Artificial Ground Freezing

Total Page:16

File Type:pdf, Size:1020Kb

Artificial Ground Freezing Proceedings_Theme_02_Proceedings IMWA 2011 22/08/2011 12:43 AM Page 113 Aachen, Germany “Mine Water – Managing the Challenges” IMWA 2011 Artificial Ground Freezing: An Environmental Best Practice at Cameco’s Uranium Mining Operations in Northern Saskatchewan, Canada Greg Newman¹, Lori Newman¹, Denise Chapman², Travis Harbicht² ¹Newmans Geotechnique Inc., 311 Adaskin Cove, Saskatoon SK, S7N 4P3, Canada ²Cameco Corporation, 2121 11th St. West, Saskatoon SK, S7M 1J3, Canada Abstract Cameco Corporation (Cameco) is becoming a leader in the application of artificial ground freezing for controlling water and ground stabilization at its existing and in-development high-grade uranium mines in Canada. Artificial ground freezing (AGF) has been used in the mining industry over the past 125 years for support of shaft sinking, tunneling, and foundation excavation. The AGF process involves chilling a brine so- lution to between -25 °C and -35 °C in a large, conventional refrigeration plant. The brine is then circulated through the ground within steel pipes in a linear or grid pattern to remove heat from the ground and freeze water within the soil/rock pore spaces to improve soil strength and decrease the mobility of liquid water. Tra- ditional AGF projects are usually short-term in nature, which has limited the relevance of the long-term effi- ciency and environmental benefits of the process. Freezing projects at the northern Saskatchewan uranium mine sites typically will be active for 10 years or longer, providing an opportunity to consider the development of a best-practice philosophy for all phases of the project, from design through to operations and decommis- sioning of freeze systems. Key Words artificial ground freezing, water control, shaft sinking, tunnelling Introduction turns to ice. When a cold heat sink (i.e. cold brine Cameco strives to continuously improve environ- pipe) is introduced in the ground, stored thermal mental performance in all aspects of operations. energy flows from the ground toward the heat Main areas of focus have been waste reduction, sink and the temperature of the ground drops. improved air quality, reduced energy consump- The warmer brine then flows back to the refriger- tion, and decreased water intake and treated water ation plant where it is re-cooled and circulated release volumes. Ground freezing has been recog- back through the system. The rate of ground cool- nized as a critical component of Cameco’s mining ing is dependent on several things: the thermal success: creating a barrier to groundwater flow, conductivity or ability of the ground to transport strengthening weak ground mass, and providing heat, the temperature of the ground and the brine, control of radon gas release. This paper will focus the ability of the ground to release heat (e.g. heat on the environmental management benefits that capacity), the magnitude of the heat gradient es- can be gained through the implementation of tablished between the warm ground and the intro- ground-freezing technology at uranium mining duced cold heat sink, and finally the amount of operations in northern Saskatchewan. Most no- water stored in the ground (Newman 1997). The tably, the use of long-term ground-freezing tech- amount of water is important because when nology provides ongoing groundwater inflow water changes phase from liquid to solid, it re- management thereby substantially reducing leases latent heat which must also be removed treatment and release volumes. In addition, oper- from the system through the cold heat sink. ating procedures and practices to reduce energy consumption has been developed and has ex- plored the potential for heat-recovery systems as part of freeze-plant operations which can be ap- plied to other operational areas, decreasing en- ergy demands. Other innovative uses for freezing are being investigated in support of future shaft sinking which could also further enhance the en- vironmental benefits of this technology. How Ground Freezing Works Artificial ground freezing (AGF) is a process by which stored thermal energy (e.g. heat) is re- moved from soil or rock to such an extent that the water held in the interstitial pores in the ground Figure 1 Typical underground ore freezing con- cools to below the phase change temperature and cept. Rüde, Freund # Wolkersdorfer (Editors) 113 Proceedings_Theme_02_Proceedings IMWA 2011 22/08/2011 12:43 AM Page 114 IMWA 2011 “Mine Water – Managing the Challenges” Aachen, Germany A typical ground freezing system is shown in surface at an unconformity between highly frac- Figure 1 (Newman 2000). In this image a series of tured silicified sandstone above and relative dry freeze pipes have been installed in a linear pattern granitic basement rock below. The fractured sand- to optimize the rate of cooling and create a frozen stone