Status of Complaints Under Mahatma Gandhi Nrega

Total Page:16

File Type:pdf, Size:1020Kb

Status of Complaints Under Mahatma Gandhi Nrega

STATUS OF COMPLAINTS UNDER MAHATMA GANDHI NREGA

Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 1. Andra Sh. S.Somi Reddy, Irregularities in NREGA funds and Requested State Government for Reply is awaited Pradesh contractor-Panchayati, use of machines instead of labour investigation on 2.3.10 Anaparthy village, East Godavari 2. Assam Shri Bankim Chandra Improper implementation of Forwarded to the State DC Kokrajhar was asked vide Brahma, Kokrajhar NREGA in Assam due to bad Government on 14.6.2007. Reply letter no. RDD/267/2006/249 Zila Committee, infrastructure and illegal activities awaited. Reminders sent on dtd. 27/6/2007/ to make an Assam 16.7.2007, 22.08.07, 28.11.07, enquiry into this matter and 26.02.08., 5.5.2008 ,23.1.09 , submit a report. No report has 27.05.09 , 21.08.2009 & been received as yet. 05.11.2009 3. Assam Shri Hazrat Ali, Non-payment of wages under Forwarded to the State D.C. Darang was requested to village No.-2 Kuari NREGA at Galandi Panchayat. Government on 31.7.08 and enquire into the matter and Pukhuri, GP Golondi, reminder sent on 23.1.09 , submit report. Report is District 27.05.09, 21.08.2009 & awaited. Darrang 05.11.2009 4. Assam Shri Billal Hussain,  Non-issuance of job cards Forwarded to the State D.C. Darang was requested to village No.-3 Golondi  Asking money for issuing job Government on 31.7.08 and enquire into the matter and Goan, GP Golandi, cards reminder sent on 23.1.09 submit report. Report is district Darrang  Not respecting the gender quota &27.05.09 , 21.08.2009 & awaited.  Non-payment of wages under 05.11.2009 NREGA. 5. Assam Shri Daniel Teron,  Non-issuance of job cards Forwarded to the State D.C. Karbi was requested to Gen. Secy. Karbi  Discriminated against people in Government on 31.7.08 and enquire into the matter and Anglong and North providing job cards reminder sent on 23.1.09 27.05.09 submit report. Report is Cachar Hill, Kisan  Failure to register a complaint , 21.08.2009 & 05.11.2009 awaited Sharamik Sobha under NREGA in Karbi Anglong District. Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 6. Assam Shri Labjen Kemprai,  Non-payment of wages Forwarded to the State D.C. NC Hill was requested to village Topodisa, S.O.  Misuse of funds under NREGA Government on 31.7.08 and enquire into the matter and Sarkari Bagan, in North Cachar Hills of Assam reminder sent on 23.1.09 27.05.09 submit report. Report is Haflong, district N.C. , 21.08.2009 & 05.11.2009 awaited. Hills 7. Assam Article in the Times of Tea plantation workers dying a Forwarded to the State Reply is awaited India slow death Government 8/9/08 and reminder September 4, 2008 sent on 23.1.09 , 28.05.09 , 21.08.2009 & 05.11.2009 8. Assam Article in the ‘The Hungry villagers scoff at rural ‘job Forwarded to the State Reply is awaited Telegraph’ 13 scheme for all’. (Karbi Anglong) Government on 13.01.09 and January, 2009 reminder sent on 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 9. Assam Article in the Morung Discrepancies in Tuensang NREGS Forwarded to the State Reply is awaited Express detected Government on 15.12.08 and Dated, 11 December reminder sent on 23.1.09, 2008 27.05.09 , 21.08.2009 & 05.11.2009 10. Assam Shri Sadananda Nath Implementing authority has not Forwarded to the State Reply is awaited and others, Chakchaka started work for job card holders on Government on 27.2.09 and Development Block in the plea that no fund for the work reminder sent on 27.05.09 , Barpeta District, has been released under NREGA 21.08.2009 & 05.11.2009 Assam 11. Assam Shri Ashit Ranjan Das Misappropriation of funds by Shri Forwarded to the State Reply is awaited (Secretary), G.P. Krishna Singh Chhatri under Government on 27.2.09 and Kalibari, under kalain NREGA. reminder sent on 27.05.09 , A.P & cachar Zila 21.08.2009 & 05.11.2009 Parishad, Silchar, district Cachar, Assam 12. Assam Shri Labjen Kemprai, Misuse of funds in respect of Forwarded to the State Reply is awaited forwarded by Ministry NREGA and other Central Schemes Government on 27.3.09 and of Home Affairs in North Cachar Hills Autonomous reminder sent on 27.05.09 , Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Council in Assam 21.08.2009 & 05.11.2009 13. Assam Shri Azizur Rohaman  Bribe is asked for issuing job Requested State Government for Reply is awaited Mazumder , Senior cards investigation on 08.05.2009 and Citizen, Village and  Job card not yet delivered to the reminder sent on 27.05.09 , Post Nagdirgram-IV, applicants from 07-08 21.08.2009 & 05.11.2009 District Cachar ,  Use of machinery instead of Assam labour  No Social Audit since 07-08 onwards Random violations of NREGS Acts Drastic corruption by the BDO (Mr, Rosoraj Das of Narsingpur and Sonai block with the close associate of Mr.S.M.Dev the Congress MP. 14. Assam Shri Abul Kalam Formulation of plan of NREGA & Requested State Government for Reply is awaited Hussain, President and its implementation without investigation on 23.06.2009 and Shri Abur Rahim, maintaining transparency reminder sent on 21.08.2009 & Asst. genl. Secy. Of safeguards in a hasty and haphazard 05.11.2009 Assam United manner. Democratic Front (AUDF), Pancharatna Road, Golpara District of Assam. 15. Assam Smt. Falguni Das and Gram Sabha meetings are not being Requested State Government for Reply is awaited others, gram held before the commencement of investigation on 17.07.2009 and Panchayat Katirail, the work under NREGA and no reminder sent on 21.08.2009 & Block Katigorah and social audit of NREGA works is 05.11.2009 Cachar District taking place. 16. Assam Shri Nur Ahmed Releasing of more funds for Requested State Government for Reply is awaited Barbhuiya, President, generating employment in the investigation on 04.08.2009 and Tupkhana Gram Gram Panchayat-Tupkhana Barak reminder sent on 21.08.2009 & Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Panchayat, P.O. Valley. It is also alleged that the 05.11.2009 Arunachal 25, Cachar NREGA Scheme could not be District. Mobile: properly implemented as no funds 9954961711 were sanctioned under NREGA for the year 2008-09 to Gram Panchayat- Tupkhana.

17. Assam Asom Mojuri Srameek Violation of NREGA guidelines Requested State Government for Reply is awaited Union, Cachar regarding issuing of job cards, investigation on 07.08.2009 and District, Assam registration of workers and reminder sent on 05.11.2009 allocation of work, payment of unemployment allowances, holding of Gram Sabha meetings by various Gram Panchayats in the Cachar District of Cachar. 18. Assam Shri Muktharul Non- issuance of job cards, work Requested State Government for Reply is awaited Hassan, President/ applications not accepted instead investigation on 11.09.2009 and Secretary, Assam applicants threatened and payment reminder sent on 05.11.2009 Mojuri Sramek Union, of wages not being made to Village- Garkhapon, workers. P.O.- Badarpur, District Karimganj. 19. Assam Irregularities in the muster roll of Forwarded to the State Reply is awaited Shri Assme Momtaz Bhella Gram Panchayat causing Government on 29/01/2010 Wahid, Gram delay in MIS and Gross anomaly panchaayat 1No. made by the Panchayat President Bhella, CIC operator, under The Mahatma Gandhi Barpeta CIC. NREGA. Keotkuchi 20. Bihar Shri Suresh Rai, Irregularities and improper Forwarded to the State Reply is awaited Coordinator, implementation of NFFWP Government on 15.02.07. Reply Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Meenapur, Muzzafarpur waited. Reminders sent on Muzzafarpur, Bihar 23.3.2007, 16.7.2007, 22.08.07, 28.11.07, 26.02.08., 5.5.2008, 23.05.08, 29.05.08, 23.1.09 , 27.05.09 , 21.08.2009 ,05.11.2009 21. Bihar Shri Maheshwar Alleging Corruption under Rozgar Complaint received on 03.07.07 Reply is awaited Prasad Yadav, MLA Guarantee Yojana, Katra forwarded to the State Bihar Vidhan Sabha Government on 28.09.07. Reminders sent on 28.11.07, 26.02.08., 5.5.2008, 23.05.08, 29.05.08, 23.1.09, 27.05.09 , 21.08.2009 , 05.11.2009 22. Bihar Shri Digvijay Singh, Alleged corruption, irregularities Complaint received on 24.08.07 Reply is awaited General Secretary, and improper implementation of forwarded to the State AICC NREGA in Munger, Bihar Government on 10.09.07. Reminders sent on 28.11.07, 26.02.08, 5.5.2008 , 23.1.09, 27.05.09, 21.08.2009 & 05.11.2009 23. Bihar Shri Birendra Kumar Alleged financial irregularities by Forwarded to the State Reply is awaited Singh the President and Secretary of GP, Government on 01.10.07. Mokar, Rohtas District, Bihar. Reminders sent on 28.11.07, 26.02.08, 5.5.2008, 23.05.08, 29.05.08, 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 24. Bihar Shri Rajnikant Rai, Misuse of funds by forgery by Forwarded to the State As per report called from State village Chataneswar, Mukhiya under NREGA. Government on 29.4.08, 29.05.08, Government complaint was block Warishnagar, 31.07.08 and reminder sent on found correct explanation has district Samastipur 23.1.09, 27.05.09 , 21.08.2009 & been called from J.E. 05.11.2009 25. Bihar Shri Parmod Yadav,  Regarding underpayment of Forwarded to the State Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government vill. Odhara, block wages. Government on 29.4.08 and Rajone, district Banka  Failure to pay wages on time reminder sent on 5.5.2008, 23.05.08, 29.05.08, 31.07.08 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 26. Bihar Shri Ram Dyal Ram, Regarding failure to pay wages on Forwarded to the State Reply is awaited vill. Teliya Sarai, time under NREGA Government on 29.4.08 and district Vaishali reminder sent on29.05.08, 31.07.08, 23.1.09 , 27.05.09, 21.08.2009 & 05.11.2009 27. Bihar Shri Chandeshwar Misuse of funds and corruption Forwarded to the State Reply is awaited Pandey, vill. under NREGA Government on 26.5.08, and Keshonarayanpur, reminder sent on 29.05.08, Bhaya-Shahpur Patori, 31.07.08, 23.1.09 , 27.05.09, district Samstipur 21.08.2009 & 05.11.2009 28. Bihar Smt. Gyanti Devi,  Manipulation in job cards Forwarded to the State Reply is awaited District President, Government 31.3.08 and reminder Woman Rastriya Janta sent on 29.05.08, 31.07.08, Dal , District 23.1.09 , 27.05.09, 21.08.2009 & Jahanabad 05.11.2009 29. Bihar Shri Mahavir Jha,  Showing completion of work Forwarded to the State Reply is awaited GP-Raj Yajuar(Med.), without carrying out any work Government 31.3.08 and reminder Block Katara, District  Fake entries in the sent on 29.05.08, 31.07.08 , Muzaffarpur Measurement Book under 23.1.09 , 27.05.09, 21.08.2009 & NREGA 05.11.2009 30. Bihar Shri Sanjay Kumar &  Non-issuance of job cards by Forwarded to the State Reply is awaited others, GP-Lagama, Panchayat Secretary and Government 31.3.08 and reminder Block Sonvarsha Raj, Mukhiya under NREGA sent on 29.05.08, 31.07.08, District Saharsa 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 31. Bihar Shri Sarfraj Khan,  Migrations of rural labourers Forwarded to the State Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government village Palatpura, due to not providing the work Government 31.3.08 and reminder block Bihar Sharif, under NREGA. sent on 29.05.08, 31.07.08, district Nalanda 23.1.09 , 27.05.09, 21.08.2009 & 05.11.2009 32. Bihar Shri Subash Tiwari,  Misuse of funds and work is Forwarded to the State Reply is awaited village Taajpur, block being got done by children Government 31.3.08 and reminder Motipur, district under NREGA. sent on 29.05.08, 31.07.08, Muzaffarpur 23.1.09 , 27.05.09, 21.08.2009 & 05.11.2009 33. Bihar Shri Ganesh Parshad  Misuse of funds Forwarded to the State Reply is awaited Thakur, village Vina,  Non issuance of job cards Government 31.3.08 and reminder block 20, district under NREGA. sent on 29.05.08, 31.07.08, Supoul 23.1.09 , 27.05.09, 21.08.2009 & 05.11.2009 34. Bihar Smt. Laxmi Sahni,  Failure to register a complaint Forwarded to the State Reply is awaited village Anandpur and not provide the work to job Government 31.3.08 and reminder Gangaoliya, district cards holders under NREGA. sent on 29.05.08, 31.07.08, Muzaffarpur 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 35. Bihar Shri Moin Ahmad  Reconstructions of road which Forwarded to the State As per report called from State Khan, village is in good condition under Government 31.3.08 & 8.10.08 Government complaint found Govindpur Khanjuri, NREGA and reminder sent on 23.1.09 , correct and explanation has block Kalyanpur, 27.05.09 , 21.08.2009 & been asked from the Rozgar district Samstipur 05.11.2009 Sewak and J.E. 36. Bihar Shri M.O.A. Sakib,  Misuse of funds Forwarded to the State Reply is awaited village Mehsaol,  Using fake muster roll Government 31.3.08 and reminder district Sitamadi  Not respecting the gender sent on 29.05.08, 31.07.08, quota 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 37. Bihar Shri Ajay Singh,  Misuse of funds Forwarded to the State Reply is awaited village Rohiya, block  Not respecting the gender Government 31.3.08 and reminder Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Dumrov, district quota in block Dumrov under sent on 29.05.08, 31.07.08, Buxar NREGA. 23.1.09 , 27.05.09, 21.08.2009 & 05.11.2009 38. Bihar Shri Murari Parshad  Non issuance of job cards, Forwarded to the State As per report called from State Sharma and others, misuse of funds under Government 31.3.08 and reminder Government case has been Goravan Panchayat, NREGA. sent on 29.05.08, 31.07.08, registered against the guilty block Silaaw, district 23.1.09 , 27.05.09 , 21.08.2009 , person. Nalanda 21.08.2009 & 05.11.2009 39. Bihar Article in The Mint Bihar’s efforts to track rural job Forwarded to the State Reply is awaited August 18, 2008 scheme stuck Government 19.8.08 and reminder sent on 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 40. Bihar Shri Uma Shanker  Misuse of funds, Forwarded to the State Reply is awaited Prashad Singh(Vice-  Non payment of wages Government on 8.10.08 and president, Congress  Use of sub-standard material reminder sent on 23.1.09 , Committee) Village under the NREGA 27.05.09 , 21.08.2009 & Shabaajpur, Post 05.11.2009 Bhikanpur, District Muzaffarpur 41. Bihar Smt. Neelam Mishra  Non-payment of wages under Forwarded to the State Reply is awaited (Woman Congress the NREGA. Government on 8.10.08 and Committee) Village reminder sent on 23.1.09 , Shotia, District 27.05.09 , 21.08.2009 & Darbanga 05.11.2009 42. Bihar Sh Pawan Sahni and  Misuse of funds Forwarded to the State As per report called from State others, Village Raj  Low payment of wages Government on 8.10.08 and Government complaint found Harpur Barhota,  Non issuance of job cards reminder sent on 23.1.09 , correct and explanation has District Samatipur under NREGA 27.05.09 , 21.08.2009 & been asked from the Rozgar 05.11.2009 Sewak and J.E. 43. Bihar Shri Govinchin  Misuse of funds and using of Forwarded to the State Reply is awaited Mahamrik, Village fake muster roll under the Government on 8.10.08 and Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Sikendarpur, Post NREGA. reminder sent on 23.1.09 , Bonsi, District Banka 27.05.09 , 21.08.2009 & 05.11.2009 44. Bihar Shri Ram Nanad Ray  Misuse of funds Forwarded to the State As per report called from State (Panchayat Member),  Using fake muster roll under Government on 8.10.08 and Government complaint is Village Kewas, Block the NREGA. reminder sent on 23.1.09 , found correct and final report Kewas Nijamat, 27.05.09 , 21.08.2009 & will be send after thorough District Samastipur 05.11.2009 investigation. 45. Bihar Shri Arun Kumar  Misuse of funds under NREGA Forwarded to the State Reply is awaited Mishra Bagi, Village Government on 8.10.08 and Sasaram, District reminder sent on 23.1.09 , Rohtas 27.05.09 , 21.08.2009 & 05.11.2009 46. Bihar Shri Gultel Yadav and  Use of machinery instead of Forwarded to the State Reply is awaited others, Village labour under NREGA Government on 8.10.08 and Chirchodi District reminder sent on 23.1.09 , Banka 27.05.09 , 21.08.2009 & 05.11.2009 47. Bihar Shri Suresh Singh and  Failure to opening account on Forwarded to the State Reply is awaited others, Panchayat bank post Government on 8.10.08 and Suryapur District  Non-issuance of job cards reminder sent on 23.1.09 , Rohtas under the NREGA. 27.05.09 , 21.08.2009 & 05.11.2009 48. Bihar Shri Amresh Thakur,  Misuse of funds Forwarded to the State Reply is awaited Ex-Writer, Gram  Bogus job cards under Government on 8.10.08 and Panchayat Raj Yajuaar NREGA. reminder sent on 23.1.09 (Centre), Block Katra, 27.05.09 , 21.08.2009 v District Muzaffarpur 49. Bihar Shri Viswash Bhajan  Underpayment of wages Forwarded to the State Reply is awaited (Sarpanch) and others,  Using of fake job cards Government on 8.10.08 and Block Makhadumpur,  Failure to provide work on reminder sent on 23.1.09 , Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government District Jahanabad time 27.05.09 , 21.08.2009 &  Using fake muster roll and 05.11.2009 manipulation in job cards under NREGA. 50. Bihar Smt. Gulesh Devi  Asking for money for issuing Forwarded to the State Reply is awaited (Sarpanch), Village job cards Government on 8.10.08 and Kumardin, Block  To keep job cards in his reminder sent on 23.1.09 , Makhadumpur, custody by Sarpanch 27.05.09 , 21.08.2009 & District Jahanabad  Not to show the muster roll in 05.11.2009 the public under NREGA. 51. Bihar Smt. Sangita Devi,  Regarding financial Forwarded to the State Reply is awaited Member, Panchayat exploitation by Block Government on 10.10.08 and Samiti, Village & P O Programme Officer reminder sent on 23.1.09 , Nad , Shivsagar, 27.05.09 , 21.08.2009 & Rohtas District 05.11.2009 52. Bihar Kumari Sobha Sinha,  Alleging that works approved Forwarded to the State As per report called from State President, Zilla by Zilla Parishad in Gaya Government on 12.11.08 and Government , with Parishad, Seh Zilla District are not being reminder sent on 23.1.09 , unnecessary interference work Yojana Samiti, Gaya sanctioned by the State Rural 27.05.09 , 21.08.2009 & was interrupted. Development Department. 05.11.2009 53. Bihar Shri Sabir Ali,  Alleging discrimination in Forwarded to the State Reply is awaited MP(RS) allocation of NRFGA funds to Government on 1.12.08 and Zilla Parishads in Purbi reminder sent on 23.1.09 , Champaran district 27.05.09 , 21.08.2009 & 05.11.2009 54. Bihar Article in “Job Guarantee scheme comes a Forwarded to the State Reply is awaited www.newkerala.com cropper in Bihar” Government on 23.12.08 , 27.05.09 , 21.08.2009 & 05.11.2009 55. Bihar Shri Kailash Kumar Misappropriation of Rs.387.000 Forwarded to the State Reply is awaited Yadav, General lakhs by the junior Engineer, Government on 18.02.09 and Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Secretary, Bihar Assistant Engineer and Engineer by reminder sent on 27.05.09 Pradesh Janta Dal making fake muster rolls under Proposal sent to depute an United, Gram NREGA. NLM.NLM report received and Panchayat Matadeeh, copy forwarded to State Dharhara Prakhand, Government for necessary action District Munger, Bihar and comments on 21.07.2009 and reminders sent on 21.08.2009 & 05.11.2009 56. Bihar Shri Sitaram Yadav, Misappropriation of funds, bogus Forwarded to the State Reply is awaited MP(LS), voucher, muster roll and no enquiry Government on 18.02.09 and till date even after the decision of proposal sent to depute an NLM. Sitamarhi District Vigilance and and reminders sent on 27.05.09 , Monitoring Committee in Zila 21.08.2009 & 05.11.2009 Parishad Sitamarhi, Sursand, Sonvarsa and Bajpatti Prakhand, Bihar 57. Bihar Shri Baldev Singh, Misuse of funds of Rs. Sixty Lakhs Forwarded to the State Reply is awaited Gram Panchayat Raj by Devendra Rai (Mukhiya) and Government on 02.03.09 and Dhabaich, Block Vinod kumar Singh (Panchyat reminders sent on 27.05.09 , Patepur, District Secretary) under NREGA 21.08.2009 & 05.11.2009 Vaishali 58. Bihar Shri Premchandra Non opening of Account for the Forwarded to the State Reply is awaited Hazra, Village payment of wages by Bank and Government on 02.03.09 and Mathiyavrit Baithniya, Post offices in Gram Panchyat reminders sent on 27.05.09 , District West under the Block Majholiya, District 21.08.2009 & 05.11.2009 Champaran West Champaran under NREGA.

59. Bihar Shri Prem Nath Singh,  Misappropriation of NREGA Forwarded to the State Reply is awaited President, Prakhand funds. Government on 02.03.09 and Congress Committee,  Exploitation of job cards holder. reminders sent on 27.05.09 , Darbhanga  Use of Machinery by 21.08.2009 & 05.11.2009 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Programme Officer , J.E and Rozgar Sewak in Village Metuniya, Block Bhedi, District Darbhanga under NREGA. 60. Bihar Visambhar Paswan, Construction of 40ft. Wide, Forwarded to the State Reply is awaited Village-Mathurapur 200ft.long, 10ft. Deep canal by Government on 28.04.2009 and post Jagdishpur Baha Sarpanch of village-Jagdish pur reminders sent on 27.05.09 , Nagari Thana-Sakra, against Governmant law. 21.08.2009 & 05.11.2009 Gram Panchayat- Jagdish purMuzaffarpur, 61. Bihar Meena Devi and Construction of road by Gram Forwarded to the State Shri Ajay Kumar Sinha, Dy. Others, Gram Pradhan from soil of playing field. Government on 22.4.2009 and Sec., Govt. of Bihar ordered Panchayat Vasori, Irregularties in making BPL reminders sent on 27.05.09 , district programme co- Block tarari, Gram list.The Fund has been sanctioned 21.08.2009 & 05.11.2009 ordinator, Bhojpur, AAra, Panchayat Vasori, for road from school to labna Bihar to look into the matter. Block Tarari, Bhojpur village but work is not started yet. Aara 62. Bihar Member, prakhand Fake muster rolls and bank account Requested State Government for Reply is awaited Karyakaram under NREGA. investigation on 01.05.2009 and Karyavayan Samiti, reminders sent on 27.05.09 , Madhepur, 21.08.2009 & 05.11.2009 63. Bihar Sh.Kailash Kumar Misappropriation of Requested State Government for Reply is awaited Yadav, Ex- NREGA funds by fake investigation on 01.05.2009 and Mahasachiv, Student muster rolls by B.D.O. reminders sent on 27.05.09 , JDU, Bihar 21.08.2009 & 05.11.2009

64. Bihar Sh. Ashok Paswan, complaining of Sh. Requested State Government for Reply is awaited District Upaadhyaksh, Shambhu Kumar, B.D.O for investigation on 01.05.2009 and Nawada, fraud of NREGA fund reminders sent on 27.05.09 , 21.08.2009 & 05.11.2009 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 65. Bihar Md. Mustkiya Not getting work or unemployment Requested State Government for Reply is awaited &others, Gram allowances. investigation on 01.05.2009 and Sohray, Panchyat reminders sent on 27.05.09 , Madanpur, District 21.08.2009 & 05.11.2009 Madhubani, 66. Bihar All labourers of Delay in payments under NREGA. Requested State Government for Reply is awaited Katihar district, Bihar investigation on 01.05.2009 and reminders sent on 27.05.09 , 21.08.2009 & 05.11.2009 67. Bihar Gramin janta of Use of J.C.B machinery. Requested State Government for Reply is awaited Tareya Prakhand, investigation on 01.05.2009 and Tikampur Village, reminders sent on 27.05.09 , Chhapra district, Bihar 21.08.2009 & 05.11.2009 68. Bihar Kumar Jagnath Labourers are not getting work. Requested State Government for Reply is awaited Prasad, Ex- investigation on 01.05.2009 and Sarpanch,Prakhand reminders sent on 27.05.09 , Dumri- 21.08.2009 & 05.11.2009 Katsari,Maksudpur- Kararia Panchayat, District Shephar, 69. Bihar Sh. Brij Kishore, Fake muster rolls and NREGA fund Requested State Government for Reply is awaited Gram Chakni, Post distribute between Panchayat investigation on 01.05.2009 and Chamanpur, Sachiv, J .E. and B.D.O. without reminders sent on 27.05.09 , Panchayat starting any work. 21.08.2009 & 05.11.2009 Chamanpur, Sheoher district, 70. Bihar NREGA workers, Manipulation in job cards and non- Requested State Government for Reply is awaited Gram Radhopur, payment of wages under NREGA. investigation on 11.05. 2009 and District Supol, reminders sent on 27.05.09 , 21.08.2009 & 05.11.2009 71. Bihar Shri Vipin kumar & Alleged that the Programme Officer Requested State Government for The State Government has Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government others , Konch Block, , Sh Umakanth Verma and the investigation on 28.05. 2009 and reported that the complaint will Gaya District, Bihar Junior Engineer Sh. Sashikant reminders sent on 21.08.2009 & present in a social audit and Shashi are seeking illegal 05.11.2009 they will report the action gratification for implementation of taken within 15 days. NREGA. And it involves allegation of corruption. 72. Bihar Shri T.Pathak, Misappropriation of funds, Requested State Government for Reply is awaited Malipur Gram irregularity in construction of road investigation on 08.07. 2009 and Panchayat, Garhpura under NREGA with an ulterior reminders sent on 21.08.2009 & Block motive of encroaching on property 05.11.2009 of the public and other private persons, organisation of fictitious Gram Sabhas, forgery of muster rolls, use of tractors in place of workers, issue of job to ineligible persons and inactionof local administration on submission of information in this manner.

