Arborfield Cross Relief Road (ACRR) Newsletter 1 - October 2018

Total Page:16

File Type:pdf, Size:1020Kb

Arborfield Cross Relief Road (ACRR) Newsletter 1 - October 2018 Arborfield Cross Relief Road (ACRR) Newsletter 1 - October 2018 Aerial view over Swallowfield Road We are pleased to introduce the first of a This programme is only part of the wider infrastructure series of newsletters on the Wokingham Major that Wokingham Borough Council is committed to Highways Programme. We encourage questions deliver; further information can be found at: you may have about this programme, as well as www.wokingham.gov.uk/major-developments/ your comments, suggestions and feedback on overview-of-major-developments any aspect of this programme. You can find our contact details overleaf. Arborfield Cross Relief Road (ACRR) The ACRR will support the development of Arborfield Major Highways Programme Strategic Development site, consisting of 3500 new Balfour Beatty is working on behalf of Wokingham homes. This new road was granted planning consent Borough Council on Wokingham’s Major Highways in January 2018 and will mitigate the traffic impact Programme, to help facilitate growth in the borough of on Arborfield Village and local roads. Since January, Wokingham. In meeting the council’s responsibilities Balfour Beatty has started the detailed design and to deliver new housing, the borough is committing undertaken a series of tasks to support the delivery substantial investment, secured from the developers, programme of the scheme: topographical survey of in a wide range of infrastructure. This comprises the proposed route corridor, statutory undertakers of new schools, open spaces and leisure facilities, apparatus identification through radar penetration community facilities and roads, amounting to approx. surveys and a series of ecological surveys, plus £1billion investments in total. monitoring to identify badger setts and bat roosts. The £124m Highways Programme delivered under Arborfield Cross Relief Road Scheme Map the SCAPE Procurement Framework includes the Arborfield Cross Relief Road (ACRR), Barkham Bridge A327 Reading Road Greensward Lane improvements, Winnersh Relief Road - Phase 2 (WRR), Lower Earley Way Dualling and three projects which Henry Street form the South Wokingham Distributor Road (SWDR); Garden Centre Swallowfield Road Eastern Gateway, Spine Road and Western Gateway, Eversley Road The programme also includes the West of Old Forest Pets Plus Road, Toutley Road and Ashridge Farm sections of Arborfield Court the North Wokingham Distributor Road (NWDR). Duck Nest These projects are being completed alongside Farm residential developer-led projects which will later connect together to form the completed road. A327 Diagrammatic map. Not to scale. Swallowfield Road Arborfield Cross Relief Road (ACRR) Newsletter 1 - October 2018 » Design and Construction Timeline Summer 2018: Detailed design and planning 1 conditions completed (subject to planning approval) Summer 2018: We are here Enabling works – Preparation for the delivery 2 of the scheme and environmental studies Winter 2018/Early 2019: Aerial view over Duck Nest Farm – Indicative Route Corridor 3 Site preparation and utilities re-routing Value Engineering Exercise Spring 2019: A value engineering exercise was carried out on the 4 Construction begins proposed Green Bridge detailed design at Bridleway ARBO17. By amending the arch profile, the design team has managed to better integrate the structure Summer 2020: into the hillside, improve landscaping opportunities 5 Arborfield Cross Relief Road opens and will likely remove the need for piled foundations. Any suitable excess material arising from the scheme earthworks will be assessed to be reused on the » Want to keep up to speed with the progress other road schemes Balfour Beatty is working on being made on our multi-million pound as part of the Wokingham Borough Council’s Major Major Highways Programme? Highway’s Programme. We’ll be communicating further updates about the project via our e-newsletter. If you’d like to receive the Arborfield Cross e-newsletter, please send your details to [email protected] We will only use your information and personal data for the purposes of sending the e-newsletter, Archaeological Investigation and it will not be shared with any third party. The project team is currently planning a series of enabling works beginning with archaeological investigations in Arborfield just north of the Contact Us: Swallowfield Road, near the site of a potential Iron Balfour Beatty has a dedicated telephone helpline Age settlement. who will be able to assess any issues and provide a response as applicable: T: 0800 121 4444 While the proposed scheme has been designed to avoid any impact on the settlement, it was important Alternatively, you can use the email address at to undertake further investigation to ensure no [email protected] damage was caused to any archaeological features, while also mapping out and recording any important For more information regarding ongoing and remains of historic use of the area. new projects, please visit: www.wokingham.gov.uk/major-new-roads.