contains water in a fracture network con- barrier wall. A freeze pipe is a two-part system that nected to ground surface and as such the water consists of an outer steel casing with a sealed bot- pressure at the depth of the ore zones is as high as tom cap and an inner high-density polyethylene 6000 kPa and has unlimited flow potential. In the tube. Cold brine, typically calcium chloride (CaCl₂) vicinity of the orebodies themselves, the ground chilled to between -25 °C and -35 °C, is introduced is often de-silicified with potentially flowing sand inside the polyethylene tube where it flows to the and unconfined squeezing clay. To complicate end of the freeze pipe before returning to the top matters, the pore-water in the ore zone vicinity of the hole in the annular gap between the tube contains high concentrations of radon gas which and the outer steel casing. It is during the return comes out of solution as soon as the pore water is flow to the top of the freeze pipe that the cold depressurized (e.g. enters the mine workings brine draws heat from the surrounding ground. below) (Werniak 1999). A typical cross-section of Ground freezing requires front-end design and the geology and associated mining-related haz- analysis to determine the rate of freezing, the op- ards is given in Figure 3. This particular image is timum freeze-pipe configuration, and the size of representative of the conditions at the high-grade refrigeration or freeze plant necessary to accom- McArthur River mine located in northern plish the project goals. Finite element analysis Saskatchewan, Canada. (FEA) is used to develop a design and to size the During early design phases at McArthur River freeze plant so it can be procured and so that there was discussion about the potential for using power consumption rates can be known ahead of a combination of cement grouting and pumping time. A typical ground-freezing heat-load curve is to stabilize the ore zone and control the pore shown in Figure 2. In this figure the units of heat water. Cement grouting will work in circum- extraction are kilowatts per meter (kW/m) which stances where the ground or rock formations are is an energy value per unit time per unit length of susceptible to grout penetration. This would be freeze pipe. It is quite typical to have many thou- the case in the fractured sandstone, but the highly sands of meters of installed freeze pipes surround- altered ground directly adjacent to the ore zones ing a mining area and so it is not uncommon to proved to be too variable and the risks associated need several megawatts of electrical power avail- with trying to grout the zone were deemed too able to drive the system. Obviously any opportu- high. Likewise, allowing inflow and having suffi- nity to reduce this energy requirement, or to cient pumping capacity to remove the water car- recover the waste heat energy, is a good practice ries very high uncertainty. In addition, allowing to adopt. the high radon-bearing water to flow intentionally into the mine poses an unnecessary risk to mine Why Ground Freezing is Needed in Uranium workers. Finally, if very high inflow volumes were Mines allowed, large amounts of water would have to be The high-grade ore deposits at Cameco’s pumped to surface and treated prior to release to McArthur River and Cigar Lake uranium mines the environment – a load which could exceed are located between 450 and 600 m below ground 3000 m³/hr. For these reasons grouting and Figure 2 Typical power consumption curve per Figure 3 Cross-section of ore and original freeze meter of installed freeze pipe. wall concept at McArthur River Mine. 114 Rüde, Freund # Wolkersdorfer (Editors) Proceedings_Theme_02_Proceedings IMWA 2011 22/08/2011 12:43 AM Page 115 Aachen, Germany “Mine Water – Managing the Challenges” IMWA 2011 pumping water were deemed to be a non-viable The subsequent delay to mine development, as primary control strategy and ground freezing was well as the water pumping and treating required considered not only the most feasible operational to remediate the shaft, has proven costly. Cameco solution, but also is beneficial in that it reduces a has applied the knowledge gained from this expe- significant volume of water which would require rience. In the future, mine shafts will be sunk management. using a unique combination of freeze-wall barrier Several implications of the challenging ground with thawed central core, instead of a grout-cur- conditions are evident in Figure 3 as they relate to tain approach. More details of this best-practice ground freezing. First of all, given the high-pres- approach to using freezing in support of shaft sure water and the poor ground conditions in the sinking are provided in the following section. vicinity of the ore, it is not possible to mine the ore without depressurizing the water and stabiliz- Best Practices for Implementing AGF ing the ground, both achieved by ground freezing.