73. Bihar Shri Vikash Singh, In the construction of drainage from Requested State Government for Reply is awaited District Coordinator, Lal Khan to Adampur Canal, investigation on 07.07. 2009 and Jamalpur post, Block- payment was made without any reminders sent on 21.08.2009 & Jamalpur, Munger work. He also informed the District 05.11.2009 district Magistrate in writing, but no action was taken.

74. Bihar Shri Birulal Passbooks have not been Requested State Government for Reply is awaited Bhanmbhi, Gram distributed to workers, payment of investigation on 23.07. 2009 and Panchayat Bucheya, wages made through factious work. reminders sent on 21.08.2009 & Block Sidhvalia 05.11.2009 75. Bihar Shri Gopal Paswan Irregularities in the digging work Requested State Government for Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government and others, village under NREGA, payment is not investigation on 23.07. 2009 and Saidi, Gram Panchayat made through passbooks. reminders sent on 21.08.2009 & Andhana, District 05.11.2009 Nalanda 76. Bihar Shri Ghan Shyam Huge amount of soil has been taken Requested State Government for Reply is awaited Singh and others, forcefully from their personal land investigation on 22.07. 2009 and Village Pakra, Block under the construction of Road-14 reminder sent on 21.08.2009 naugachhia,District Bhagalpur 77. Bihar Shri Rajesh Kumar, Regarding migration of labour and Requested State Government for Reply is awaited Vice Chairman,Zilla failure to conduct Programmes on investigation on 22.07. 2009 and Parishad, District time under NREP. reminders sent on 21.08.2009 & Darbhanga 05.11.2009 78. Bihar Villagers of Gram Misappropriation of funds and less Requested State Government for Reply is awaited Panchayat- Keshopur, payment given to workers by investigation on 07.08. 2009 and Block- Jhajha, Jamui Mukhiya and Rozgar Sewak reminders sent on 21.08.2009 & District 05.11.2009 79. Bihar Shri Panchu Rishidev Regarding embezzlement of Requested State Government for Reply is awaited Singhpur, P.O. NREGA funds by fake signatures in investigation on 04.08. 2009 and Kumarkhand, the passbook in the Kumarkhand reminders sent on 21.08.2009 & Madhepura District post office, against Sh. S.N. Hal, 05.11.2009 Sub Post office Vasad, and other post masters of Branch Rani Patti, Branch Laxmipur Bhagavati, Branch Parmanandpur, and Branch Mangkhanda.

80. Bihar Dr. Murari Mohan Work is not provided to workers Requested State Government for Reply is awaited Jha, Vice President, under NREGA in District investigation on 03.09. 2009 and Darbhanga District Darbhanga reminder sent on 05.11.2009 Congress, Gram Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Darhar, Post Laheriasarai, District Darbhanga 81. Bihar Shri Kesvar Yadav, Alleging embezzlement and Requested State Government for Reply is awaited Tiwari Vigha, Post- corruption of funds in the post investigation on 25.09. 2009 and Rafiganj, District office of block- Rafiganj reminder sent on 05.11.2009 Auranagabad 82. Bihar Smt. Viyafi Devi, Regarding to appointment the Requested State Government for Reply is awaited Gram- Sarupai(Tola Panchayat Rozgar Sewak in Gram- investigation on 25.09. 2009 and Khape), Post- Sarupai. reminder sent on 05.11.2009 Jagdishpur, Block- Vijayepur 83. Bihar Article in Dainik Construction of public park under Requested State Government for Reply is awaited Jagaran NREGA in Motihari Town of East investigation on 30.09. 2009 and Champaran District of Bihar reminder sent on 05.11.2009 84. Bihar Mohmad Ashfhak S/o Alleging embzzlement of funds in Requested State Government for Reply is awaited Mohd. Israel, Gram & NREGA works. investigation on 12.10. 2009 and Panchayat- Jalwara, reminder sent on 05.11.2009 Block- Kawati, District Darbhanga 85. Bihar Shri Akshay Kumar, Regarding failure to povide job Requested State Government for Reply is awaited Coordinator, Post card to an eligible household,failure investigation on 12.10. 2009 and office Street, to pay unemployment allownace as reminder sent on 05.11.2009 Chhitrguptnagar, per provisions of the Act & failure Kakkarvada, Patna to conduct social audit, no inspection of muster rolls. 86. Bihar Mohd. Naushad Alam, Misuse of NREGA funds in Gram Requested State Government for Reply is awaited General Secretary Panchayat No.17 Gangwar Buzurg investigation on 27.10. 2009 and Delhi Pradesh, Tehsil Runni Saidpur, District reminder sent on 05.11.2009 Purwanchal Social Sitamarhi, Bihar Organisations (Regd.) Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 87. Bihar Shri Asha Devi and Embezzlement of NREGA funds by Requested State Government for Reply is awaited others, Gram Gram Panchayat Mukhiya and investigation on 06.11. 2009 Panchayat Madhopur, payment made to ghost workers at District Patna Gram Panchayat Madhopur, District Patna 88. Bihar Shri Lal Chandra Requested State Government for Reply is awaited Embezzlement and Corruption in Thakur, Ward investigation on 06.11. 2009 NREGA by Mukhiya and NREGA Member No. 07, Gram Sewak at Gram Panchayat Panchayat Bagnagar, Bagnagar, Block Jokihat, District Block Jokihat, District Araria Araria 89. Bihar Shri Ramji Singh Fake entries in muster roll, payment Requested State Government for Reply is awaited Sharma, Gram made by forge signature in Bank investigation on 06.11. 2009 Dakhner, Thana Passbook Gram Dakhner, Thana Parayya, District Gaya Parayya, District Gaya 90. Bihar Dr. Murari Mohan Requested State Government for Reply is awaited Jha, Vice President, investigation on 11.11. 2009 Work is not provided to workers Darbhanga District under NREGA in District Congress, Gram Darbhanga Darhar, Post Laheriasarai, District Darbhanga 91. Bihar Shri Sanat Kumar, Requested State Government for Reply is awaited Issuance of job cards to ineligible Gram & Post- Karma, investigation on 11.11. 2009 persons, failure to provide full Block- Kudni, payment to the workers Panchayat-Karamidih, District Muzzafarpur 92. Bihar Shri Nilendu Thakur, Irregularities (use of JCB machines Forwarded to State Government Reply is awaited President, Biraul and fake muster roll) in the on 04.01. 2010 Block Kisan Khet implementation of NREGA in Itwa Majdoor Congress Shiv Nagar and Saho Gram Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government (Rajiv Gandhi Panchayats. Bhawan) 93. Bihar Gram Panchayats’ Regarding inadequate bank staff for Forwarded to State Govt on Reply is awaited Mukhiya of Semari, the disbursement of wages to 04.01.2010 Sahinaw, Sahinav and NREGA workers. Gazipur and form Panchayat Samiti members of Nathmalpur East, Gaziapur and Sinha 94. Bihar Shri Radheshyam Regarding release of Rs 30 lakh for Forwarded to State Govt on 11.01. Reply is awaited Singh, Member, All the maintenance of irrigation canal 2010 India Congress to Barachatti Block, Gaya Committee 95. Bihar Shri Alimuddin Irregularities in the implementation Forwarded to State Govt on 18.01. Reply is awaited Ansari, Hind Khet of NREGA in the districts of 2010 Majdoor Panchayat Purnea, Araria, Kishanganj and Katihar. 96. Bihar Smt. Kumkum Regarding irregularities in the JD NLM has been requested to Reply is awaited Bhardwaj, member of implementation of Mahatma depute two NLM on 25-1-2010 Congress Party, Gandhi NREGA in the district of Lakhisarai, Bihar Lakhisarai, Bihar 97. Bihar Eleven NREGA Financial irregularities in the Forwarded to State Govt on 11th Reply is awaited workers implementation of the Mahatma February, 2010 Gandhi NREGA in Malwa Panchayat, Obra Block, Aurnagabad district. it has been highlighted that money was withdrawn from the accounts of workers. 98. Bihar Shri Baidya Nath Regarding irregularities in the Forwarded to State Govt on 11th Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Choudhary, village implementation of the Mahatma February, 2010 Eraji Jagat, P.O. Gandhi NREGA. In the enclosed Benapatti, district letter it has been highlighted that in Madhubani actual works were not executed but money were withdrawn and in some cases where works were executed were of poor quality. 99. Bihar Shri Suman Kumar regarding non payment of wages to Forwarded to State Govt on 11th Reply is awaited Singh workers, absence of citizen board February, 2010 and works not provided to women and physically challenged. In the enclosed letter it has been highlighted that amount incurred for digging work has been exaggerated 10 Bihar Shri Sanjay Singh, Ex- Regarding irregularities in the Forwarded to State Govt on 16-2- Reply is awaited 0. Mukhiya Nawabganj, appointment of Programme Officer, 2010 Araraia Shri Bhola Das, Chhatpur district 10 Bihar Shri Prem Kumar Financial irregularities in the Forwarded to State Govt on 24-2- Reply is awaited 1. Sharma implementation of the Mahatma 2010 Gandhi NREGA in by the Postmaster of Phulwari, Bhojpur district.

10 Bihar Shri Ramesh Karpat Regarding financial irregularities Forwarded to State Govt on 24-2- Reply is awaited 2. by the Rojgar Sewak and Mukhiya 2010 of Bhimpur Gram Panchayat, Chhtapur Block, Supaul District. It is highlighted that 62 workers worked for 18 days but were paid only for 9 days after two months. Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 10 Chhattisg Sh. Nand Lal Jaiswal, Regarding irregularities in Land Forwarded to the State The State Government has 3. arh Narainpur, Reforms works in Narainpur Government on 31.7.08 and reported that, three member Chhattisgarh. district under NREGA. reminders sent on 23.1.09 , enquiry team was constituted 27.05.09 , 21.08.2009 by the Collector Nariainpur. &05.11.2009 However as the Gram Panchayat Garpa is situated around 110 KM from Orcha Janpad Panchayat and in a severely naxal affected part of the district. The team has not been able to conduct the enquiry. Enquiry report awaited 10 Chhattisg Article in Dainik ‘Palayan Se ujre Darjan Bhar Gaav’ Forwarded to the State Reply is awaited 4. arh Bhaskar Dated 31 Government on 5.1.09 and December 2008 reminders sent on 27.05.09 , 21.08.2009 &05.11.2009 10 Chhattisg Shayam Lal Kanwar, Complaint against executive Forwarded to the State Reply is awaited 5. arh Paudi Uproda, Korba engineer Shri Sanjay Sharma for Government on 04.05.2009 and financial Irregularties. No technical reminders sent on 27.05.09 , engineer appointed for road 21.08.2009 &05.11.2009 construction. 10 Chhattisg Sh. S.L. Salooja, Non- issuance of job cards under Requested State Government for Reply is awaited 6. arh Behind High Court, NREGA investigation on 8.05.2009 and near Shanti Niketan, reminders sent on 27.05.09 , District Bilaspur, 21.08.2009 &05.11.2009 Chhattisgarh 10 Chhattisg Shri Ashok Poor quality of work, involvement Requested State Government for The State Government has 7. arh Manikpuri, Adarsh of contractors under NREGA in investigation on 10.08.2009 and reported vide letter dated Nagar ward no. 03, District Kabirdham. reminders sent on 21.08.2009 7/12/2009 that the complain near Shiv Mandir, &05.11.2009 has been forwarded to Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Kawardha, District Collector, Kabirdham for an Kabirdham enquiry. Enquiry report is awaited 10 Chhattisg 417/APS/M(RD)/09 Nonpayment of wages to workers Requested State Government for Reply is awaited 8. arh Shri Ankit Bagbahara, since last six months under investigation on 06.11.2009 District-co-ordinator, NREGA Babu Sagar Chand Ward No.11, Janpad Baghabahara, District Mahasamund, Chhattisgarh 10 Chhattisg Shri Kushal Kaushik, Fake entries in muster roll, use of Requested State Government for The State Government has 9. arh Gram Panchayat low quality material in construction investigation on 06.11.2009 reported vide letter dated Peepertarai, Block of road at Gram Panchayat 17/12/2009 that the complain Kota, District Bilaspur Peepertarai, Block Kota, District has been forwarded to Bilaspur Collector, Bilaspur for an enquiry. Reply is awaited 11 Chhattisg Shri Bhupendra Singh Irregularities in muster roll Forwarded to State Government The State Government has 0. arh Saluja and Shri on 11.01. 2010 reported vide letter dated 22-1- Surendra Agrawal, 2010 that the complain has Mahasamund been forwarded to CEO, Mahasamund and asked for Action Taken Report Action taken Report is awaited 11 Chhattisg Shri Mukesh Jahria, Regarding irregularities in the Forwarded to State Govt on Reply is awaited 1. arh President, Vigilance execution of work under Mahatma 20.01.2010 and Monitoring Gandhi NREGA. Committee, District Kabirdham 11 Chhattisg Shri Ramesh Sahu Regarding detail of Action taken by Forwarded to State Govt on 11-2- Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government arh the State Government against Shri 2010. Chetan Chandrakar, SDO, Dept of water resources 11 Goa Prof. Nelly J. Complainant has alleged that Requested State Government for Replay is awaited 3. Rodrigues, Zila devolution of powers is very bad investigation on 07/07/2009 and Panchayat Member and Zila Panchayat in Goa are not reminders sent on 21.08.2009 Colva Constiuency, given any role as far as NREGA is &05.11.2009 Calata, Majorda, concerned. Salcete, Goa 11 Gujarat From Shri Madhu A report on NREGA work in Requested State Government for Reply is awaited. 4. Sudan Mistry , Dahod District Gujarat on 27-29 comments on 12.02.2010 Member , CEGCJanuary,2010 ,MGNREGA 11 Haryana Sh. Sanjay Sharma,  Irregularities in the Forwarded to the State It is reported that a copy of the 5. Govind Nagar, Hisar implementation of NREGA Government on 20.10.08 and complaint was sent to the DPC, Road, District Sirsa  Misuse of funds under NREGA reminders sent on 23.1.09, Sirsa on 4-9-08 to get an in Sub-Division Odha of 27.05.09 , 21.08.2009 enquiry conducted by a Senior District Sirsa by Shri Pashel &05.11.2009 Officer and submit report. Kumar, S.D.O. DC Sirsa on 18.09.08 had informed that the matter is being enquired into by the Superintendent of police, State Vigilance Bureau, Hissar. Report is awaited. 11 Haryana Article in Times of “Panchayat employee held while Forwarded to the State Reply is awaited 6. India accepting bribe” Government on 27/03/2009 and Dated: 26 March 2009 reminders sent on 27.05.09 , 21.08.2009 &05.11.2009 11 Haryana Shri Mansingh problem in opening of account and Requested State Government for Reply is awaited 7. Chauhan J.E. are not willing to work investigation on 29/06/2009 and reminders sent on 21.08.2009 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government &05.11.2009 11 Haryana Smt Aina, Member of Financial irregularities (Rs Forwarded to the State Reply is awaited 8. VMC and other GP 4,92,000) in the implementation of Government on 05.01.2010 members NREGA by the Pradhan of Tigaon Gram Panchayat. 11 Haryana Akhil Bharatiya Regarding irregularities in the Forwarded to State Govt on 11-2- Reply is awaited 9. Bhrastachar Unmulan implementation of Mahatma 2010 and Kalyan Sansathan Gandhi NREGA by the Sarpanch and Secretary. It has been highlighted that 350 accounts were opened on false name, whereas in actual only 50 workers were employed for digging well. 12 Haryana Shri Baldev Singh, Regarding not providing Forwarded to State Govt on 8-3- Reply is awaited 0. resident of Rania information related with the 2010 Tehsil, Sirsa Mahatma Gandhi NREGA under RTI Act 2005 by the Block Development Officer and Panchyat Officials. 12 Himachal Dr. Krishan Lal, Enquiry against Gram Pradhan for Forwarded to the State The State Government has 1. Pradesh village Kanol, Block self recommendation for Government on 28.04.2009 and reported that as per inquiry Pragpur, Tehsil Dehra, construction of Protection walls & reminders send on 27.05.09, report which is conducted by Village Kalon,Tahsil drainage 21.08.2009 & 05.11.2009 the BDO Pragpur, the GP Dehra, Kangra Kanol has executed Tiala works under NREGA. Project Officer , DRDA Kangra has directedBDO Pragpur to recover the amount from defaulting GP for spending NREGA funds on non permissible works. ATR is still Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government awaited. 12 Himachal Shri Ravindra Kumar, Fake entry in muster roll and Requested State Government for As per report received from 2. Pradesh VPO Kamlah Fort, corruption by Pradhan and other investigation on 01.05.2009 and State Government, DC cum Tehsil Sarkaghat, members under NREGA reminders send on 27.05.09 , DPC (NREGA) Mandi has District Mandi 21.08.2009 & 05.11.2009 informed that according to enquiry conducted by the BDO Dharmpur, the GP Kamlah Fort has misappropriation of the funds tuning to Rs.37015/- and out of that amounting to Rs. 20850/- have been resubmitted in the Panchatay account by the concerned GP members . As complainant has lodged an FIR against the concerned GP and relevant records i.e. cash book, proceeding register and bill vouchers are in the custody of police, accordingly conducting of further enquiry is not possible/ The District Panchayat Officer Mandi has been asked to initiate proceedings against defaulting GP and action taken report is still awaited. 12 Himachal Villagers of Gram Use of Machinary instead of Requested State Government for Reply is awaited 3. Pradesh Panchayat - labourers in the construction of investigation on 14.10.2009 and Saryanj, Block road and recording of fictitious reminder send on 05.11.2009 Kunikar, District workers in muster roll by Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Solan pradhan.

12 Himachal Letter received from Requesting for nomination of Requested State Government for Reply is awaited 4. Pradesh the chairman & MD, Shri Akhtar Ali as Gram investigation on 08.02.2010 Council of Islamic Panchayat Rojgar Sevak in Education, Gram panchayat Majra, Tehsil Research, Training, Paonta Sahib , District Sirmor, Human Rights & Himachal Pradesh Welfare (Regd.),District Yamuna Nagar, Haryana. 12 Jammu & Two newspaper Stoppage of construction of road Forwarded to the State Reply is awaited. 5. Kashmir cutting from Demchok to Demchok Government on 2.12.2009 Phoo in Leh District 12 Jharkhan Shri Kishori Rajwar, Regarding effort by unscrupulous Forwarded to the State Reply is awaited 6. d VPO Kukraha, block persons to disrupt on going work Government on 26.5.2008 and Sarath, district under NREGA in village Kukraha reminders sent on 23.1.09 , Deoghar 27.05.09 , 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010 12 Jharkhan Shri Ramayan  Poor quality of work Forwarded to the State It is reported that report sought 7. d Sharma, Sushila  Late payment of wages under Government on 30.6.2008 and from Dc- cum- DPC, Ranchi Bhavan, Post-Saparom NREGA in Saher Panchayat of reminder sent on 23.1.09 , vide letter no.7677 dated (Nagadi), Ranchi block Ratu, District Ranchi. 27.05.09 , 21.08.2009 & 22.11.08. and reminder 05.11.2009, no.1434 dated 24.02.09 and 16.12.09,08.02.10,03.03.10 and 2966 dated 27.04.09 31.03.2010 12 Jharkhan Shri Om Prakash Non- payment of wages for the past Forwarded to the State It is reported that the reply 8. d Aman, State many months to NREGA workers Government on 2.7.08. NLM received from Dc-cum- DPC Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Representative, in Manika Block of Latehar deputed, report received as per Latehar and is under Jharkhand Pradesh District. which the complaint is not found examination. Congress Committee correct. reminder sent on 23.1.09 , 27.05.09 & 21.08.2009 , 05.11.2009, 16.12.09,08.02.1003.03.10 and 31.03.2010 12 Jharkhan Times of India Activists come under attack for Forwarded to the State Reply is awaited, ATR not 9. d June 8, 2008 exposing graft in Jobs scheme- Government on 8.6.08 and received Social audit threat to local leaders reminders sent on 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010 13 Jharkhan Online article in NREG wages not paid, farmer sets Forwarded to the State Reply is awaited, ATR not 0. d Indian Express himself on fire Government on 3.6.08 and received July 3, 2008 reminders sent on3.7.08, 23.1.09 , 27.05.09, 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010 13 Jharkhan PMO office  Manipulation in payment of Forwarded to the State State Govt. has reported that 1. d forwarding a letter of wages Government on 21.7.08 and incomplete report received Shri Pitambar  Involvement of middlemen & reminders sent on 23.1.09 , from DC-cum-DPC, Simdega. Kandeyang, Village contractors and corruption in 27.05.09 , 21.08.2009 & Fresh report has been sought Navatoli, District the implementation of NREGA 05.11.2009, vide letter no.8541 dated Simdega 16.12.09,08.02.10,03.03.10 and 19.12.08 and reminder letter no 31.03.2010 1642 dated 28.02.09 13 Jharkhan Smt. Neelu Chopra,  Misappropriation of funds, Forwarded to the State The State Government has 2. d District Dhanbad  Use of sub standard material Government on 1/10/2008. NLM appointed Sh. D.K. Tiwari,  Getting commission under deputed, report received as per SLM to make an enquiry and Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government NREGA in Topchanchi block which the complaint is not found report. of District Dhanbad, Jharkhand correct. Reminders sent on 23.1.09 DC-cum-DPC, Dhanbad has by Shri Sanjiv Kumar (DFO) , 27.05.09 , 21.08.2009 & been asked to submit report Dhanbad. 05.11.2009, vide letter no.6769 dated 16.12.09,08.02.10,03.03.10 and 20.10.08 and reminder no.2352 31.03.2010 dated 26.03.09. Report is awaited. 13 Jharkhan Shri Raj Kumar Shau,  Using fake muster roll Forwarded to the State It is reported that report sought 3. d Village Turwa and  Misuse of funds Government on 8/10/2008 and from DC-cum-DPC, Latehar Ekmhuwa, Block  Failure to opening account reminders sent on 23.1.09 , vide letter no. 7676 dated Chandwa, District under NREGA. 27.05.09 , 21.08.2009 & 22.11.08. Reminder 8791 dated Latehaar 05.11.2009, 31.12.08 and letter no.1644 16.12.09,08.02.10,03.03.10 and dated 23.02.09. 31.03.2010 Reply is awaited 13 Jharkhan Article received Via  Low payment of wages Forwarded to the State It is reported that report sought 4. d Email by Mr. R.K.  Manipulation in job cards Government on 15/09/2008 and form DC, Chatra vide letter no. Rajak  Bogus job cards under NREGA reminders sent on 23.1.09 , 7628 dated 20.11.08 and September 12, 2008 in village Paroriya, Post 27.05.09 , 21.08.2009 & reminder no 2895 dated Badgawan, and District Chatra. 05.11.2009, 22.04.09. 16.12.09,08.02.10,03.03.10 and Reply is awaited 31.03.2010 13 Jharkhan Shri Panjabi Rawut,  Misappropriation of funds Forwarded to the State It is reported that report is 5. d President Twenty  Irregularities in the Government on 5.11.08 and awaited from Dc, Deoghar is Point Programme implementation of NREGA reminders sent on 23.1.09 , awaited. Implementation 27.05.09 , 21.08.2009 & Reply is awaited Committee, Block 05.11.2009, Mohanpur, Diostrict 16.12.09,08.02.10,03.03.10 and Deogarh 31.03.2010 13 Jharkhan E-mail received by the Pending payment of Forwarded to the State Reply is awaited 6. d Ministry from Jean Unemployment allowance in Government on 28.11.08 and Dreze Manika Block reminders sent on 23.1.09 , Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government (two letters have been sent) 27.05.09 , 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010 13 Jharkhan Shri Rameshwar  Misappropriation of funds Forwarded to the State Spot inspection has been 7. d Oraon, village Rehal,  Use of fake muster roll by Shri Government on 2.12.08 and conducted on 27.11.08 by GP Pandaypur, district Nand Kumar Ram , (Ex. reminders sent on 23.1.09 , Joint secretary, R.D.D., Latehar Engineer), Virender Chobe 27.05.09 , 21.08.2009 & Jharkhand and report submitted (A.E.), Dineshwar Tiwari 05.11.2009, on16.12.08. That report has (J.E.)and mediator Shiv Nandan 16.12.09,08.02.10,03.03.10 and been sent to Dc, Latehar for Yadav, Abhas Miya and Sanjay 31.03.2010 necessary action vide letter no. Oraon. 527 dated 20.01.09.

