(To Be Published in the Gazette of India, Part-II, and Section 3, Sub
Total Page:16
File Type:pdf, Size:1020Kb
FORM 1 BASIC INFORMATION S.NO. Item Details 1 Name of the Project Sri. Ulli Lakshmayya. 2 S.No. in the schedule 1(a) 3 Proposed capacity/ area/ length/ Proposed Capacity: 6,87,453. 75 MT tonnage to be handled/ command M3. area/ lease area/ number of wells to Area: 22.43 Ha. be drilled 4 New/ expansion/ modernization New Area 5 Existing capacity/ Area etc. Fresh Area 6 Category of Project i.e. ‘A’ or ‘B’ “B” 7 Does it attract the general condition? No If yes please specify. 8 Does it attract the specific condition? No If yes please specify. 9 Location Plot/ Survey/ Khasra No. Sy. No.535 Village Asanagiri Tehsil Nathavaram District Visakhapatanam. State Andhra Pradesh 10 Nearest railway station/ airport Ravikampadu – 80 Km. along with distance in kms. 11 Nearest town, city, district Narsipatnam – 30 Km. headquarters along with distance in kms. Visakhapatnam – 100 Km. 12 Village panchayaths, Zilla parishad, Asanagiri Village, Municipal Corporation, Local body Nathavaram Mandal, (Complete postal address with Visakhapatnam. telephone no’s to be given) Andhra Pradesh 13 Name of the applicant Sri.Ulli.Lakshmayya 14 Registered address Sri.Ulli.Lakshmayya, S/o Bheemayya, Kothuru Village, Koyyuru Mandal, Visakhapatnam District, Andhra Pradesh State. 15 Address for Correspondence Name Sri.Ulli.Lakshmayya Designation/Owner/Partner/CEO) Lessee/Individual. Address Sri.Ulli.Lakshmayya, S/o Bheemayya, Kothuru Village, Koyyuru Mandal, Visakhapatnam District, Andhra Pradesh State. 1 Pin code 531087. e-mail [email protected] Telephone no. 8106762333. Fax no. 16 Details of Alternative sites examined, No alternative sites are examined. if any location of these sites should be shown on a toposheet.65K/4 17 Interlinked projects None 18 Whether separate application of None interlinked project has been submitted? If yes, date of submission Not Applicable If no, reason Not Applicable 19 Whether the proposal involves approval/ clearance under: if yes, details of the same and their status None to be given. (a) The Forest (Conservation) Act, 1980 (b) The Wild Life (Protection) Act, 1972 (c) The CRZ Notification, 1991 20 Whether there is any Government None Order/ Policy relevant/ relating to the site? 21 Forest land involved (hectares) The applied mining lease does not comes under forest zone. 22 Whether there is any litigation pending against the project and / or land in which the project is propose to be set up? None (a) Name of the court (b) Case No. (c) Orders/ directions of the court, if any and its relevance with the proposed project. 2 (I) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, S.No. Information/Checklist Yes/No wherever possible) with source confirmation of information data 1.1 Permanent or temporary Yes Present land use is a Hillock (Govt change in land use, land land) 22.430 Ha. cover or topography including increase in intensity of land The Applied Area is covered with use (with respect to local shrubs and very few small trees. land use plan) 1.2 Clearance of existing land, No The Applied area is elevated and vegetation and buildings? covered with shrubs, bushes etc., Except for shrubs no major clearance is required. 1.3 Creation of new land uses? No 1.4 Pre-construction No Survey completed, Site service investigations e.g. bore building will e constructed. houses, soil testing? 1.5 Construction works? Yes Site Service Building will be constructed. 1.6 Demolition works? No No constructions exist. 1.7 Temporary sites used for No Local villagers shall be employed construction works or housing of construction workers? 1.8 Above ground buildings, Yes A site service building will be structures or earthworks constructed within the quarry including linear structures, lease area. No major construction cut and fill or excavations work is involved. 1.9 Underground works No Not Applicable including mining or tunneling? 1.10 Reclamation works? Yes Can be done after completion of mining Activity. 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and Yes Semi Machined open cast manufacturing processes? Quarrying by using compressor operated jack hammer drills, 3 excavators and dumpers etc. 1.14 Facilities for storage of goods Yes Land will be provided for storage or materials? within the mine premises. 1.15 Facilities for treatment or Yes During the plan period 29,586 M3 disposal of solid waste or of waste will be generated. This liquid effluents? waste will be dumped on temporary dump. 1.16 Facilities for long term No Not Required, Local Villagers shall housing of operational be Employed. workers? 