Recommended publications
  • SECTION 3 Erosion Control Measures
    SECTION 3 Erosion Control Measures 1. SEEDING When • Bare soil is exposed to erosive forces from wind and or water. Why • A cost effective way to prevent erosion by protecting the soil from raindrop impact, flowing water and wind. • Vegetation binds soil particles together with a dense root system, increasing infiltration thereby reducing runoff volume and velocity. Where • On all disturbed areas except where non-vegetative stabilization measures are being used or where seeding would interfere with agricultural activity. Scheduling • During the recommended temporary and permanent seeding dates outlined below. • Dormant seeding is acceptable. How 1. Site Assessment. Determine site physical characteristics including available sunlight, slope, adjacent topography, local climate, proximity to sensitive areas or natural plant communities, and soil characteristics such as natural drainage class, texture, fertility and pH. 2. Seed Selection. Use seed with acceptable purity and germination tests that are viable for the planned seeding date. Seed that has become wet, moldy or otherwise damaged is unacceptable. Select seed depending on, location and intended purpose. A mixture of native species for permanent cover may provide some advantages because they have coevolved with native wildlife and other plants and typically play an important function in the ecosystem. They are also adapted to the local climate and soil if properly selected for site conditions; can dramatically reduce fertilizer, lime and maintenance requirements; and provide a deeper root structure. When re- vegetating natural areas, introduced species may spread into adjacent natural areas, native species should be used. Noxious or aquatic nuisance species shall not be used (see list below). If seeding is a temporary soil erosion control measure select annual, non-aggressive species such as annual rye, wheat, or oats.
    [Show full text]
  • Freezing in Naples Underground
    THE ARTIFICIAL GROUND FREEZING TECHNIQUE APPLICATION FOR THE NAPLES UNDERGROUND Giuseppe Colombo a Construction Supervisor of Naples underground, MM c Technicalb Director MM S.p.A., via del Vecchio Polit Abstract e Technicald DirectorStudio Icotekne, di progettazione Vico II S. Nicola Lunardi, all piazza S. Marco 1, The extension of the Naples Technical underground Director between Rocksoil Pia S.p.A., piazza S. Marc Direzionale by using bored tunnelling methods through the Neapo Cassania to unusually high heads of water for projects of th , Pietro Lunardi natural water table. Given the extreme difficulty of injecting the mater problem of waterproofing it during construction was by employing artificial ground freezing (office (AGF) district) metho on Line 1 includes 5 stations. T The main characteristics of this ground treatment a d with the main problems and solutions adopted during , Vittorio Manassero aspects of this experience which constitutes one of Italy, of the application of AGF technology. b , Bruno Cavagna e c S.p.A., Naples, Giovanna e a Dogana 9,ecnico Naples 8, Milan ion azi Sta o led To is type due to the presence of the Milan zza Dante and the o 1, Milan ial surrounding thelitan excavation, yellow tuff, the were subject he stations, driven partly St taz Stazione M zio solved for four of the stations un n Università ic e ds. ip Sta io zione Du e omo re presented in the text along the major the project examples, and theat leastsignificant in S t G ta a z r io iibb n a e Centro lldd i - 1 - 1.
