Rossendale and Rochdale Railway Path and Greenway
Total Page:16
File Type:pdf, Size:1020Kb
Rossendale and Rochdale Railway Path and Greenway Maps and detailed drawings 11 March 2013 John Grimshaw February 2013 Rossendale and Rochdale Railway Path and Greenway The long sought railway path from Rawtenstall to About 75% of the route is traffic free, mostly This railway runs through an almost continuous Rochdale has been gradually pieced together over on the old railway where some 12km of route is built up corridor, hence its immense value as Challenges the last 30 years starting shortly after the railway already open to the public to some standard or a communication route for local trips for both selected blockages to overcome was finally closed in 1966. The Healey Dell section another. Despite the length of old railway there business and school commuting, but at the engineering was opened quite early, and most recently the are surprisingly few bridges left intact although same time manages to draw a thread of green works Whitworth Cycleway, which really sets the standard numerous robust sandstone retaining walls testify countryside together so that the overall impression km of surfacing required for a popular shared use route. to the railway achievement. There are four tunnels is of an attractive countryside journey, with some 0 Rawtenstall – Newchurch No1 – 140m, and No 2 – 250m at memorable views of the hills and quarries either Station Waterfoot, Stubbye Lee 100m long under the side of the valley. main New Line road for the only practical route to Lench Road Bacup, and one 40m long under Whitworth Road in Rochdale. There are 2 minor road bridges over the 2 railway in the Britannia area and two in the Healey Dell Nature Reserve as well as an unused one just Buckhurst Plant south of Whitworth, and two river bridges, one over Newchurch No1 the Irwell on the approach to the Council Depot at 4 Bacup and another over the Spodden at the south Rakehead Lane end of Whitworth. The Alan Fishwick Way crosses the Irwell on a low 5 arch viaduct in Cloughfold To Blackwood Road and then there is the magnificent Healey Dell Beech Woods Viaduct which must be ranked amongst the most 6 Now with the plans for a mountain bike centre at spectacular and picturesque railway path bridges Futures Park to support the trails at Lee and Cragg in the country. New Line Tunnel Lane End Road ramp Quarries, and the increased interest in cycling for New Lane crossing everyday trips, particularly for school children, there drainage is an urgent incentive to complete the whole. The 8 Rossendale Cycle Forum published its proposals Trough End summit for the northern section in October 2012 and in the same month Rochdale allocated just over £90,000 to carry out the most pressing improvements on Shawforth South their section. 10 Facit North This note summarises the overall project and highlights the issues to be resolved. Slingco Ltd Lee and Cragg 12 The proposed route between Rawtenstall and QuarryLee and bike trails Rochdale Railway Stations is 20 km long. It Cragg follows the corridor of the former railway all the way to the Common at Greenbank Road and Taylor Rossendale Street. At this point the railway route is lost. The Rochdale 14 last 3.5 km divert to follow relatively quiet roads to the centre of Rochdale with its tram and railway stations and cycle hub. Shawclough Road 16 Lower Healey Lane Whitworth Road Tunnel 18 subway works pedestrian street Metrolink Station 20 Rochdale Station Rossendale and Rochdale Railway Railway Path and Greenway The quality of the route will depend very much on process could ensure that the corridor is built into Traffic-free and km on-road sections the arrangement of the connecting road sections all future developments and crucially that its links 0 Rawtenstall linking each traffic free greenway. Remarkably are continually improved and extended so that more Station Rawtenstall Station these can all be achieved in a quite natural way and more of the communities, schools, work places without recourse to using the main road, and if and leisure facilities up the valleys can connect to Kay Street 0.5 the proposals shown here are achieved, the only use it for their everyday and recreational journeys. Waterfoot Primary School significant main road crossings to be dealt with are 2 1.6 Clough Bridge the A6066 to New Line Reservoir, and Shawclough Over 100,000 visitors are forecast for each year Road after Healey Dell. The final on road section to use the Lee and Cragg Quarries Mountain Bike Bacup & to Rochdale Town centre will require some area together with the extensive network of linking Buckhurst