1.17 New road, rail or sea traffic No Existing Roads are sufficient for during construction or the quarrying activities. No rail operation? line is Required. Sea traffic is not Applicable. 1.18 New road, rail, air waterborne No Existing roads are sufficient for or other transport the quarrying activities. No rail infrastructure including new line is required. or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No Not required existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not required lines or pipelines? 1.21 Impoundment, damming, No Nil culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No None 1.23 Abstraction or transfers of No Water shall be drawn from the water form ground or surface local villages for the purpose of waters? drinking purpose. 1.24 Changes in water bodies or No The project no way affects the the land surface affecting existing drainage pattern/run off. drainage or run-off? Precautions should be taken for dump yard. 1.25 Transport of personnel or No Local people are working for this materials for construction, quarry. There is no need of operation or transportation for personal. decommissioning? 1.26 Long-term dismantling or No No decommissioning or restoration works? 1.27 Ongoing activity during Yes Increase in dust levels for short decommissioning which duration 4 could have an impact on the environment? 1.28 Influx of people to an area in Yes Local people will be employed in either temporarily or mines. permanently? 1.29 Introduction of alien species? No No alien species will be introduced. 1.30 Loss of native species or No No native species or generic genetic diversity? diversity is lost. The proposed Applied area is slightly elevated and covered with shrubs, bushes and small trees. 1.31 Any other actions? No None 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with S.No. Information/Checklist approximate quantities /rates, confirmation Yes/No wherever possible) with source of information data 2.1 Land especially undeveloped Yes Present land use is slightly or agricultural land (Ha) elevated (Govt land) 22.430 Ha. The Applied area is covered with shrubs and very few small trees. 2.2 Water (expected source & Yes Water requirement will be meet competing users) unit: KLD through tankers from the nearby villages. Requirement of water in the mine is about 30 m3/day. 2.3 Minerals (M3) Yes Laterite 2,66,282 M3/Annum. 2.4 Construction material – Yes No Major construction work is stone, aggregates, sand / soil involved. A site service building (expected source – M3) will be constructed. 2.5 Forests and timber (source – No No Timber is used. MT) 2.6 Energy including electricity Yes Generator power supply available and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources No No other natural resources will be (use appropriate standard used. units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or 5 raise concerns about actual or perceived risks to human health. Details thereof (with Information/Checklist approximate quantities /rates, S.No. confirmation Yes/No wherever possible) with source of information data 3.1 Use of substances or No There are no Hazardous materials, which are substances or material is to hazardous (as per MSIHC human health or the rules) to human health or the environment. environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No The proposed project does not disease or affect disease cause any change to the vectors (e.g. insect or water prevailing factors. borne diseases) 3.3 Affect the welfare of people Yes The Mining Operations will bring e.g. by changing living improvement in the socio- conditions? economic levels in the study area. 3.4 Vulnerable groups of people No Mine workers are likely to get who could be affected by the exposed to dust. Dust masks will project e.g. hospital patients, be provided to all the employees. children, the elderly etc., 3.5 Any other causes No None. 4. Production of solid wastes during construction or operation or decommissioning (MT/month). Details thereof (with approximate quantities /rates, S.No. Information/Checklist Yes/No wherever possible) with source confirmation of information data 4.1 Spoil, overburden or mine NO The Recovery of the area is 90% wastes So No Waste is Generating. 4.2 Municipal waste (domestic No No Municipal Waste will be and or commercial Generated. wastes) 4.3 Hazardous wastes (as per No No Hazardous Waste is Hazardous Waste anticipated. Management Rules) 4.4 Other industrial process No No Process wastes are anticipated. wastes 4.5 Surplus product No No Surplus products are envisaged.