IRFAN ALI Ward No.10, Pakiza Hotel, Near Islamia Sr. Sec. School, Sikar, Rajasthan (INDIA) Email: [email protected], Contact No.: +91-7023786472 / +86-13611922421

CAREER OBJECTIVE & CAREER SUMMARY

To enhance the technical skills and seeking a challenging career that will enable me to utilize my competence to work with a growth oriented organization. Having work experience of more than 9 years (Onshore + Offshore) in Oil & Gas projects in Middle East & Asia:-  Yamal LNG Project, MWP03 Penglai Yard, PRC  QatarGas Onshore Facilities Project II (QGX) at RasLaffan, State of Qatar  QatarGas Onshore Facilities Project III & IV (QCS) at RasLaffan, State of Qatar  Gas Sweetning Facilities Project at Mesaieed & Dukhan, State of Qatar  ZADCO SFFD Produced Water Treatment Unit, Zirku Island, United Arab Emirates

ACADEMIC QUALIFICATION

Degree/ Course Institution / Year Board/University Percentage Master of Computer Punjab Technical Distance Netcom College of IT & Management First Division Application (MCA) University Punjab Technical Distance Master Degree (MSc. IT) Netcom College of IT & Management First Division University Sri Kalyan Govt. College, B.Sc Degree (Mathematics) University of Rajasthan Second Div. Sikar, Rajasthan 12th (Physics, Chemistry, Vidya Bharti Public Sr. Sec School, Rajasthan Board of 70.15% Mathematics) Sikar, Rajasthan Secondary Education

COMPUTER DIPLOMA

Diploma Institution / Year Board/University Percentage ‘A’ Level (Diploma in Application Netcom Computer Center, Sikar DOEACC, New Delhi Grade D Programming) ‘O’ Level (Diploma in Computer Netcom Computer Center, Sikar DOEACC, New Delhi Grade B Application)

HSE COURSES

Course Institution Certificate BOSIET (Basic Offshore Safety Induction Emirates Technical & Safety Development OPITO Certificate No. Emergency Training) Center, Abu Dhabi 0058570011061318414 Emirates Technical & Safety Development OPITO Certificate No. Basic H2S Training Center, Abu Dhabi 0058901411061318527 Induction for Fire Safety Level II Total Safety, State of Qatar Total Safety U.S Inc Certificate

Gas Tester Awareness Total Safety, State of Qatar Total Safety U.S Inc Certificate

COMPUTER SKILLS  Easy Plant system - Web based Technip in-house completion & progress measurement software for tracking project Construction, Pre-Commissioning, Commissioning Phases and monitor Construction progress, Quality Control Form (QCF) progress, Punch list, Material Preservation, etc.  Easy Piping system - Web based Technip in-house software for tracking project Spooling database, Welding progress, Spool fabrication & erection progress, NDT tracking, Flange management & Material traceability progress, etc.  CSIM & PDA system – Construct SIM is used to sight & report 3D model of project, PDA application is used to track& monitor spool location & progress.  WINPCS system - (Windows Project Completion System) product of COMPLAN for tracking project Mechanical, Pre- Commissioning, Commissioning Phases and monitor quality Check Sheets (‘A’, ’B’ & ‘C’ check sheet), Punch listing, Completion Certificates, Preservation, Engineering Tags, etc.  Petro PCS (Zenetor Check) system - product of Falcon Global for tracking the project completion & turnover documents at different stages of project like Mechanical completion, Pre-commissioning and commissioning dossiers.  TALISMAN & ITP System - (FoxPro based CCIC in-house software) of tracking of project engineering, QA/QC documents, like Welding Reports, Isometric drawings, spools, NDT reports(RT,PT,UT,MPI, PWHT), Piping Test Package & QA/QC Inspection Reports, etc  Strong hold over programming Languages such as Visual FoxPro, ‘C’, ‘C++’, VB & Core Java, and Application Software such as Adobe Acrobat, MS office.  Having knowledge of installing, updating and managing Computer Application & System software’s. Project developed:  Employee Management System (EMS) application, developed in C++, using C++ function like file/stream handling, classes, inheritance, polymorphism, string manipulation, etc.  Library Database tracking application, developed in FoxPro, having utilities of adding, editing, removing, issuing, tracking the books & students record.