Recommended publications
  • Tree Watch Issue 39 November 2018
    Wokingham District Veteran Tree Association Tree Watch Issue 39 November 2018 On 20th November, we had 7,582 trees in our database and 10,902 photographs Welcome to the latest issue of Tree Watch. I hope you all had an enjoyable summer. The recent weather has not been particularly conducive to surveying, but these dark evenings mean we can make plans for our surveys in the spring. If you haven’t done any tree surveying yet, but think you might like to get involved please let us know. We would like to recruit some more people to help us complete our veteran tree survey. If you don’t want to survey, perhaps you have some ideas for new projects we could initiate. On page 10 Linda Martin tells us about a yew forest in Sussex. Nearer to us is the Ankerwycke yew. Join us in January to see this iconic tree and learn about it from Toby Hindson from the Ancient Yew Forum (see events details). In 2015, the National Trust planned to put a board walk around the tree to prevent root compaction. The photos here were taken five years ago and it will be interesting to see what the site looks like now. As I was putting the final touches to this issue, I listened to an episode of the BBC radio 4 programme “Open Country” about ash trees (20th November). See recommended websites on page 13 for the link if you’d like to listen to it (just ignore the bit about the invention of the wheel).
    [Show full text]
  • Arborfield Cross Relief Road) Compulsory Purchase Order 2018
    WOKINGHAM BOROUGH COUNCIL THE WOKINGHAM BOROUGH COUNCIL (ARBORFIELD CROSS RELIEF ROAD) COMPULSORY PURCHASE ORDER 2018 DRAFT STATEMENT OF REASONS 85 1. Introduction 1.1. On [ ] 2018 Wokingham Borough Council (the “Council” and the “Acquiring Authority”) resolved to make the Wokingham Borough Council (Arborfield Cross Relief Road) Compulsory Purchase Order 2018 (the “Order”) to acquire land and interests over land within the Arborfield area and to enable the delivery of a new relief road known as the Arborfield Cross Relief Road (the “ACRR”). 1.2. The Order is made pursuant to sections 239, 240, 246, 250 and 260 of the Highways Act 1980 (the “1980 Act”) for the acquisition of all interests (except mining interests and others specifically excluded) in the land shown coloured pink (the “Order Land") on the plan attached to the Order (the “Order Plan”), and as described in the Schedule to the Order. The land proposed to be acquired pursuant to the Order is also described in greater detail in section 2 below. Further detail as to the powers under which the Order is made are found in section 3 below. 1.3. The Order Land is split into fields, supporting both arable and pasture farming, interspersed with a number of small woodland blocks. The Order Land is described further in section 2 of this Statement of Reasons. 1.4. The Order is being sought so that the Council can assemble in its ownership the Order Land to facilitate and enable the construction, on schedule, of a new section of highway linking the A327 Reading Road in the north and the A327 Eversley Road in the south east, along with associated necessary works (the “Scheme”).