    [Show full text]
  • Report 2008/05 Pacific Earthquake Engineering Research Center College of Engineering University of California, Berkeley August 2008
    PACIFIC EARTHQUAKE ENGINEERING RESEARCH CENTER Performance-Based Earthquake Engineering Design Evaluation Procedure for Bridge Foundations Undergoing Liquefaction-Induced Lateral Ground Displacement Christian A. Ledezma and Jonathan D. Bray University of California, Berkeley PEER 2008/05 AUGUST 2008 Performance-Based Earthquake Engineering Design Evaluation Procedure for Bridge Foundations Undergoing Liquefaction-Induced Lateral Ground Displacement Christian A. Ledezma and Jonathan D. Bray, Ph.D., P.E. Department of Civil and Environmental Engineering University of California, Berkeley PEER Report 2008/05 Pacific Earthquake Engineering Research Center College of Engineering University of California, Berkeley August 2008 ABSTRACT Liquefaction-induced lateral ground displacement has caused significant damage to pile foundations during past earthquakes. Ground displacements due to liquefaction can impose large forces on the overlying structure and large bending moments in the laterally displaced piles. Pile foundations, however, can be designed to withstand the displacement and forces induced by lateral ground displacement. Piles may actually “pin” the upper layer of soil that would normally spread atop the liquefied layer below it into the stronger soils below the liquefiable soil layer. This phenomenon is known as the “pile-pinning” effect. Piles have been designed as “pins” across liquefiable layers in a number of projects, and this design methodology was standardized in the U.S. bridge design guidance document MCEER/ATC-49-1. A number of simplifying assumptions were made in developing this design procedure, and several of these assumptions warrant re-evaluation. In this report, some of the key assumptions involved in evaluating the pile-pinning effect are critiqued, and a simplified probabilistic design framework is proposed for evaluating the effects of liquefaction-induced displacement on pile foundations of bridge structures.
    [Show full text]
  • JBT Lecture Paper
    JACKED BOX TUNNELLING Using the Ropkins System TM , a non-intrusive tunnelling technique for constructing new underbridges beneath existing traffic arteries DR DOUGLAS ALLENBY, Chief Tunnelling Engineer, Edmund Nuttall Limited JOHN W T ROPKINS, Managing Director, John Ropkins Limited Lecture presented at the Institution of Mechanical Engineers Held at 1 Birdcage Walk, London On Wednesday 17 October 2007 © Institution of Mechanical Engineers 2007 This publication is copyright under the Berne Convention and the International Copyright Convention. All rights reserved. Apart from any fair dealing for the purpose of private study, research, criticism or review, as permitted under the Copyright, Designs and Patent Act, 1988, no part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means without the prior permission of the copyright owners. Reprographic reproduction is permitted only in accordance with the terms of licenses issued by the Copyright Licensing Agency, 90 Tottenham Court Road, London W1P 9HE. Unlicensed multiple copying of the contents of the publication without permission is illegal. Jacked Box Tunnelling using the Ropkins System TM , a non-intrusive tunnelling technique for constructing new underbridges beneath existing traffic arteries Dr Douglas Allenby BSc(Hons) PhD CEng FICE FIMechE FGS, Chief Tunnelling Engineer, Edmund Nuttall Limited John W T Ropkins BSc CEng MICE, Managing Director, John Ropkins Limited The Ropkins System TM is a non-intrusive tunnelling technique that enables engineers to construct underbridges beneath existing traffic arteries in a manner that avoids the cost and inconvenience of traffic disruption associated with traditional construction techniques. The paper outlines a tunnelling system designed to install large open ended rectangular reinforced concrete box structures at shallow depth beneath existing railway and highway infrastructure.