WORK EXPERIENCE – Total: 8 Years (Onshore + Offshore) Experience in Major Oil & Gas Projects

Position : Easy Plant Lead Company : Technip France Project : JSC Yamal LNG Project, MWP03 Penglai Yard, PRC Main Contractor : Technip, JGC & Chiyoda Department : Easy Plant & Carry Over Work Department Tenure : 17, November 2014 to Present Key Responsibilities:  Configure Work & Activity Breakdown Structure (WBS & ABS) and Project list (Discipline, Work/Progress Discipline, Type code) database Into Easy plant system.  Setup the Budget quantity and Man-hours for each sub work class and update planning baseline schedule curve at work class level in Easy plant system.  Define ITP/QCP Category, Actions & Forms/Check Sheets and sub work class definition in Easy plant system as per ABS.  Setup the Contracts, Preservation, Punch list, Test pack and Manpower data definition in Easy Plant System.  Update all Project Engineering tag data in Civil & Process database with actual quantities.  Follow the Quality progress by bar-code QCF and generate the certified progress reports.  Follow the Construction progress by tag and generate overall reports & S curves.  Setup Pre-Commissioning /Commissioning SWC and supervise the progress follow up by QCF.  Setup Easy Piping project referential (WPS, Welders, System/Sub-system, WBU, etc.) in Easy piping system.  Coordinate with subcontractors to input the report of daily progress of welding, spool prefabrication, erection, painting, material trace-ability, NDT selection and other specified data for piping activities into Easy Piping system.  Supervise “Easy plant” operators to input daily report and other specified data into system.  Supervise the spool tracking through PDA barcode and update the PDA generated status into Easy plant system.  Support Easy plant group members and users for tracking, updating and reporting progress into Easy plant system.  Generate Material availability & Construction progress 3D report through “Construct SIM / CSIM)”.  Coordinate with Engineering for PCOW (Planned Carry over work) & Construction team for preparation of UCOW (Unplanned Carry over work) list and take approval from client prior to module sail away.  Prepare Job Cards for all discipline based on (PCOW/UCOW) Cary Over work list and send to Sabetha through SharePoint. Position : WinPCS Administrator Company : Scalla Contracting L.L.C. Project : ZADCO SFFD Produced Water Treatment Unit, Zirku Island Main Contractor : Arabian Industries L.L.C. Department : Commissioning Department Tenure : 24, April 2013 to 29, March 2014 Key Responsibilities:  Responsible for site WinPCS program training  Responsible for providing field support for implementation  Responsible for managing user rights  Responsible for System health checks  Responsible for providing installation support to end users  Responsible for WinPCS helpdesk request  Responsible for table modifications in WinPCS  Responsible for identifying end user’s needs for WinPCS improvements  Responsible for maintaining the WinPCS development schedule  Configure the WinPCS server and create installer for client application.  Configure the Check sheet in WinPCS and update the .LCX files accordingly.  Configure the Edit and View screens and update the .INI files accordingly.  Define system turnover package format (hard and electronic copy)  Ensure the completion of system boundary identification  Ensure that all P&IDs, single lines, and plot plans are incorporated  Review and evaluate the following lists for completeness and accurate scoping, and ensure feedback to engineering design is incorporated:  Equipment List  Line List  Valve List  Instrument / Input - Output (I/O) List  Cable Schedule  Ensure system turnover package release dates are in WinPCS  Load all project lists (e.g., reference, engineering, specification, etc.) in turnover software  Associate engineering tables to reference tables (e.g., equipment to commissioning system, document to test package, etc.)  Define ties to Construction Quality Procedures and forms required for quality installation and commissioning activities on all components per company procedures  Define ties from components to preventative maintenance activities  Capture all the deficiencies in the construction as a punch item and update all the punch item by category, discipline and system wise into the WinPCS.  Connect all the Tag to the respective System / Sub-system and discipline.  Link all the required check & test sheets (A, B & C) to tag equipment in the system.  Escalate any lagging issues to appropriate discipline superintendent and site manager  Generate status reports for site and project management  Identify deficiencies in systems Position : Sr. Data/Talisman Operator Company : Consolidated Contractors Company S.A.L (CCIC) Project : Gas Sweetning Facilities Project at Mesaieed & Dukhan Main Contractor : Petrofac International Limited Department : Certification Department Tenure : 17, April 2012 to 14, April 2013 Key Responsibilities:  Coordinate with Commissioning team to update the System/Sub-System limits, Test Package limit, Instrument Loops, Electric Circuits, Civil/Structure/Mechanical/HVAC tags, E&I Equipment & Cables into PetroPCS project completion system.  Agree with client for the key TAGs & ITRs to be uploaded in PetroPCS project completion system based on approved Inspection & Test Plan and TAG Type matrix for ITRs by client.  Allocate the ITRs to TAG based on System/Subsystem/Discipline and generate the Bar code check sheet for each ITR and Test package.  Scan the ITRs into system with legibility and proper resolution and update the status of the ITRs as completed.  Check the completeness of ITR while receiving from QC through transmittal and update the Punch Item in Project Completion System.  Coordinate with all disciplines and functions requiring document control support, to help & ensure the successful implementation of documentation.  Once the Sub-System is completed, compile it with proper spine, cover sheet and white binders and review for its final completeness and attach the Mechanical completion certificate for approval.  Responsible for Certification and final handover of the Project Dossiers like Mechanical Completion dossier, Pre- Commissioning/Commissioning dossier, Construction Data Book, Pipe book for Pipeline, etc.  Generating a Daily & Weekly progress report by system, discipline, category, etc and forward to discipline, construction, control, QC and Project manager.  Supervising the establishment and maintenance of the central filing systems in systematic manner for easy retrieval at later stage.