    [Show full text]
  • International Passenger Survey, 2008
    UK Data Archive Study Number 5993 - International Passenger Survey, 2008 Airline code Airline name Code 2L 2L Helvetic Airways 26099 2M 2M Moldavian Airlines (Dump 31999 2R 2R Star Airlines (Dump) 07099 2T 2T Canada 3000 Airln (Dump) 80099 3D 3D Denim Air (Dump) 11099 3M 3M Gulf Stream Interntnal (Dump) 81099 3W 3W Euro Manx 01699 4L 4L Air Astana 31599 4P 4P Polonia 30699 4R 4R Hamburg International 08099 4U 4U German Wings 08011 5A 5A Air Atlanta 01099 5D 5D Vbird 11099 5E 5E Base Airlines (Dump) 11099 5G 5G Skyservice Airlines 80099 5P 5P SkyEurope Airlines Hungary 30599 5Q 5Q EuroCeltic Airways 01099 5R 5R Karthago Airlines 35499 5W 5W Astraeus 01062 6B 6B Britannia Airways 20099 6H 6H Israir (Airlines and Tourism ltd) 57099 6N 6N Trans Travel Airlines (Dump) 11099 6Q 6Q Slovak Airlines 30499 6U 6U Air Ukraine 32201 7B 7B Kras Air (Dump) 30999 7G 7G MK Airlines (Dump) 01099 7L 7L Sun d'Or International 57099 7W 7W Air Sask 80099 7Y 7Y EAE European Air Express 08099 8A 8A Atlas Blue 35299 8F 8F Fischer Air 30399 8L 8L Newair (Dump) 12099 8Q 8Q Onur Air (Dump) 16099 8U 8U Afriqiyah Airways 35199 9C 9C Gill Aviation (Dump) 01099 9G 9G Galaxy Airways (Dump) 22099 9L 9L Colgan Air (Dump) 81099 9P 9P Pelangi Air (Dump) 60599 9R 9R Phuket Airlines 66499 9S 9S Blue Panorama Airlines 10099 9U 9U Air Moldova (Dump) 31999 9W 9W Jet Airways (Dump) 61099 9Y 9Y Air Kazakstan (Dump) 31599 A3 A3 Aegean Airlines 22099 A7 A7 Air Plus Comet 25099 AA AA American Airlines 81028 AAA1 AAA Ansett Air Australia (Dump) 50099 AAA2 AAA Ansett New Zealand (Dump)
    [Show full text]
  • Arborfield & Barkham Neighbourhood Plan 2019-2036 May 2019
    Arborfield & Barkham Neighbourhood Plan 2019-2036 May 2019 A plan for the community69 by the community Arborfield & Barkham Neighbourhood Plan Contents GLOSSARY 4 FOREWORD 5 1. Introducing Arborfield and Barkham ............................................................................................... 6 Figure 1 Map of Arborfield and Barkham Neighbourhood Plan Area ....................................................................... 7 2. Vision and objectives for the plan .................................................................................................. 11 Policy Matrix 13 3. Sustainable Development ............................................................................................................. 14 4. Identity and Rural Setting ............................................................................................................. 17 POLICY IRS1: PRESERVATION OF SEPARATION OF SETTLEMENTS .......................................................................... 19 POLICY IRS2: RECOGNISE, RESPECT AND PRESERVE IDENTITY AND RURAL SETTING OF SETTLEMENTS ................. 20 POLICY IRS3: PROTECTION AND ENHANCEMENT OF THE NATURAL ENVIRONMENT AND GREEN SPACES ............ 22 POLICY IRS4: PROTECTION AND ENHANCEMENT OF THE HISTORIC CHARACTER OF THE AREA ............................. 25 5. Thriving Communities ................................................................................................................... 29 POLICY TC1: RETENTION OF EXISTING VALUED COMMUNITY FACILITIES ..............................................................
    [Show full text]
  • Appendix B Summary of Public Comments
    Appendix B Summary of Public Comments TOTAL Objection 187 Comment 43 Mixed 2 Support 3 No reason given 8 Principle / scale of development 141 Highways (general comments) Increase in traffic and congestion (gridlocks at rush hour) 163 Cumulative impact upon congestion with other development in Wokingham Borough Council 73 Highway safety impact of additional traffic (inc drivers and other road/footway users) 115 Highway proposals do not mitigate development (nil detriment not Achieved) 85 Noise from additional traffic (general) 20 Pollution from additional traffic (air, sewage) 22 Impact of additional traffic upon communities 119 Roads are already congested 149 Roads already in a poor condition and should be repaired 14 Impact of construction traffic 23 Congestion will turn country lanes into rat runs 34 Highway improvements will change the character of the area (loss of country lanes) 28 Extra traffic will discourage horse riders, cyclists and pedestrians 54 Object to principle of traffic lights - will increase congestion 3 Extra length of road should be built to accommodate extra cars (bypass) 24 Need to consider M3 & M4 corridor links more broadly 26 Network of footpaths, bridleways and cycle ways required 47 Multi user bridleway necessary to continue to support equestrian business around the development 21 Bridleways required for horse riders 27 Further work required to demonstrate how pupils will get to secondary school (safe walking/cycling routes, bus, green ways) 14 Traffic modelling challenged on it's conclusion and consultation methods 27 Traffic modelling does not take to account the other application TA 4 OFF-SITE: Arborfield Arborfield Cross will be unsafe and congested 2 Arborfield bypass is essential 16 Arborfield bypass needed before any new development 9 Arborfield bypass should join up with Shinfield Eastern Relief Rd 5 Object to bypass going to east of village 2 A327 north of Arborfield would be congested 10 Overload A327 (congestion/safety) 44 Loss of 'village' character to Arborfield 24 OFFSITE: Barkham Bottleneck at Barkham Bridge.