Reply is awaited 13 Jharkhan Shri Jean Dreze, Alleging involvement of Shri Forwarding to the Sate It is reported that report sought 8. d forwarding a Tasleem Ansari in NREGA scam Government on 31.12.2008 and from DC-cim-DPC, Palamu. complaint of Shri ‘construction of two roads at the reminder sent on 23.1.09 , Lakahman Bhuiyan, same spot’ in Palamau. 27.05.09 , 21.08.2009, Reply is awaited Jharkhand 16.12.09,08.02.10,03.03.10 and 31.03.2010 13 Jharkhan E-mail from Shri Jean Two NREGA activists Bhukan Forwarding to the Sate Reply is awaited 9. d Dreze, Singh and Niyamat Ansari were Government on 17.3.2009 and arrested on false charges in Manika, reminders sent on 27.05.09 & district Latehar 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010 14 Jharkhan Shri Jayant Pandey, Alleged for increase in the salary of Forwarding to the State It is reported that report has 0. d NREGA Karamchari NREGA karamchari. The Government on 20.04.2009 and been sought from Dc-cum- Sangh, Dhanbad, complainant alleged that Rs 3500 is reminders sent on 27.05.09 , DPC, Dhanbad. very less in compare to Panchayat 21.08.2009 & 05.11.2009, Sewak 16.12.09,08.02.10,03.03.10 and Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 31.03.2010 14 Jharkhan People of Khusdad Execution of work(check dam, dug Requested State Government for Reply is awaited 1. d Village, Nagar Uttari well) in violation of the decision of investigation on 08.07.2009 and Police Station the Aam Sabha and inaction of the reminders sent on 21.08.2009 & local administration of information 05.11.2009, in this matter. 16.12.09,08.02.10,03.03.10 and 31.03.2010 14 Jharkhan Sh. Thakur Hasda, Fraud of NREGA funds in Requested State Government for Reply is awaited 2. d Praband Parishad Hiranpur- Block, Pakur District of investigation on 17.07.2009 and member, Gram Jharkhand reminders sent on 21.08.2009 & Jampur 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010 14 Jharkhan Times Of India, 1st Harassing the women worker. The Requested State Government for Reply is awaited 3. d June 2009 worker Smt. Geeta Devi has alleged investigation on 02.06.2009 and that she received Rs 47000 for reminders sent on 21.08.2009 & construction of well. However, the 05.11.2009, second installment was not 16.12.09,08.02.10,03.03.10 and provided to her. 31.03.2010 14 Jharkhan Social Activist from Corruption, malpractices and Requested State Government for Reply is awaited 4. d Jaag Hazaribagh irregularities under NREGA. investigation on 29.07.2009 and organisation, District NLM division is requested on Hazaribagh 28.08.09. Reminder sent on 21.08.2009 & 05.11.2009, 16.12.09, 08.02.10,03.03.10 and 31.03.2010 14 Jharkhan Shri kailash Prasad, Financial irregularities in the Requested State Government for Reply is awaited 5. d Gram, Post, Prakhand implementation of NREGA by the investigation on 27.07.2009 and & Thana- Borio BDO, Borio Block and not reminders sent on 21.08.2009 & Bazar, District providing the information sought 05.11.2009, Sahebganj, Jharkhand under the RTI Act,2005. 16.12.09,08.02.10,03.03.10 and Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 31.03.2010 14 Jharkhan Shri Sudama Pandey, Involvement of middlemen in Requested State Government for Reply is awaited 6. d President of alloting work, underpayment of investigation on 07.08.2009 and Madhupur, Block wages and fradulent payment of reminders sent on 21.08.2009 & Congress Committee, wages 05.11.2009, Gram Saptar, Block- 16.12.09,08.02.10,03.03.10 and Madhopur, Deoghar 31.03.2010 District. Mobile: 9431313635 14 Jharkhan Prof. Jean Dreze, Alleging two cases of corruption, Requested State Government for 1. There was no siphoning off 7. d Member, Central malpractices and irregularities investigation on 07.09.2009. NREGA funds because the Employment under NREGA in Khunti and Evidences submitted by amount had been paid to the Guarantee Council Palamau Districts of Jharkhand. complainants were forwarded to workers as per their actual and Ms. Reetika State Government on 15.09.09 number of working days Khera, Centre for reminders on 16.09.09 & though irregularities were Development 05.11.2009 and replied to the detected in muster roll. Economics complainant on 23 .10.09. and The District Administration reminder on 31.03.2010 has taken immediate action against Rojgar Sathi and Gram Rojgar Sewak for irregularities detected in the MRs. FIR has been lodged against Rojgar Sathi(Mate) Shri Sunil Prajapati & Shri Ram Janam Ram and the contract of Shri Chandan Kumar,GRS has been cancelled. 2. Report awaited from the State Government 3. (i) FIR lodged aginst Sri Buka Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Munda, Smt. Sumitra Sanga and Sh. Dondo Pahan all Abhikartas of scheme( Construction of Pond at Siladon and Plantation at Samra Sthal in the village Sildon under Birhu Gram Panchayat)

(ii) Labhuk Samities dissolved. (iii) GRS of Birhu panchayat dismissed (iv) Panchayat Sewak of Birhu Panchayat suspended. (v) Recommended to the State Government for suspension of J.E. Sh. Dharmdeo Prasad Singh in charge of Birhu Panchayat. Made arrangements for easy payments through Banks/Post Offices by depositing Rs. 10 Lakh in Head Post Office, Khunti as advance so that they can clear the advices/invoices of wage payment as soon as they are received. 14 Jharkhan Shri Jai Prakash Sahu, Demand for bribe for doing work Requested State Government for Reply is awaited 8. d Pravakta, Zila and making measurement book , investigation on 08.09.2009 and Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Kryakani Sadasya, embezzlement and corruption in reminder sent on 05.11.2009, Jharkhand Mukti NREGA projects, misuse of funds 16.12.09,08.02.10,03.03.10 and Morcha Block- and irregularities in various 31.03.2010 Dhanvar, District schemes, use of poor quality Giridih materials, wages not being paid by the post offices and banks. 14 Jharkhan Shri Gopi Ram and Regarding failure to provide work Requested State Government for Reply is awaited 9. d others, Block Godda, during last two years investigation on 11.09.2009 and District Godda, reminder sent on 05.11.2009, Jharkhand 16.12.09,08.02.1003.03.10 and 31.03.2010 15 Jharkhan Shri Gopiram and Requested State Government for Reply is awaited 0. d others, District Godda Work not provided under NREGA investigation on 11.11.2009, in District Godda 16.12.09,08.02.10.03.03.10 and 31.03.2010 15 Jharkhan Shri Chandan Payment of wages not made by Requested State Government, Reply is awaited 1. d Hembrem, Block Bank Accounts, underpayment of 16.12.09,08.02.1003.03.10nt for Barhet, District wages under NREGA at Block investigation on 11.11.2009 Sahebganj Barhet, District Sahebganj 15 Jharkhan Shri Rohitashv Requested State Government for Reply is awaited Duplication of works under 2. d Bhagat, Gram investigation on 11.11.2009, NREGA at Gram Panchayat Gram Panchayat Pratappur, reminders on Panchayat Pratappur, Block Block Mehrama, 16.12.09,08.02.1003.03.10 and Mehrama, District Godda District Godda 31.03.2010 15 Jharkhan Shri Trilokinath Dev Irregularities in the renovation of Requested State Government for Reply is awaited 3. d and others, Gram pond, Social Audit being not investigation on 11.11.2009, Panchayat Lakhoria, conducted at Gram Panchayat reminders on Thana Sarwan, Lakhoria, Thana Sarwan, District 16.12.09,08.02.10,03.03.10 and District Devghar Devghar 31.03.2010 15 Jharkhan Jayant Pandey, Alleged for increase in the salary of Requested State Government for Reply is awaited 4. d NREGA Karamchari NREGA karamchari. The investigation on 20.4.2009 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Sangh, Dhanbad complainant alleged that Rs 3500 is reminders on 21.08.2009 & very less in compare to Panchayat 05.11.2009, Sewak 16.12.09,08.02.10,03.03.10 and 31.03.2010

15 Jharkhan Mr. Sambhu Nath Financial irregularities to the tune Requested State Government for Reply is awaited 5. d Singh, Coordinator, of Rs 3.995 Crores (mainly The investigation on 31/03/2010 Rastriya Mudde ke Mahatma Gandhi NREG liye Nagorik Ayog, scheme),Violation of The Mahatma Gumla, Jharkhand Gandhi NREG Act and guidelines, False entry in the Mahatma Gandhi NREGA’s Management Information System (MIS), Fake muster roll entries, Bogus vouchers for material purchase and No investigation/ action has been taken by the District Commissioner on the matter. 15 Karnatak E-mail received from No proper monthly payment, no Forwarded to the State Reply is awaited 6. a the Secretary of payment, no pay slips and no Government on 27/03/2009 and Karnataka identification from KEONICS reminders sent on 27.05.09 , 25 March 2009 21.08.2009 &05.11.2009 15 Karnatak Shri Shashi Kumar Irregularities in the implementation Forwarded to the State Reply is awaited 7. a of NREGA by the Panchayat Government on 30.12.2009 Secretary and Engineer in Biadarakote, Gram Panchayat, Mandya district. 15 Karnatak Shri C. K. Gangaiah, Regarding irregularities in the JD (NLM) has been requested to Reply is awaited 8. a Member, Gram implementation of Mahatma depute NLM for investigation on Panchayat, Gandhi NREGA in the district of 29.01.2010. Honisigere, Tumkur Tumkur, Karnataka by Panchayat Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government district President, Secretary, Engineers and concerned Government officials. 15 Kerala Shri G. Radhamani, Irregularities in the implementation Forwarded to State Government Reply is awaited 9. Valiyamoolayil of Mahatma Gandhi NREGA in on 3-2-2010 Veedu, Akathumuri, Cherunniyoor Gram Panchayat, Vennicode (PO), Kerala, Varkala, Trivandrum like not providing employment, (Dist) unemployment allowance and non payment of wages 16 Madhya Shri Ram Kumar and Misuse of funds under the NREGA Forwarded to the State Deputed State Quality Monitor 0. Pradesh others, Village Government on 30.9.08 and (SQM) Shri M.K. Shastri for Panchayat Janpad, reminders sent on 23.1.09, investigation. Report awaited. Block Junardev, 27.05.09 , 21.08.2009 & District Chhindwara 05.11.2009 16 Madhya Shri Uttam Pandey, Construction of PCC and drain at Forwarded to the State Reply is awaited 1. Pradesh District Sidhi, Nagar Panchayat Rampur Nakin Government on 01.04.09 and Madhya Pradesh instead of Gram Panchyat reminders sent on 27.05.09 , Ghughata under NREG Scheme in 21.08.2009 & 05.11.2009 District Sidhi. Which is violation of the guidelines of NREGA. 16 Madhya Ashok Patni, Bilala Forging & misappropriating of Forwarded to the State Reply is awaited 2. Pradesh Mill Road, Gram amount in Gram Panchayat Kaka Government on 28/04/2009 and Panchayat Kaka kheri, Kheri in 2008 ,neither any work reminders sent on 27.05.09 , District-Ashoknagar took place nor any issue of 21.08.2009 & 05.11.2009 jobcard& complaint against sarpanch, C.O., Sub. Engineer, Engineer,R.I.S &fake work shown on paper 16 Madhya Raghuvir and Others, Use of machinery, corruption in Forwarded to the State Reply is awaited 3. Pradesh Gram Panchayt Guda, Panchayat works. Government on 20.04.2009 and Pali reminders sent on 27.05.09 , Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 21.08.2009 & 05.11.2009 16 Madhya Shri Atul Gautham, Fund flow and unemployment Requested State Government for Reply is awaited 4. Pradesh Social Worker, Satna, allowance which is due from last investigation on 11.05.2009 and two years by Satna Zila Panchayat. reminders sent on 27.05.09 , 21.08.2009 & 05.11.2009 16 Madhya Shri Harprasad Corrupt practices by Shri Verma, Requested State Government for Reply is awaited 5. Pradesh Adivasi, adhyaksh, CEO, Zila Panchayat palera and investigation on 29.05.2009 and Zila Panchayat Palera, requesting for investigation by the reminders sent on 21.08.2009 & District Tikamgarh, CEO, Tikamgarh. 05.11.2009 Madhya Pradesh. 16 Madhya Shri Vishvakarma, Against Executive Engineer of Requested State Government for Reply is awaited 6. Pradesh Vishvakarma Sadan, PWD, Sh. Rajkumar Kala, S.D.O. investigation on 19.06.2009 and Malviya Colony, Lal Sh. S.L.Batham and Junior reminders sent on 21.08.2009 & Chowki, District Engineers Sh. R.S. Sawnalay, Sh. 05.11.2009 Khandwa, Madhya K.K.Kurapa, Sh. S.C. Dighe Pradesh regarding corruption in various road projects. Alleged that only 35% of sanctioned money was used for road projects. Found corruption of 22.5 lakh.

16 Madhya Sh. Avaneesh Non payment and Delay in wages, Requested State Government for Reply is awaited 7. Pradesh Bhargava, President, fake payment and use of machinery investigation on 16.7.2009 and District Congress in Bhopal. reminders sent on 21.08.2009 & Committee Bhopal 05.11.2009 and NLM report (Gramin), Bhopal forwarded to State Government for action and comments on 09.10.2009 16 Madhya Shri Chainsingh Sarpanch is demanding money Requested State Government for Reply is awaited 8. Pradesh Nagar, Gram from complainant for completing investigation on 06.07.2009 and Panchayat Tutiahedi, the well excavation work. reminders sent on 21.08.2009 & Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Tehsil Sarangpur 05.11.2009 16 Madhya Shri Rameshchandra Sarpanch is demanding money Requested State Government for Reply is awaited 9. Pradesh Nagar, Gram from complainant for investigation on 06.07.2009 and Panchayat Tutiahedi, completingthe well excavation reminders sent on 21.08.2009 & Tehsil Sarangpur work. 05.11.2009 17 Madhya Shri Jeevan Sakhla, Misconduct of publicity work in the Requested State Government for Reply is awaited 0. Pradesh Press Reporter, Khatik Khatik Mohalla, Garoth District- investigation on 17.07.2009 and Mohalla, Garoth- Mandsaur and misappropriation of reminders sent on 21.08.2009 & Janpad, District- funds of around Rs. 4 lakhs 05.11.2009 Mandsaur, 458880, 09826340807 17 Madhya Shri Kunwar S/o Shri Use of criminal force to obtained Requested State Government for Instructions has been issued to 1. Pradesh Hukum Singh Parihar, signature from poor villagers for investigation on 15.07.2009 and CEO Shivpuri to look in to Village & Post & certifying the organization of gram reminders sent on 21.08.2009, matter early Thana Survaya, sabha, forgery of job cards, low 05.11.2009 &11.12.2009 Janpad Panchayat- quality of road work & Shivpuri, District- misappropriation of funds, failure Shivpuri to conduct social audit 17 Madhya Shri Jaswant Singh Misappropriation of funds and Requested State Government for Instructions has been issued to 2. Pradesh Rathore, 75, corruption in digging of wells under investigation on 17.07.2009 and CEO Dhar to look in to matter Kashibagh Colony , Kapil Dhara Yojna reminders sent on 21.08.2009 & early Dhar 05.11.2009 17 Madhya Shri Shivnarayan Non Payment of wages and dug Requested State Government for Instructions has been issued to 3. Pradesh Dwedi, Gram well work under NREGA has been investigation on 17.07.2009 and CEO Rewa to look in to matter Panchayat Aitla, stopped reminders sent on 21.08.2009 & early Janpad Panchayat 05.11.2009 Raipur Kurch, District Rewa 17 Madhya Villagers of Gram Complaining of improper Requested State Government for Instructions has been issued to 4. Pradesh Panchayat Jamuniya implementation of NREGA and investigation on 17.07.2009 and CEO Chindwara to look in to Jethu, Tehsil Parasia, requesting to investigate muster reminders sent on 21.08.2009 & matter early. Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government District Chindwada rolls, Physical verification of works 05.11.2009 (Shri Surender and quality checking in respect of Satankar & others) M.B. road construction and scrutiny of Panchayat documents relating to NREGA works during last 3 years. 17 Madhya Shri Anand Kumar Fake Muster rolls and payment of Requested State Government for Instructions has been issued to 5. Pradesh Sharma, Gram and wages in digging of wells under investigation on 17.07.2009 and CEO Satna to look in to matter Post Badkhera, Janpad Kapil Dhara Yojna under NREGA reminders sent on 21.08.2009 & early Panchayat Majhgaun, 05.11.2009 District Satna 17 Madhya Shri Jalil Ansari, S/o Misappropriation of funds and Requested State Government for Instruction has been issued to 6. Pradesh Shri Khalil, R/o Bahar corruption in digging of wells under investigation on 24.07.2009 and the Collector/D.P.C , Shaher Chanderi, Kapil Dhara Yojna in NREGA. reminders sent on 21.08.2009 & Ashoknagar, M.P. to District Ashoknagar 05.11.2009 investigate the matter. 17 Madhya Shri Mangi Lal Wages not being paid to the Requested State Government for Instruction has been issued to 7. Pradesh Rathod, Gram Dabla workers and nonpayment to the investigation on 24.07.2009 and the Collector/D.P.C , MadhoSingh, Tehsil material supplier also for last three reminders sent on 21.08.2009 & Mandsaur, M.P. to investigate Bhanpura, District months 05.11.2009 the matter. Mandsaur 17 Madhya News paper item Editor of Saptahik “Khabro Ka Requested State Government for Reply is awaited 8. Pradesh forwarded by the Hamrahi” Chhattarpur , Madhya investigation on 04.08.2009 and Editor of Saptahik Pradesh complaining against reminders sent on 21.08.2009 & “Khabro Ka Hamrahi” Sarpanch & Secretary of Kund 05.11.2009 Gram Panchayat in Chhattarpur District for alleged forgery in muster rolls by including the name of a dead person under NREGA

17 Madhya Shri Kandhi Lal Sahu Regarding ficitious road work from Requested State Government for Instruction has been issued to 9. Pradesh S/o Shri Lachi Ram Dhoomavati Mandir to Kisanpur investigation on 31.07.2009 and the Collector/D.P.C , Seoni, Sahu, Panchayat under NREGA & failure to enter reminders sent on 21.08.2009 & M.P. to investigate the matter. Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Reprsentatives, Gram data in NREGA website 05.11.2009 Panchayat- Dhooma, Janpad- Lakhnadaun, Seoni 18 Madhya Shri Kailash Kundal, Fake entries in Job cards, use of Requested State Government for Instruction has been issued to 0. Pradesh President of District machinery, payment made through investigation on 24.08.2009 and the Collector/D.P.C , Dewas, Congress Committee, fake vouchers & bills under reminders sent on 21.08.2009 & M.P. to investigate the matter Dewas District NREGA 05.11.2009. The MoS (RD-PJ) has replied to the complainant on (Forwarded by Sh. 30.09.2009 Suresh Pachauri through MOS(PJ)) 18 Madhya Shri Nathu Singh S/o Alleged that Sarpanch Sh. Sardar Requested State Government for Reply is awaited 1. Pradesh Shri Magoo singh singh has stopped the work of investigation on 12.08.2009 and Gram- Piplya construction of well under NREGS reminders sent on 21.08.2009 & Mohmmmad, Tehsil- and is demanding bribe to restart 05.11.2009 Garoth, Mandsaur the work District

18 Madhya Shri Ram Lal Shukla Not providing information sought Requested State Government for Instruction has been issued to 2. Pradesh S/o Shri Ram Vishal under RTI Act, 2005 and requesting investigation on 21.08.2009 and the CEO Rewa , M.P. to Shukla, Gram and to investigate into irregularities and reminder sent on 21.08.2009 investigate the matter Post- Lohi, Tehsil- corruption in the NREGS. Hujur

18 Madhya Shri Mansingh Thakur Alleging irregularities and Requested State Government for Reply is awaited 3. Pradesh and others, Gram corruption done by Secretary and investigation on 2.09.2009 and Panchayat-Virora Sarpanch in the NREGA reminders sent on 21.08.2009 & Pahar Khas, 05.11.2009 Tikamgarh District 18 Madhya Shri Shivkumar Alleging works are not done Requested State Government for Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Pradesh Patwa, Former physically like road construction, investigation on 04.09.2009 and General Secretary , pond construction etc. reminder sent on 05.11.2009 Zila - Congress misapprorpriation of funds & Committee, District- forgery in muster rolls against Singhroli Secretary and Sarpanch of Gram Panchayat Kursa 18 Madhya Shri Ramayan, Gram Payment of wages made through Requested State Government for The State Government has 5. Pradesh Panchayat Kheda, ghost workers and dead persons, investigation on 08.09.2009 and reported that the DC cum DPC District Sidhi use of low quality material in reminder sent on 05.11.2009 Sidhi to reply immediately works, Gram Pradhan Keep job cards in his custody. 18 Madhya Shri Chandan Pandey, Bypassing trained mates and Requested State Government for The State Government has 6. Pradesh Gram Panchayat corruption under NREGA investigation on 08.09.2009 and reported that the DC cum DPC Duari, Janpad reminder sent on 05.11.2009 Rewato reply immediately Panchayat Raipur Kurch, District Rewa 18 Madhya Shri Kailash Prasad Non-payment of wages of workers, Requested State Government for The State Government has 7. Pradesh Yadav, Gram job cards kept by Sarpanch, investigation on 08.09.2009 and reported that the DC cum DPC Panchayat Lidwaha, duplication in dug well construction reminder sent on 05.11.2009 Tikamgarh to reply Tehsil Prithivipur , works under NREGA at Durretha, immediately District Tikamgarh Mastapur and Raniganj Gram Panchayats in District Tikamgarh. 18 Madhya Shri Kashiram, Gram Non-payment of wages to the Requested State Government for The State Government has 8. Pradesh Panchayat Dargaun workers, manipulation in the job investigation on 08.09.2009 and reported that the DC cum DPC Khurd, District cards under NREGA reminder sent on 05.11.2009 Tikamgarh to reply Tikamgarh immediately 18 Madhya Shri Yadvendra Not completing various works Requested State Government for The State Government has 9. Pradesh Yadav, MLA, Taal under NREGA in District investigation on 08.09.2009 and reported that the DC cum DPC Darwaja, Tikamgarh Tikamgarh reminder sent on 05.11.2009 Tikamgarh to reply immediately 19 Madhya Shri Punte Ahirwar, Duplication of well construction Requested State Government for The State Government has Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Pradesh Gram Kurrai, Tehsil works and involvement of investigation on 08.09.2009 and reported that the DC cum DPC Jatara, District contractors under NREGA. reminder sent on 05.11.2009 Tikamgarh to reply Tikamgarh immediately 19 Madhya Shri Mannulal, Gram Payment of wages not being not to Requested State Government for The State Government has 1. Pradesh Panchayat Kantikhas, workers, embezzlement, corruption investigation on 08.09.2009 and reported that the DC cum DPC District Tikamgarh in the Gram Panchayat Kantikhas reminder sent on 05.11.2009 Tikamgarh to reply immediately 19 Madhya Shri Brijnandan Duplication in construction of Requested State Government for The State Government has 2. Pradesh Yadav, Orcha road, dugwells, corruption under investigation on 08.09.2009 and reported that the DC cum DPC Prithivipur, District NREGA in the Block Prithivipur of reminder sent on 05.11.2009 Tikamgarh to reply Tikamgarh Tikamgarh District. immediately 19 Madhya Shri Chota, Gram Use of low quality material in Requested State Government for The State Government has 3. Pradesh Panchayat Dargaun construction of dug wells, investigation on 08.09.2009 and reported that the DC cum DPC Khurd, Tehsil Jatara, paymement of wages not being reminder sent on 05.11.2009 Tikamgarh to reply District Tikamgarh made under NREGA in Gram immediately Panchayat Dargaun Khurd 19 Madhya Smt. Meera Yadav, Duplication of dug wells Requested State Government for The State Government has 4. Pradesh MLA, A/139 Housing contruction works, use of low investigation on 08.09.2009 and reported that the DC cum DPC Board Colony, quality material, job cards kept by reminder sent on 05.11.2009 Tikamgarh to reply Kohefiza, Bhopal Gram Pradhan in Gram Panchayat immediately Bhamaura, Tehsil Niwadi, District Tikamgarh 19 Madhya Shri Ramkumar and Fake works taken up, Requested State Government for It is reported that quality of 5. Pradesh others, Gram- misappropriation of funds ,bogus investigation on 08.09.2009 and work is poor. The amount, Jyoramora, Tehsil- job cards ,using fake bills and poor reminder sent on 05.11.2009 which is to be recovered ,is Prithvipur, District quality of materials were used in being estimated. Tikamgarh NREGS.

19 Madhya Shri Mahendra Singh, Duplication and use of low quality Requested State Government for The State Government has 6. Pradesh Taal Darwaja, District material in the construction of dug investigation on 11.09.2009 and reported that the DC cum DPC Tikamgarh wells under NREGA, Gram Sabha reminder sent on 05.11.2009 Tikamgarh to reply Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Meetings not being held, no shelf of immediately projects preparedin District Tikamgarh. 19 Madhya Shri Brijmohan, Gram Payment of wages not made to Requested State Government for Reply is awaited 7. Pradesh Purainia, Gram workers, fudged entries in muster investigation on 11.09.2009 and Panchayat Ramnagar, rolls, embezzlement done under reminder sent on 05.11.2009 District Tikamgarh NREGA. 19 Madhya Shri Sobaran Singh, Use of machinery and involvement Requested State Government for Reply is awaited 8. Pradesh Gram Panchayat of contractor under NREGA. investigation on 11.09.2009 and khanjapura, Tehsil reminder sent on 05.11.2009 Sewenda, District Datia 19 Madhya Shri Bharat Pal and Duplication of works and Requested State Government for The State Government has 9. Pradesh others, Gram embezzlement under NREGA in investigation on 11.09.2009 and reported that the DC cum DPC Panchayat Bhamaura, District Tikamgarh. reminder sent on 05.11.2009 Tikamgarh to reply District Tikamgarh. immediately 20 Madhya 273/PS/M(RD)/09 Corruption, misuse of NREGA Requested State Government for Reply is awaited 0. Pradesh Shri Harpal Singh, fund, fake muster rolls and investigation on 30.09.2009 and Ward Panch, fraudulent withdrawal from bank reminder sent on 05.11.2009 Panchayat Pveya, accounts of non- existent workers Vikas Khand by Sarpanch, Sachiv, J.E. and Sohaval , District Divisional Officer under NREGA Satna, Madhya Pradesh 20 Madhya Shri Banke Bihari Various problems of Panchayat Requested State Government for Reply is awaited 1. Pradesh Sharma, Prantia Sachiv under NREGA investigation on 22.10.2009 and Upadhyaksh, reminder sent on 05.11.2009 Panchayat Sachiv Mahasangh Bhopal, Madhya Pradesh 20 Madhya Shri Shivraman Singh Corruption in the printing of job Requested State Government for Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Pradesh Rathore, Gram cards and photographs under investigation on 14.10.2009 and Panchayat Indergarh, NREGA in District Datia. reminder sent on 05.11.2009 District Datia 20 Madhya 537/VIP/Secy RD Requesting to create a Task Force Requested State Government for Reply is awaited 3. Pradesh Prime Minister’s for proper implementation of investigation on 06.11.2009 Office forwarded NREGA Scheme in Madhya aletter of Shri Uday Pradesh Pratap Singh, Member of Parliament (LS) dated 19.09.2009 20 Madhya Shri Nabin Sahu, Corruption, manipulation in job Requested State Government for Reply is awaited 4. Pradesh District President, cards and use of machinery under investigation on 17.11.2009 District Youth NREGA. Congress (I) Committee (Grameen), Jatara, District Tikamgarh, Madhya Pradesh ( From office of MOS- RD-PJ) 20 Madhya Shri Mukesh Gupta, Failure to provide work for job card Requested State Government for Reply is awaited 5. Pradesh Shri Rakesh Sahu, and holders, corruption, fake muster investigation on 17.11.2009 Villegers, Gram rolls and misuse of NREGA fund Kamrari, District by Secretary and Pradhan. Datia, Madhya Pradesh 20 Madhya Shri Chiddo Khan, Failure to conduct committee Requested State Government for Reply is awaited 6. Pradesh Sabhapati, Sanchar meeting investigation on 11.11.2009 and Sankaram Samiti, Gram- Bodera, Janpad Panchayat- Tikamgarh Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 20 Madhya Villagers of Gram To keep job cards in the custody of Requested State Government for Reply is awaited 7. Pradesh Panchayat- Bharjhuna Secretary & works done by investigation on 11.11.2009 Kala, Janpad contractors in the Kapil Dhara Panchayat- Sohawal, project District- Satna 20 Madhya Smt Gangotri Devi Issuance of fake job cards, fake Requested State Government for Reply is awaited 8. Pradesh and others, Gram entries in muster roll, duplication in investigation on 11.11.2009 Panchayat Chatuwa, well construction work under Block Dindori, NREGA at Gram Panchayat District Dindori Chatuwa, Block Dindori, District Dindori 20 Madhya Shri Narayan Verma, Embezzlement and corruption Requested State Government for Reply is awaited 9. Pradesh Gram Panchayat under NREGA at Gram Panchayat investigation on 11.11.2009 Patlawad, Block Patlawad, Block Dhamnod, Tehsil Dhamnod, Tehsil Dharampuri, District Dhar Dharampuri, District Dhar 21 Madhya Villagers of Gram Use of low quality material in Requested State Government for Reply is awaited 0. Pradesh Panchayat Dumduma, various projects under NREGA at investigation on 11.11.2009 Block Prithivipur, Gram Panchayat Dumduma, Block District Tikamgarh Prithivipur, District Tikamgarh 21 Madhya Shri Manohar Singh Embezzlement of NREGA funds Requested State Government for Reply is awaited 1. Pradesh and others, Gram around Rs. 80 Lacks, use of JCB investigation on 11.11.2009 Panchayat- Auston, machines, use of poor quality District- Tikamgarh materials.

