Beech Gardens Bulletin 53 – 30.01.15 What we have achieved this week Planned for Next Week: What is planned for next few weeks Beech Gardens, above Beech Street Tunnel, refer to (area Beech Gardens, above Beech Street beyond that 1) Tunnel, refer to (area 1) Beech Gardens, above Beech Street Tunnel, refer to (area 1) Commenced marking out levels in beds for screed and Continue screed to planted beds in Works to planted beds in preparation of soft landscaping works. insulation. preparation for soft landscaping works. Commencement of soft landscaping works. Bryer Court & Pond, refer to (area 2) Bryer Court & Pond, refer to (area 2) Bryer Court & Pond, refer to (area 2) Commenced preparation of base of pond ready for Continue preparation of base of pond Waterproofing to pond and areas adjacent to the pond. waterproofing ready for waterproofing. Construction of the pond bridge. Completed the construction and casting of concrete Continue tiling to west side of pond. Waterproofing of pond. elements for the pond bridge. Beech Gardens, refer to (area 3) Beech Gardens, refer to (area 3) Completed screed to west side of pond. Continue with screeding and tiling works. Continue with the laying of screed and tiles Commenced tiling to west side of pond. Further works regarding construction of Continue construction of amphitheatre and other features. Beech Gardens, refer to (area 3) amphitheatre steps. Works to planted beds in preparation of soft landscaping works. Continue screed at south end. John Trundle Court, refer to (area 4) Commence soft landscaping. Continue screed in the central area. Further soft landscaping work. John Trundle Court, refer to (area 4) Completed granite setts at south end in central area and Continue screed and tiles at north and Completion of soft landscaping works. commenced tiling. west side of the building. Commence planting. Commenced screed to falls in planted beds in preparation Continue tiling to fire escape turrets. White Lyon Court, refer to (area 5) for soft landscaping. Remove old screed and tiles at south Removal of tiles and screed. John Trundle Court, refer to (area 4) west end. Installation of new rainwater outlets. Continue tiling at north and west side. White Lyon Court, refer to (area 5) Installation of insulation and waterproofing layers. Continue tiling to fire escape turrets. Continue preparation of surfaces for Laying of screed and tiles. Continue waterproofing to west side of building. waterproofing works. Bunyan Court, refer to (area 6) Re-commence screeding to west side of building. Continue the installation of insulation Continue installation of insulation and waterproofing layers. Commenced installation of sub-bases for soft landscaping. and waterproofing layers above Virgin Continue with the screed and tile installation. Switched pedestrian walkway at Aldersgate Footbridge. Offices. Works to planted beds in preparation of soft landscaping White Lyon Court, refer to (area 5) Continue tiling. works. Continue installation of insulation and waterproofing layer. Bunyan Court, refer to (area 6) Re-commence tiling. Continue tiling. Out of hours numbers: Bunyan Court, refer to (area 6) Commence screed to falls in planted beds Barbican Estate Office - 020 7029 3953 Continue tiling. Environmental Health Department 020 7606 3030 (Noise in preparation for soft landscaping. Continue grouting of tiles. pollution) Commence insulation in planted beds in preparation for screed to falls.