    [Show full text]
  • Wokingham Borough Council
    WOKINGHAM BOROUGH COUNCIL MEETING OF THE PLANNING COMMITTEE WEDNESDAY 30 MARCH 201 1 AGENDA Civic Offices Shute End Wokingham Susan Law Berkshire Chief Executive THE COUNCIL'S VALUES In making a difference to other people's lives we are .. ONE Wokingham, ONE Borough - working in partnership FOCUSED on Customers and Community BOLD --- innovative and flexible OPEN - integrity, trust and transparency Chief Exewtive's Department P.O. Box 150 Shute End, Wokingharn Berkshire-. R040-. 1WQ - Tel: (0118) 974 60M) Fax: (01 18) 979 0877 Minimm No: (01 181 977 8909 DX: 33506 - Wokinsham To: The Chairman and Members of the Planning Committee A Meeting of the PLANNING COMMITTEE will be held at the Civic Offices, Shute End, Wokingham on Wednesday 30 March 201 Iat 7.00pm. Susan Law Chief Executive 22 March 201 1 Members:- Steve Chapman (Chairman), Chris Bowring (Vice Chairman), Stephen Conway, Lee Gordon-Walker, Norman Gould, Tim Holton, Jenny Lissaman Bob Pitts and Claire Stretton ITEM WARD SUBJECT PAGE NO. NO. 152.00 None Specific MINUTES 1 To confirm the Minutes of the Meeting of the Committee held on 2 March 201 1. 153.00 None Specific APOLOGIES To receive any apologies for absence. DECLARATIONS OF INTEREST To receive any declarations of interest. APPLICATIONS TO BE DEFERRED AND WITHDRAWN ITEMS To consider any recommendations to defer applications from the schedule and to note any applications that may have been withdrawn. SCHEDULE OF APPLICATIONS Item Page Ward Location Application No. Rec. No. No. 156.00 Sonning Weir House, Sonning Fl201012231
    [Show full text]
  • Statutory Proposal to Expand Farley Hill Primary School Through Use of Additional Premises on the Arborfield Green Development from 1St September 2021
    Statutory Proposal to Expand Farley Hill Primary School through use of additional premises on the Arborfield Green development from 1st September 2021 Issued to comply with the requirements of Section 6 and Schedule 3 of School Organisation (Prescribed Alterations to Maintained Schools) (England) Regulations 2013. School Farley Hill Primary School Church Road Farley Hill Reading RG7 1UB Local Authority Wokingham Borough Council Childrens Services Shute End Wokingham Berkshire RG40 1BN Description of The proposed alteration are: alteration and The opening of a second site within the Arborfield Green evidence of housing development (accompanied by the temporary closure of demand. the current Farley Hill site) in September 2021. The phased expansion of Farley Hill Primary School from 210 places (Reception to Year 6) to 420 places (with the Admission Number increasing to 60 from September 2024) and 630 statutory primary school places (with the Admission Number increasing to 90 from September 2026). The opening of a new nursery class from September 2021. All dates are subject to review and revision, in the light of the number of children resident in the new Arborfield Garrison Strategic Development Location community and the available capacity in local schools. Farley Hill Primary School is a 210 place primary school, sited in the village of Farley Hill, 1.4 miles (straight line distance) from the new Arborfield Green school site. The school’s current Designated Area for admissions purposes includes the Arborfield Garrison site and over 2/3rd of the admissions are drawn from the area of the garrison and associated communities. Farley Hill Village itself has a very small community and contributes only a small proportion of the school roll (less than 5 children per year group).