21 Madhya Shri Radhey Shyam Use of JCB machines, work are not Requested State Government for Reply is awaited 2. Pradesh and others, Gram done physically, irregularities and investigation on 11.11.2009 Post- Chirola, Tehsil- corruption done in various NREG Pathariya, District- Schemes. Damoh Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 21 Madhya 760/VIP/S(RD)/09 Corruption by the Sarpanch, Gram Requested State Government for Reply is awaited 3. Pradesh A letter from the Panchayat Barethi, Satna District, investigation and requested NLM Hon’ble Prime Madhya Pradesh. Division for appointing NLM on Minister forwarding a 09.12.2009 copy of letter dated 06.11.09 of Shri Devraj Singh Patel, Member of Parliament, Lok Sabha. 21 Madhya Shri Ashok Shinde, Alleged irregularities amounting to Rs. Requested State Government for Reply is awaited 4. Pradesh Editor in charge, 13.68 crore by Sh. Nikunj Srivastava, investigation on 6.1.2010 Navbharat Press, Collector, Chhindwara, under National Chhindwara, Madhya Rural Employment Guarantee Scheme Pradesh 21 Madhya Shri Deepak Kumar Allegations of corruption against Sh. Requested State Government for Reply is awaited 5. Pradesh Mishra, Advocate Santosh Patel, CEO, Sohagpur investigation on 8.1.2010 District and Session Panchayat in Shahdol district in the Court, Shahadol, implementation of NREGA & Madhya Pradesh possessing assets of more than his known source of income.

21 Madhya Petition of the workers Alleged non payment of wages to Requested State Government for Reply is awaited 6. Pradesh of Gram Morrammana, workers and use of machines/tractors investigation on 8.1.2010 Gram Panchayat Guda, under NREGA. near Pali, District Tikamgarh, Madhya Pradesh 21 Madhya Shri Vijay Agrawal, Alleged lack of support from district Requested State Government for Reply is awaited 7. Pradesh 6PM Newspaper, administration to the people of Mhow investigation on 8.1.2010 Lunawat Publications & Tehsil. Media (P) Ltd., Dhenu Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government market, Indore,, Madhya Pradesh 21 Madhya Shri Umesh Agnihotri, Irregularities and corruption of crore of Requested State Government for Reply is awaited 8. Pradesh President , BJP, rupees by the collector Sh. Maneesh investigation on 8.1.2010 Bhrastachar Unmulan Shrivastava in the implementation of Manch, Bhopal, Madhya NREGA in the district of Shivpuri, Pradesh Madhya Pradesh.

21 Madhya Sh. Chandrika Prasad Alleged corruption under NREGA to Requested State Government for Reply is awaited 9. Pradesh Dwivedi, Member, the tune of rupees 12.73 lakhs by the Sri investigation on 13.1.2010 Madhya Pradesh Krishna Swasahayata Samooh Sanstha, Congress Committee, Gram Alampura, Janpad Panchayat Bhopal, Madhya Palera, District Tikamgarh, Madhya Pradesh Pradesh.

22 Madhya Sh. Manish Vani, Alleged corruption, substandard Requested State Government for Reply is awaited 0. Pradesh District Vice President, work/construction, use of machines and investigation on 13.1.2010 Youth Congress, 31, contractors under NREGA in Alirajpur Vinoba Marg, Jobat, district, Madhya Pradesh. District Alirajpur, Madhya Pradesh, 22 Madhya Shri Deepak Kumar Allegations of irregularities and Requested State Government for Reply is awaited 1. Pradesh Mishra, Advocate corruption against 77 Sarpanchs and investigation on 21.1.2010 District and Session Secretaries of Gram Panchayats in Court, Shahdol Sohagpur Block of Shahdol district, Madhya Pradesh in the implementation of NREGA

22 Madhya The report dated Reported starvation death in NREGA Requested State Government for Reply is awaited 2. Pradesh 6.1.2010, captioned worker’s family in Sehora block of the investigation on 21.1.2010 “Starvation death in Jabalpur district in Madhya Pradesh. Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government NREGA worker’s family”, published in The Hindu newspaper 22 Madhya Shri Shobha Ram Alleging misappropriation of funds Requested State Government for Reply is awaited 3. Pradesh Chaudhary and Shri under NREGA by Delgaon Panchayat. investigation on 1.2.2010. Girdharilal Chaudhary, Delgaon, PO-Dhangaon, An NLM enquiry has been conducted. district Khandwa of After examining the report it has been Madhya Predesh observed that the complaints are (forwarded by malafide and has no substance. The President’s complainants failed to prove the Secretariat ) allegation against the Sarpanch and Secretary inspite of the best efforts by the NLM. 22 Madhya Shri Santosh Kumar Rai, Alleging irregularities amounting to Requested State Government for Reply is awaited 4. Pradesh Councillor, Housing Rs. 13.68 crore by Shri B.M.Sharma, investigation on 5.2.2010 Board Colony Collector, Dhar and incharge Sh. (forwarded by President Bhadhoria under NREGS Secretariat), Chhindwara

22 Madhya Shri Jairam Choudhary, Alleged misappropriation of funds Requested State Government for Reply is awaited 5. Pradesh Delgaon, PO-Dhangaon, under NREGA by Sarpanch and investigation on 5.2.2010 district Khandwa of Secretary of Delgaon Panchayat. Madhya Predesh An NLM enquiry has been conducted. (forwarded by After examining the report it has been President Secretariat) observed that the complaints are malafide and has no substance. The complainants failed to prove the allegation against the Sarpanch and Secretary inspite of the best efforts by the NLM. 22 Madhya Shri Vijay Kumar Misappropriation of fund by using Requested State Government for Reply is awaited 6. Pradesh Choudhary and others name of non existence workers under investigation on 5.2.2010 NREGA in GP-Khami, Barghat, Seoni Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government district. 22 Madhya Shri Shiv Prasad Shukla, Corruption & payment of the wage in Requested State Government for Reply is awaited 7. Pradesh village Mughar, tehsil the non existence workers by village investigation on 5.2.2010 Nagoud, district Satna. Sarpanch. 22 Madhya Sh. Rajesh Nayak Taking commission and Requested State Government for Reply is awaited 8. Pradesh Saurabh, Deputy misappropriation of fund under investigation on 5.2.2010 President Yuva JD(U), NREGA in district Panchayat Katni by Katni Sh. Rajendra Singh incharge officer. 22 Madhya Villagers of Kachriya, Using fake muster roll and under Requested State Government for Reply is awaited 9. Pradesh Post-Kaparwari, payment of wage by sarpanch/sachiv investigation on 5.2.2010 Chhindwara. in GP Kachriya, district Chhindwara. 23 Madhya Sh. Sanjay Misra, Corruption and violation of NREGS’s Requested State Government for Reply is awaited 0. Pradesh Khandwa guideline in execution of following investigation on 17.2.2010 works:  Alteration and widening of road from Dival to Bilud  Alteration from Arud to Hirapur  Alteration of road from Rustampur to Pandhana  Expansion & deepening of drain in Bamangoan Aakhai  Desilting, earthwork, pitching and construction of ‘Ghat’ in Punasa

by Sh. Nikunj Srivastava, collector then Khandwa, Dr. Sanjay Goyal then CEO, Shri J.P. Srivastva, existing collector Neemach, Shri R.R. Ahirwar account officer, Executive Engineer (water resource) Sh. L.N. Gandhi and Executive Engineer (PWD) Sh. P.N. Vajpayee. Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 23 Madhya Sh. Suresh Kumar, Non-payment of wage under NREGA. Requested State Government for Reply is awaited 1. Pradesh village Barod, Tehsil investigation on 17.2.2010 Sitamau, district Madsour 23 Madhya Shri Radheshyam, Corruption and misappropriation of Requested State Government for Reply is awaited 2. Pradesh [forwarded by MoS fund under NREGS investigation on 17.2.2010 (RD-SA)] Village Chirola, Tehsil Pathria, District Damoh of Madhya Predesh.

23 Madhya Sh. Arundev Pandey, Misuse of fund under NREGS by Requested State Government for Reply is awaited 3. Pradesh Advocate, vill. Sh. Diwakar Narayan Patel, then investigation on 19.2.2010 KhatKhari, Post- CEO, Devsar-Badain Khutar, District Sangrouli 23 Madhya Sh. Om Prakash Misappropriation of fund and Requested State Government for Reply is awaited 4. Pradesh Pandey & others, Vill. inferiority in work under NREGS. investigation on 19.2.2010 Jhonta, Block- Majhgawan,district Satna 23 Madhya Sh. Mangi Lal, vill. Corruption in implementation of Requested State Government for Reply is awaited 5. Pradesh Pahela, tehsil Karahal, NREGS in GP Pahela. investigation on 19.2.2010 district Sheopur 23 Madhya Sh. Pawan Dhuwara, Corruption under NREGS in Requested State Government for Reply is awaited 6. Pradesh Mahamantri, District district Tikamgarh and Chhatarpur. investigation on 19.2.2010 Congress Committee Tikamgarh 23 Madhya Sh. Daulatram Patel, Newspaper cuttings alleging Requested State Government for Reply is awaited 7. Pradesh Ujjain charging of commission by the in- investigation on 4.3.2010 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government [forwarded by Prime charge from Panchayat Secretaries Minister’s Office] for implementation of NREGA.

23 Madhya Sh. Laxminarayan Regarding filling up of pond well Requested State Government for Reply is awaited 8. Pradesh Nayak, Ex-MP (Lok from river Jamani and Dhasaan by investigation on 4.3.2010 Sabha) making stop dams in Tikamgarh [forwarded by Prime district of Madhya Pradesh. Minister’s Office] 23 Madhya Shri Kalu, village Fake job cards and Requested State Government for Reply is awaited 9. Pradesh Chhaayanmaina, tehsil misappropriation of fund investigation on 3.3.2010 Sonkachch, district Devas 24 Madhya Ram Bihari Garg, Irregularities in conferring ‘Nirmal Requested State Government for Reply is awaited 0. Pradesh G&P Khutaha, district Gram Puruskar’ to GP-Khutaha investigation on 3.3.2010 Satna 24 Madhya Sh. Ram Prakash Making of job card of dead person, Requested State Government for Reply is awaited 1. Pradesh Chaturvedi, Dy. Fake muster roll and fraud of Rs. investigation on 5.4.2010 Sarpanch, village 20 lakh approximate by secretary panchayat Charhet, Rakesh Kumar with the help of JP- Jaisinghnagar, CEO Jaisinghnagar. district Shahdol 24 Madhya Villagers of Jamali, Work is not provided, under Requested State Government for Reply is awaited 2. Pradesh tehsil Gandhvani, payment of wage, non disclosure of investigation on 5.4.2010 district Dhar information and late payment of wage by village Secretary 24 Maharash Shri Rajan Kshirsagar, Non-issuance of job cards, delay in Forwarded to the State Reply is awaited. 3. tra Joint Secretary, starting the NREGA work and Government on 29.8.08 and Maharashtra Rajya failure to provide the reminders sent on 23.1.09 , Shetmajoor Union 27.05.09 , 21.08.2009 & unemployment allowance as per the (lalbawta) 05.11.2009 Shivajinagar, provision of NREG Act. Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Parbhani, district Beed 24 Maharash Shri Baliram Non- issuance of job card, works Forwarded to the State The Government of 4. tra Bhumbe,Taluka not being started and refusal to Government on 29.8.08 and Maharashtra, Planning Committee Majalgaon accept form no. 04 under NREGA. reminders sent on 23.1.09 , Commission vide letter No. District Beed, 27.05.09 , 21.08.2009 & MREGS-2008/CR-51/EGS-6, Maharastra 05.11.2009 dated 18-2-2010 has reported that the enquiry was conducted under the Collector of Beed and the Action Taken Report has been sent to the complainant. 24 Maharash Shri Harishchandra Misappropriation of NREGA Fund Forwarded to the State Reply is awaited. 5. tra Pawar, Human Right by the Govt. of Maharashtra. Government on 29.8.08 and Activist, C/16, Hudco reminders sent on 23.1.09 , Colony Mangrulpir 27.05.09 , 21.08.2009 & Tah. Mangrulpir, 05.11.2009 District Washim 24 Maharash Shri. Harishchandra Nonpayment of legitimate wages of Requested State Government for Reply is awaited 6. tra Pawar, President of one hundred days from 2006 to investigation on 08.05.2009 , and NREGS, Labour 2008 reminders sent on 27.05.09 , Organisation, Tq 21.08.2009 & 05.11.2009 Mangrulpir , District Washim, Maharashtra 24 Maharash Mr. Harishchandra Failure of the Government in Requested State Government for Reply is awaited 7. tra Pawar, President, proper implementation of the investigation on 09. 06.09 and Adarsh Gram Vikas NREGA. Misappropriation of reminders sent on 21.08.2009 & Mandal NREGS funds and failure in the 05.11.2009 District Mangrulpir formulation of rules under section 32 of NREG Act, failure in submission of Annual Reports, etc Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 24 Maharash Mr. Rajan Kshirsagar, Job Cards have not been issued to Requested State Government for Reply is awaited 8. tra General Secretary, all the applicants, No training to investigation on 04. 06.09 and Centre of Indian Trade Gram Rozgar Sevak's, Minimum reminders sent on 21.08.2009 & Union wages not paid at Walur Tal Selu. 05.11.2009

24 Maharash Col. B. K Gupta, Irregularities in Amaravathi District Requested State Government for ATR in Marathi language has 9. tra NLM Report of Maharashtra. investigation on 15. 07.09 and been received form State Govt. reminders sent on 21.08.2009 & State Govt has been requested 05.11.2009 to forward ATR in English/Hindi language 25 Maharash Shri Harischandra Threatening to go on fast unto Forwarded to State Government Reply is awaited 0. tra Pawar, President , The death from 15.08.09 in front of on 19.08.2008 and reminder sent NREGS Labour Rashtrapati Bhavan, New Delhi. on 05.11.2009 Organisation of India Regarding payment of wages and unemployment allowance. 25 Maharash General Secretary, Regarding demands of Gram Forwarded to the State Reply is awaited 1. tra Centre of India Trade Rozgar Sahayaks of Aurangabad Government on 22.01.2010 Unions 25 Maharash Prof. Madhu Patil Regarding irregularities in the Forwarded to State Govt on 24-2- Reply is awaited 2. tra implementation of the Mahatma 2010 Gandhi NREGA in Parnada Block, Osmanabad District.

25 Manipur www.Kanglaonline.co Ccpur Villagers beaten up badly for Forwarded to the State Reply is awaited 3. m refusing to pay militants. Government on 1.06.08 and June 1, 2008 reminders sent on 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 25 Manipur Article in The Fake job card scam under scanner Forwarded to the State Reply is awaited 4. Statesman in Manipur Government on 26.08.08 and August 26, 2008 reminders sent on 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 25 Manipur Shri Paominthang,  Job card holders do not Forwarded to the State Reply is awaited 5. Social Worker, received actual allotted work Government on 17.10.08 and Henglep Sub-  General public of Henglep reminders sent on 23.1.09 , Division, Block got only 65 days of 27.05.09 , 21.08.2009 & 05.11.2009 Churachandpur works in comparison with District ,Manipur other Blocks  Deputy Commissioner has diverted 45 days working money for Famine Relief Funds 25 Manipur Article in www.e- NREGS workers file case against Forwarded to the State Reply is awaited 6. pao.net Pradhan Government on 20/03/2009 and Dated: 16 March 2009 reminders sent on , 27.05.09 , 21.08.2009 & 05.11.2009 25 Manipur Shri Dineshwar Regarding show cause notice by Forwarded to the State Reply is awaited 7. Meetei, Pradhan, Smt Bimola Devi, Member, Takyel Government on 9-3-2010 Gram Panchayat Zilla Parishad to Shri Dineshwar Meetei, Pradhan, Takyel Gram Panchayat .

25 Nagaland Article in The Morung Where is the NREGA money? Forwarded to the State Reply is awaited 8. Express Government 3.9.08 and reminders 1st September, 2008 sent on 23.1.09 , 27.05.09 , (Villagers of Rurur in 21.08.2009 & 05.11.2009 Shamator Block, Dimapur) 25 Orissa Shri Jayadev Jena, Alleged Non-issuance of job cards Forwarded to State Government The enquiry revels that there is 9. M.L.A. & President, under NREGA in Launa Patuni on 19.09.07. Reminders sent on no such village in the name of Orissa Pradesh Village of Chamakpur GP under 28.11.07, 26.02.08, 5.5.2008, Launa Patuni Chamkpur GP Congress Committee, Joda Block in Keonjhar district of 23.5.08, 29.5.08,5.06.08 , 23.1.09 , under Joda Block in Keonjhar Bhubaneswar Orissa 27.05.09 & 21.08.2009 & District as reported by PD, Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 05.11.2009, DRDA, Keonjhar. Hence the 16.12.09,08.02.10,03.03.10 and question of Non-issuance of 31.03.2010 job cards to villager’s dosen’t arises so the allegation is baseless. 26 Orissa Shri Ayodhaya Nath Issuance of job cards to non – Forwarded to the State It is reported by PD, DRDA, 0. Mishra, vill. Bargaon, labourers under NREGA Government 8.5.08 and reminders Nuapada that the allegation district Nuapada sent on 23.1.09 , 27.05.09 made by Shri Ayodhaya Nath 21.08.2009 & 05.11.2009, Mishra regarding corruption, 16.12.09,08.02.10,03.03.10 and payment made through 31.03.2010 imperfect muster rolls, poor quality of work are baseless . on enquiry it is found that in the GP Bargaon there were 1029 households registered under NREGS and job cards have been issued to all of them. Hence, there is no deviation in regard to issuance of job cards. 26 Orissa Times of India Activists come under attack for Forwarded to the State This allegation relates to two 1. June 8, 2008 exposing graft in Jobs scheme- Government on 8.06.08 and districts namely Koraput and Social audit threat to local leaders reminders sent on 23.1.09 , Raygarh 27.05.09 , 21.08.2009 & Koraput: 05.11.2009, As per the enquiry report of 16.12.09,08.02.10,03.03.10and PD, DRDA Koraput, Narayan 31.03.2010 Heraka Nayeb Sarpanch of Borigi GP under Narayanpatna Block expired on 9.5.2008 due to an accident while he was riding a bike. He met with this accident with a tractor coming Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government in opposite direction. The said driver of the tractor arrested on 14.5.2008 and was forwarded to court of JMFC, Laxmipur Police have initiated case under section – 279& 304 (A) of IPC against him. Raygarh: As per the enquiry report of PD, DRDA, Rayagarh regarding report published in Times of India on 8.6.2008 is far from truth, unsound and baseless. Hence it considers no merit. 26 Orissa Online article in NREG wages not paid, farmer sets Forwarded to State Government On enquiry it was found that 2. Indian Express himself on fire on 3.07.08 and reminders sent on the allegation is baseless. July 3, 2008 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010 26 Orissa Shri Beraja Prashad  Misappropriation of NREGA Forwarded to State Government As per the enquiry report of 3. Parida and others, funds on 7.10.08 and reminders sent on PD, DRDA, Jajpur the Kalamatia G.P, Block  Using of false bills and fakes 23.1.09 , 27.05.09 , 21.08.2009 & allegation is baseless. Bari, District Jajpur muster roll under NREGA. 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

26 Orissa Ex-Sarpanch & others,  Corruption Forwarded to State Government Enquiry report will be 4. Village Arandua  Using of fake muster roll on 7.10.08 and reminders sent on submitted soon. Reply is Block Basudebpur,  Use of sub-standard material 23.1.09 , 27.05.09 , 21.08.2009 & awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government District Bhadrak under NREGA. 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

26 Orissa Shri Lalit Mohan  Non- payment of wage Forwarded to State Government Enquiry report will be 5. Pradhan, Village  Payment of wage to the wrong on 7.10.08 and reminders sent on submitted soon. Reply is Saleising, Post persons under NREGA. 23.1.09 , 27.05.09 , 21.08.2009 & awaited Bhaghiapada, District 05.11.2009 Boudh , 16.12.09,08.02.10,03.03.10 and 31.03.2010 26 Orissa Shri Nimai Chandra Regarding mis-utilisation of funds Forwarded to State Government Irregularities and miss- 6. Sarkar, M.L.A., by violation of Govt. instruction on 24.10.08 and reminders sent on utilization of funds by Malkangiri, Orissa under NREGA by Gompakonda GP 23.1.09 , 27.05.09 , 21.08.2009 & Panchayat executive officer, Legislative Assembly, Secretary, VLW-cum–AEO and 05.11.2009 GP Secretary and Sarpanch Bhubaneswar GPEO of Kalimela Block in , 16.12.09,08.02.10,03.03.10 and appers to be true on the basis Gompakonda Gram Panchayat, 31.03.2010 of enquiry report of PD, Kalimela Block of Malkangiri DRDA, Malkanagiri. Constituency (along with findings Accordingly, executive of report of social audit of NREGS officer , panchayat Secretary conducted by the NGOs RITES and Sarpanch of Gompakonda Forum and Harmony at Nuaguda Gram Panchaya, Kalimela and Gangala Panchayats, Block of Malkanagiri have Malkangiri Block) been placed under suspension. Local Fund Audit has been requested to conduct a special Audit for financial irregularities in Gornpakoda GP. 26 Orissa Article in the Business In Orissa, Ghost come to life Forwarded to State Government On enquiry it is found that the 7. Standard on 29.9.2008 and reminders sent payment of wages has been 24 September, 2008 on 23.1.09 27.05.09 , 21.08.2009 made to those labourers who Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government & 05.11.2009, have worked under NREGS. 16.12.09,08.02.10,03.03.10 and Hence the allegation is 31.03.2010 baseless. 26 Orissa Villagers of Gram Alleging misappropriation of funds Forwarding to the State The enquiry report revels that 8. Panchayat Kulunda, more than Rs. 3.00 Lakh and Government on 31.12.2008 and the allegation is baseless. Orissa. demanding percentage of money reminders sent on 23.1.09 , from executants of NREGA works 27.05.09 , 21.08.2009 & out if estimated cost by B.D.O and 05.11.2009, Mr. Fakira(Executive Officer) 16.12.09,08.02.10,03.03.10 and under NREGA 31.03.2010

26 Orissa Shri Arun Gochhayat Violation of NREGA guidelines. Forwarding to the State On enquiry by BDO, Banarpal, 9. and other villagers, Government on 27.02.2009 and when petitioner was contacted, Village Santarapur, reminders sent on 27.05.09 , he denied the fact regarding Block Banarpal, 21.08.2009 & 05.11.2009, making allegation about District Angul 16.12.09,08.02.10,03.03.10 and violation of NREGs Act and 31.03.2010 Gudiline.he is satisfied with implementation of NREGA in his area. Further Shri Arun Gochhayat have got job card bearing No. 28970 whose family member have completed 100 days work and satisfied with the payment under NREGS. Hence the allegation is totally false. 27 Orissa Unnamed (Because of  Complaining of Smt. Rasmita Forwarding to the State The local enquiry conducted 0. a chance of a threat), Mishra (J.E) under NREGA for Government on 27.02.2009 and by PD, DRDA, Ganjam revels Block Rangeilunda, preparing false bills. reminders sent on 27.05.09 , that the allegation is baseless. District Ganjam,  Allowing machinery. 21.08.2009 & 05.11.2009, Orissa  Involvement of middleman. 16.12.09,08.02.10,03.03.10 and Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 31.03.2010

27 Orissa Shri Basant Naik and Violation of NREGA guidelines Forwarding to the State On enquiry by BDO, Banarpal, 1. others, Village Talmul under NREGA. Government on 27.02.2009 and when petitioner was contacted, Sasan (Harajanshai), reminders sent on 27.05.09 , he denied the fact regarding GP Talmul, Block 21.08.2009 & 05.11.2009, making allegation about Banarpal, District 16.12.09,08.02.10,03.03.10 and violation of NREGs Act and Angul, Orissa 31.03.2010 Gudilines. Further Shri Basant Naik have got job card bearing No. 8865 who is working as Gram Rakhi and is not interested for NREGS work. On verification of all the GP by the enquiry officers , it was found that there is no violation of NREGS Gudeline and rules.

27 Orissa B.K. Sandh (President Corruption in implementation under Forwarding to the State Corruption in NREGS 2. RJD, District NREGA work and violation of Government on 8.04.2009 and implementation, violation of Committee, Bolangir) norms and guidelines and taking reminders sent on 27.05.09 , terms and guidelines and poor bribe by B.D.O in Block Titilagarh, 21.08.2009 & 05.11.2009, quality of work, no District Bolangir. 16.12.09,08.02.10,03.03.10 and maintenance of 60:40 and 31.03.2010 taking bribe by BDO Titilagarh as are not correct as initimated by PD, DRDC, Bolangir after enquiry. 27 Orissa Shri Abul Kalam, Non- issuance of job cards and Forwarding to the State As initimated by PD, DRDC 3. Marginal Farmer taking bribe for issuing job cards Government on 8.04.2009 and Jajpur, though the job card of (forwarded by office under NREGA. reminders sent on 27.05.09 , Abul Kalam prepared and kept of the Minister of 21.08.2009 & 05.11.2009, in GP office for month State for Rural 16.12.09,08.02.10,03.03.10 and together, he did not atten the Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Development) 31.03.2010 GP to receive the same despite being reminded from time to time. However Sarpanch and GRS handed over the job card to him at his residence.

