Environmental Clearance Application

1. Form 1M

(I) Basic Information

i. Name of the Mining Lease site: “Building Stone Quarry” of Sri.Bheemanna.N.Arkasali ii. Location / site (GPS Co-ordinates): Corner Pillar Latitude Longitude A N 15° 17’ 54.6” E 74° 58’ 53.5” B N 15° 17’ 54.7” E 74° 58’ 56.1” C N 15° 17’ 51.4” E 74° 58’ 56.5” D N 15° 17’ 51.3” E 74° 58’ 53.8” WGS-WGS 84 iii. Size of the Mining Lease (Hectare): 0.808 Ha, iv. Capacity of Mining Lease (TPA): 15,000 TPA for 2017-18, 1,50,000 TPA for 2018-19, 1,50,000 TPA for 2019-20. v. Period of Mining Lease: 5 Years vi. Expected cost of the Project: 161 Lakhs vii. Contact Information: Sri. Bheemanna.N.Arkasali C/O V.V.Vitalkar, # 2, 2nd Floor, Sampanginagara, Hubli, District, .

(II) Environmental Sensitivity

Sl. No. Areas Distance in kilometer / Details 1. Distance of project site from nearest rail or road There is no river, rivulet involved bridge over the concerned River, Rivulet, Nallah in the project. Road bridge is etc. passing through the Bedthi hallah which is at 2.20 Kms (SE) from the site. 2. Distance from infrastructural facilities: Railway line Hubli Railway Station – 18.80 Kms(NE) National Highway NH 63 – 7.60 Kms(SE) (Hubli-Karwar Hwy) State Highway SH 1 – 2.60 Kms (E) (Khalaghatgi to Dharwad Road) Major District Road Yammatti to Gambyapur Road - 0.80 Kms (E) Any Other Road Linganakoppa to Gambyapur Road - 1.20 Kms(N)

Building Stone Quarry in part of Sy No 25/4, Ganjigatti Village, Khalaghatgi Taluk, . Sri. Bheemanna.N.Arkasali 3

Environmental Clearance Application

Electric transmission line pole or tower Electric pole near Yammatti Village 1.00 kms (SE) Canal or check dam or reservoirs or lake or ponds Nirsagar Kere- 1.60 Kms(N) Karlakoppa Pond- 3.30 Kms(SW) In-take for drinking water pump house Near Yammatti village at 1.12 kms (SE) Intake for Irrigation canal pumps None Within 5 kms 3. Areas protected under international conventions, None national or local legislation for their ecological, landscape, cultural or other related value 4. Areas which are important or sensitive for WATER BODY: ecological reasons - Wetlands, watercourses or Nirsagar Kere- 1.60 Kms(N) other water bodies, coastal zone, biospheres, Karlakoppa Pond- 3.30 Kms(SW) mountains, forests Forest: Reserved Forest - 2.80 km (W) 5. Areas used by protected, important or sensitive None species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 6. Inland, coastal, marine or underground waters None 7. State, National boundaries None Within 5 kms 8. Routes or facilities used by the public for access to SH 1 – 2.60 Kms (E) recreation or other tourist, pilgrim areas (Khalaghatgi to Dharwad Road) 9. Defense installations ---- 10. Densely populated or built-up area, distance from Yammatti village - 1.15 kms (SE) nearest human habitation 11 Areas occupied by sensitive man-made land uses Khalaghatgi - 12.60 kms (S) (hospitals, schools, places of worship, community facilities) 12. Areas containing important, high quality or scarce None resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 13. Areas already subjected to pollution or None environmental damage. (those where existing legal environmental standards are exceeded) 14. Areas susceptible to natural hazard which could None cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) 15. Is proposed mining site located over or near fissure None / fracture for ground water recharge 16. Whether the proposal involves approval or Not Applicable clearance under the following Regulations or Acts, namely:- (a) The Forest (Conservation) Act, 1980; (b) The Wildlife (Protection) Act, 1972; (c) The Coastal Regulation Zone Notification, 2011.

Building Stone Quarry in part of Sy No 25/4, Ganjigatti Village, Khalaghatgi Taluk, Dharwad District. Sri. Bheemanna.N.Arkasali 4

Environmental Clearance Application

If yes, details of the same and their status to be given. 17. Forest land involved (hectares) No Forest land is involved 18. Whether there is any litigation pending against the No litigation or court case is project and/or land in which the project is propose pending against the proposed to be set up? project. (a) Name of the Court (b) Case No. (c) Orders or directions of the Court, if any, and its relevance with the proposed project.

Undertaking: I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost Date: 17.01.2018 Place: Dharwad (Signature of Project Proponent Along with name and address)

Sri. Bheemanna.N.Arkasali C/O V.V.Vitalkar, # 2, 2nd Floor, Sampanginagara, Hubli Taluk, Dharwad District, Karnataka.

Building Stone Quarry in part of Sy No 25/4, Ganjigatti Village, Khalaghatgi Taluk, Dharwad District. Sri. Bheemanna.N.Arkasali 5