Standards and Guidelines for Communication Sites
Total Page:16
File Type:pdf, Size:1020Kb
STANDARDS AND GUIDELINES FOR COMMUNICATION SITES © 2005 MOTOROLA, INC. 68P81089E50-B ALL RIGHTS RESERVED 9/1/05 — UP PRINTED IN U.S.A. Document Copyrights © 2005, Motorola, Inc. All rights reserved. No duplication or distribution of this document or any portion thereof shall take place without the express written permission of Motorola, Inc. No part of this document may be reproduced, distributed, or transmitted in any form or by any means, electronic or mechanical, for any purpose without the express written permission of Motorola. To order additional copies of this document contact your Motorola sales representative. Disclaimer While reasonable efforts have been made to assure the accuracy of the information contained in this document, Motorola, Inc. assumes no liability resulting from any errors or omissions in this document, or from the use of information obtained herein. The information in this document has been carefully checked and is believed to be entirely reliable. However, no responsibility is assumed for inaccuracies. Motorola, Inc. reserves the right to make changes to any products, procedures or practices described herein to improve reliability, function, or design, and reserves the right to revise this document and to make changes from time to time in content hereof with no obligation to notify any persons of revisions or changes. Any standards cited in this document are subject to change without notice. Motorola, Inc. does not assume any liability arising out of the application or use of any product, circuit, design, recommendation or advice described herein; neither does it convey a license under its patent rights or the rights of others. Trademark Information and Motorola are trademarks of Motorola, Inc. Any brand or product names appearing in this manual are trademarks or registered trademarks of their respective holders. Applicability The standards and guidelines in this revision of this manual shall apply to new communication sites built after the publication date of this revision of the manual. Standards and guidelines in this manual are not required to be implemented at sites built prior to publication of this revision. TABLE OF CONTENTS Chapter 1. Introduction .................................................................................. 1-1 1.1 Committee Members ...................................................................................................................1-1 1.2 Organization of this Manual ........................................................................................................1-1 1.3 Safety Information .......................................................................................................................1-2 1.3.1 Safety Statements Defined .................................................................................................1-2 1.3.2 General Safety Guidelines ..................................................................................................1-3 1.4 Standards ....................................................................................................................................1-4 1.4.1 Australia and New Zealand Standards ...............................................................................1-8 1.4.2 Standards Organization Websites ....................................................................................1-10 1.5 Glossary ....................................................................................................................................1-11 Chapter 2. Site Design and Development ..................................................... 2-1 2.1 Compliance with RF Energy Exposure Standards ......................................................................2-1 2.2 The Motorola Site Design and Integration Team ........................................................................2-2 2.3 General Outline of Work .............................................................................................................2-2 2.4 Planning ......................................................................................................................................2-3 2.4.1 Location of Utility Entrances ...............................................................................................2-3 2.4.2 Location of AC Power Neutral-Ground Bond ......................................................................2-3 2.4.3 Site Development Drawings ...............................................................................................2-3 2.4.4 Land Survey and Site Development Staking Considerations .............................................2-4 2.4.5 Temporary Facilities ...........................................................................................................2-5 2.4.6 Geotechnical Considerations ..............................................................................................2-6 2.5 Constructability Review ...............................................................................................................2-7 2.6 Site Walks ...................................................................................................................................2-7 2.7 Permitting, Zoning, Code and Regulatory Considerations ..........................................................2-9 2.7.1 Americans With Disabilities Act Considerations .................................................................2-9 2.7.2 Federal Clean Water Act Considerations .........................................................................2-10 2.8 Fire Suppression .......................................................................................................................2-10 2.9 Electrical Service ......................................................................................................................2-10 2.10 Foundation Design and Installation .........................................................................................2-11 2.10.1 Foundation and Geotechnical Services ..........................................................................2-11 2.10.2 Concrete Foundation Design and Installation Considerations ........................................2-12 2.10.3 Concrete and Soils Installation Monitoring .....................................................................2-14 2.11 Site and Facility Acceptance Testing ......................................................................................2-16 2.12 Tower Design and Construction ..............................................................................................2-16 2.12.1 Tower Design Drawings .................................................................................................2-18 2.12.2 Design Considerations to Help Reduce Effects of Lightning ..........................................2-19 2.12.3 Tower Safety ..................................................................................................................2-22 2.12.4 Regulations Affecting Towers .........................................................................................2-22 2.12.5 Securing the Tower ........................................................................................................2-23 2.12.6 Antenna and Dish Antenna Loading ...............................................................................2-23 2.12.7 Tower Construction ........................................................................................................2-25 2.12.8 Tower Transmission Cables ...........................................................................................2-25 2.13 Site Drawings of Record .........................................................................................................2-27 68P81089E50-B 9/1/05 UP I Chapter 3. Communication Site Building Design and Installation ............. 3-1 3.1 Site Categories ........................................................................................................................... 3-1 3.2 Definitions of Communications Equipment Sites ........................................................................ 3-2 3.3 Building/shelter Design and Location Considerations ................................................................ 3-5 3.3.1 Location Considerations ..................................................................................................... 3-7 3.3.2 Equipment Shelter Off-Loading .......................................................................................... 3-7 3.3.3 Seismic Considerations ...................................................................................................... 3-8 3.4 Foundation Considerations ......................................................................................................... 3-8 3.5 Floor Loading .............................................................................................................................. 3-9 3.6 Ceilings and Floors ................................................................................................................... 3-10 3.6.1 Ceilings ............................................................................................................................. 3-10 3.6.2 Floors ............................................................................................................................... 3-11 3.7 Weatherproofing/Sealing .........................................................................................................