Adani Power (Jharkhand) Ltd Durgapur Godda
Total Page:16
File Type:pdf, Size:1020Kb
Reliable Solutions & Planning Adani Power (Jharkhand) Ltd Durgapur Godda REPORT AND DRAWINGS OF DGPS SURVEY FOR PREPARATION OF GEO-REFERENCED DIGITAL PLAN IN SHAPE LAYER FOR ACCURATE DELINEATION OF FOREST LAND OVER AN AREA OF 15.170 ACRE. IN VILLAGE JATAKOTI, TELGAON, NIMAKALAN, DAKETA, CHOTTASAHARPUR, RANIDIH, SARONI, DHANKUNDA, DHAMINI SEMRIYA, JHIRLI, GORADIH FOR FOREST DIVERSION IN RESPECT OF PROPOSED 66 KV TRANSMISSION LINE ROUTE FROM 2x800 M.W. MOTIA T.P.P. AT GODDA TO INTAKE PUMP HOUSE AT SAHIBGANJ Submitted By ADANI POWER (JHARKHAND) LTD Gangta Khurd, Near DC Residence, Godda-814133 Jharkhand State Consultant Reliable Solutions & Planning. 1/7 INDRAPRATHA HOUSING COMPLEX, AMRAI, DURGAPUR, -713203, WEST BENGAL.INDIA, +91-7001931913, +91-8670192873 E-mail: [email protected] DGPS Survey report of proposed 66 KV transmission line route for Intake & Booster Pump House Reliable Solutions & Planning Adani Power (Jharkhand) Ltd Durgapur Godda Project at a Glance Introduction Statutory Compliance Technical Approach & Methodology I. Preparation of Plan showing proposed forest area. II. Demarcation of Boundary of the proposed forest area & Erection of Boundary Pillar. III. Establishment of Ground Control Base Station. IV. DGPS observation for Geo Referencing of proposed forest area. V. Preparation of Geo referenced Digital Plan in Shape file. DGPS Survey report of proposed 66 KV transmission line route for Intake & Booster Pump House Reliable Solutions & Planning Adani Power (Jharkhand) Ltd Durgapur Godda LIST OF ANNEXURE Sl. No. DESCRIPTION ANNEXURE Ministry of Environment & Forest and climate 1 Annexure-I Control Letter Photograph showing the DGPS observations 2 over the Base and demarcated Forest land Annexure-II boundary area location Raw DGPS observation data by Static Method 3 Annexure-III for Establishment of Base Station Raw DGPS observation by RTK Method for 4 Geo Referencing of demarcated Forest land Annexure-IV boundary Coordinates of Forest land boundary area within the proposed transmission line from 5 Annexure-V pillar 1 to pillar 2, pillar 2 to pillar 3 and pillar 258 to pillar 261 Fore Bearing, Back Bearing, point to point distance within the proposed transmission line 6 Annexure-VI from pillar 1 to pillar 2, pillar 2 to pillar 3 and pillar 258 to pillar 261. (Traverse Station Data) DGPS Survey report of proposed 66 KV transmission line route for Intake & Booster Pump House Reliable Solutions & Planning Adani Power (Jharkhand) Ltd Durgapur Godda LIST OF PLATES Sl. No. DESCRIPTION PLATE 1 Geo Referenced digital plan Plate-I Soft copy in 2 Geo Referenced digital plan in Shape file DVD Soft copy in 3 Fly on Google Earth (KML) for MoEFCC presentation DVD DGPS Survey report of proposed 66 KV transmission line route for Intake & Booster Pump House Reliable Solutions & Planning Adani Power (Jharkhand) Ltd Durgapur Godda PROJECT AT A GLANCE INTRODUCTION- M/s Adani Power Limited is primarily engaged in power generation and transmission. Adani power Limited incorporate in India under the compabies Act. 1956 with corporate identity number L40100GJ1996PLC030533, whose registered office is at Shikhar NR Mithakhali Circle, Navrangpura, Ahmedabad, Gujrat 380009, India and principal place of business is at Adani Power Limited, Achalraj, opp Mayor Bungalow, Law Garden, Ahmedabad 380006, Gujrat, India. M/s Adani Power (Jharkhand) Limited has proposed to established a Thermal Power Plant in Godda District of Jharkhand state. DGPS survey required for 66 KV transmission line for Intake & Booster Pump House at Boarijor. The width for proposed transmission line is 18 meter and it passes through different type of land i.e. Raiyati land, Govt. land & Forest land. As some portion of proposed transmission line passes through Forest land, therefore Forest clearance under FC Act 1980 shall be required. DGPS Survey report of proposed 66 KV transmission line route for Intake & Booster Pump House Reliable Solutions & Planning Adani Power (Jharkhand) Ltd Durgapur Godda The land schedule of 15.170 Acres of proposed forest area is as follows Village list of transmission line route for Boarijor block BLOCK/ SL.NO. VILLAGE NAME THANA NO. TEHSIL/ FOREST LAND ANCHAL 1 Jatakoti 28 Boarijor 0.298 2 Telgaon 39 Boarijor 1.588 3 Nimakalan 41 Boarijor 0.848 4 Daketa 44 Boarijor 1.348 5 Chottasaharpur 7/65 Boarijor 4.709 6 Ranidih 53 Boarijor 5.001 7 Saroni 52 Boarijor 0.486 8 Dhankunda 55 Boarijor 0.196 9 Dhamini Semriya 16 Boarijor 0.110 10 Jhirli 18 Boarijor 0.064 11 Goradih 20 Boarijor 0.523 Total area 15.170 STATUTORY COMPLIANCE- Ministry of Environment & Forest, FC division, Govt. of India vide letter No. F. No. 11-9/98-FC dated 8th July 2011 has issued a general letter pertaining to submission of Authenticated Geo reference Digital plan for applications under FC act 1980 for all applicant applied applied for Non Forest Use of