    [Show full text]
  • Development No Weeks on Parish Ward Listed By: Management Day Of
    Development No weeks on Parish Ward Listed by: Management day of Ref No committee F/2010/2266 29/16 Arborfield and Arborfield, and Head of Newland, Shinfield South Development Shinfield Wards Management Applicant Partnerships for Renewables Location Land at Rushy Mead South of Lower Earley Way (Uppetwood Farm) Shinfield RG2 9,414 Proposal The proposed erection, 25 year operation and subsequent decommissioning of a wind energy development comprising of the following elements: Four wind turbines, each with a maximum overall height (to vertical blade tip) of up to 130 metres, together with new and upgraded access tracks temporary works, hardstanding areas, control and metering, building, cabling, improved vehicular access from Cutbush Lane and the A327, an anemometry mast and compensatory flood storage. Type Other largescale major development PS Category 6 Officer Laura Callan FOR CONSIDERATION BY Planning committee on 27 April 201 1 REPORT PREPARED BY Head of Development Management SUMMARY The proposal is to erect 4 wind turbines up to a height of 130m (from ground level to vertical blade tip) and 80m to centre of hublnacelle. The development would also involve the creation of new and upgraded access tracks and hardstanding areas to allow construction, access and maintenance. In order to access the site with abnormal loads works to the public highway would be required. An anemometry mast 80m high would also be required on the site to allow continued monitoring of wind speed data. The development is proposed to have a 25 year operation. The proposal is considered to require an Environmental Impact Assessment under the Environmental lmpact Assessment regulations.
    [Show full text]
  • Arborfield Cross Relief Road - Newsletter October 2020
    Arborfield Cross Relief Road - Newsletter October 2020 » Project Overview Aerial view of the ACRR corridor Arborfield Cross Relief Road Scheme Map A327 Reading Road Greensward Lane Sindlesham Road Henry Street Garden Centre Pets Plus Eversley Road Swallowfield Road Arborfield Court Duck Nest Farm Swallowfield Road With less than a month from completion, the new 2.3km relief road is taking its final shape. It will reduce congestion, boost employment and create opportunities for more sustainable travel, providing traffic relief in Arborfield and Arborfield Cross and the surrounding rural lanes. It will also support the development of Arborfield Strategic Development site consisting of 3,500 new homes. A computer fly-through showing a visualisation of the new road once complete can be viewed on YouTube by searching ‘ACRR-Barkham Bridge fly through’. » Work to date Works have been progressing with the finishing touches being added. We continue to maintain social distancing in line with Government advice and guidance. As it stands, we are on target for an official opening of this scheme mid-November 2020. The only remaining item will be the final landscaping works on the verges which have been planned to coincide with the planting season. Since the last issue of this newsletter we have completed a series of works, as shown here: Looking from Swallowfield South towards the green bridge. The Finishing touches of paving under the new green bridge fencing has now been completed Arborfield Cross Relief Road - Newsletter October 2020 Road markings have been laid along the full length of the carriageway along with reflective road studs providing enhanced lane guidance in poor visibility Self-binding gravel has been laid as the final layer on the bridleways New 5 metre-wide bridleway on a raised embankment leading up to leading from Swallowfield Road up and over the new green bridge the new green bridge Bridge Farm roundabout now substantially Swallowfield Road is now fully open.
    [Show full text]
  • Arborfield Cross Relief Road Consultation Exhibition Boards
    Arborfield Cross Relief Road Public Consultation About this exhibition Welcome Please feel free to review the display boards and to discuss your comments with Council officers who are on hand to provide further information. Please also complete a I am pleased to welcome you to this Arborfield questionnaire. Cross Relief Road consultation. The purpose of this exhibition is to provide you with information Other Exhibitions on the routes that could best relieve Arborfield Cross from the traffic impacts of new You can view the same display boards in your own time at a development at Arborfield Garrison and around static exhibition at Henry Street Garden Centre, Swallowfield Shinfield. Road, Arborfield from Monday 09 September until Sunday 03 November 2013, open Monday to Saturday 9.00 am to Your views are important and, in holding this consultation, you may 5:.30 pm and Sundays 10.30 am to 4.30 pm, and at the be sure that your opinions will be seriously considered. Council Offices, Shute End, Wokingham from Monday 09 September until Friday 01 November 2013, Monday to Friday Background only 10.00am to 3.00pm. The Council is committed to the development of 3,500 new homes You can also talk to Council officers at the Garden Centre and at Arborfield Garrison in addition to those around Shinfield, at a number of other mobile exhibitions. The venues, dates Spencers Wood and Three Mile Cross by 2026. The relief road is and times are as follows: proposed to minimise the impacts of traffic growth on the village of Arborfield Cross and surrounding rural lanes.