27 Orissa E-mail dated 01-08-09 Regarding delay in NREGA wage Requested State Government for As per the enquiry report of 4. from Shri Ajith Kumar payments in Bhainsadani Village of investigation on 11.08.2009 and PD, DRDA Nuapada, it is Panda, r/o Ward No-6, Boden Block in Nuapada District. reminders sent on 21.08.2009 & found that none of the P O Khariar, District 05.11.2009. Evidences of the labourers have maded Nuapada, Orissa. complaint has been sent on unemployment allowance. Due 22.10.2009, to non open of accounts in the 16.12.09,08.02.10,03.03.10 and post office /bank before 31.03.2010 payment is observed that some delay have been made due to criss of account payee cheques to the labourers. This has been sorted out by issuing of bearer cheque to labour by BDO immediately. The allegation regarding of eight days is false but total 12 days of work are done. The allegation regarding false payments against some labourers who have not work so totally baseless. The amounts have been paid through cheque to the labourers who actually worked. other lesion could not be proved. Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 27 Orissa Shri Mohan Sahu and Wages have been drawn on forged Requested State Government for From the enquiry report of 5. others, Village /PO names from Andhra Bank. Also investigation on 25.09.2009 and BDO Deogaon, it real that Sikuan, District requested to investigate into the reminder sent on 05.11.2009, migrations of people due to Bolangir misuse of funds released under 16.12.09,08.02.10,03.03.10 and non availability of work not a NREGS. 31.03.2010 fact. The allegation regarding the payment most of the labouers without work is baseless and fabricated. 27 Orissa Villegers, vill. Miss-utilisation of NREGS fund Forwarded to the State Reply is awaited 6. Nuagan, GP. Pritipur, sanctioned against the project " Government on 08.01.2010 PS. Binjharpur, Dist. Renovation of Panda Tank'' &14.01.2010 and reminder sent on Jajpur,dated: 08.02.10,03.03.10 and 31.03.2010 21/11/2009 27 Punjab Shri Roshan Lal and  Fake entry in job cards. Requested State Government for Reply is awaited 7. others, Village  Keeping job cards in his custody investigation on 05.05.2009 and Gambowal, Tehsil by Sarpanch. reminders sent on 27.05.09 & Dasuha, District  People not getting work. 21.08.2009 & 05.11.2009 Hosiharpur 27 Punjab Shri Ranjit Singh S/o Misappropriation of fund of Rs. 2 Requested State Government for Reply is awaited 8. Kawal singh, Kot Lakh by Sarpanch, Praveen kumar investigation on 23.06.2009 and Khurd, Gram reminders sent on 21.08.2009 & Panchayat, tehsil , 05.11.2009 District Jalandhar (East), Panjab 27 Punjab Shri Ranjit Singh, Misuse of funds by Sarpanch Shri Requested State Government for Reply is awaited 9. Gram Panchayat Kot Praveen Kumar, GP Kot Khurd by investigation on 06.07.2009 and Khurd, Block East, allowing construction of road in reminders sent on 21.08.2009 & Distrit Jalandhar other village kukar Pind and not in 05.11.2009 Kot Khurd village 28 Punjab Shri Sahib Ram Regarding bogus job cards. Requested State Government for Reply is awaited 0. Kadwasara, former investigation on 20.08.2009 and Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Sarpanch Gram reminders sent on 21.08.2009 & Panchayat- Ramsra, 05.11.2009 Tehsil- Abohar , Firozpur District 28 Punjab Shri Jai Singh, 1). Mrs. Charanjit Kaur, Delay in Requested State Government for Reply is awaited 1. president, Nrega payment of wages in villaghe investigation on 22.10.2009 and Workers Union, B- sarawan Bodla, Block Mlout, reminder sent on 05.11.2009 1/665, Ranjitgarh District Mukatsar, Punjab Gurudwara Road, 2). NREGA Workers Union, Phillaur, District Violation of NREGA ,2005 and Jalandhar has non-issuance of job cards in Village forwarded complaints Subhra in Patti Block of District of Mrs. Charanjith Taran Taran. Kaur and NREGA Workers Union 28 Punjab 673/APS/M(RD)/09 Inadequacies e.g. no prospective Requested State Government for Reply is awaited 2. Shri Vijay Inder plan, improper distribution of investigation on 07.11.2009 Singla, Member of funds, no work has been provided Parliament (Lok and no record of data entry under Sabha) NREGA Scheme in district Sangrur, Punjab. 28 Punjab Shri Jai Singh, Non-payment of wages to 10 Forwarded to State Government Reply is awaited 3. President, NREGA workers of Sarawan village since on 31.12.2009. Workers Union, April 2009 Phillaur, District Jalandhar. 28 Punjab Residents of Village Regarding financial irregularities in Forwarded to State Govt on 2-3- Reply is awaited 4. Mehta, Tehsil Baba the implementation of Mahatma 2010 Bakala, District Gandhi NREGA by the Sarpanch Amritsar 28 Rajasthan PMO office forwarded  Manipulation in job cards & Forwarded to the State No irregularities found on the Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government the complaint of Shri muster roll Government on 21/7/08 and work site payment given to the Gula Ram, President  Non-display of proper board reminders sent on 23.1.09 , labour through bank/post offices ABKS, Rattangarh  Non-payment of wages through 27.05.09 , 21.08.2009 & account bank or post office 05.11.2009, 16.12.09,  No facility of crèche, drinking 08.02.10,03.03.10 and 31.03.2010 water, shade etc.

28 Rajasthan Shri Radhey Shyam Asking of money to open bank Forwarded to the State Reply is awaited 6. Sharma, Village account under NREGA. Government on 17.10.08 and Dargama, Post reminders sent on 23.1.09 , Pancholi, Tahsil 27.05.09 , 21.08.2009 & Madrayal, District 05.11.2009, 16.12.09, Karauli 08.02.10,03.03.10 and 31.03.2010

28 Rajasthan Shri Ram Niwas, Misuse of funds under NREGA Forwarded to the State Reply is awaited 7. Village Khera Government on 17.10.08 and Jagannathpura, Tahsil reminders sent on 23.1.09 , Chaksu, District Jaipur 27.05.09 , 21.08.2009 & 05.11.2009,16.12.09,08.02.10,03.0 3.10 and 31.03.2010

28 Rajasthan Shri P. Ravindran, Regarding digging of public pond Forwarded to the State All the villagers of Mukundpura 8. APS to M/o under NREGA. Government on 17.10.08 and denied to made the sanctioned Agricalture & reminders sent on 23.1.09 , Tank due to the safety of school Consumer Affairs 27.05.09 , 21.08.2009 & building and its students. Food & Public 05.11.2009, 16.12.09, Distribution, 08.02.10,03.03.10 and 31.03.2010 Government of India ( forwarding a letter of Shri Bodan Meena, Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Village Mukundpura, Tahsil Rajgarh, District Alwar) 28 Rajasthan Anonymous, village  Discrimination against the Forwarded to the State Reply is awaited 9. Thakurwas, Panchayat people in providing jobs Government on 17.10.08 and Malsa Bawari, District  Late payment of wages reminders sent on 23.1.09 , Pali Failure to provide medical and 27.05.09 , 21.08.2009 & other facilities under NREGA. 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

29 Rajasthan Article in Frontline Accounts of Corruption Forwarded to the State Reply is awaited 0. Dated 3 Jan 2009 Government on 5.1.09 and reminders sent on 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

29 Rajasthan Shri Bharat Lal Meena Asking money for opening bank Forwarded to the State Reply is awaited 1. and others, village account. Government on 31.03.09 and Ralawat, Tehsil Supplying withdrawal form under reminders sent on 27.05.09 , Chaksu, District Jaipur NREGA. 21.08.2009 & 05.11.2009 29 Rajasthan Villagers , Gram Misappropriation of funds by using Forwarded to the State The State Government has been 2. Panchayat Katkar, PS fake muster rolls by sarpanch& Government on 31.03.09 and reported that FIR 38/09 has been Hindone, District Secretary. reminders sent on 27.05.09 , registered against Sarpanch and Karouli 21.08.2009 & 05.11.2009, Sachiv on 24.01.2009 16.12.09,08.02.10,03.03.10 and investigation is in progress. Recommended for suspension of 31.03.2010 Sarpanch and Sachiv, commissioner and secretary Panchayati Raj Department Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Rajasthan has been requested to look in to the matter. 29 Rajasthan Shri Om Prakash and Misappropriation of funds by using Forwarded to the State Reply is awaited 3. others, Village fake muster roles Government on 31.03.09 and Rampura, District Failure to provide medical and reminders sent on 27.05.09 , Hanumangarh other facilities. 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

29 Rajasthan Shri Mangala Ram Manipulation in muster rolls. Forwarded to the State Surpanch and Upsarpanch found 4. Meena( Ex- Government on 31.03.09 and guilty disciplinary actions against Sarpanch), G.P. reminders sent on 27.05.09 all related is under process. Boskhoh, Panchayat 21.08.2009 & 05.11.2009, Samiti Bassi, 16.12.09,08.02.10,03.03.10 DistrictJajpur and 31.03.2010

29 Rajasthan Article in Frontline Accounts of Corruption Forwarded to the State Reply is awaited 5. Dated 3 Jan 2009 Government on 5/1/2009 and reminders sent on 27.05.09 , 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

29 Rajasthan Villagers of Gram  Low payment of wages Forwarded to the State It was got enquired by State Level 6. Kundli Nadi, GP-  Misuse of funds and other Government on 9/4/2009 and Monitor, No irregularity from in Bhookha, Tehsil irregularities under NREGA reminders sent on 27.05.09, development works UC and CC Malarna Dungar, 21.08.2009 & 05.11.2009, work issued by competent district Sawai 16.12.09,08.02.10,03.03.10 and authorities. Madhopur 31.03.2010

29 Rajasthan Shri Yoginder, Village Misappropriation of funds by Forwarded to the State Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Jhoroll, Tehsil Tadbai, Sarpanch and Secretary under Government on 27/4/2009 and District Bhartpur NREGA. reminders sent on 27.05.09, 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

29 Rajasthan Villagers, Village  Use of J.B.C. machinery instead Forwarded to the State It was got enquired by SLO, No 8. Badakheda, Tehsil of labour Government on 27/4/2009 and JCB and other machine work used Bayawar, District  Misappropriation of funds by reminders sent on 27.05.09 & in that work. Matter under Ajmer, Rajasthan Sarpanch, Secretary Shri 21.08.2009 & 05.11.2009, process. Reply is awaited Shankar lal 16.12.09,08.02.10,03.03.10 and  Unexperienced untrained mate, 31.03.2010 J.E Shri Bhgalaram and B.D.O. Shri Balwant Singh Pawar under NREGA 29 Rajasthan All Rojgar Sahayak, Low wages rate under NREGA. Forwarded to the State All the Gram Rojgar Sahayak are 9. District Jalore, Government on 27/4/2009 and getting their salary according Rajasthan reminders sent on 27.05.09, circular issued by the Finance 21.08.2009 & 05.11.2009, Department Govt. of Rajasthan 16.12.09,08.02.10,03.03.10 and 31.03.2010

30 Rajasthan Shri M.P Kotnala, Misappropriation of funds and Forwarded to the State Reply is awaited 0. Assistant Private bogus job cards by Sarpanch under Government on 27/4/2009 and Secretary to Minister NREGA. reminders sent on 27.05.09, of State for 21.08.2009 & 05.11.2009, Environment & 16.12.09,08.02.10,03.03.10 and Forests forwarding the 31.03.2010 complaint of Shri Praladh Meena & others, Village Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Ghaghurda, Tehsil & District Karoli 30 Rajasthan Jafar Khan, Moliser Use of machinery- tractor & JCB Forwarded to the State It was got enquired by state level 1. chotta village of machine, reference of Rajasthan Government on 04.05.2009 and monitor the surpanch secretary Jandva Gram patrika dated 28-03-09, FIR lodge reminders sent on 27.05.09, and Gram Rojgar Sahayak was Panchayat, Tehsil against Gram sewak 21.08.2009 & 05.11.2009, found guilty to create irregularity. Ratan Garh, Churu 16.12.09,08.02.10,03.03.10 and The District collector Churu has instructed to conducted 31.03.2010 disciplinary action against them.

30 Rajasthan All NREGA workers, Nonpayment of wages from 4 Forwarded to the State Reply is awaited 2. village-Abhayapura, months of post office-Radhopura, Government on 21.04.2009 and Post –Radhopura, Block- Bamanwas reminders sent on 27.05.09, Sewai Madhopur 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

30 Rajasthan Sohan Lal Dara,State Regarding appointment of Forwarded to the State In NREGA the required staff 3. Mahamantri,Rajasthan experience staff in 'NREGA staff Government on 28.04.2009 and approved by the Rajasthan Rojgar Gram Sewak Sangh, pattern of block/Gram panchayat in reminders sent on 27.05.09, Gurantee Parishad is posted. Jaipur, NREGA(Rajasthan) 21.08.2009 & 05.11.2009 30 Rajasthan Villagers of Gram Half payment of wages by Gram Forwarded to the State It was got enquired by State Level 4. Kundali Nadi, Gram Sarpanch. Only 70 persons work Government on 08.04.09 and Monitor, No irregularity from in Panchayat Bhookha, and Sarpanch and Gram Secretary reminders sent on 27.05.09, development works UC and CC Tehsil Malarna made fake entry of 300 persons. No 21.08.2009 & 05.11.2009, work issued by competent Dungar, Gram Photograph on Job cards. 16.12.09,08.02.10,03.03.10 and authorities. Kundali Nadi, Gram 31.03.2010 Panchayat Bhookha, Tehsil Malarana, Sawai Madhopur 30 Rajasthan Shri Srichand and Construction of Grewal road Requested State Government for Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government others, Gram Barras, without measurement and use of investigation on 06.05.2009 and Tehsil Laxmangarh, machinery instead of labour under reminders sent on 27.05.09, District Sirkar NREGA. 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

30 Rajasthan Shri Jaswanth Singh Change of working hours of Requested State Government for All DPCs has instructed for 6. Rawat, Ajmer labourers due to hot weather and investigation on 11.05.2009 and working hours 7 a.m. to 4 p.m. to scorching sunlight from 7am to reminders sent on 27.05.09, 6 a.m. to 1 p.m. under NREGA. 4pm to 6am to 1 pm under NREGA 21.08.2009 & 05.11.2009, in Rajasthan. 16.12.09,08.02.10,03.03.10 and 31.03.2010

30 Rajasthan Shri Nakku and Irregularities and corruption made Requested State Government for Matter is pending at district level 7. others, District by ACEO Shri Tikamchand Vohra. investigation on 30.04.2009 and Reply is awaited Banswarha, Rajasthan reminders sent on 27.05.09 , 21.08.2009 & 05.11.2009 , 16.12.09,08.02.10,03.03.10

30 Rajasthan Shri Amarchand Against Sarpanch of Karansar Requested State Government for Reply is awaited 8. Tiwari, Khijuria Gram Panchayat and other persons. investigation on 01.06.2009 Village , Karansar The complainant has alleged that and reminder sent on Gram Panchayat, Shri Ashok Mehta, assistant 21.08.2009 & 05.11.2009, Samarlake Panchayat Secretary of the Gram Panchayat 16.12.09,08.02.10,03.03.10 and Samiti, Jaipur District, has misappropriated money by 31.03.2010 rajasthan. forging of muster rolls and job cards. He has submitted an affidavit regarding the illegal action of Sh. Ashok Mehta. 30 Rajasthan Shri Shobhang Singh Use of low quality material, Requested State Government for It was got enquired by the SDO Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government and others, Gram improper measurement and investigation on 23.06.2009 and Degana the material used in Nond, Gram involvement of contractor in reminders sent on 21.08.2009 & Nrega works found quality wise Panchayat Langod, NREGA works.( Wall construction 05.11.2009, 16.12.09, only senctioned works were Tehsil Degana, and road work) 08.02.10,03.03.10 and 31.03.2010 conducting. District Nagore , Rajasthan 31 Rajasthan Shri Moti Singh The JE and Development Officer of Requested State Government for Reply is awaited 0. Nimblana, Member Panchayat samiti are interfering investigation on 19.06.2009 and Panchayat samiti with the execution of NREGA reminder sent on 21.08.2009 & Sayala, District jalore works and violating the instruction 05.11.2009, 16.12.09, of the State Government issued in 8.02.10,03.03.10 and 31.03.2010 this regard.

31 Rajasthan Shri Manaram, Use of contractors and making of Requested State Government for It was got enquired by committee 1. Bijrasar, Bhiyasar and false payments to fictitious persons investigation on 19.06.2009 and conducted by CEO Churu. All Ransisar Gram for the use of tractors and low reminder sent on 21.08.2009 the work found accordingly as Panchayat, Sardar quality of execution. & 05.11.2009, 16.12.09, proposed payment required labour sahar Panchayat 08.02.10,03.03.10 and 31.03.2010 has given through their Bank / Post Office Account no Samiti, jaipur District irrigularities found. of Rajasthan. 31 Rajasthan Shri Raghuvir Singh Forgery in muster roll& NREGA Requested State Government for Reply is awaited 2. S/o Kanchan Singh, road work remaining incomplete in investigation on 23.06.2009 and Tribal- Jatav Jharkai Gram Panchayat, District reminder sent on 21.08.2009 & Bharatpur. 05.11.2009 , 16.12.09, 08.02.10,03.03.10 and 31.03.2010

31 Rajasthan Shri Devendar kumar Misuse of NREGA funds by the Requested State Government for Mr. Bhardwaj requested to work 3. Bharadwaj, Bhawar Sarpanchs of Karoli District & investigation on 23.06.2009 and with this Department he has Vilas Road, Karoli- forcing of the District reminder sent on 21.08.2009 & intimated to apply as Department District Administration by the Sarpanchs 05.11.2009, 16.12.09, pulished for General requirement for not taking any action against 08.02.10,03.03.10 and 31.03.2010 no particular complaint in that Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government them. letter.

31 Rajasthan Shri Ram Chandra Issue of sanctioned order for Requested State Government for Reply is awaited 4. Baikha, Panchayat continuation of road work for investigation on 23.06.2009 and Samiti Bhinay provision of employment against reminder sent on 21.08.2009 & DPC Ajmer 05.11.2009, 16.12.09, 08.02.10,03.03.10 and 31.03.2010

31 Rajasthan Jafar khan, Entry of Ghost workers in the Requested State Government for It was got enquired by state level 5. Bheemsar Gram muster roll, non-availability of shed investigation on 26.5.2009 and monitor the surpanch secretary Panchayat, Churu and first-aid kit at the worksite, reminder sent on 21.08.2009 & and Gram Rojgar Sahayak was children below 18 years of age 05.11.2009, 16.12.09, found guilty to create irregularity. found working at the worksite and 08.02.10,03.03.10 and 31.03.2010 The District collector Churu has instructed to conducted forging of muster rolls. Serious disciplinary action against them. allegations on the Gram Rozgar Sahayak for keeping blank muster rolls at his house. 31 Rajasthan Natives of Gram Misappropriation of funds through Requested State Government for Reply is awaited 6. Panchayat Khedli, forged muster rolls by the Sarpanch investigation on 07.07.2009 and Panchayat Samiti and the GP Secretary. reminder sent on 21.08.2009 & Hindon, karauli 05.11.2009, 16.12.09, District in Rajasthan 8.02.10,03.03.10 and 31.03.2010

31 Rajasthan Shri Ajay Saharan and Sarpanch and Secretary have Requested State Government for It is got enquired and found that 7. Others, Gram showed the public funded sports investigation on 09.07.2009 and the work in school field Ramkaan, Tehsil field under NREGA. reminder sent on 21.08.2009 & commenced in April 2008 due to Rawatsar, District 05.11.2009, 16.12.09, rain and Desert area the field Hanumangarh. 8.02.10,03.03.10 and 31.03.2010 could maintained.

31 Rajasthan Shri Rampal s/o Payment was not made to Requested State Government for Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Kishanram, Gram complainant for providing water investigation on 09.07.2009 and Kaagal, Gram tank under NREGA works. reminder sent on 21.08.2009 & Panchayat Bhundara, 05.11.2009, 16.12.09, Tehsil Bhopalgarh, 08.02.10,03.03.10 and 31.03.2010 District Jodhpur.

31 Rajasthan Hazari Ram Bishnoi, Complaint against Gram Pradhan Requested State Government for It was got enquired by SLO and 9. Gram Panchayat regarding embezzlement in road investigation on 16.07.2009 and found that construction work were Udsar, Tehsil Nokha, construction and pond construction reminder sent on 21.08.2009 & made as sanctioned in action plan District Bikaner under NREGA. Use of tractor and 05.11.2009& 05.11.2009, all the villagers of that area were no shed and medical facilities on 16.12.09,08.02.10,03.03.10 and satisfied about Nrega work and facilities provided by the worksite 31.03.2010 Government.

32 Rajasthan Shri Papu Lal Meena Misappropriation of funds under Requested State Government for It could not find out due to lack of 0. NREGA by faking signatures & investigation on 16.07.2009 and proper address, so could not thumb impression on job cards and reminder sent on 21.08.2009 & enquired. pass book by local ward panch and 05.11.2009, 16.12.09, Reply is awaited local school teacher in village 08.02.10,03.03.10 and 31.03.2010 Kushalpura, Gram panchayat- Indragarh. 32 Rajasthan Smt. Mitileash Untimely payment of wages, Requested State Government for It is got enquired by SLO the 1. Sharma, Sarpanch, signature of the Sarpanch not being investigation on 16.07.2009 and report under consideration. Panchgawon, Mobile- obtained on muster rolls & pass reminder sent on 21.08.2009 & Reply is awaited 09414206921, book, failure to issue job cards, 05.11.2009, 16.12.09, 09414027999, E-mail: issue of bogus job cards arbitrary 08.02.10,03.03.10 and 31.03.2010 pachgaonpanchayat@ selection of mates in Pachgaon gmail.com Gram Panchayat of Dholpur District. 32 Rajasthan Shri Ram Lal and Sub- standard material used in Requested State Government for Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government others graval roads & Khandvanja roads, investigation on 16.07.2009 and misappropriation of funds, bogus reminder sent on 21.08.2009 & job cards in Gram Panchayat 05.11.2009, 16.12.09, Sheraraw. 08.02.10,03.03.10 and 31.03.2010

32 Rajasthan Shri Hajari Ram Misappropriation of funds & poor Requested State Government for It was got enquired by SLO and 3. Bishnoi, Ward Panch quality of materials used in investigation on 16.07.2009 and found that construction work were ward no. 3, Gram different works such as reminder sent on 21.08.2009 & made as sanctioned in action plan Panchayat- Udsar, construction of water body, roads 05.11.2009, 16.12.09, all the villagers of that area were Tehsil- Nokha, etc., fake job cards, use of machines 08.02.10,03.03.10 and 31.03.2010 satisfied about Nrega work and facilities provided by the District- Bikaner instead of labour. Government.

32 Rajasthan Shri Shankar Singh, Misappropriation in muster roll, Requested State Government for Reply is awaited 4. Former Senior Deputy embezzlement of NREGA fund by investigation on 16.07.2009 and Director, District Development Officer, fake payment reminder sent on 21.08.2009 & Congress Committee, of wages under NREGA funds. 05.11.2009, 16.12.09, Rajasmand 08.02.10,03.03.10 and 31.03.2010

32 Rajasthan Smt. Chandrvati, Misconduct by the Assistant Requested State Government for It was got enquired by the SLO 5. Sarpanch, Gram Secretary of the Panchayat- not investigation on 30.06.2009 and the working and behavior of Panchayat- siging on the attendant register reminder sent on 21.08.2009 & Gram Rojgar Sahayak found Ganagvana, Panchayat favouritism in engagement of 05.11.2009, 16.12.09, better no irregularity and Samiti, Nandbai mates & forgery in muster rolls, 08.02.10,03.03.10 and 31.03.2010 Partiality were seemed in the work the facts of complaint found disallowing work & wages on incorrect. Political & caste basis, obstruction in execution of work etc. This complaint has been made earlier to higher officials but the matter has not been dealt with Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government properly 32 Rajasthan Shri Shankar Bhawani Rowing of funds fraudulently Requested State Government for Reply is awaited 6. S/o Shri Inderaj, inconvenience with glorious investigation on 30.06.2009 and Deepak Telecom, Tent computer centre & harassment of reminder sent on 21.08.2009 & Market, near Mamta the complainant 05.11.2009, 16.12.09, Tent House New 08.02.10,03.03.10 and 31.03.2010 Mandi Gharsana, District- ShriGanganagar 32 Rajasthan Shri Mangturam Manipulation in muster roll through Requested State Government for It could not find out due to lack of 7. Malghat, Aadsar Baas, entered the name of close relatives investigation on 17.07.2009 and proper address, so could not ward no 19, of mates and JE, improper payment reminder sent on 21.08.2009 & enquired. Shridungargarh of wages made to workers under 05.11.2009, 16.12.09, NREGA. 08.02.10,03.03.10 and 31.03.2010

32 Rajasthan Shri Basanti Lal Hiraji Manipulation in muster roll through Requested State Government for The matter is got enquired by 8. Meena and others, fake entries, Payment was made investigation on 17.07.2009 and SLO irregularities found in Gram Gram Panchayat through fake signature, work was reminder sent on 21.08.2009 & Panchayat work secretary, Orvadia, Tehsil not provided to job card holders. 05.11.2009, 16.12.09, surpanch JTA, ETC were Salumber, District 08.02.10,03.03.10 and 31.03.2010 involved district collector Udaipur has instructed to Udaipur conducted disciplinary action against them 32 Rajasthan Shri Pratap Fransis, Regarding attack on NREGA Requested State Government for The copy of complaint not 9. Sarpanch, Gram worker at worksite by axe on investigation on 17.07.2009 and received. Panchayat Salavad 27.06.09 at 7:30 in Garam reminder sent on 21.08.2009 & Khurd, Panchayat Panchayat Salavad. 05.11.2009, 16.12.09, Samiti Kherabad, 08.02.10,03.03.10 and 31.03.2010 District Kota

33 Rajasthan Shri Bhaggo, Village Payment was made through fake Requested State Government for Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Korer, Tehsil Degg, entries in muster roll under investigation on 17.07.2009 and District Bharatpur NREGA. reminder sent on 21.08.2009 & 05.11.2009 , 16.12.09, 08.02.10,03.03.10 and 31.03.2010

33 Rajasthan Shri Ramprasad, Use of machinery in NREGA Requested State Government for Reply is awaited 1. Village Pulasar, Tehsil works, Manipulation in muster roll investigation on 17.07.2009 and Sardarshahar, District through fake entries, pure water reminder sent on 21.08.2009 & Churu was not provided on worksite. 05.11.2009 , 16.12.09, 08.02.10,03.03.10 and 31.03.2010

33 Rajasthan Shri Pamdichar s/o Regarding not providing Requested State Government for All the District Collectors has 2. Devilal Soni, Gram information under Right to investigation on 23.07.2009 and already instructed to provide Panchayat Nachana, Information Act reminder sent on 21.08.2009 & information to which those who Tehsil Pokhran 05.11.2009 , 16.12.09 request in prescribed manner. 08.02.10,03.03.10 and 31.03.2010

33 Rajasthan Shri Lakhuram Use of low quality material and Requested State Government for It was got enquired and found 3. Kuldia and others, machinary in graval road investigation on 23.07.2009 and irregularity were made in Gram Panchayat construction under NREGA in reminder sent on 21.08.2009 & panchayat work. Surpanch, Bhimsar, Tehsil Gram Panchayat Bhimsar of 05.11.2009, 16.12.09, Secretary are responsible for that. Sujangarh,District District Churu 08.02.10,03.03.10 and 31.03.2010 District Collector instructed to conducted disciplinary action Churu against them.