plant Rawtenstall 2.8 careful work to make the route really attractive for bridleways. It will also link with the Mary Towneley Grammar School pedestrians and cyclists. Loop. This centre will be a natural focus for the 4 & Waterfront 3.4 Trewell Bridge Primary School path building so that the public can reach it by bike and visitors to the centre have the choice of the rugged climb up to Lee Quarry or the easier 4.8 Blackwood Road gradients and the family centred routes offered by 5.3 Stacksteads Park the railway path. 6 Lee Quarry 5.6 Woods 6.3 Current work is focussed on drawing up a detailed Bacup set of proposals to complete the overall route, Trough 6.9 The Sidings reaching agreements with landowners and taking End 7.4 these forward into a firm programme for delivery. 8 summit 150 200 250 300 Britannia Primary School John Grimshaw metres Most of the proposed route is in public ownership Coordinator of the Rossendale and Rochdale 9.4 10 g Shawforth with relatively few negotiations required to achieve Greenway Project r a St John with d the vital continuity. i 10.2 St Michael e Facit [email protected] n Primary School t 10.7 The private sections include around the boundary o f 11.2 SlingCo of Buckhurst Hire Plant Yard at Waterfoot in order January 2013 12 o St Anselm’s Primary School & to avoid using the main road, and the Slingco gap r i Whitworth Leisure Centre g to the north of Whitworth. It is hoped that voluntary i Whitworth n Whitworth High School & agreements can be reached with all these parties to a l St Bartholomew’s Primary Sch make practical connections which can be seen as 13.0 r Rossendale Tonacliffe Primary School a enhancements of their area. i 14 l w Rochdale a The programme for completing the overall y Healey Dell Viaduct Rawtenstall and Rochdale route can proceed on a Shawclough number of fronts. The detailed route can be agreed Primary and land negotiations put in hand with a view to 16 School obtaining planning consents so that works can be initiated as and when funds become available. At the same time there are substantial sections of the railway route where work can start now, for example to make the Healey Dell to Greenbank Road section 18 Exisisting 17.8 cycleway to Fieldhouse Road into a high quality path and route worthy of an Falinge Park Greenbank urban greenway. The beautiful Britannia to New High School Primary School Line Reservoir section has been damaged by the lack of maintenance of the ditches, and consequent 20 142AOD Rochdale Station Tram Station Rochdale Town Hall water erosion, as well as a recent small landslide and cycle hub 20.3 Rochdale Station on this section. Early work here would be valuable as most of the path remains intact. In parallel with these route redevelopments the forward planning Rossendale and Rochdale Railway Railway Path and Greenway Map 1 : Rawtenstall Town Centre to Rakehead 3 4 5 N 6 2 7 9 1 8 10 1:10,000 scale when printed at A3 size 0 metres 1000 11 1. The Railway Station is the end of the line. The 15 At the same time the greenway route 12 17 first section of the old railway is now Bocholt Way, is south of the main road through the 14 constructed to bypass Bacup Road and to take valley and so is separated from most of the 16 traffic from the town centre. Rather than build a residential areas by lying to the north. So it cycling route along the south side of this road, it does become an important part of the project to 13 would be better to link the station to the town centre ensure that there are good links across the road and as shown here. onto the path at frequent intervals. 18 19 2. Follow the wide pavements on this side of the 9. A crossing is needed here. At this stage we 20 notorious gyratory with crossings provided at all road recommend a zebra crossing for shared use at a junctions. convenient location to be agreed. 15. The existing 3. The open town centre space could be a focus for 10. An excellent section of twin path designed to bridge over the cycle routes and a convenient start to Bank Street separate horses here. This standard cannot be river needs some and its shops. repairs to its parapet. achieved throughout, and elsewhere a wide grass 21 verge will have to provide the basis for a bridlepath It is though an attractive 4. Bacup Road is not ideal but it does link to the old route. part of the route and gives a bridge under the railway which takes you onto good view up and down the river. Fallbarn Road which is suitable for cycling. 11. Past Highfield Road the path is too narrow and It carries a public footpath which needs widening to 2.5m with a good grass verge for continues through the factory buildings.