Consultant Engineer’s Monthly County Vehicle Cost Distribution Record Section
Route
District Month Ending Contract No. Job No. Consultant Engineering Firm Project
State Job Numbers Vehicle Total Number
Total
Prepared by
Checked by Consultant Engineer State Resident Engineer
Note: See instructions on reverse side
Printed 4/4/2018 BC 932 (Rev. 10/97) Instructions for Preparing Form BC 932
1. This form is to be prepared and submitted by the Consultant at the end of each month. Copies are to be retained by both the Consultant and the State Resident Engineer for each separate job file.
2. When vehicles are used only for state work, payment will be made at the maximum monthly rate specified in the contract agreement. When a vehicle is used on more than one project in a month, the monthly maximum rate will be prorated to the various projects based on the number of days used on each project. (See Vehicle Nos. 59, 66 & 70 in example below.)
3. When vehicles are used only for state work, payment will be made at the daily rate specified in the contract agreement up to the maximum monthly rate. (See Vehicle Nos. 67 & 72 in example below.)
EXAMPLE (Assumed monthly rate of $325.00 & daily rate of $15.00) Vehicle Number Job No. 1 Job No. 2 Job No. 3 Job No. 4 Total
59 20 / 20 x 325 = 325.00 $ 325.00
66 6.5 / 20 x 325 = 3.5 / 20 x 325 = 4.5 / 20 x 325 = 5.5 / 20 x 325 = 105.65 56.88 73.12 89.37 $ 325.00
67 1 x 15 = 15.00 2.5 x 15 = 37.50 10 x 15 = 150.00 4 x 15 = 60.00 $ 262.50
70 13 / 22 x 325 = 9 / 22 x 325 = 192.05 132.95 $ 325.00
72 1 x 15 = 15.00 $ 15.00
Total $312.68 $227.33 $548.12 $164.37 $1252.50