnk gu?rritrr[('(' ' linl<ing through Structured Financial Message system (sIrMS) rcg li3itr')'1. Rci: l..l.his ofl-ice letrer No: MCC/MNG/KtJlDI.'C/Purnping m:rin l)ol'/ dated:05-01-2018' l7-01 2. your ofllce lerrer No: I tOIT l2l2004/PIIJ (Mnglr)/513, derted: 'l0l(l N9' i]' I ), wirir rc['erence [o lhe ilbgvc, as licl NI-lAl pglrcy gurrlrllrnt's ', ' Lfre bank gllarilrltcc ltrllirrtri rlatecl .23 0l-2018 we ar'- herewith rc-sutiirLiiting obtninc'cl from CorporaLion Llank' \'l(i l'l St r t-t c:l,u rt',r'l Iirnancial Message Systern (SITMS) M angalu ru for taking further action in this regarcl' Encl: I. Message report Iinking with SFMS platform' 2, []an l< Gu arantce tSd$ono! You rs lr'ritl-r itl I I i' €n-+-.=----_s- Comrftssioncr Mangaluru City Oorllorttt t'rr i rtt lr ftMangalu Copr' 1o: itlt'itll'tlt lt;itl tr';il I Dcputy Project Director' Itl)MU, Mirrrgalt.tt-t-t lr.rr inlrlrmiil itrn' 2 Executive Engineer, KU Mangaluru 125 MANGALURU CITY CORPORATION Post Box No: 756 t.albagh, Mangaluru-575003. Commissioner Telephone No: 0824-22203 l3-3 I 8 City Corporation, Fax: 0824- 2220310. Website: www.mangalorecity.gov i rt Mangaluru. E-mai | : commissioner.mcc@gmail'corn Ref No: MCC/MNG/KUIDFC/ Pumplng m'alu l2oL7-L8f639 Date: 05.O1.2OI9 The Project Director, National Flighway Authority of India, Project lmplementation Urtit- Mangaluru Elethel, Tharethota Near PumPwell, Mangaluru - 575005 Sir, Kuntikana Sub: Permission for laying sewer pumping main of I lOOmm dia DI K9 class PiPe at ol service road from Km 371'845 to km 372'325 on RHS for a length of 480m with I No crossing on NH-66 - reg' Ref : i)This office letter no: MCC/ MNG/ Coml2OIT-181128, dated 17-O7-2017 ' 2) Your office letter no: I IOI3l4l2O04lPIU (Mnglr) 1197, Dated: 19-07-2017 ' ,3) your office tetter no: l IOl7 l7l2OO4lPIU (Mnglr) 1329( 1, Dated: 28-09-2018 In continuation to this office,"rr"r a.;it;.the details as per NHAI policy circular erre No: RW/NH-33044/ 29l2Ol5/SB (R) dated: 22.I1.2016 along with the following documents furrrisfied for t.aking further action in this regatrd' 1. Licence fee for 5 years - Rs. 11,91,6351- including GST' '2. Security deposit Bank Guarantee of Rs' 3' 40,000/-' line 3. Agreement regarding granting of right of way permission for laying sewer 4. Undertaking for standard conditions of NHAI guidelines' 5, lndemnity bond. 6. Affidavit undertaking 7. Undertaking to relocate the utilities at own cost' 8. Strip plan of sewer line passing and laying along NH- 66' 9, Methodolory of laying sewer line. lO. Cross section of sewer line (Drawing)" of work' I I Trafhc management plan and methodolory during execution 12. Checklist. This is for your kind information and further needful' /"' Yours sincerelY ic -f*- *f Commissioner Mangg\uru CitY CorPoration 64 Tffiangaluru cc: l, Deputy ProJect Dlrector,rKIUWMIB-RPMU, Mangaluru for kind. information' 2. Executive Engineer, KUIDFC-KIUWMIP-PIU, Mangaluru for information 126 vz c.l o 2 2., = = o;i4* lrl 'F.2, rJ- P6; ri s 4<-9. F E? - v?n E Ei: E p+ LO 4e t6i A tE" /. a') F t- l i !. O i; E F cl.1:; F d2 '2 al'\ .F .. i ii f4 F q F: O rrl ; :i F) O a) I f, lc) O tq) l'i o t. r t(n l: ru F rr ti l- I t'i o ri O rYl .l: (J o t\ t:rP o I 14. id-l 3 H Oc-? il ,{= q) 4\ Lll ru Ea: o 4.ta i |'n a rt'l & +sg a_ zl lia cl It-) r/-l 2 a) ra:) :Ei iEf . tt:! I s3sul8roM <' ! ozz _f 127 ;fu-{ / Telephone :91-8244264499 '4rrrriF trJ' ns eiqft frR}s ifrfr-tr | rebfax : 91-8244254499 qtfer*-{sl- ( r+rrfi-q rlfq ttwqrrt +1' er.ar+* 1i5r-tt') f-tf, /e-mait: man@nhai org New Mangalore Port Road Company Ltd' (A Subsidiary of National Highways Autltority of Indi:t) qffiq{-mTqt€-fi g+rf-qqef/ Project lmplementation Unit - Mangalore CIN : U45 203D12004PLC12411 2 -fi .r s-zs -iilf,', ardnzr, ffif, *- r{rs (Nl 66) q-rril -- 575005 Door No 3-29. "Bethel", Tharetlrota, Near Pumpwell (NH.66), Mangalorq - 575005. No.l 1 017 /7 /2o04/P.u (Mnglr)/ 3 23 CA) September 28th, 2018 To The Commissio.ner Mangalore Crty Corporation Lalbagh Mangalore-575003 Sub: Development of Adequate Road Connectivity to New Port-Permission for laying sewer pumping main of 1100mm dia DlK9 Class pipe at Kuntikan Service Road from Km.37 a length of 480m with 1 No. of crossing on Ref: 1. Deputy Commissioner, D.K.Dist, Mangalore I 205 /201 8/ 54026/81 Dt. 28.09.201 B 2. MCC, Mangalore letter No: MCC/MNG/KUI dt. 16.02.2018 3. This office letter No.1 1017 /7 /z))4lPlu(Mngl Sir, This has reference to the above proposal vide to submit the detailed documents along with the intluding GST for the initial period of 10 Rs.2,2O,OOO/- for the above subject work No.RW/NH -33044/29/201 5/S&R( R) dated 22j1.201 6. Further, vide letter 2nd cited you have requested to confirm the particulars for above subject work with license fee Rs.Rs.11,91,634/- including GST for the initial period of 10 years along Bank Guarantee of Rs.2,20,000/- as per NHAI Police Circu la r.