Position : As a Document Controller Department : Document Control Group (DCG) Tenure : 17, April 2011 to 16, April 2012 Key Responsibilities:  Prepare and maintain the Incoming/Outgoing transmittal log, Correspondence log and Registers (Construction DR, Engineering DR, Technical DR)  Encode controller documents in Visual Byblos Cyberspace (VBC) and prepare Crystal Report (IDT) for internal departmental distribution.  Receive and assign reference/control numbers, classify, and summarize documents, information and data.  Ensure the proper and correct distribution of controlled/uncontrolled documents and drawings as per Project Primary and Secondary Documents Distribution Matrix (DDM).  Ensure issued copies being used by the recipient personnel is latest revision and to collect the superseded documents and replace it with latest revision.  Co-Responsible for preparing reports and presentation from extracted data and information such as Progress Monitoring Crystal Report, Releases and On Hold Drawings Report, other technical and non-technical reports.  Perform other related duties and responsibilities to support Document Control and quality assurance as defined by management & Document Control Engineer.  Supervising the establishment and maintenance of the central filing systems in systematic manner for easy retrieval at later stage.  Establishing and control of the Project Standards/Codes library.  Knowledge and Responsible for the following Controlled Documents  Client Document Control Procedure and Project Procedures.  Isometric, generated spool and Engineering Drawings.  Vendor Drawings and Documentation.  Sub-contractor Drawings and Documentation.  Project procedures like PQP, QCP, QMP, ITP, MS, MAR, etc.  RFF / RFE / RSF = Fabrication, Erection, Support Fabrication.  TQ / FS / SI = Technical Query, Field Revisions (Sketches), Site Instructions.  PSI = Pipe Support Document Control and Index.  Instructing/training DCG personnel with respect to the requirements of the procedures. Position : Computer/Talisman Operator Company : Consolidated Contractors Company S.A.L (CCIC) Projects : QatarGas Onshore Facilities Project III & IV (QCS) at RasLaffan Main Contractor : Chiyoda Technip Joint Venture (CTJV) Department : Certification Department Tenure : 08, November 2009 to 16, April 2011 Key Responsibilities:  Maintaining flow of document through transmittals send/receive to and by each discipline. Receives, indexes, and checks all incoming documentation, in any form, and enters it into the ITP System.  Forecasting ITP requirements, Receiving ITPs, System Limit Drawings, As built Drawings, Punch Lists and Verification of completed inspection reports for All (Mechanical, Piping, Pipeline, Civil & E&I) Disciplines to check the completion as per Approved ITP.  Retrieving, Updating, & Maintaining Project Inspection Reports in ITP system (FoxPro based CCIC in-house software).  Monitor and updated the status of punch list to the database and generate daily/weekly reports by unit, system, and discipline wise.  Filing and archiving of Project documentation with indexing and cataloging by Discipline/Catcode, to facilitate easy retrieval at later date.  Ensure proper storage of documents in electronic (.PDF) formats by scanning the project documents with proper resolution & legibility; and uploading the soft copy into the WinPCS.  Project Systems/sub-system Quality documents review prior to transmission to client (Qatar Gas) for approval, in compliance with the client approved QA/QC Procedures.  Generating Daily & Weekly progress reports such as Outstanding Check lists, Look Ahead Schedules, Punch list report, Completed Tags/System/Subsystem reports and reporting to Project Quality and Control manager.  Comparing the ITP System & WinPCS rectifying the discrepancies in the system.

