Town/Village of Harrison Comprehensive Plan 2006 DRAFT
Total Page:16
File Type:pdf, Size:1020Kb
Town/Village of Harrison Comprehensive Plan 2006 M A IN S T COLUMBUS AV PARK AV DUXBURY RD C EN TU R Y R I D G E R D DRAFT AD H A E V IN E M A H A R R I S O N A V P U R D Y H ST A V I L A N DS C Y T R OAKLAND AV D January 2007 G TAYLO Table of Contents Chapter 1: Comprehensive Plan Summary Chapter 2: Town-wide Analyses Chapter 3: Neighborhood Analyses Chapter 4: Plan Concepts and Future Land Use Plan Table of Contents Chapter 1: Comprehensive Plan Summary Chapter 2: Town-wide Analyses 2.1 Changes since the 1988 Update 2-1 2.2 Previous Plans 2-3 2.3 The Planning Process 2-3 2.4 Development History 2-3 2.5 Context: The Region and Town 2-4 2.5.1 The Region – A Region at Risk 2-6 2.5.2 Westchester County Planning Strategies – Patterns for Westchester 2-6 2.6 Demographics 2-8 2.6.1 Population 2-8 2.6.2 Housing stock 2-9 2.7 Planning Concerns: Development Controls 2-12 2.7.1 Land Use 2-12 2.7.2 Town Development Trends 2-14 2.7.3 Neighborhoods 2-17 2.7.4 Zoning 2-19 2.7.5 Development Controls 2-22 2.8 Transportation and Parking 2-25 2.8.1 Hierarchy of Roadways 2-25 2.8.2 Other Transportation 2-28 2.8.3 Planning Concerns: Circulation and Parking Controls 2-32 2.9 Community Facilities, Services, and Infrastructure 2-34 2.9.1 Emergency Services 2-34 2.9.2 Education 2-36 2.9.3 Water, Sewer and Stormwater Management 2-38 2.10 Natural Environment 2-41 2.11 Open Space and Recreation 2-45 2.11.1 Open Space and Recreation Plan 2-46 2.11.2 Private Recreation 2-48 Chapter 3: Neighborhood Analyses 3.1 Harrison Central Business District 3-1 3.2 Downtown Harrison and Southern Harrison 3-17 3.2.1 Downtown Harrison 3-17 3.2.2 Southern Harrison 3-20 3.3 West Harrison: Silver Lake and Park Lane 3-25 3.4 Purchase and the Platinum Mile 3-35 3.4.1 Purchase 3-35 3.4.2 Platinum Mile 3-46 Chapter 4: Plan Concepts and Future Land Use Plan 4.1 Plan Concepts 4-1 4.1.1 Town-wide Concepts 4-1 4.1.2 Downtown Central Business District Concepts 4-2 4.1.3 Downtown Harrison Concepts 4-2 4.1.4 West Harrison Concepts 4-2 4.1.5 Purchase and Platinum Mile Concepts 4-3 4.2 Future Land Use Plan 4-3 4.3 Future Land Use Plan Elements 4-4 4.4 Summary of Plan Recommendations 4-7 4.5 Implementation and First Priorities 4-10 List of Figures Figure 2-1: Regional Context 2-5 Figure 2-2: Patterns for Westchester 2-7 Figure 2-3: Census Tracts 2-10 Figure 2-4: Land Use 2-13 Figure 2-5: Zoning Map 2-20 Figure 2-6: Road Hierarchy 2-26 Figure 2-7: Public Transportation 2-29 Figure 2-8: Education and Community Facilities 2-35 Figure 2-9: Sewers 2-39 Figure 2-10: Environmental Features 2-42 Figure 2-11: Recreation and Open Space 2-47 Figure 3-1: CBD Aerial 3-2 Figure 3-2A: CBD Land Use 3-3 Figure 3-2B: CBD Commercial District 3-4 Figure 3-3A: Zoning Districts in CBD 3-6 Figure 3-3B: Table of Use Regulations 3-7 Figure 3-4: Physical Assets in CBD 3-9 Figure 3-4A: Buildings of Architectural Interest in CBD 3-11 Figure 3-4B: Buildings of Architectural Interest in CBD 3-12 Figure 3-5: Development Proposals and Potential Improvements in CBD 3-16 Figure 3-6: Zoning in Southern and Downtown Harrison 3-18 Figure 3-7: Non-conforming lots 3-21 Figure 3-8: Lots with Development Potential 3-24 Figure 3-9: Silver Lake Aerial 3-26 Figure 3-10: Silver Lake Land Use 3-27 Figure 3-11: Zoning in West Harrison 3-31 Figure 3-12: Aerial of Purchase 3-36 Figure 3-13: Zoning in Purchase 3-38 Figure 3-14: Significant Properties in Purchase 3-45 Figure 3-15: Platinum Mile 3-47 Figure 4-1: Future Land Use Plan 4-13 List of Tables Table 2-1: Population in Harrison 1980-2003 2-8 Table 2-2: Select Demographic Characteristics from 2000 Census 2-8 Table 2-3: Selected Census Tract Characteristics 2-9 Table 2-4: Age of Housing Units 2-9 Table 2-5: Housing Units in Structure 2-11 Table 2-6: Key trends in housing need 2-11 Table 2-7: Generalized Land Use 2-14 Table 2-8: Private Employment sites in Harrison, with 500 or more Employees 2-17 Table 2-9: Summary of Existing Zoning Districts 2-21 Table 2-10: Average Daily (Weekday) Peak Period Ridership from Harrison 2-28 Table 2-11: Total Passenger Counts at Airport 2-30 Table 2-12: Harrison Central School District 2-37 Table 2-13: Parks and Open Space 2-51 Table 3-1: Development Potential in Purchase 3-44 Comprehensive Plan Harrison 2006 DRAFT Chapter 2: Town-wide Analyses Chapter 2: Town-wide Analyses This Comprehensive Plan for the Town/Village of Harrison has been prepared to update the