Forest Land (Enclosed as Annexure I). Therefore, the present report prepared after conducting DGPS observation and other related field survey. Using above said DGPS observation and field survey data the Geo Referenced Digital plan has been prepared in compliance of requirements for submission of online application for Right of Way (R.O.W.) of proposed 66 KV transmission line route as per FC Act, 1980. TECHNICAL APPROACH & METHODOLOGY DGPS Survey report of proposed 66 KV transmission line route for Intake & Booster Pump House Reliable Solutions & Planning Adani Power (Jharkhand) Ltd Durgapur Godda I. PREPARATION OF PLAN SHOWING PROPOSED FOREST AREA The proposed forest land of 15.170 Acres area lies 12 Nos. of Cadastral Map of Revenue Village JATAKOTI, TELGAON, NIMAKALAN, DAKETA, CHOTTASAHARPUR, RANIDIH, SARONI, DHANKUNDA, DHAMINI SEMRIYA, JHIRLI and GORADIH. The said map scanned properly in order to avoid any error and transfer to ARC GIS software for Digitization. The digitized sheet was compared with existing land use and finalized. The proposed forest area of 15.170 Acres lies within number of plots. The boundary of said area was identified over the Map by marking 261 Nos. of concrete pillar namely from pillar 1 to pillar 2, pillar 2 to pillar 3 and pillar 258 to pillar 261 for proper delineation of proposed forest area. II. DEMERCATION OF BOUNDARY OF THE PROPOSED FOREST AREA & FIXING OF CONCRETE PILLAR. The survey team of Reliable Solutions & Planning was demarcated the applied forest area by closed traverse method from traverse station from pillar 1 to pillar 2, pillar 2 to pillar 3 and pillar 258 to pillar 261 by using Total Station. The concrete pillar were fixed over the entire demarcated point i.e. boundary point i.e. boundary from pillar 1 to pillar 2, pillar 2 to pillar 3 and pillar 258 to pillar 261. DGPS Survey report of proposed 66 KV transmission line route for Intake & Booster Pump House Reliable Solutions & Planning Adani Power (Jharkhand) Ltd Durgapur Godda III. ESTABLISHMENT OF GROUND CONTROL BASE STATION A group of surveyor along with SOUTH Make Global Navigation Satellite System commenced the respective field survey work at the proposed forest area along proposed 66 KV transmission line. During the reconnaissance survey, it was found that topography of the said area is hilly area. Therefore, it was decided to establish two Nos. of Control Base Station for formation of primary Triangulation in different location of the proposed forest area. DGPS observation by STATIC METHOD was carried out over the said location by taking about 2 hours of satellite observations. During the course of field survey, numbers of Ground Control Base Points were established named as Base 1, Base 2 & more for DGPS observation by STATIC method for Geo Referencing of all the demarcated & Concrete pillar from pillar 1 to pillar 2, pillar 2 to pillar 3 and pillar 258 to pillar 261 of the applied Forest area. The raw & post processed DGPS field observation data of all base line by STATIC method showing the number of satellite signal received during the observation. Latitude, Longitude, Northing, Easting & Z value. Primary triangulation network adjustment data in HRMS & VRMS, etc. is attached with this report as ANNEXURE-III. The photograph showing the DGPS observation over the two base line/ station is attached with this report as ANNEXURE-II. DGPS Survey report of proposed 66 KV transmission line route for Intake & Booster Pump House Reliable Solutions & Planning Adani Power (Jharkhand) Ltd Durgapur Godda IV. DGPSOBSERVATION FOR GEO REFERENCING OF PROPOSED FOREST AREA DGPS observation were carried out by RTK method over all points from all the established Ground Control Base Station i.e. Base-1 & Base-2 to the already demarcated proposed forest area boundary pillar by from pillar 1 to pillar 2, pillar 2 to pillar 3 and pillar 258 to pillar 261 for establishment of Secondary Triangulation Network in order to Geo Referencing of proposed forest area. The raw & post processed DGPS field observation data of proposed forest area from pillar from pillar 1 to pillar 2, pillar 2 to pillar 3 and pillar 258 to pillar 261 showing the Latitude, Longitude, Northing, Easting value is attached with this report as ANNEXURE IV. V. PREPARATION OF GEO REFERENCING DIGITAL PLAN IN SHAPE FILE After completion of all field survey the processed data has been used for preparation of Geo Referenced Digital Plan in Shape layer file. The Geo Referenced Digital Plan in Shape layer is attached with this report as Plate No.1 along with its soft copy i.e. in DVD. The coordinate of all corner points of proposed forest boundary pillar from pillar 1 to pillar 2, pillar 2 to pillar 3 and pillar 258 to pillar 261 is attached as ANNEXURE V. Traverse Station data thst is Fore Bearing, Back Bearing, Traverse Leg distance from pillar 1 to pillar 2, pillar 2 to pillar 3 and pillar 258 to pillar 261 is attached herewith as ANNEXURE VI.