MONTHLY STATUS REPORT OCTOBER 2013
Construction activities performed during October 2013:
Installed Intermediate Cover on Cell 8 Connected Cell 8 Header to Cell 7 Completed Sed Pond 5 Stormwater Upgrades Installed a Second SulfaTreat Can
Construction activities anticipated for November 2013:
Finish Intermediate Cover on Cell 8 to elevation 240’
Reports/Plans submitted during October 2013:
September 2013 - Monthly Status Report (prepared and distributed to the State of Maine Bureau of General Services) September 2013 - Waste Activity Report (prepared and distributed to the State of Maine Bureau of General Services) September 2013 - Overweight Truck Report (prepared and distributed to the State of Maine Bureau of General Services) September 2013 - Odor Complaint Report (prepared and distributed to the State of Maine Bureau of General Services) September 2013 - Host Benefits Summary (prepared and distributed to the State of Maine Bureau of General Services)
Highlights of landfill activities during October 2013:
Continued waste placement in cell 8 Conducted operator training covering the new Global Harmonization System, cold stress management, power and hand tool safety, and high visibility clothing Held a dinner/tour for the Old Town Rotary Juniper Ridge Landfill Monthly Status Report Page-2
Activities anticipated for November 2013:
Continue full operation in cell 8
Landfill Related Complaints for October 2013:
JRL received one complaint during the month of October 2013 which was confirmed to be landfill related.
Licenses/permits/approvals applied for, received, or renewed in October 2013:
None
License, permit, application or report fees paid in October 2013:
None
Volume of leachate transported for disposal during October 2013:
670,320 Gallons
Landfill gas extracted for destruction through flares during October 2013:
98,066,186 Cubic Feet
Quantity of wastes/other materials received at the landfill during October 2013:
63,240.87 Tons