    [Show full text]
  • Combined Ground Freezing Application for the Excavation of Connection Tunnels for Centrum Nauki Kopernik Station - Warsaw Underground Line II
    Combined ground freezing application for the excavation of connection tunnels for Centrum Nauki Kopernik Station - Warsaw Underground Line II Achille Balossi Restelli, Elena Rovetto Studio ingegneria Balossi Restelli e Associati Andrea Pettinaroli Studio Andrea Pettinaroli s.r.l. ABSTRACT The Station “C13” of Warsaw Underground Line II, with tunnel crown 10m below the water table, required the excavation of three connection tunnels, underpassing a six-lane in service road tunnel, working from two lateral shafts. After the collapse occurred while digging the first tunnel, the use of artificial ground freezing was chosen to ensure the excavation under safe conditions. A complex freezing pipe geometry and excavation sequencing was necessary because of the interferences of the overlying road tunnel diaphragm wall foundations, shaft internal structures and previous grouting activities. A combined freezing method was used: nitrogen for freezing the tunnel arches, brine for freezing the intermediate wall and for maintenance stages. Sandy and silty sandy layers were frozen around the crowns and sides. No treatment was necessary for the inverts, lying in clay. A monitoring system of ground temperatures and structure movements allowed for successful completion of work in 8 months. INTRODUCTION The C13 Station of the Warsaw Underground-Line II is located on the West bank of the Vistula River. It consists of two shafts and three connecting tunnels, passing under the Wislostrada (WS) Road tunnel. According to the initial geotechnical investigation, tunnels should have been excavated in high- plasticity clay, but during the first borings non cohesive soil was encountered. Additional investigations were performed on both shafts and a more detailed stratigraphy was reconstructed (Lombardi et al.
    [Show full text]
  • Selection of Shaft Sinking Method for Underground Mining in Khalashpir Coal Field, Khalashpir, Rangpur, Bangladesh
    IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684 Volume 3, Issue 5 (Sep-Oct. 2012), PP 15-20 www.iosrjournals.org Selection of Shaft Sinking Method for Underground Mining in Khalashpir Coal Field, Khalashpir, Rangpur, Bangladesh Atikul Haque Farazi1, Chowdhury Quamruzzaman2, Nasim Ferdous3, Md. Abdul Mumin4, Fansab Mustahid5, A.K.M Fayazul Kabir6 1,2,3,4, 5, 6 (Department of Geology, University of Dhaka, Bangladesh) Abstract : Khalashpir coal field is the 3rd largest coal field in Bangladesh, where coal occurs at depths of 257m to 483m below the surface. Considering the Geological, Geo-environment and other related geo- engineering information, underground mining have been selected there to extract the deposit. In this paper, our concern is about shaft sinking method for underground mining. Depths of the coal seams reveal the necessity of a vertical shaft underground which again needs deep excavation. The problem arises with the excavation because of nearly 138m thick Dupitila Sandstone Formation just 6m below the surface in the area. It is loose, water bearing, containing dominantly porous and permeable sandstone and experiences massive water flow. So, the major concern is that any excavation through this will readily collapse and suffer massive water inrush. This will totally disturb the whole mining work progression and cause economic loss as well. By analyzing the ground condition of the Khalashpir cola field, artificial ground freezing has been identified most appropriate as shaft sinking method to control the ground water and to stabilize the loose soil during excavation. Lawfulness of the method and reason of neglecting other two common shaft sinking methods has been pointed out in this paper.
    [Show full text]
  • New Tunnel Construction Starts Across the City
    The offi cial publication of the Tunnelling NORTH AMERICAN EDITION Association of Canada October ~ November 2017 MONTREAL AT WORK New tunnel construction starts across the city 001tunNA1017_cover.indd 1 20/09/2017 11:44 TECHNICAL / GEOTECHNICAL ENGINEERING GROUND CONTROL Joseph Sopko, director of ground freezing for Moretrench, discusses the design of frozen Earth structure for cross passage excavation structure, thermal analysis and design, and frost heave and thaw consolidation evaluation. Quite often the geometry of the cross passage relative to the main tunnels requires complex drilling angles, specialised equipment and quality assurance procedures to ensure accurate placement and continuity of the refrigeration Joseph Sopko pipes (Figure 2). Joseph is the director of ground freezing The first component of the design of a frozen cross passage for Moretrench is the evaluation of the material properties of the soil, both in the natural and frozen state. Ground freezing is most applicable in coarse-grained water bearing soils. Other methods such as the sequential excavation method (SEM) are typically well suited HE USE OF GROUND freezing for fine grained clayey or silty clayey soils. The preliminary to provide excavation support evaluation is typically driven by the permeability of soils. If and groundwater control groundwater cannot be controlled by dewatering or grouting for the construction of cross techniques from the surface, freezing becomes an attractive passagesT between two tunnels has option. been used extensively in Europe, Asia The permeability of the soils in the excavation zone is and most recently in North America best evaluated by groundwater pumping tests. However, such on the Port of Miami Tunnel and the tests are rarely available requiring evaluation of the grain Northgate Link Extension in Seattle.