33 Rajasthan Shri Ravindra Kumar, Fake entries in muster roll in Gram Requested State Government for It was got enquired and facts of 4. Gram and Post Astawan, Tehsil Kumher, District investigation on 23.07.2009 and the complaint found true the Astawan, Tehsil Bharatpur & physical assault on the reminder sent on 21.08.2009 & District Collector Bharatpur to Kumhere, District complainant on making a 05.11.2009, 16.12.09, Breach off the contract of Gram Bharatpur complainant 08.02.10,03.03.10 and 31.03.2010 Rojgar Sahayak and other work.

Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 33 Rajasthan Villagers of Garm Use of low quality material in Requested State Government for Reply is awaited 5. Gilund, Panchayat NREGA works forged records of investigation on 23.07.2009 and Samiti Railmagra, Gram Sabha proceedings. reminder sent on 21.08.2009 & District Rajsamand 05.11.2009 , 16.12.09, 08.02.10,03.03.10 and 31.03.2010

33 Rajasthan Villagers of Gran Forgery in issuance of job cards, Requested State Government for In the enquiry Report most of the 6. Hathijar, Tehsil Vair, payment made for fictitious works investigation on 23.07.2009 and facts found true. District District Bharatpur reminder sent on 21.08.2009 & Collector Bharatpur has instructed 05.11.2009, 16.12.09, to conducted disciplinary action 08.02.10,03.03.10 and 31.03.2010 against Surpanch, Secretary, JTA etc.

33 Rajasthan Shri Balwant & Regarding misbehavior with Requested State Government for It was got enquired by SLO. No 7. others, Gram workers & work being provided to investigation on 21.07.2009 and misbehavior were conducted Panchayat Bhompura, only one member of the registered reminder sent on 21.08.2009 & against NREGA labour, work is District Hanumangarh household, preparation of fake job 05.11.2009, 16.12.09, providing to those who are cards, reduction of working hours. 08.02.10,03.03.10 and 31.03.2010 applying accordingly

33 Rajasthan Shri Ganga Ram and Discrimination in providing work, Requested State Government for Reply is awaited 8. Others, Gram manipulation of job cards investigation on 16.07.2009 and Panchayat Fathepur, reminder sent on 21.08.2009 & Panchayat Samiti 05.11.2009, 16.12.09, Khamnaur 08.02.10,03.03.10 and 31.03.2010

33 Rajasthan Shri Ram Lal and Irregularities made by Panchayat Requested State Government for Reply is awaited 9. others, Gram Secretary investigation on 16.07.2009 and Panchayat Jugrajpura, reminders sent on 21.08.2009 & Panchayat Samiti 05.11.2009 and 31.03.2010 Shrimadhopur 34 Rajasthan Shri Ratanlal Use of JCB machinery, sub Requested State Government for Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Mandovra, A-445, standard material by Secretary and investigation on 16.07.2009 and Vijay singh Sarpanch in Gram Panchayat reminder sent on 21.08.2009 & Pathiknagar, District Hamirgarh 05.11.2009 , 16.12.09, Bhilwara 08.02.10,03.03.10 and 31.03.2010

34 Rajasthan Shri Vijendra Singh Illegal encroachment on the land Requested State Government for Stay order has been taken from 1. and others, Gram selected for construction of road investigation on 16.07.2009 and the additional district collector Musalpur, Tehsil under NREGA in Gram Musalpur reminder sent on 21.08.2009 & Dholpur. After decision graval Sapau, District 05.11.2009, 16.12.09, road has been constructed. Dholpur 08.02.10,03.03.10 and 31.03.2010 Reply is awaited

34 Rajasthan Jafar khan Entry of Ghost workers in the Requested State Government for It was got enquired by state level 2. muster roll, non-availibility of shed investigation on 26.05.2009 and monitor the surpanch secretary and first-aid kit at the worksite, reminder sent on 21.08.2009 & and Gram Rojgar Sahayak was children below 18 years of age 05.11.2009, 16.12.09, found guilty to create irregularity. found working at the worksite and 08.02.10,03.03.10 and 31.03.2010 The District collector Churu has instructed to conducted forging of muster rolls. Serious disciplinary action against them. allegations on the Gram Rozgar Sahayak for keeping blank muster rolls at his house. 34 Rajasthan The Indian Express, “In Rajasthan, child labour under Requested State Government for Reply is awaited 3. Delhi NREGA” investigation on 31.07.2009 and reminder sent on 21.08.2009 & 05.11.2009 and 31.03.2010 34 Rajasthan Reports received Cement concrete roads are being Requested State Government for Reply is awaited 4. taken up under NREGS in investigation on 10.08.2009 and Rajasthan reminder sent on 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government

34 Rajasthan Shri Seva Singh and Less payment being given to the Requested State Government for In conducted enquiry the concern 5. others, R/o Chak 21- NREGA workers & discrimation in investigation on 07.08.2009 and JTA was found incompetent to 23 Z, Gram engagement of mates allocation of reminder sent on 21.08.2009 & measure worksite so district has Panchayat- work and not given 100 days work 05.11.2009 and 31.03.2010 instructed to conduct disciplinary Sahebsingh wala to the NREGA workers against him.

34 Rajasthan Villagers of Gram Manipulation in muster roll, use of Requested State Government for Matter was got enquired the 6. Panchayat Angari, machinery, payment of wages in investigation on 10.08.2009 and surpanch was faound guilty to Tehsil Thanagazi, the name of ghost workers. reminder sent on 21.08.2009 & issue Patta and to construct District Alwar 05.11.2009, 16.12.09, community centre, District 08.02.10,03.03.10 and 31.03.2010 collector has instructed to do disciplinary action all liable persons.

34 Rajasthan Forge entries in muster roll, Requested State Government for The facts of the complaint were 7. Shri Ramswaroop Irregularities in the issuance of job investigation on 20.08.2009 and not particular, complaint could Agarwal, Near Pili cards, use of machinery under reminder sent on 21.08.2009 & not found on mentioned address Kothi, Naka Madar, NREGA in District Ajmer 05.11.2009, 16.12.09, so the SLO recommended to file Ajmer 08.02.10,03.03.10 and 31.03.2010 this complaint.

34 Rajasthan Improper selection of worksite Requested State Government for Reply is awaited Shri Shankar and 8. under NREGA at Gram Panchayat investigation on 20.08.2009 and others, Datda chota ka Kishangarh in District Bhilwada. reminder sent on 21.08.2009 & Jhupda, Panchayat 05.11.2009, 16.12.09, Kishangarh, Tehsil 08.02.10,03.03.10 and 31.03.2010 Kotdi, District Bhilwada

34 Rajasthan Jai Shri Mewar Jagruk Non-payment of wages to the Requested State Government for This work was conducted by 9. Samiti, Bhupalsagar, workers under NREGA at Gram investigation on 20.08.2009 and PWD Department payment of District Chittodgarh Panchayat Rampuria Khurd in reminder sent on 21.08.2009 & concerned labour already paid to District Chittorgarh 05.11.2009, them. There is no complaint now Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 16.12.09,08.02.10,03.03.10 and in this regard. 31.03.2010

35 Rajasthan Requested State Government for The complaint appreciate the 0. Shri Dhanna Lal investigation on 20.08.2009 and work of NREGA, he said that the Sharma and others, Irregularities in the implementation reminder sent on 21.08.2009 & sewerage and other pacca work Gram Panchayat of NREGA in Gram Panchayat 05.11.2009, which is done in other schemes is Harota, Tehsil Chomu, Harota 16.12.09,08.02.10,03.03.10 and not proper. District Jaipur 31.03.2010

35 Rajasthan Shri Jogaram S/o GP are not observing office hours Requested State Government for It was got enquired and found that 1. Surja Ram Garg and & mostly remain closed, works are investigation on 11.08.2009 and the office of the Gram Panchayat others, Gram- Panchu, done physically, failure to pay reminder sent on 21.08.2009 & regularly remained open in office Tehsil- Nokha, wages for the last 8 months, Use of 05.11.2009, hours. No other irregularities in Bikaner District of poor quality of materials in the 16.12.09,08.02.10,03.03.10 and development works. Rajasthan construction of gravel roads, bogus 31.03.2010 job cards, facilites at worksites not being provided 35 Rajasthan Shri Nand Lal Alleging that unproductive works Requested State Government for Reply is awaited 2. Sharma, President, are being taken up resulting in investigation on 31.08.2009 and Nagar Congress waste of money and no inspection reminder sent on 05.11.2009, Committee, Gram is being done by the NREGA 16.12.09,08.02.10,03.03.10 and Panchayat, Tehsil – officials in Gram Panchayat 31.03.2010 Pandalgarh, Bilwara Kachola. District, Kachola, . Mobile- 9414393653 35 Rajasthan Shri Ashok Wald, S/o Regarding under payment of wages Requested State Government for Reply is awaited 3. Shri Aisi ram, R/o investigation on 04.09.2009 and Chak 15A(B), Tehsil- reminder sent on 05.11.2009, Anoopgarh, District- 16.12.09,08.02.10,03.03.10 and Shri Ganganagar 31.03.2010 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government

35 Rajasthan Shri Jeewan Lal Payment was made in the name of Requested State Government for Reply is awaited 4. Rathore, Gram ghost workers at Gram Panchayat investigation on 04.09.2009 and Panchayat Barantia, Barantia in District Bhilwara reminder sent on Panchayat Samiti, 05.11.2009,16.12.09,08.02.10,03.0 Hurada, District 3.10 and 31.03.2010 Bhilwara

35 Rajasthan Requested State Government for The matter was got enquired by 5. investigation on 01.09.2009 and SLO the fact in the complaint was Shri Kishanram, Gram Embezzlement, faking of pond reminder sent on 05.11.2009, found false and baseless. Panchayat Kudusu, construction works, Fake job cards 16.12.09,08.02.10,03.03.10 and Tehsil Nokha, District made under NREGA in Gram 31.03.2010 Bikaner Panchayat Kudusu

35 Rajasthan Requested State Government for Reply is awaited 6. Villagers of Gram Low quality material used in works, investigation on 01.09.2009 and kataar, Tehsil Aasind, use of machinery under NREGA in reminder sent on 05.11.2009, District Bhilwada Gram Panchayat Kataar 16.12.09,08.02.10,03.03.10, 31.03.2010 35 Rajasthan Requested State Government for It was got enquired by SLO 7. investigation on 01.09.2009 and payment to the labours is giving Shri Chaturbhuj reminder sent on 05.11.2009 and through their Bank/Post Office Non-payment of wages to the Sharma, Nayana, 31.03.2010 Accounts in time, only four workers under NREGA at Gram labour are not getting their District Nayana, Panchayat Sirond payment from their Post Office District Bharatpur account willfully, other facts are false and baseless.

35 Rajasthan Shri Rajvir Meena, Use of poor quality material in Requested State Government for Reply is awaited 8. Yuva Congress NREGA projects investigation on 08.09.2009 and Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government President, Gram reminder sent on 05.11.2009, Panchayat- 16.12.09,08.02.10,03.03.10 and Savantgarh, Block- 31.03.2010 Hidoli, District Bundi

35 Rajasthan shri Ram Singh Koli, Corruption in NREGA tenders Requested State Government for Reply is awaited 9. Pradhan, Panchayat investigation on 08.09.2009 and Samiti- Thodabhim, reminder sent on 05.11.2009, District Karauli 16.12.09,08.02.10,03.03.10 and 31.03.2010

36 Rajasthan All NREGA workers, Failure to fulfill the demand of Requested State Government for Reply is awaited 0. Gram Panchayat- 17 Striking workers investigation on 08.09.2009 and K.N.D(Khanuwali), reminder sent on 05.11.2009, Panchayat Samiti- 16.12.09,08.02.10,03.03.10 and Anupgarh, District- 31.03.2010 Sri Ganganagar

36 Rajasthan Shri Debi Lal Sahu, Unfair selection of NREGA mates Requested State Government for Reply is awaited 1. Danik Nav Jyoti and corruption in NREGA works. investigation on 08.09.2009 and Reporter, Panchayat reminder sent on 05.11.2009, Samiti- Madalgarh, 16.12.09,08.02.10,03.03.10 and Gram Panchayat- 31.03.2010 Dholpura, District Bhilwara 36 Rajasthan Shri Badri Lal and Fraudulent withdrawal of wages Requested State Government for Reply is awaited 2. others, Panjikrit from bank accounts of workers investigation on 08.09.2009 and workers reminder sent on 05.11.2009, NREGA,Gram 16.12.09,08.02.10,03.03.10 and Panchayat- Samidhi, 31.03.2010 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Panchayat Samiti- Nainwa, District Bundi. 36 Rajasthan 10/56/VIP/PS to Suggestion for welfare of Nishakat Requested State Government for In this matter commissioner 3. MOS (RD-PJ)/2009 people under NREGA Act. investigation on 30.09.2009 and handicapped Rajasthan suggested Shri Khillimal Jain, reminder sent on 05.11.2009. to provide works in NREGA Commissioner Minister of State (RD –PJ) replied work for handicapped Govt. of (Nishaktijan) ,Social to the complainant on 19.11.2009 Rajasthan already directed all the DPCs in this regard in the month Justice & Welfare of November 2009 wide letter No. Department, F 16 (RD/NREGA/MAT-II/9-10 Rajasthan, Jaipur dated 12.11.2009.

36 Rajasthan Requested State Government for Reply is awaited 4. investigation on 14.10.2009 and Villagers of Gram- Misappropriation of funds , reminder sent on 05.11.2009, Nokhada, Tehsil- threatening of workers, use of 16.12.09,08.02.10,03.03.10 and Koliyat, District machines, fake job cards, and 31.03.2010 Bikaner forged muster rolls.

36 Rajasthan Shri Gopal Lal Balai, Corruption in the work & money Requested State Government for Reply is awaited 5. Mahamantri, Zila relating to NREGA, no investigation on 14.10.2009 and Saganthan, Block investigation of works by District reminder sent on 05.11.2009, Congress Committee, Magistrate. 16.12.09,08.02.10,03.03.10 and Gram Panchayat- 31.03.2010 Dhanop, Tehsil Shahpura, District Bhilwara, Mobile- 9950669451 36 Rajasthan Shri Punjab Singh, Recording of fictitious workers in Requested State Government for Reply is awaited 6. Branch Post mater, NREGA investigation on 14.10.2009 and District- Dhaulpur reminder sent on 05.11.2009, Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 16.12.09,08.02.10,03.03.10 and 31.03.2010

36 Rajasthan Use of poor quality materials, no Requested State Government for Reply is awaited 7. use of red soil and rollers in investigation on 14.10.2009 and Shri Ram Narayan and construction of Graval roads. reminder sent on 05.11.2009, others, Gram- Lavan, 16.12.09,08.02.10,03.03.10 and Tehsil & District- 31.03.2010 Dausa

36 Rajasthan Issuance of false job cards, use of Requested State Government for It has got enquired by SLO report 8. Shri Rajender Kumar fake muster roll & defalcation and investigation on 14.10.2009 and under process. Meena, Up- Sarpanch, corruption in funds reminder sent on 05.11.2009, Gram Panchayat- Ghat 16.12.09,08.02.10,03.03.10 and Reply is awaited ka Barana, District- 31.03.2010 Bundi

36 Rajasthan Fake job cards, misuse of funds by Requested State Government for Reply is awaited Shri Amir Khan, 9. showing more attendance investigation on 14.10.2009 and Gram- Ghuriya, reminder sent on 05.11.2009 and Panchayat- Sipla, 31.03.2010 Post- Theda, Tehsil & District- Jaisalmer

37 Rajasthan Shri Ashok Kumar Violation of financial and accounts Requested State Government for It has got enquired by SLO mater 0. Bajya, Rajasthan rules by the Sarpanch and Sachiv of investigation on 22.10.2009 and under process. Pradesh Mahamantri, Gram Panchayats under NREGA. reminder sent on 05.11.2009, Suchnaadhikar Jan- Eg. In Gram Panchayat Boraj, 16.12.09,08.02.10,03.03.10 and Reply is awaited Jagran & Rashtriya Panchayat Samiti Dudu, District 31.03.2010 Vichar manch, Head Jaipur. office – Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government M.P.Kalyanpura, Tehsil Kishangarh, District Ajmer, Rajasthan. 37 Rajasthan Smt. Kameri Devi Corruption and irregularities in the Requested State Government for It has got Enquired by SLO all the 1. Meena, Zila Pramukh, implementation of NREGA in investigation on 22.10.2009 and purchasing of NREGA items ZIla Parishad Dausa, District Dausa reminder sent on 05.11.2009, found in accordance the financial ajasthan. 16.12.09,08.02.10,03.03.10 and rules. No irregularities found in 31.03.2010 other matters.

37 Rajasthan 452/APS/M(RD)/09 Making Suggestions for bringing Requested State Government for Reply is awaited 2. Dr. Sandhya improvement in the quality of work investigation on 09.11.2009 and Choudhury, undertaken under NREGA reminder sent on and 31.03.2010 Pindbarha, District Serohi, Rajasthan 37 Rajasthan Duplication in issuance of job cards Requested State Government for Reply is awaited 3. in Gram Panchayat Cipla in District investigation on 06.11.2009 and Villagers of Gram Jaisalmer reminder sent on Panchayat Cipla, 16.12.09,08.02.10,03.03.10 and District Jaisalmer 31.03.2010

37 Rajasthan Use of low quality material and no Requested State Government for In this matter the quality of 4. Shri Bhagirath Prasad proper measurement done in investigation on 06.11.2009 and material used in NREGA works Guru, Member construction of road under NREGA reminder sent on found according norms, public of that Gram Panchayat appreciate Panchayat Samiti in Gram Panchyat Balera in Distrivt 16.12.09,08.02.10,03.03.10 and Churu 31.03.2010 the scheme and constructed works Suzangarh, District also, Charge of the complaint

Churu found false and baseless.

37 Rajasthan Shri Puran Lal and Asking money by Gram Secretary Requested State Government for Reply is awaited 5. Others, Gram for entering name and issuing investigation on 06.11.2009 and Panchayat Konder, muster roll under NREGA in Gram reminder sent on Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Panchayat Konder in District Churu 16.12.09,08.02.10,03.03.10 and District Karauli 31.03.2010

37 Rajasthan Shri Bhanwaruram Fake entries in muster roll, use of Requested State Government for In the enquiry report charges 6. Nayak, Zila Parishad low quality material, payment not investigation on 06.11.2009 , against Gram Panchayat work found false and baseless. In the Member, Gram made by Bank Accounts at Gram 16.12.09,08.02.10, 03.03.10 and social audit campaign all the Bhadana, District Panchayat Gothda, Panchayat 31.03.2010 samiti Mundwa in District Nagaur works and other activities were Nagaur appreciated by local public 37 Rajasthan Fake entries in muster roll, use of Requested State Government for Reply is awaited 7. machinery and involvement of investigation on 06.11.2009 and Shri Malaram s/o Shri contractor at Gram Panchayat reminder sent on Momtaji Garg, Gram Tadwa, District Jalore 16.12.09,08.02.10,03.03.10 and Tadwa, District Jalore 31.03.2010

37 Rajasthan Payment made to ghost workers, Requested State Government for this matter was got enquired by 8. Shri Dungraram and fake entries in muster roll under investigation on 06.11.2009 and BDO parbatsar constructed work others, Gram NREGA at Gram Panchayat Peeh, reminder sent on found as sanctioned in the action Panchayat Peeh, Panchayat Samiti Pabatsar, District 16.12.09,08.02.10,03.03.10 and plan, wages to the labour duly Nagaur 31.03.2010 submitted through their Bank / Panchayat Samiti Post office account, No

Pabatsar, District irregularities found in panchayat Nagaur works.

37 Rajasthan Fake entries in muster roll, payment Requested State Government for The matter got enquired by CEO 9. Shri Sher Singh and made to ghost workers under investigation on 06.11.2009 and Nagour issue raised in complaint others, Gram NREGA at Gram Panchayat reminder sent on found false, works under NREGA Panchayat Dantina, Dantina, District Nagaur 16.12.09,08.02.10,03.03.10 and are conducting as proposed and District Nagaur 31.03.2010 sanctioned in action plan.

38 Rajasthan Villagers of Gram Use of low quality material under Requested State Government for It was got enquired by SLO some 0. Panchayat Todgarh, NREGA at Gram Panchayat investigation on 06.11.2009 and irregularities found in Panchayat records, So district collector has Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Todgarh, Panchayat Jawaja, District reminder sent on directed to take disciplinary Panchayat Jawaja, Ajmer 16.12.09,08.02.10,03.03.10 and action against culprits. District Ajmer 31.03.2010

38 Rajasthan Fake entries in muster roll, payment Requested State Government for It was got enquired by SLM 1. Shri Jawahar Singh made in name of dead persons, investigation on 06.11.2009 and irregularities regarding supply of and others, Gram ghost workers at Gram Panchayat reminder sent on material, to calling of tenders Panchayat Hatizar, Hatizar, Panchayat Samiti Vaer, 16.12.09,08.02.10,03.03.10 and overwriting and cutting in District Bharatpur 31.03.2010 mustrolls etc. The surpanch Panchayat Samiti Secretary JTA and others are

Vaer, District liable for that district collector has Bharatpur instructed to take disciplinary action against them 38 Rajasthan Fake entries in muster roll, payment Requested State Government for Reply is awaited 2. made in name of ghost workers in investigation on 06.11.2009 and Shri Harjilal and District Bikaner reminder sent on others , District 16.12.09,08.02.10,03.03.10 and Bikaner 31.03.2010

38 Rajasthan Fake entries in muster roll, Requested State Government for This matter was got enquired by 3. embezzlement by using fake bill, investigation on 06.11.2009 and district level officer and SLO also payment made in the name of ghost reminder sent on in both the reports 9 issues out of Shri Shanker Lal workers at Gram Panchayat Kot, 16.12.09,08.02.10,03.03.10 and 11 found false and baseless in Patel, Gram Panchayat Panchayat Girwa, District Udaipur 31.03.2010 remaing2 issues about fake entries in muster rolls and interruption by

Kot, Panchayat Girwa, the peoples of Surpanch found District Udaipur true for which district Collector Udaipur has instructed to take disciplinary action against them.