Position : Computer/Talisman Operator Company : Consolidated Contractors Company S.A.L (CCIC) Projects : QatarGas Onshore Facilities Project II (QGX II) at RasLaffan Main Contractor : Chiyoda Technip Joint Venture (CTJV) Department : Certification Department Tenure : 17, January 2008 to 07, November 2009 Key Responsibilities:  Checking the completeness Inspection reports and Test Package and copy the A3 cat. of punch list from test package for updating in WinPCS database.  Checking & preparing the incoming & outgoing transmittal from/to QC of ITR (Inspection Test Reports) and maintaining the transmittal log for future retrieval.  Enter the ITR (Inspection and test report) into ITP System with inspection dates & RFI Number and writing the entry serial no. on ITR.  Entering the piping line number, ISO number with respective weld number (Shop/Field weld) into the Talisman.  Entering the daily welding report in Talisman and generating weld log history from the Talisman.  Data Entry of NDT Reports like RT, UT ,PT, MPI, DWR & PWHT reports in Talisman (FoxPro based CCIC in-house software) for each weld joint and document the serial no reports.  Filing and archiving of Inspection Test Reports with indexing and cataloging by System/Subsystem & Discipline and NDT reports by type and serial wise.  Scanning the documents in electronic (.PDF) formats to update with proper resolution & legibility; and uploading the soft copy into WinPCS.  Preparing Site Quality Assurance Record Book (SQARB) – Specific & Generic for final handover.  Generating Daily & Weekly progress reports such as Outstanding Check lists, Punch list report, Completed Tags/System/Subsystem reports and reporting to Certification manager.

Position : Computer Trainer Institute : Netcom Computer Center Location : Bajaj road, Sikar, Rajasthan (India) Tenure : Jan 2006 to June 2007 Key Responsibilities:  Activities include teaching Computer Software such as Windows OS, MS Office (Excel, Access, Word and PowerPoint), Visual FoxPro and programming Languages such as ‘C’, ‘C++’ and Visual Basic.  Accounting Software (Tally 6.3 & 7.2), Internet Operations and System Assembling and Software Installation.  Maintaining the student DBMS by creating new tools in database and updating the database as per the center requirement.

SUBSTANTIAL SKILLS  Extensive Knowledge of Project Document.  Use initiative and be able to work with minimal supervision, comprehensive problem solving ability.  Solid data entry skills; highly developed computer skills in Excel, Word, Power Point, Access Database, Adobe Acrobat, etc.  Willingness to learn, team facilitator, takes up challenges in a positive manner, keen listener.  Strong English written and oral communication skills.

CERTIFICATES AWARDED  Appreciation certificate by Qatar Gas II for contribution in successful completion and final handover of QA record books (SQARB) of Qatar Gas II LNG Onshore facilities Project (QGX, Train 4 & 5).  A+ graded certificate in Hardware by GT Hardware & Networking College.  Indian Scout & Guide certificate by Governor of Rajasthan for Band display at Jaipur.  3rd price in Science exhibition for Kero-Petro Gas model at Three Dots Children Academy, Jhunjhunu.

PERSONAL PROFILE  Father's Name : Late. Arshad Ali Khan  Date of Birth : 5th January, 1986  Nationality : Indian  Religion : Islam  Marital status : Married  Language Known : English, Hindi and Urdu, Basic Chinese  Hobbies : Reading Books and playing Table Tennis  Contact No. : 0091-7023786472  Permanent Address : Ward No. 10, Pakiza Hotel, Near Islamia Sr. Sec. School, Sikar, Rajasthan, India (332001)

PASSPORT DETAILS  Passport No. : Z 2936564  Place of Issue : JAIPUR  Date of Issue : 07/08/2014  Date of Expiry : 06/08/2024

Date: 15 Jan 2017 IRFAN ALI