    [Show full text]
  • Welcome to the Winter Newsletter This Is Your Guide to What’S Been Going on in Arborfield Green Over the Last Few Months
    www.arborfieldgreen.co.uk [email protected] Arborfield Green Community Newsletter Welcome to the Winter Newsletter This is your guide to what’s been going on in Arborfield Green over the last few months. Keep reading for more information about our recent community events and updates on the development. Celebrating our community On Friday 30th November 2018, Arborfield Green was treated to its annual Christmas fair and lights switch on at their local Community Centre. The event was a great opportunity for all Arborfield Green residents to come together at the start of the festive season at the historical military site. Highlights of the evening included Saint Sebastian Wokingham Band playing Christmas carols and a visit from Santa. The fair culminated with the Christmas tree lights switch on outside the Community Centre. The Mayor of Wokingham Borough Council, Councillor John Sammie Bryans, Kaiser, was present to give a speech and initiate the Development Director for Crest Nicholson said: countdown to Christmas. “We are very proud to have hosted this exciting Christmas event Our next event will be this spring, with Arborfield for both the new and existing community at Arborfield Green. This Green’s Easter fête taking place on Saturday 30th March is the third year we have celebrated Christmas at Arborfield, and from 10am to 1pm at the Community Centre. Keep an the event has developed over those years. We are keen to involve eye out for more information nearer the time. local people in our event planning, and are now looking forward to developing an Easter event with local families.” Arborfield Green: A Timeline of Development 1904 1937 1939 Land in Arborfield acquired by the War Office Land in Arborfield acquired by the War Office Army Technical School opens and Poperinghe for the Arborfield Remount Depot.
    [Show full text]
  • Reading Station I Onward Travel Information Buses and Taxis Local Area Map
    Reading Station i Onward Travel Information Buses and Taxis Local area map km 0 0.5 Caversham Key 0 Miles 0.25 A Bus Stop Rail replacement Bus Stop H RL Station Entrance/Exit North NA Taxi Rank Interchange Key 1 NE CM 0 m C Reading Crown Court in CM u Christchurch Meadows t e H Hotel s w Reading HX The Hexagon Theatre/Arts Centre a l KM Kings Meadow k Station i n L Reading Central Library g d i M Reading Museum & Town Hall s WS t RL Rivermead Leisure Complex a RailAir n c Coach Stop SC Oracle Shopping & Leisure e KM South West H Royal Berkshire Hospital SA EK EL Reading Station Interchange Cycle routes EM SB EO Footpaths EP SC H SD H FN M FE FC H C L H HX CW SC Reading is a H PlusBus area Contains Ordnance Survey data © Crown copyright and database right 2018 & also map data © OpenStreetMap contributors, CC BY-SA Rail replacement buses/coaches depart from the North Interchange (Stop PlusBus is a discount price ‘bus pass’ that you buy with your train ticket. It gives you unlimited bus travel around your ND) see map above. chosen town, on participating buses. Visit www.plusbus.info Main destinations by bus (Data correct at September 2019) DESTINATION BUS ROUTES BUS STOP DESTINATION BUS ROUTES BUS STOP DESTINATION BUS ROUTES BUS STOP SA EP 3, 3b, 9, 10, Arborfield Cross 3, 3b Mortimer Village 2, 2a SA 19a/19b/19c Arborfield Green 3, 3b SA { Northumberland Avenue 5+ SC { University of Reading (Main Campus) 21+, 21a EK { Basingstoke Road 6+, 6a SC { Palmer Park Stadium 4/X4, 17+ EO X38, X39, X40 EL NA { Bath Road (towards Calcot) jet black1
    [Show full text]