38 Rajasthan Villagers of Suberi Irregularities in construction of Requested State Government for Reply is awaited 4. Gram Panchayat, Village road and bridges. investigation on 17.11.2009 and Panchayat Samity reminder sent on Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Kherwara, District 16.12.09,08.02.10,03.03.10 and Udaipur, Rajasthan 31.03.2010 (From office of MOS- RD-SA) 38 Rajasthan Article in ‘Times of One person named Shri Ram Requested State Government for Reply is awaited 5. India’ dated Khiladi was killed during a bloody investigation on 24.11.2009 and 07.11.2009 clash between NREGA workers in reminder sent on Chandanpura Village under 16.12.09,08.02.10,03.03.10 and Sarmathura Police Station in 31.03.2010 Dholpur. 38 Rajasthan Villegers, Gram Monopoly of sarpanch, Up Forwarded to the State Reply is awaited 6. Panchayat Jasuri Sarpanch,gram sewak and some Government on 08.01.2010 and Baya, Makrana- ward member,Scam in use of reminder sent on 341505, District material ,using of cheap materials 08.02.10,03.03.10 and 31.03.2010 Nagor, dated: and mishandling of muster rolls. 10/12/2009 38 Rajasthan Investigation team, Duplicating 450 job cards and Forwarded to the State Reply is awaited 7. NREGA, Village misuse of NREGA fund by Shri Government on 13.01.2010 and Himmatsar (Nokha) Prakash Bhatnagar B.D.O. Nokha reminder sent on 08.02.10,03.03.10 and 31.03.2010 38 Rajasthan Shri Tarachand Corruption & Miss-utilisaation of Forwarded to the State Reply is awaited 8. Bhambu, S/o Shri MGNREGA fund by Shri Rajendra Government on 13.01.2010, and Rugharam, c/o Diya Goarh, BDO, Churu Panchayat reminder sent on Finance(Front side of Samity 08.02.10,03.03.10 and 31.03.2010 the rest house) Kothbarh, District Churu, Rajasthan, dated: 16/12/2009 38 Rajasthan Hinustan Times, delhi. Starvation death of a MGNREGA Forwarded to the State It is reported that by the state 9. Thursday, Page No. 8, worker Government on 14.01.2010, and Govt. District Collector, dated: 7/1/2010 reminder sent on Chitorgarh, has mention in her Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 08.02.10,03.03.10 and 31.03.2010 reports are as follows: 1. There is a RD Account (No. 378002674122) for Rs.200 p.m. in “Sahara India’’ in the name of Shri Kishan Singh in which Rs. 3200/- has been found to be deposited till 14th December,2009 2. There exists a job card of NREGA of the family in which the household has worked for 27 days. 3. There exist a Ration Card in the name of the family in which 5kg of wheatand 3lit. of kerosene for month of Nov-Dec were obtained. 4. The report further mentions that food was cooked twice a day in the family of Kishan Singh and that relatives had come to ailing Kishan Singh prior to his demise. It is evident from the the report of collector, that the death of Shri Kishan Singh cannot be linked to starvation under any circumstances. The matter looking to the purely humanitarian. 39 Rajasthan Dr. Sudhir Krishna, Various problems faced by local Forwarded to the State Reply is awaited 0. Additional Secretary, farmers and making suggestions Government on 28.01.2010, and Ministry of Panchayat regarding MGNREGA reminder sent on Raj, Government of 08.02.10,03.03.10 and 31.03.2010 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government India, District Sriganganagar dated: 8/1/2010 39 Rajasthan Shri Hariram, shri Corruption, irregularities and Forwarded to the State Reply is awaited 1. Amar singh issuance of false job cards Government on 28.01.2010, and choudhury and reminder sent on Villegers, Gram 08.02.10,03.03.10 and 31.03.2010 panchayat Rajlani, panchayat Samity Bhupalgarh, District jodhpur, Rajasthan dated: 6/10/2009 39 Rajasthan Zilla Sangathan Irregularities and Misuse of Forwarded to the State Reply is awaited 2. Muntri, Congress MGNREGA fund by Panchayat Government on 28.01.2010and Sewadal, Gram & Post official. reminder sent on Shibarh, District 08.02.10,03.03.10 and 31.03.2010 Sawai Madhopur, Rajasthan 39 Rajasthan Shri Ramshwarup Corruption, Issuence of job cards Forwarded to the State Reply is awaited 3. Rajpurahit, Prisedent, and fake muster rolls Government on 28.01.2010, Suchanadhikar Jan- reminder sent 08.02.10,03.03.10 Gagaran and Rashtriya and 31.03.2010 Bichar Manch, district Ajmer, dated: 17/12/2009 39 Rajasthan Shri Abdul Latif S/o Corruption and Misuse of fund on Forwarded to the State Reply is awaited 4. Shri Rashid, 1- R.S.M. the project of Grebal Road under Government on 28.01.2010 and Ahduri, Tehsil Pugal, Mahatma Gandhi NREGA reminder sent on District Bikaner, 08.02.10,03.03.10 and 31.03.2010 dated: 18/12/2009 39 Rajasthan Shri Ratanlal , Gram Issuence of false job cards and Forwarded to the State Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Dariyati District misutilisation of fund by faking Government on 04/03/2010 by Fax Dungarpur, Rajasthan muster rolls and Post and 31.03.2010

39 Rajasthan Mahatma Gandhi Recuritment of computer operator Forwarded to the State Reply is awaited 6. NREGA Computer at Gram Panchayat level under Government on 04/03/2010 by Fax oparetor Sangha, Mahatma Gandhi NREGA and Post and reminder sent on District Shri- 31.03.2010 Ganganagar 39 Rajasthan Shri Vijay Kumar Complaining worng Forwarded to the State Reply is awaited 7. Gupta, Rashtriya implementation of Mahatma Government on 04/03/2010 by Fax Saha-Sangojak, Akhil Gandhi NREGA and Post and reminder sent on Bharatia Gogamori 31.03.2010 Vikash Samity, Gram Gogamori, Thesil Nohar, district Hanumangarh 39 Rajasthan Villegers, Gram Irregular work to construction of Forwarded to the State Reply is awaited 8. Vhimgang, Gram Anikat and using poor quality Government on 04/03/2010 by Fax Panchayat Sisola, materials & toools and Post and reminder sent on Panchayat Samity 31.03.2010 Nainba, District Bundi 39 Rajasthan Shri Shankar Ajnabee, Regarding corruption, Missuse of Forwarded to the State Reply is awaited 9. S/o Shri Hanuman fund and some suggestion to Government on 04/03/2010 by Fax Prashad Kumabat, improve the Mahatma Gandhi and Post and reminder sent on District Sikar NREGA 31.03.2010

40 Rajasthan Shri Pratap Singh, Corruption and Misuse of fund by Forwarded to the State Reply is awaited 0. Gram Borkheda,Teha faking muster rolls under Mahatma Government on 16/03/2010 and Bouli, District Sawai Gandhi NREGA and requesting to reminder sent on 31.03.2010 Madhopur, Rajasthan. stop NREGA Works. 40 Rajasthan All NREGA workers, Withdrawl the NREGA fund by Forwarded to the State Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Gram Panchayat utilizing died NREGA workers Government on 16/03/2010 and Sahaba, Teshil Hazra w/o Kherdin Jati Khumbar, reminder sent on 31.03.2010 Taranagar, District Job cards No. 986. Under Mahatma Churu, Rajasthan Gandhi NREGA. 40 Rajasthan Smt. Lila, Board Late payment of wages under Forwarded to the State Reply is awaited 2. Panch (Board No. 11), Mahatma Gandhi NREGA. Government on 16/03/2010 and Gram Panchayat reminder sent on 31.03.2010 Mandaba, Panchayat samity Kothra, District Udaipur, Rajasthan 40 Rajasthan Shri Shankarlal and Issuence of false job cards and Forwarded to the State Reply is awaited 3. villagers, Gram corruption by Sarpanch and Gram Government on 16/03/2010 and Panchayat Jalubala, Sewak. reminder sent on 31.03.2010 Tehsil Pokran, District Jaisalmer, Rajasthan. 40 Rajasthan Shri Ratanlal , Gram Issuence of false job cards and Forwarded to the State Reply is awaited 4. Dariyati District misutilisation of fund by faking Government on 11/03/2010 and Dungarpur, Rajasthan muster rolls reminder sent on 31.03.2010

40 Rajasthan Mahatma Gandhi Recuritment of computer operator Forwarded to the State Reply is awaited 5. NREGA Computer at Gram Panchayat level under Government on 11/03/2010 and oparetor Sangha, Mahatma Gandhi NREGA reminder sent on 31.03.2010 District Shri- Ganganagar 40 Rajasthan Shri Vijay Kumar Complaining wrong Forwarded to the State Reply is awaited 6. Gupta, Rashtriya implementation of Mahatma Government on 11/03/2010 and Saha-Sangojak, Akhil Gandhi NREGA reminder sent on 31.03.2010 Bharatia Gogamori Vikash Samity, Gram Gogamori, Thesil Nohar, district Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Hanumangarh 40 Rajasthan Villegers, Gram Irregular work to construction of Forwarded to the State Reply is awaited 7. Vhimgang, Gram Anikat and using poor quality Government on 11/03/2010 and Panchayat Sisola, materials & toools reminder sent on 31.03.2010 Panchayat Samity Nainba, District Bundi 40 Rajasthan Shri Shankar Ajnabee, Regarding corruption, Missuse of Forwarded to the State Reply is awaited 8. S/o Shri Hanuman fund and some suggestion to Government on 11/03/2010 and Prashad Kumabat, improve the Mahatma Gandhi reminder sent on 31.03.2010 District Sikar NREGA 40 Rajasthan Shri shankarlal s/o Corruption, using poor quality Forwarded to the State Reply is awaited 9. Shri Vikhalal and materials and misuse of fund and Government on 29/03/2010 and Mangilal s/o Shri do not provide any information reminder sent on 31.03.2010 Ramlal and Villagers, under RTI Act to villagers. Gram Post Jalubala, District Jaisalmer, Rajasthan 41 Rajasthan Shri Rajesh Kumawat, Failure to pay minimum wages and Forwarded to the State Reply is awaited 0. Deputy Secretary, misue of Mahatma Gandhi NREGA Government on 29/03/2010 and Rajasthan Pradesh fund by Gram Pradhan and Roggar reminder sent on 31.03.2010 Youth Congress, Sewak. Gram Nimaz, Panchayat Samity Jaitaran, Rajasthan 41 Rajasthan All Villagers, Gram Failure to pay minimum wages, Forwarded to the State Reply is awaited 1. Panchayat Chorri, using machinary like JCB and Government on 29/03/2010 and District Banswara, Tractor and misuse of fund under reminder sent on 31.03.2010 Rajasthan Mahatma Gandhi NREGA. 41 Rajasthan Rajasthan Gram Failure to provide work to the job Forwarded to the State Reply is awaited 2. Sewak Sangha, cards holder, using machinaries, Government on 29/03/2010 and Upasakha, poor seleection of worksite and reminder sent on 31.03.2010 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Hanumangarh, misuse of Mahatma Gandhi Rajasthan. NREGA fund. 41 Rajasthan Mr. Manoj Sharma The complaint is about the closure Forwarded to the State Reply is awaited 3. from village Balunda; of work due to unsocial elements Government on 31/03/2010 block Jaitaran in Pali, and corrupt officers. Rajasthan. 41 Tamil Shri M. Sasi Kumar, Use of machinery, forgery of Requested State Government for Reply is awaited. 4. Nadu Secretary, muster rolls and misappropriation investigation on 27.10.2009 and Konangipatti of funds by village Panchayat reminder sent on 05.11.2009 Consumer Council, Official Smt. K.Chandra, her Namakkal District, husband Shri K. Kathirvel and her Tamil Nadu father Shri Ganesan under NREGA 41 Tamil Sh. Dhanraj, Anna Alleged irregularities in NREGS in Requested State Government for Reply is awaited 5. Nadu Street, Thervai village, Thervai village investigation on 5.2.2010 Gummidipoondi, Thiruvallur, Tamil Nadu (forwarded by Prime Minister’s Office) 41 Tamil ‘Medical’ K.  Wage payment to the labourers by Requested State Government for Reply is awaited 6. Nadu Paramasivam, recording the false and bogus investigation on 5.2.2010 Chairman measurement. Thirumoorthy  Non disbursement of wages Resevoir Project through Banks/Post office. Committee, Coimbatore district (forwarded by Prime Minister’s Office) 41 Uttar Shri F Bahadur Singh Regarding corruption and misuse of Forwarded to State Government Complaint not received. 7. Pradesh Yadav, village funds under NREGA 7.5.08 and reminders sent on Bankut, block 23.5.08, 29.5.08, 5.06.08 ,23.1.09 , Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government chitrakut, district 27.05.09 , 21.08.2009 & Banda 05.11.200916.12.09,08.02.10,03.0 3.10 and 31.03.2010

41 Uttar Shri Rajesh chammar,  Misuse of NREGA funds Forwarded to State Government Investigating procedure is 8. Pradesh vill. Sonegarha Halia,  Payment of low wages 7.5.08 and reminders sent on going on by State Quality district Mirzapur  Non- issuance of job cards 23.5.08, 29.5.08, 5.06.08 ,23.1.09 , Monitor. 27.05.09 , 21.08.2009 & Reply is awaited 05.11.2009 16.12.09,08.02.10,03.03.10 and 31.03.2010

41 Uttar Shri Bhuvaneshwar Improper implementation of Forwarded to the State Reply is awaited. 9. Pradesh Prasad Mehta, MP NREGA Lakhimpur Khiri Government on 4.7.08 and (LS) reminders sent on 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 16.12.09,08.02.10,03.03.10 and 31.03.2010

42 Uttar Dainik Jagran Sonia Gandhi’s visit to Raibarely Forwarded to the State Reply is awaited. 0. Pradesh May 15/08 disclosed many loopholes in the Government on 15.5.08 and functioning of NREGA. reminders sent on 5.06.08, 23.1.09, 27.05.09, 21.08.2009 .09 & 05.11.2009 16.12.09, 08.02.10, and 03.03.10 Proposal sent on 15.5.08 to NLM division for appointment of an NLM. Report received. Copy sent to the State Government for necessary action/ comments. Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 42 Uttar Shri Harish Chander Misuse of funds under the NREGA. Forwarded to the State Investing Committee had been 1. Pradesh (Advocate), Village Government on 8.9.2008 and formed second time by the Mahawalpur, Post reminders sent on 23.1.09 , order of District Magistrate. Dulhipur, District 27.05.09 , 21.08.2009 & Chanduali 05.11.2009, Reply is awaited 16.12.09,08.02.10,03.03.10 and 31.03.2010

42 Uttar Shri Sanatosh Singh  Misuse of funds Forwarded to the State Investigating procedure is 2. Pradesh Village or Kothi  Corruption Government on 8.9.2008 and going on by State Quality Dhokal Singh, Block  Use of sub standard material reminders sent on 23.1.09 , Monitor. Haliya, District  Fake bill under the NREGA. 27.05.09 , 21.08.2009 & Mirazapur 05.11.2009 , Reply is awaited 16.12.09,08.02.10,03.03.10 and 31.03.2010

42 Uttar Article in the Indian Cong. files complaint, says Babus Forwarded to the State Reply is awaited 3. Pradesh Express siphoned off NREGS funds Government on 22/09/2008 and 22 September 2008 reminders sent on 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 and 31.03.2010

42 Uttar Ms. Annie Raja, Non-payment of honorarium to Forwarded to the State According to the report of 4. Pradesh Member CEGC Rozgar Sevak in Allahabad district Government on 30.9.08 and Chief Development Officer; of Uttar Pradesh reminders sent on 23.1.09 , the payment of Rozgar Sevak 27.05.09 , 21.08.2009 & has been done. 05.11.09 , 16.12.09,08.02.10,03.03.10 and 31.03.2010

42 Uttar Shri P.L. Punia, State Alleging misappropriation of funds Forwarded to the State NLM deputed and allegations Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Pradesh Incharge, Public and manipulation of job cards by Government on 12.12.08 and are found to be false. Grievance Redressal, Gram Pradhan, BDO and Panchayat reminders sent on 23.1.09 , UP Congress Secretary in village Sisouna, block 27.05.09 , 21.08.2009 & Committee Dariyabad, district Barabanki of 05.11.2009, 16.12.09,08.02.10 Uttar Pradesh. and 31.03.2010

42 Uttar Shri Veer Singh, VPO Misuse of funds of Rs. 100,000/- Forwarded to the State Investigation is going on at 6. Pradesh Hazipur, district by withdrawing money in the Government on 1.01.09 and District Level. Jalaun name of person who has not reminders sent on 23.1.09 , worked by BDO 27.05.09 , 21.08.2009 & Reply is awaited 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

42 Uttar Shri Shaliender Singh, Misuse of funds Rs. 26 Lakh under Forwarded to the State Reply is awaited 7. Pradesh Village Koiladar, Post NREGA. Government on 27.02.09 and Dhani Bazaar, District reminders sent on 27.05.09 , Maharajganj 21.08.2009 & 05.11.2009 , 16.12.09,08.02.10,03.03.10 and 31.03.2010

42 Uttar Shri Behafoo Ram and  Failure to provide work on Forwarded to the State As per report called from State 8. Pradesh others, Village demand Government on 3.3.2009 and Government action has been Shriganj, Block  Non-payment of unemployment reminders sent on 27.05.09 , taken against guilty person and Karnda, Tehsil & allowance under NREGA 21.08.2009 & 05.11.2009, final report will be sent. District Ghazipur 16.12.09,08.02.10,03.03.10 and 31.03.2010

42 Uttar Article in No money, no land, no Forwarded to the State Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Pradesh www.expressindia.co food….couple says no to life Government on 16/03/2009 and m reminders sent on 27.05.09 , On 14th March 2009 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

43 Uttar Grievances received No work provided to the workers Forwarded to the State Reply is awaited 0. Pradesh via e-mail from Mr. who demanded for work and cases Government on 20/03/2009 and Vinod Kumar and Mr. of Non- Payment of wages. reminders sent on 27.05.09, Kumar Shiralakar 21.08.2009 & 05.11.2009 43 Uttar Ms. Arundhati Dhuru, Violation of NREGA norms in GO Forward to the State Government Reply is awaited 1. Pradesh Advisor to 175/38-7-2009-377 NREGA 108 on 22.04.2009 and reminders sent commissioners dated 21st January 2009, on 27.05.09 , 21.08.2009 & appointed by the Department of Rural Development 05.11.2009 , Supreme Court of - Government of Uttar Pradesh 16.12.09,08.02.10,03.03.10 and India in Right to food 31.03.2010 Case,

43 Uttar Mohan Lal s/o Use of poor quality material and Forward to the State Government According to the report of Joint 2. Pradesh Premraj, Gram Kaser construction was held at wrong on 30.04.2009 and reminders sent District Project Coordinator Panota, Block place. on 27.05.09 , 21.08.2009 & Complaint had not been found Vazirganj, Badaun 05.11.2009 , true. Please dispose this matter 16.12.09,08.02.10,03.03.10 and from the pending list of 31.03.2010 complaints.

43 Uttar Shri Girish Pratap  Corruption Requested State Government for As per report called from State 3. Pradesh Singh, Gram  Fraud of funds by Gram investigation on 01.05.2009 and Government notice has been Panchayat Member, Pradhan and Gram reminders sent on 27.05.09 , issued to the Gram Pradhan Village Kotha, Post Development officer under 21.08.2009 & 05.11.2009 , and final report will be sent Sohanpur, Vikas NREGA. 16.12.09,08.02.10,03.03.10 and after complete enquiry. Khand Vankata, 31.03.2010 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government District Deoria,

43 Uttar Shri Brijpal, Gram  Use of machinery. Requested State Government for According to the report of 4. Pradesh Panchayat Tissa,  Misuse of NREGA funds investigation on 04.05.2009 and Additional District Project Tehsil Jansath, reminders sent on 27.05.09 , Coordinator Complaint had not District Muzaffar 21.08.2009 & 05.11.2009, been found true. Please dispose Nagar , U.P 16.12.09,08.02.10,03.03.10 and this matter from the pending 31.03.2010 list of complaints

43 Uttar Sh Phool Singh, S/o. Corruption and anarchy created by Requested State Government for According to the report of Joint 5. Pradesh Late Ramswarup Pardhan under NREGA scheme. investigation on 14.05.2009 and District Project Coordinator Singh, Gram Allipur, reminders sent on 27.05.09 , Complaint had not been found Vikash Khand 21.08.2009 & 05.11.2009, true. Please dispose this matter Airayan, Tehsil 16.12.09,08.02.10,03.03.10 and from the pending list of Khaga, Janpad 31.03.2010 complaints. Fatehpur, Hal Mukam Nahar Colony, Sinchai Vibhag, Fatehpur 43 Uttar Sh. Jai Singh, Member Use of machines under NREGA Requested State Government for Reply is awaited 6. Pradesh gram Panchayat works and tampering of fund by investigation on 14.05.2009 and Behgaon, Block Pramukh Sh. Roshan Singh. reminders sent on 28.05.09 and Govardhan, Tehsil or reminder sent on 27.05.09 , Zanpad Mathura 21.08.2009 & 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

43 Uttar Shri Ram Kirpal Misappropriation of NREGA funds Requested State Government for According to the report of 7. Pradesh Tripathi, Gram by Gram Pradhan & Gram investigation on 08.05.2009 and Additional District Project Pachoha, District Panchayat Secretary under NREGA reminders sent on 27.05.09 , Coordinator Complaint had Ghorakpur, Uttar 21.08.2009 & 05.11.2009, been found partially true. Pradesh 16.12.09,08.02.10,03.03.10 and Please dispose this matter from Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 31.03.2010 the pending list of complaints.

43 Uttar Shri Najeem Ansari, Failure to provide work on time to Requested State Government for Investigating procedure is 8. Pradesh Mahamantri, job cards holders, use of machinery investigation on 08.05.2009 and going on by State Quality Asangathit Karmkar instead of labour and ratio of 60:40 reminders sent on 27.05.09 , Monitor. Shramik Union not maintained under NREGA. 21.08.2009 & 05.11.2009 , Reply is awaited (AKSU) District 16.12.09,08.02.10,03.03.10 and Allahabad, Uttar 31.03.2010 Pradesh

43 Uttar Shri Bhailal Kaul, Complaining against Sh. Jaswant Requested State Government for Investigating procedure is 9. Pradesh Member of Singh, Chief Development Officer, investigation on 28.05.2009. and going on by State Quality Parliament(LS) Mirzapur, Uttar Pradesh about his reminders sent on 21.08.2009 & Monitor. arbitrary manner of functioning. 05.11.2009, 16.12.09,08.02.10,03.03.10 and Reply is awaited 31.03.2010

44 Uttar Shri Rajesh Dwivedi, Irregularities and corruption under Requested State Government for Investigation is going on at 0. Pradesh Member, Uttar NREGA by Shri Sanjay investigation on 04.06.2009 and District Level. Pradesh Congress Pandey,BDO, Meorpur and Dr. reminders sent on 21.08.2009 & Committee. K.D.Ram,CDO in Meorpur Block 05.11.2009 , Reply is awaited of Sonbhadra District 16.12.09,08.02.10,03.03.10 and 31.03.2010

44 Uttar Shri Ramavadh Yadav Gram Pradhan Sh. Arun Singh was Requested State Government for According to the report of Joint 1. Pradesh and others, misappropriated money under investigation on 16.06.2009 and District Project Coordinator Sabhsudipur Gram various projects like digging of reminders sent on 21.08.2009 & Complaint had not been found Panchayat, tehsil ponds, constriction of primary 05.11.2009, true. Please dispose this matter Sahaganj, Jaunpur schools, Children’s mid-day meal 16.12.09,08.02.10,03.03.10 and from the pending list of Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government District, Uttar Pradesh and construction of hand pump, 31.03.2010 complaints. road etc. The complainant has submitted an affidavit regarding the illegal action of Gram Pradhan. 44 Uttar Shri Sandeep Pandey, Forcible and illegal withdrawal of Requested State Government for Action is being taken by State 2. Pradesh Indira Nagar, money by the husband of the investigation on 22.06.2009 and Government. Lucknow, Uttar Pradhan of GP Aira Kake Mau, reminders was sent on Pradesh Block Bharawan, District Hardoi, 25.08.2009 , 21.08.2009 & Reply is awaited U.P 05.11.2009 , 16.12.09,08.02.10,03.03.10 and 31.03.2010

44 Uttar 04/VIP/M(RD)/09 Duplication of works and Requested State Government for Investigation is going on by 3. Pradesh Shri Pradeep dishonesty in payment of wages in investigation on 22.06.2009 and Technical Audit Cell. Mathur, MLA, Uttar Gram Sabha Pyarepur, Block reminders sent on 21.08.2009 & Pradesh Legislative Fakharpur, District Bahriach, Uttar 05.11.2009 , Reply is awaited Assembly, Vidhan Pradesh. Same road project, 16.12.09,08.02.10,03.03.10 and Bhawan, Lucknow. Saradpara link road to Khaira in 31.03.2010 Block Fakharpur has been taken up under different Schemes including NREGA. The wage amount has been fraudulently paid to the worker and same has been misappropriated in Gram Sabha Pyarepur , Block Fakharpur. 44 Uttar Shri Sheetla Prasad The misbehavior and non- Requested State Government for According to the report of Joint 4. Pradesh Pandey, Zilla Mantri, cooperation of the Branch Manager investigation on 22.06.2009 and District Project Coordinator Panchayat Raj Sewa and others of Harhua Branch of reminders sent on 21.08.2009 & Complaint had not been found Parishad Uttar Union Bank of India in Varanasi 05.11.2009 , true. Please dispose this matter Pradesh. District in the operation of NREGS 16.12.09,08.02.10,03.03.10 and from the pending list of accounts. 31.03.2010 complaints. Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government

44 Uttar Shri Krishan Kant Against Gram Pradhan of Akoda Requested State Government for According to the report of 5. Pradesh Tripathi S/o Sh. Gram Panchayat and other persons. investigation on 16.06.2009 and Additional District Project Ramkaran Tripathi, Gram Pradhan has misappropriated reminders sent on 21.08.2009 & Coordinator Complaint had Akoda Gram money under NREGA in various 05.11.2009 , been found partially true. Panchayat, Rohi Post, projects, and not given full 16.12.09,08.02.10,03.03.10 and Please dispose this matter from Gyanpur- Vikas information to the people. 31.03.2010 the pending list of complaints. Khand, Sant Ravidas He has submitted his affidavit as Nagar, Bhadoi District well as affidavit of two other of U.P. persons regarding the illegal action against the Pradhan. 44 Uttar Shri Amarnath Requested to done the excavation Requested State Government for According to the report of Joint 6. Pradesh Kshatriya (e-mail), work of Taal at village Suralia, investigation on 25.06.2009 and District Project Coordinator, Village Suralia, tehsil Tehsil Kerakat, District Jaunpur reminders sent on 21.08.2009 & the renovation of the Pond will kerakat, District under NREGA. 05.11.2009, be done either from NREGS Jaunpur. 16.12.09,08.02.10,03.03.10 and Fund or from any other source 31.03.2010 of Fund.

44 Uttar Shri Raj Bahadur Misappropriation of funds in Gram Requested State Government for Investigation is going on at 7. Pradesh Yadav, Member of Panchayats namely Kotakadala, investigation on 19.06.2009 and District Level. State Working Uchadih, Sakroha, Curahkashrova reminders sent on 21.08.2009 & Committee Party, by Gram Vikas officer Sh. 05.11.2009 , Reply is awaited Janpad Chitrakoot, Chandrabhan Singh Patel. No 16.12.09,08.02.10,03.03.10 and Vikas Khand estimation and measurement for the 31.03.2010 Manikpur, Lucknow work. There has been duplication of District, Uttar Pradesh works and misappropriation of funds by Raj Bahadur yadav by forging the signature of the Pradhan. 44 Uttar Ramvan & others,U.P Poor quality of work, lack of Requested State Government for Due to incomplete information, 8. Pradesh transparency in execution of work investigation on 23.6.2009 and the Complaint had been send Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government and connivance of the reminders sent on 21.08.2009 & back to the GOI. Pradha,B.D.O. and J.E. 05.11.2009 , Reply is awaited 16.12.09,08.02.10,03.03.10 and 31.03.2010

44 Uttar Vijay Mani Tripathi, Irregurities in purchase of camera Requested State Government for Action is being taken by State 9. Pradesh District President, of Rs. Fifty Lakhs, taking of bribe investigation on 23.6.2009 and Government. Chitrakoot, UP of Rs. Five Lakhs reminders sent on 21.08.2009 & 05.11.2009 and 31.03.2010 Reply is awaited

45 Uttar Pramod,Hitendra and Complaint against gram Pradhan Requested State Government for According to the report of 0. Pradesh others, Gram Panchayt for not providing work to job card investigation on 23.4.2009 and Additional District Project Narhai, Block holders reminders sent on 21.08.2009 & Coordinator Complaint had Mithwil, 05.11.2009 , been found true. Action is Siddharth Nagar 16.12.09,08.02.10,03.03.10 and being taken at District Level. 31.03.2010 Reply is awaited 45 Uttar Godhan Lal s/o Use of poor quality material and Requested State Government for According to the report of Joint 1. Pradesh Premraj, constructions was held at wrong investigation on 30.4.2009 and District Project Coordinator Gram Kaser Panota, place. reminder sent on 21.08.2009, Complaint had not been found Block Vazirganj, 16.12.09,08.02.10,03.03.10 and true. Please dispose this matter Badaun 31.03.2010 from the pending list of complaints.

45 Uttar Zubair Ahmad Khan, Regarding corruption in BDO Requested State Government for Reply is awaited 2. Pradesh Former state secretary office Risia Bazar, District investigation on 8.5.2009 and (UP Congress Bahriach reminders sent on 21.08.2009 & committee) 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 45 Uttar Shri Amarnath The complainant has requested to Requested State Government for According to the report of Joint 3. Pradesh Kshatriya, renovation of a Taal at village investigation on 26.6.2009 and District Project Coordinator, village Suraila, Tehsil Suraila, Tehsil Kerakat, District reminders sent on 21.08.2009 & the renovation of the Pond will Kerakat, District Jaunpur 05.11.2009, be done either from NREGS Jaunpur 16.12.09,08.02.10,03.03.10 and Fund or from any other source 31.03.2010 of Fund.

