Flat No.132,Pkt-23,Sec-24

Total Page:16

File Type:pdf, Size:1020Kb

Flat No.132,Pkt-23,Sec-24

KAPIL SAXENA Flat No.132,Pkt-23,Sec-24 Unity Apartment Rohini New Delhi - 110085 Contact No: +919369990212 Em@il-id : [email protected]

OBJECTIVE:

To serve the organization with dedication, discipline, hard work & loyalty, to get desired results and optimum utilization of resources to achieve growth.

SUMMARY OF EXPERIENCE:

I have about 11Years of experience in Oil & Gas Pipeline construction field. Executed various cross-country and city gas distribution projects with proper planning and managing. Independently carried out Hydrotesting, Hot-Tapping, Shut downs , Commisioning and all Cross Country and CGD activities.

Procurement of Equipment & spare parts & Work Contracts – Preparation of Technical specifications, Evaluation of Bids, Negotiation, Placement of Order.

Worked as Contractor personnel, as third party inspection personnel, as surveillance person and as Project Management Consultant personnel.

JOB EXPERIENCE:

ORGANISATION : JAY MADHOK ENERGY PVT.LTD.

DURATION : FROM February 2011 to Present PLACE : NEW DELHI ROLE : PROJECT MANAGER

PROJECT : Jalandhar City Gas Distribution Project

JOB PROFILE: Design, Engineering, Execution of CGDN, City Gate and CNG stations project. Pre-commissioning and hydro testing of steel pipeline. Co-ordination with Consultant for Design & Engineering Documents.

Co-ordination with Local & Central authorities like Chief Controller of Explosives, NHAI, Forest deptt. etc. for ROU acquisition / Permissions / NOC for laying of Gas Pipelines & CNG Station Installation.

Implementation of City Gas Project and HSE.

Procurement of Equipment & spare parts & Work Contracts – Preparation of Technical specifications, Evaluation of Bids, Negotiation, Placement of Order. Preparation of Gas Sales Agreements with customers.

Financial closure of project, liasioning with financial institutes like banks etc and fulfilling all the requisites for the same.

Preparation of Monthly Status Reports of Project progress for Management Information.

Spotting and pursuing new business opportunities.

Co-ordination with in-house & external market research teams for Market Potential Assessment of various cities for future City Gas Distribution Projects, Bid planning, preparation & strategy for Bidding future CGDN Projects, complying with PNGRB regulations and tariff models.

Assisting in Planning, Project Management, Material Management, Resource Management and Technical Services of the company.

To maintain co-ordination with site and Head office and accordingly plan the project for timely completion. Identification of City Gate Station, Tap-off and CNG station location.

ORGANISATION : TRACTEBEL ENGINEERING PVT.LTD.

DURATION : FROM JULY 2010 to February 2011

PROJECT : DELHI CITY GAS DISTRIBUTION PROJECT CLIENT : INDRAPRASTHA GAS LIMITED PLACE : NEW DELHI ROLE : CONSTRUCTION ENGINEER

JOB PROFILE: Inspection of Route Survey ,Stringing , Trenching , Welding , Radiographic Interpretation,UT,DPT,MPT,Hydro- Testing.

HDD,Lowering, Holiday Testing, Padding, Backfilling, Cleaning, Hydro-testing, Hot-Tapping, Shut-Downs, Compacting, Restoration of 4” to 12” of CS Pipeline.

Inspection for the fabrication of Above Ground Interconnecting pipeline for the Equipments. Planning & Managing 3-4 Sites at single time in different places with proper time management. Certification of Contractors Billing, As-Built Drawings & all Financial Assessments

ORGANISATION : VELOSI CERTIFICATION SERVICES (I) Pvt.Ltd.

DURATION : FROM DEC 2009 to JUNE 2010

PROJECT : MUNDRA BHATINDA PIPELINE PROJECT CLIENT : HPCL MITTAL ENERGY LIMITED Consultant : ENGINEERS INDIA LIMITED PLACE : PALANPUR ROLE : SPREAD CO-ORDINATOR

JOB PROFILE: Surveillance of various activities like Stringing, Mainline Welding, Trenching, Field Joint Coating,HDD, Radiographic Interpretation, UT, DPT, MPT, Hydro- Testing. ORGANISATION : GERMANISCHER LLOYD INDUSTRIAL SERVICES DURATION : FROM APR 2009 to DEC 2009