    [Show full text]
  • Case Study of Heat Transfer During Artificial Ground Freezing With
    water Article Case Study of Heat Transfer during Artificial Ground Freezing with Groundwater Flow Rui Hu 1,†, Quan Liu 2,*,† and Yixuan Xing 2 1 School of Earth Science and Engineering, Hohai University, Nanjing 211100, China; [email protected] 2 Geoscience Centre, University of Göttingen, 37077 Göttingen, Germany; [email protected] * Correspondence: [email protected]; Tel.: +49-157-835-53628 † These authors contributed equally to this work. Received: 13 August 2018; Accepted: 21 September 2018; Published: 25 September 2018 Abstract: For the artificial ground freezing (AGF) projects in highly permeable formations, the effect of groundwater flow cannot be neglected. Based on the heat transfer and seepage theory in porous media with the finite element method, a fully coupled numerical model was established to simulate the changes of temperature field and groundwater flow field. Firstly, based on the classic analytical solution for the frozen temperature field, the model’s ability to solve phase change problems has been validated. In order to analyze the influences of different parameters on the closure time of the freezing wall, we performed the sensitivity analysis for three parameters of this numerical model. The analysis showed that, besides the head difference, the thermal conductivity of soil grain and pipe spacing are also the key factors that control the closure time of the frozen wall. Finally, a strengthening project of a metro tunnel with AGF method in South China was chosen as a field example. With the finite element software COMSOL Multiphysics® (Stockholm, Sweden), a three-dimensional (3D) numerical model was set up to simulate the change of frozen temperature field and groundwater flow field in the project area as well as the freezing process within 50 days.
    [Show full text]
  • Forensics-By-Freezing.Pdf
    Forensics by Freezing Joseph A. Sopko, Ph.D., P.E., M.ASCE Moretrench American Corporation, 100 Stickle Avenue, Rockaway, NJ 07866, e-mail: [email protected] ABSTRACT Subsurface conditions in water bearing unconsolidated soils can often produce difficult construction situations for the installation of secant piles, slurry diaphragm walls and jet grouted impermeable zones. In certain isolated cases, ground freezing has been used to provide temporary earth support and/or groundwater control where these varying unpredicted conditions retard or even prevent construction. The concept of freezing these soils to the state of a strong, impermeable medium not only facilitates excavation, but also permits visual observation of the conditions that created the initial difficulties. This paper presents case histories where ground freezing was used as a remedial technique for slurry diaphragm walls, jet grouted base seals and secant pile excavation support. The paper evaluates the soil conditions and provides a forensic analysis of the cause of the complications that lead to the need to implement ground freezing. INTRODUCTION Artificial ground freezing is a method used to provide temporary earth support and ground water control for deep excavations, typically in water bearing unconsolidated soils, but occasionally in highly fractured rock. Freezing is accomplished by drilling and installing a series of subsurface refrigeration pipes along the perimeter of the proposed excavation. A refrigerated coolant is circulated through the frozen pipes, forming a frozen earth barrier. (see Figure 1). There are different methods of drilling and installing the freeze pipes, as well as two primary methods of refrigeration. One of these methods is referred to as the direct expansion where a cryogenic liquid, such as liquid nitrogen, is pumped into the pipes to vaporize.