existing Plan, to better reflect the current planning framework for Harrison. The last update to the Plan was conducted in 1988. Many of the 1988 recommendations have been enacted, and some are in progress. This update focuses on three key topics: • Resolving remaining planning issues since the 1988 Update; • Identifying and resolving critical new issues; and • Incorporating any new town projects into the plan. This plan is a guide to Harrison’s decision makers on major planning issues and their solutions (or options). Data and analyses are updated where necessary. Following the format as laid down by the 1988 update, this plan provides specific geographically based planning action guides for downtown Harrison, West Harrison (Silver Lake and Park Lane), southern Harrison, Purchase, and the Platinum Mile. The bulk of this plan concerns these areas. This chapter sets the context for understanding geographically-specific issues and actions and also includes discussion on issues that have no specific geographic boundary (wetlands preservation, zoning changes, potable water and stormwater management concerns). 2.1 Changes since the 1988 Update Harrison today is a mature suburban community with a pattern of development which has become well defined and firmly established. The following is a summary of the major factors which shaped the growth of Harrison since the 1988 Master Plan. Land Use Land use patterns in Harrison were well established by 1988 and defined as follows: two densely developed hamlet centers in Downtown Harrison and at Silver Lake, a large area of suburban residences south of the Cross Westchester Expressway, a belt of corporate office development north of the Cross Westchester Expressway from Rye Brook to White Plains, an area of former estates which was being subdivided, centering around Purchase, and a rural area of rough terrain and small house sites in the northwest corner of Harrison. This general land use pattern has been consolidated since 1988 with further subdivisions and the creation of suburban residences in Purchase and Park Lane. A new country club, the Country Club at Purchase, was established on a large estate east of Purchase Street, adding to the open space character of the area. Recent Development Areas By 1988 the predominant area of undeveloped land in Harrison was located in Purchase, and this is where development has been concentrated since. The largest area of recent development was the Park Lane subdivision in Purchase, in a development of 306 single 2-1 Comprehensive Plan Harrison 2006 DRAFT Chapter 2: Town-wide Analyses family homes. In addition, 73 single family homes were developed off Purchase Street in the Hickory Pine (Purchase Estates) subdivision. Natural Features Wetlands, floodprone areas, steep slopes and other environmentally sensitive areas are local features which define the community. They are also characteristics which strongly influenced development, constraining development in areas such as northwestern Harrison (along Park Lane). A number of additional state wetlands were designated in Harrison since 1988. The most recent designations were in July 2004. Critical Environmental Areas A Critical Environmental Area (CEA) is a specific geographic area designated by a state or local agency as having exceptional or unique environmental characteristics. In establishing a CEA, the fragile or threatened environmental conditions in the area are identified, under the State Environmental Quality Review Act. Four CEAs were designated by Westchester County in Harrison in 1990: Westchester County Airport 60+ Ldn1 noise contour, Silver Lake Park, and Maplemoor Golf Course and Saxon Woods County Park (parts of which are in Harrison). Development proposed in a designated CEA is subject to a more in-depth review than other areas. Specifically, proposed development wholly or partially within or substantially contiguous to a CEA under the State Environmental Quality Review Act (SEQRA) requires that all actions be designated Type I and the lead agency either in the Environmental Assessment Form (EAF) or a DEIS (Draft Environmental Impact Statement) to consider potential impacts on the characteristics of a CEA. The airport CEA is the largest in Harrison, constituting approximately one third of the area north of Westchester Avenue. Town/Village-Owned Property Since the 1988 Plan, the Beaver Brook Swamp project (Project Home Run) commenced which, when completed will provide 18 acres of recreation area.