PROJECT : BARMER SALAYA PIPELINE PROJECT Cairn India's 670 km-long crude carrier pipeline, the longest in its category anywhere in the world,

CLIENT : CAIRN ENERGY INDIA PTY. LTD. TPIA : GLIS PLACE : Barmer ROLE : INSPECTION ENGINEER

JOB PROFILE: Inspection and monitoring before and during welding Visual Inspection of 24” and 8” Mainline and Tie-in welding. Visual Inspection of 1 SEHMS tube - coupling welding, Pull box and end box welding Witnessing 1 tube repair and vandalized tube repair. Witnessing pneumatic test for 1”SEHMS Tube. Witnessing SEHMS cable pulling and Splicing Stage inspection as per quality plan Witnessing WQT for 24” & 8” mainline welding, Tie-in welding, Repair welding and 1” coupling and tube repair welding Radiography interpretation Witnessing and Interpretation during DPT and MPT Witnessing and Interpretation during Ultrasonic testing. Surveillance and monitoring during Stringing of Pipes. Review of WPS and PQR. Verifying Pipe book & Quality Records Stage wise inspections like MTC review and traceability of material fit up inspection, Welding inspection, and stage wise and final Dimensional inspection as per Quality assurance plan.

ORGANISATION : NANDINI IMPEX (Pvt.) Ltd.

DURATION : FROM APR 2007 TO APR 2009

PROJECT : NOIDA CITY GAS DISTRIBUTION PROJECT CLIENT : ADANI ENERGY LIMITED. TPIA : GVC ENERGIES LIMITED. PLACE : NOIDA ROLE : PROJECT ENGINEER

PROJECT : FARIDABAD CITY GAS DISTRIBUTION PROJECT CLIENT : ADANI ENERGY LIMITED. TPIA : GVC ENERGIES LIMITED. PLACE : FARIDABAD ROLE : PROJECT ENGINEER

PROJECT : LUCKNOW CITY GAS DISTRIBUTION PROJECT CLIENT : ADANI ENERGY LIMITED. TPIA : GVC ENERGIES LIMITED. PLACE : LUCKNOW ROLE : PROJECT ENGINEER PROJECT : LUCKNOW CITY GAS DISTRIBUTION PROJECT CLIENT : GREEN GAS LIMITED. CONSULTANT : MECON LIMITED. PLACE : LUCKNOW ROLE : PROJECT ENGINEER

PROJECT : JAI KHODIYAR/REGENT SPUR PIPELINE PROJECT CLIENT : SABARMATI GAS LIMITED CONSULTANT : JP KENNY WOOD GROUP ENGINEER (I) Pvt. Ltd. TPIA : GLIS PLACE : ADALAJ (AHMEDABAD) ROLE : PROJECT ENGINEER

ORGANISATION : JAY SOMNATH IRON WORKS An ISO 9001 (Deals with Petroleum & Gas Pipeline Projects)

DURATION : FROM NOV. 2004 TO APR 2007

PROJECT : KALOL HIMMATNAGAR PROJECT CLIENT : GSPL CONSULTANT : TECPL PLACE : KALOL ROLE : SITE ENGINEER (QC)

PROJECT : JAGOTI PITHAMPUR PIPELINE PROJECT CLIENT : GAIL (INDIA) LTD. CONSULTANT : JP KENNY PTY. LTD. PLACE : UJJAIN ROLE : SITE ENGINEER (QC)

ORGANISATION : FORTUNA STRUCTURES PVT. LTD. : Manufacturer of Ancillaries being supplied To TATA MOTORS & Ship Deck Fittings. DURATION : FROM APRIL. 2003 TO OCT. 2004

PROFESSIONAL SKILLS:

ASNT Level- 2 – RT, UT, PT & MPT. Knowledge of welding, ASME and other welding related codes and standards.

Networking Software: Gasworks 9.0 (For steel grid network design of city gas distribution) Gas Calc 4.0

EDUCATION:

B.E. Production (2003) - First Class from North Maharashtra University. COMPUTER SKILLS:

Operating system: - WINDOWS XP, WINDOWS 7

OFFICE TOOLS:

M S Word, MS Excel, Auto-Cad

PERSONAL DETAILS:

Father's Name : Shri N.S.Saxena Nationality : Indian Marital Status : Married Languages Known : English.Hindi Date of Birth : 17th June 1975 Passport Validity : 2017

Recommended publications