    [Show full text]
  • Design of Ground Freezing for Cross Passages and Tunnel Adits
    Design of ground freezing for cross passages and tunnel adits J.A. Sopko Moretrench, A Hayward Baker Company, Rockaway, NJ, USA ABSTRACT: Ground freezing has been used extensively in the last ten years for the construction of transit tunnel cross passages and SEM tunnels, as well as short adits for utility tunnels. Quite often the ground freezing design requirements are more complex than in conventional shafts. The frozen earth structures are frequently located in urban areas where freezing forces against structures and utilities are common. Additional considerations must be given to frost heave and thaw consolidation. This paper discusses the design procedures related to frost action. Case histories are presented that indicate how frost effects can be controlled with heating pipes, coolant control, insulation methods, and in some cases additional structural bracing. A unique project is discussed where building columns required the installation of a jacking system to accommodate the heave and settlement. 1 INTRODUCTION 1.1 Frost action in soils When water freezes, the volume increases by approximately nine percent. It is often assumed that the volumetric expansion of soil is as simple as estimating the pore volume and concluding that in a saturated soil this volume will expand by this percentage. Experience and laboratory testing have shown that the process is somewhat more complicated. The soil skeleton will expand when pressure in the ice exceeds the overburden pressure required to initiate separation of the soil skeleton. With sufficient ice pressure, the soil skeleton separates and a new ice lens forms (Andersland & Ladanyi 2004). Typically, the formation of ice lenses requires cyclic freezing and thawing as experienced in nature with seasonal temperature variation.
    [Show full text]
  • BAUER Soil Freezing BAUER Soil Freezing Creates a Solid, Load Resistant and Watertight Structure in the Ground – by Turning Groundwater Into Ice
    BAUER Soil Freezing BAUER Soil Freezing creates a solid, load resistant and watertight structure in the ground – by turning groundwater into ice. 2 Soil Freezing Content Freezing Methods ......................................................4 Applications ............................................................... 6 Equipment ................................................................. 8 Soil freezing is a technique for temporary soil reinforce- BAUER Spezialtiefbau GmbH owns a high level know- ment by creating an ice-soil structure in the ground. how and worldwide experience in the various ground The concept is to convert pure water into ice. Freezing freezing fi elds. Frozen ground may be used to create is obtained by circulation of liquid nitrogen or brine in solid, load resistant and watertight structures for tun- closed pipes placed in the ground, or by a combination neling works, cross passages between tunnels, pits of both methods. and shaft excavations and TBM break-in or rescue. Soil Freezing 3 Freezing Methods There are two different freezing but it has high energy and mainte- for freezing the ground – but this methods which can be used for soil nance costs. The indirect method method is also suitable for confi ned freezing. The direct method is freez- is freezing with liquid brine, which spaces. The so-called mixed method ing with liquid nitrogen (lN2). This offers low energy and maintenance is a combination of freezing with liq- method takes a short freezing time costs. It takes around 20 to 30 days uid nitrogen and brine. Freezing with liquid nitrogen – the direct method Nitrogen is maintained in a liquid state in an insulated tank slightly above the atmospheric pressure. At a temperature of -196 °C the fl uid circulates in copper pipes installed in the ground and freezes the soil around the pipes.
    [Show full text]
  • Ground Freezing
    Ground Freezing CT3300 Use of Underground Space Name Student nr. Email Bert Lietaert Maite Santiuste Cardano Alexandros Petalas Dimitrios Baltoukas Klaas Siderius 1 Preface For the cou rse CT3300 “Use of Underground Sp ace” at the Technical University Delft it required to write a report about a subject that has to do with underground construction. As a group we decided to write the report about the subject; Ground Freezing. Ground freezing is a relative young technique of underground construction and is being used more often as a result of increasing complexity in underground construction. As a group we wanted to get a better of the understanding of this technique and the appl ication areas. In Chapter 4 different freezing techniques will be disc ussed and the applica tion area of these different freezing techniques . Chapter 5 discusses the design of a frozen so il body and different influences that should be taken into account. Chapter 6 elaborates m onitoring techniques that can be used and the need of monitoring programs. Chapter 7 discuses the change of ground prope rties during and after freezing. Chapter 8 g ives information about causes of failures related to ground freezing. In Chapter 9 three case s tudies are presente d where grou nd freezing has been used and measurements of these freezing have been made. -2- 2 Contents 1 Preface................................................................................................................................ 2 2 Contents.............................................................................................................................
    [Show full text]