45 Uttar Shri Ram Kishor Not providing Bill, Vouchers and Requested State Government for According to the report of Joint 4. Pradesh Diwakar, Member Zila related documents of NREGA to investigation on 1.7.2009 and District Project Coordinator Panchayat, Kathethi, Zila Panchayat Office. reminders sent on 21.08.2009 & Complaint had not been found Kanpur Dehat 05.11.2009 , true. Please dispose this matter 16.12.09,08.02.10,03.03.10 and from the pending list of 31.03.2010 complaints.

45 Uttar Smt. Jamuna devi and Misappropriation of funds through Requested State Government for Investigation is going on at 5. Pradesh Others, Gram Sabha spurious work and forgery in job investigation on 7.7.2009 and District Level. Nari Khera, Block cards. reminders sent on 21.08.2009 & Reply is awaited Sumerpur, District 05.11.2009 and 31.03.2010 Unnao. 45 Uttar Sh. Brijesh Pandey, Misuse of NREGA funds, purchase Requested State Government for Reply is awaited 6. Pradesh State coordinator , UP of materials without quotation, investigation on 16.7.2009 and congress committee improper release of funds, against reminders sent on 21.08.2009 & CDO& other officers in Gonda 05.11.2009, district. 16.12.09,08.02.10,03.03.10 and 31.03.2010

45 Uttar Sh. Arvind Kumar No development work took place, Requested State Government for According to the report of 7. Pradesh misappropriation of funds in investigation on 16.7.2009 and Additional District Project fictitious wells, road work, use of reminders sent on 21.08.2009 & Coordinator Complaint had not JCB machines instead of labour 05.11.2009 , been found true. Please dispose against Gram Pradhan and secretary 16.12.09,08.02.10,03.03.10 and this matter from the pending Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government of panchayat- Chirora Bujurag, 31.03.2010 list of complaints. Block Gursarain, Jhansi. 45 Uttar Shri Saket Bihari Fictitious plantation work in Requested State Government for Reply is awaited 8. Pradesh Mishra, President, Kamasin & Narayani blocks of investigation on 15.7.2009 and District Congress Banda district reminders sent on 21.08.2009 & Committee, Banda 05.11.2009, 16.12.09,08.02.10,03.03.10 and 31.03.2010

45 Uttar Shri Sharwan Kumar Alleging that the orders of Hon'ble Requested State Government for Reply is awaited 9. Pradesh and Others , District High Allahbad High Court, investigation on 06.07.2009 and Gonda Lucknow Bench in WP no. reminders sent on 21.08.2009 & 1860/55/09 & 2001/55/09 & 05.11.2009, 2001/55/09 are not being 16.12.09,08.02.10,03.03.10 and implemented and their salary for 31.03.2010 the month of April 2009 has not been paid. 46 Uttar Shri Umesh Bhadur Misuse of funds in plantation Requested State Government for According to the report of 0. Pradesh Singh (Bablu), District during last 4 years in Raibareli by investigation on 07.07.2009 and District Development Officer Coordinator, Phone: procurement of planting materials reminders sent on 21.08.2009 & Complaint has not been found 09450168573 at higher rates & plantation if fewer 05.11.2009, true. Please dispose this matter saplings than what was purchased 16.12.09,08.02.10,03.03.10 and from the pending list of & use of low quality planting 31.03.2010 complaints. materials 46 Uttar Dr. Girish, State Misappropriation of NREGA funds Requested State Government for According to the report of 1. Pradesh Secretary, Communist & low payment to job card holders investigation on 07.07.2009 and Additional District Project Party of India, Phone- & in institution of false F.I.R. reminders sent on 21.08.2009 & Coordinator Complaint had 05222624943 against Shri Prakash S/o Shri Gaya 05.11.2009, been found true. Please dispose Prasad 16.12.09,08.02.10,03.03.10 and this matter from the pending 31.03.2010 list of complaints.

Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 46 Uttar Shri R.C. Singh Complaining of sanitation and Requested State Government for Investigation is going on at 2. Pradesh (Advocate), Gangotri water drainage system in gram investigation on 09.07.2009 same District Level. Vihar Colony, sabha Barbara, Janpad Gajipur, letter has received on 17.08.2009 Kathvaitha, Shivpur, Uttar Pradesh under RTI Act, 2005. and reminders sent on 21.08.2009 Reply is awaited Varanasi, Uttar , 03.09.2009 & 05.11.2009, pradesh 16.12.09,08.02.10,03.03.10 and 31.03.2010

46 Uttar Villagers from village Use of Machinery and death of a Requested State Government for Reply is awaited 3. Pradesh Davsaresh, Block laborer, keeping job cards in his investigation on 23.07.2009 and Govardhan , District custody by Gram Pradhan. reminders sent on 21.08.2009 & Mathura , U.P. 05.11.2009 , 16.12.09,08.02.10,03.03.10 and 31.03.2010

46 Uttar Shri Nasir Ahmed, Underpayment of wages to women Requested State Government for According to the report of Joint 4. Pradesh Block President, Uttar workers, manipulation in muster investigation on 17.07.2009 and District Project Coordinator Pradesh Youth roll under NREGA. reminders sent on 21.08.2009 & Complaint had been found Congress, Gram 05.11.2009, true. Action is being taken. Duboli, Post Savrahi, 16.12.09,08.02.10,03.03.10 and Reply is awaited District Kushinagar, 31.03.2010 Ph. 9695149254 46 Uttar Shri Ramesh kumar, Regarding not providing work to Requested State Government for According to the report of 5. Pradesh Gram Manjharia, Gram Rozgar Sewak and NREGA investigation on 17.07.2009 and Additional District Project District Gajipur job cards holders. reminders sent on 21.08.2009 & Coordinator Complaint had not 05.11.2009, been found true. Please dispose 16.12.09,08.02.10,03.03.10 and this matter from the pending 31.03.2010 list of complaints.

46 Uttar Shri Dharamraj Irregularities in the issuance of job Requested State Government for Reply is awaited 6. Pradesh Singh, Gram cards, manipulation in job cards. investigation on 23.07.2009 and Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Panchayat Barahmafi, reminders sent on 21.08.2009 & Block Manikpur, 05.11.2009 and 31.03.2010 District Chitrakoot 46 Uttar Shri Ghanashyam Irregularities by the Pradhanpati Requested State Government for Reply is awaited 7. Pradesh Singh & others, Gram Shri Ramkripal and Gram Vikas investigation on 10.08.2009 and Panchayat Basti, Adhikari. reminders sent on 21.08.2009 & District Barabanki 05.11.2009, forwarded by Shri 16.12.09,08.02.10,03.03.10 and Mazhar Aziz Khan, 31.03.2010 Zilla Prabharai of NREGA Vigilance Committee, District Barabanki, Uttar Pradesh

46 Uttar Shri Brijesh Pandey, Misappropriation in the allotment Requested State Government for According to the report of Joint 8. Pradesh State Coordinator, UP of the NREGA funds in District investigation on 18.08.2009 and District Project Coordinator NREGA vigilance & Gonda. reminders sent on 21.08.2009 & Complaint had been found monitoring 05.11.2009, partially true. Please dispose Committee, 132, Patel 16.12.09,08.02.10,03.03.10 and this matter from the pending Nagar,near Gonda 31.03.2010 list of complaints. Medical Centre. Ph 9918491464 46 Uttar Villagers of Gram Embezzlement of NREGA funds, Requested State Government for According to the report of Joint 9. Pradesh Panchayat Vardwari, forcefully capturing of bank investigation on 18.08.2009 and District Project Coordinator Block Mursan,Tehsil passbooks and job cards, faking of reminders sent on 21.08.2009 & Complaint had not been found Hathras, District works. 05.11.2009, true. Please dispose this matter Mahamaya Nagar 16.12.09,08.02.10,03.03.10 and from the pending list of 31.03.2010 complaints.

47 Uttar Shri Satya Bhagwan Failure to provide work on time, Requested State Government for Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Pradesh S/o Late Ram Lal, wages not being paid to the investigation on 14.08.2009 and Gram Post- Gausganj, NREGA workers and information reminders sent on 21.08.2009 & Janpad- Hardoi sought under RTI Act 2005 not 05.11.2009, being provided by the BDO 16.12.09,08.02.10,03.03.10 Kachona. 47 Uttar Shri Bharat Singh, Allegation of corruption, Requested State Government for According to the report of 1. Pradesh Village Hardhan Juda, irregularities and manipulation investigation on 24.08.2009 and Additional District Project Block Chahnia, under NREGA reminder sent on 05.11.2009, Coordinator Complaint had not District Chandauli, 16.12.09,08.02.10,03.03.10 and been found true. Please dispose Uttar Pradesh (As 31.03.2010 this matter from the pending desired by S(RD) a list of complaints. team of NLMs should be sent and they should be speak to and get the input from complainant) 47 Uttar Shri Khemchand and Nonpayment of wages to workers Requested State Government for Reply is awaited 2. Pradesh others, Gram under NREGA investigation on 24.08.2009 and Bambavad Police reminder sent on 05.11.2009 , Station Badalpur, 16.12.09,08.02.10,03.03.10 and Tehsil Dadri, District 31.03.2010 Gautam Budh Nagar 47 Uttar Shri Ram Kumar Excavation work of pond not done Requested State Government for Reply is awaited 3. Pradesh Sahu, Gram and non- payment of wages to investigation on 24.08.2009 and Kodrajeet, Block workers under NREGA. reminder sent on 05.11.2009, Bihar, Tehsil Kunda, 16.12.09,08.02.10,03.03.10 and District Pratapgarh 31.03.2010

47 Uttar Shri Santosh Kumar, Failure to provide work to job card Requested State Government for According to the report of Joint 4. Pradesh Gram Bakhtar, Gram holders, embezzlement done by investigation on 24.08.2009 and District Project Coordinator Panchayat Kalua Gram Pradhan, asking money for reminder sent on 05.11.2009, Complaint had not been found Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Bakhtar, Block sanction works under NREGA 16.12.09,08.02.10,03.03.10 and true. Please dispose this matter Mauranipur, District 31.03.2010 from the pending list of Jhansi complaints. 47 Uttar Shri Sherab Khan, Not completing the pond digging Requested State Government for According to the report of 5. Pradesh Gram Ninora, Block work under NREGA. investigation on 24.08.2009 and Additional District Project Bangra, District Jhansi reminder sent on 05.11.2009, Coordinator Complaint had not 16.12.09,08.02.10,03.03.10 and been found true. Please dispose 31.03.2010 this matter from the pending list of complaints. 47 Uttar Shri Bhai Ramlal Regarding not sanction of funds to Requested State Government for According to the Chief 6. Pradesh Yadav, Gram Mudila NREGA works. investigation on 24.08.2009 and Development Officer of Jhansi Tiwari, Post kota reminder sent on 05.11.2009, the report had not been found Mukundpur, District 16.12.09,08.02.10,03.03.10 and true. Please dispose this matter Maharajganj. Ph. 31.03.2010 from the pending list of 9415643943 complaints. 47 Uttar Shri Sandeep Pandey, Lathi charge by the Gram Pradhan Requested State Government for Action is being taken by State 7. Pradesh Indira Nagar, and his men on the workers while investigation on 25.08.2009 and Government. Lucknow, Uttar asking for their pending wages on request was sent to NLM division. Pradesh 14 th January ,2009 And reminder sent on 05.11.2009 Reply is awaited , 16.12.09,08.02.10,03.03.10 and 31.03.2010

47 Uttar All Villagers of Gram Alleging misbehaviour of Block Requested State Government for Investigation is going on at 8. Pradesh Panchayat- Development Officer with NREGA investigation on 16.09.2009 and District Level. Sarhanbujurg, Vikas workers reminder sent on 05.11.2009, Reply is awaited Khand- Amoli, 16.12.09,08.02.10,03.03.10 and District Fatehpur 31.03.2010

47 Uttar Shri Khushi Ram and Gram Sabha meetings are not being Requested State Government for According to the Chief 9. Pradesh others, Gram held & failure to provide work investigation on 16.09.2009 and Development Officer of Panchayat- reminder sent on 05.11.2009, Kashiram Nagar the report had Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Khargatipur, Vikas 16.12.09,08.02.10,03.03.10 and not been found true. Please Khand- Sidpura, 31.03.2010 dispose this matter from the Tehsil- Patiyali, pending list of complaints. District Kashiram Nagar 48 Uttar Shri Sultan Singh, Complain regarding use of fake Requested State Government for According to the Chief 0. Pradesh Gram Panchayat- attendance, to keep job cards in investigation on 16.09.2009 and Development Officer of Viran Khera, Block- custody of Sarpanch, reminder sent on 05.11.2009, Kanpur Nagar the report had Bhitargaon, Tehsil- misappropriation of funds under 16.12.09,08.02.10,03.03.10 and not been found true. Please Chhadampur, District various projects & from the 31.03.2010 dispose this matter from the Kanpur Nagar workers bank accounts, demanding pending list of complaints. bribe for making job cards 48 Uttar Shri Udaybhan Singh Works are done physically, Requested State Government for According to the chief 1. Pradesh S/o shri Inder Bahadur Corruption &, embezzlement and investigation on 16.09.2009 and development officer of Gonda Singh, Gram- Rajapur, misuse of funds and threatens to reminder sent on 05.11.2009, the report had been found Block- Paraspur, workers in Gram- Rajapur, Block- 16.12.09,08.02.10,03.03.10 and partially true and remedial Tehsil- Karnailganj, Paraspur, Tehsil- Kasalganj, 31.03.2010 action is being taken. District- Ginda District- Gonda. 48 Uttar Shri Satnam Singh, Misuse of funds , denial of Requested State Government for Investigation is going on at 2. Pradesh Advocate, Former registration to eligible applican investigation on 16.09.2009 and District Level. Secretary, Mobile- Etah ts and issuance of false job reminder sent on 05.11.2009, Reply is awaited 94352888523 cards, recording of fictitious works. 16.12.09,08.02.10,03.03.10 and 31.03.2010

48 Uttar Shri Magan Lal s/o Corruption, embezzlement, under Requested State Government for Reply is awaited 3. Pradesh Shri Sarpati, Gram payment of wages, misuse of funds investigation on 16.09.2009 and Sagauli, Block in Karuadihi, Bela, Vajti, Raipur reminder sent on 05.11.2009, Bamaur, District Gram Panchayats in Block Pratapur 16.12.09,08.02.10,03.03.10 and Jhansi of District Allahabad 31.03.2010

48 Uttar All villagers of Gram- Misuse of funds and many Requested State Government for Investigation is going on at Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Pradesh Emeliya,Pargana incomplete projects under NREGS investigation on 16.09.2009 and District Level Muskara, Tehsil- not completed by Gram Pradhan reminder sent on 05.11.2009, Reply is awaited Modha, District 16.12.09,08.02.10,03.03.10 and 31.03.2010

48 Uttar Shri Ram Kakar Embezzlement done by Pradhan Requested State Government for Investigation is going on at 5. Pradesh Bundwar, Gram- and Gram Vikas Officer in NREGA investigation on 16.09.2009 and District Level Budwar, District- projects. The complainant alleged reminder sent on 05.11.2009, Reply is awaited Lalitpur that there are many schemes that 16.12.09,08.02.10,03.03.10 and are still incomplete like 31.03.2010 construction of drains, afforestation etc. The complainant has requested to investigate the irregularities and corruption in NREGS. 48 Uttar Shri Indermani Dubey, Embezzlement and corruption in Requested State Government for According to the Chief 6. Pradesh Chief Secretary, Zila the NREGA funds, issuance of job investigation on 16.09.2009 and Development Officer of Congress Committee, cards to dead persons, bogus job reminder sent on 05.11.2009 , Jaunpur the report had not been Gram Sabha- cards, wages not paid to workers, 16.12.09,08.02.10,03.03.10 and found true. Please dispose this Ghughuri Sultanpur, failure to provide muster roll at the 31.03.2010 matter from the pending list of Block- Khuthan, worksite in Jaunpur District. complaints. Jaunpur District

48 Uttar Shri Ranvijay Singh, Manipulation in muster rolls, Requested State Government for Investigation is going on at 7. Pradesh District Deoria issuance of fake job cards, payment investigation on 16.09.2009 and District Level made in the name of ghost workers reminder sent on 05.11.2009, Reply is awaited at Lar, Bhatpar Rani, Bankata, 16.12.09,08.02.10,03.03.10 and Bhagalpur Blocks in District 31.03.2010 Deoria 48 Uttar Shri Wahid Ali and Job cards kept with the Gram Requested State Government for Investigation is going on at 8. Pradesh others, Gram Pradhan, work was not provided investigation on 16.09.2009 and District Level Panchayat Barpar, under NREGA reminder sent on 05.11.2009, Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Nyaya Panchayat 16.12.09,08.02.10,03.03.10 and Parsia, District 31.03.2010 Gorakhpur 48 Uttar Shri Buddhu Raidas, Discrimination in the selection of Requested State Government for Reply is awaited 9. Pradesh Gram Panchayat the worksite under NREGA investigation on 16.09.2009 and Hasnapur Paharpur, reminder sent on 05.11.2009, Thana Masoli, District 16.12.09,08.02.10,03.03.10 and Barabanki 31.03.2010

49 Uttar Shri Hari Singh, Gram Corruption and Embezzlement Requested State Government for Investigation is going on at 0. Pradesh Panchayat Bansari, under NREGA at Gram Panchayat investigation on 16.09.2009 and District Level Block Chagar Bansari, Block Chakarnagar, reminder sent on 05.11.2009, Reply is awaited Nagar,District Etawah District Etawah 16.12.09,08.02.10,03.03.10 and 31.03.2010

49 Uttar Requested State Government for Reply is awaited Shri Chhote Lal, Gram 1. Pradesh investigation on 25.09.2009 and Sabha- Amiliya Misuse of funds & fake muster rolls reminder sent on 05.11.2009 , Tarhar, Block- in various projects under NREGA 16.12.09,08.02.10,03.03.10 and Shankargarh, District- 31.03.2010 Allahabad

49 Uttar Requested State Government for According to the Chief 2. Pradesh Shri Arun Jayaswal, investigation on 25.09.2009 and Development Officer of Misappropriation & irregularities in Gram Panchyat- Mad, reminder sent on 05.11.2009, Chandauli,the complaint has funds, use of fake muster rolls & Block- Chakiya, 16.12.09,08.02.10,03.03.10 and not been found true, Please job cards District- Chandauli 31.03.2010 dispose this matter from the pending list of complaints. 49 Uttar Shri Munir Ahmed, Rejoining of suspended Panchayat Requested State Government for According to the Chief 3. Pradesh Gram- Mukimpur- Adhikari which found guilty in investigation on 25.09.2009 and Development Officer of Judhora, Post- misappropriation of funds reminder sent on 05.11.2009, Sitapur,the complaint has been Akohara, Tehsil- 16.12.09,08.02.10,03.03.10 and found true, The remedial action Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Sidhauli, District- 31.03.2010 has been taken Sitapur 49 Uttar Requested State Government for According to the Chief Shri Sahidul Hassan 4. Pradesh Use of fake job cards & fake investigation on 25.09.2009 and Development Officer of S/o Nazir, Gram signatures, recording of fictitious reminder sent on 05.11.2009, Sitapur,the complaint has been Panchayat- Ulra, workers, keep pass book in custody 16.12.09,08.02.10,03.03.10 and solved, Please dispose this Block- Bisawa, of Gram Pradhan 31.03.2010 matter from the pending list of District- Sitapur complaints. 49 Uttar Requested State Government for According to the Chief Shri Puran S/o Shri 5. Pradesh Failure to provide works, non – investigation on 25.09.2009 and Development Officer of Narayan Singh and payment of wages, defalcation and reminder sent on 05.11.2009 , Mathura the report had not others of Gram- Jeit, corruption in funds, use of 16.12.09,08.02.10,03.03.10 and been found true. Please dispose Block & District- machines instead of labour 31.03.2010 this matter from the pending Mathura list of complaints. 49 Uttar 584(15)/ MOS Fraudulent withdrawl of money Requested State Government for According to the Chief 6. Pradesh (RD)/09 from his account no.11286 page no. investigation on 30.09.2009 and Development Officer of Shri Raghuraj Singh, 388/43 dated 23.6.2009 by the reminder sent on 05.11.2009. Mainpuri the report was found Gram Panchayat Bank Manager, Gram Pradhan. and MOS(RD-PJ) replied to the true. and remedial action is Tigwan, Gram Gram Panchayat Officer by faking complainant on 13.11.2009, being taken Madhonagar, Vikas his signatures. 16.12.09,08.02.10,03.03.10 and Khand Bewar, Tehsil 31.03.2010 Bhogaon, District Mainpuri forwarded by Shri JitinPrasada, MOS fro (P&NG) 49 Uttar 269/APS/M(RD)/09 Manipulation in job cards and Requested State Government for Investigation is going on at 7. Pradesh Shri Asha Ram, Gram misuse of NREGA funds by Gram investigation on 30.09.2009 and District Level Peria Kodar, Thana Pradhan. reminder sent on Machreta, District 05.11.200916.12.09,08.02.10,03.0 Reply is awaited Sitapur, Uttar Pradesh 3.10 and 31.03.2010

Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 49 Uttar Shri Sanjay Dixit,  Alleged murder of a NREGA Requested State Government for Reply is awaited 8. Pradesh Member, Central worker Shri Puttilal in Gram investigation on 06.10.2009 and Employment Panchayat Narayanpur Jaisingh, reminders send on 23.10.2009. Guarantee Council Block Paraspur, Gond District for and 05.11.2009 (CEGC) addressed to making complaint against delayed 16.12.09,08.02.10,03.03.10 and Union Minister, Rural payment of wages. 31.03.2010 Development.  Irregularities and violation of NREGA guidelines in Mehoba District of Uttar Pradesh. 49 Uttar Smt. Maneka Corruption in Tree Plantation Requested State Government for According to the Chief 9. Pradesh Gandhi, MP(LS) scheme under NREGA in District investigation on 09.10.2009 and Development Officer of Bareli, Uttar Pradesh and reminder sent on 05.11.2009 & Bareilly the report had not requesting for investigation through 11.12.2009 been found true. Please dispose Technical Audit Cell 16.12.09,08.02.10,03.03.10 and this matter from the pending 31.03.2010 list of complaints.

50 Uttar Shri Munnalal and Work not provided for 100 days, Requested State Government for Investigation is going on at 0. Pradesh others, Gram Sabha payment through fake entries in investigation on 08.10.2009 and District Level Kudar, Tehsil muster roll under NREGA at Gram reminder sent on 05.11.2009 Charkhari, District sabha Kudar, Tehsil Charkhari, 16.12.09,08.02.10,03.03.10 and Reply is awaited Mahoba District Mahoba. 31.03.2010

50 Uttar Shri K.R. Delay in payment of wages from Requested State Government for Investigation is going on at 1. Pradesh Yadav,President, the bank investigation on 08.10.2009 and District Level Gram Pradhan reminder sent on 05.11.2009 and Welfare Association, 31.03.2010 Reply is awaited 2/91 Jankipuram Vistar,Mobile- 9415774832, 9936411463 , District Lucknow Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 50 Uttar Shri Satish Kumar & Failure to provide work, To keep Requested State Government for According to the Chief 2. Pradesh Shri Ram Kumar, job cards in custody of Pradhan. investigation on 08.10.2009 and Development Officer of Unnao Gram Sabha- Behta, reminder sent on the report had not been found Block- Hiloli, Tehsil- 05.11.200916.12.09,08.02.10,03.0 true. Please dispose this matter Purva, Thana- Asoha, 3.10 and 31.03.2010 from the pending list of Post- Kanchanpur, complaints. District Unnao 50 Uttar Shri Rajbahadur and Requested State Government for Investigation is going on at Work not provided payment of 3. Pradesh others, Gram investigation on 14.10.2009 and District Level wages being not made, non- Pyarepur, Post Karora, reminder sent on 05.11.2009 and Reply is awaited issuance of job cards under Block Sujanganj, 31.03.2010 NREGA. District Jaunpur 50 Uttar Shri B.R.Verma, B- Requested State Government for According to the Chief 4. Pradesh 133, New Ashok Work not provided to job investigation on 14.10.2009 and Development Officer of Nagar, Delhi-1100096 cardholders under NREGA in Gram reminder sent on 05.11.2009 and Mathura the report had not Panchayat Thok Kamal, Block 31.03.2010 been found true. Please dispose Raya in Distrct Mathura this matter from the pending list of complaints. 50 Uttar Shri Kallan Siddiqui, Requested State Government for According to the Chief 5. Pradesh Gram Panchayat investigation on 14.10.2009 and Development Officer of Payment made in the name of ghost Kandela, Tehsil reminders on 05.11.2009 & Behraich the report had not workers in Gram Panchayat Kaisarganj, District 06.11.09, been found true. Please dispose Kandela, Tehsil Kaisarganj, District Bahriach 16.12.09,08.02.10,03.03.10 and this matter from the pending Bahriach. 31.03.2010 list of complaints.

50 Uttar Shri Ramprasad Gupta Manipulation in muster roll, Requested State Government for According to the Chief 6. Pradesh and others, Gram Payment of wages being not made, investigation on 14.10.2009 and Development Officer of Panchayat Kanhara, use of machinary, use of low reminder sent on 05.11.2009, Sonebhadra the report had not Block Chopan, Tehsil quality material under NREGA in 16.12.09,08.02.10,03.03.10 and been found true. Please dispose Robartsganj, District Gram Panchayat Kanhara, Block 31.03.2010 this matter from the pending Sonbhadra Chopan, Tehsil Robertsganj, list of complaints Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government District Sonbhadra 50 Uttar Shri Bani Singh, Gram Requested State Government for According to the Chief 7. Pradesh Panchayat Barauli, investigation on 14.10.2009 and Development Officer of Underpayment of wages in Gram Tehsil Shikarpur, reminder sent on Bulandshahr the report had not Panchayat Barauli, Tehsil District BulandShahr 05.11.200916.12.09,08.02.10,03.0 been found true. Please dispose Shikarpur, District BulandShahr 3.10 and 31.03.2010 this matter from the pending list of complaints. 50 Uttar Shri Zakir Ali and Requested State Government for According to the Chief Job cards kept with the Gram 8. Pradesh others, Gram Sabha investigation on 14.10.2009 and Development Officer of Pradhan, payment of wages not Jaitapur, Block reminder sent on 05.11.2009, Behraich the report had not being made under NREGA in Gram Fakhrpur, Tehsil 16.12.09,08.02.10,03.03.10 and been found true. Please dispose Sabha Jaitapur, Block Fakhrpur, Mahsi, Distrct 31.03.2010 this matter from the pending Tehsil Mahsi, Distrct Bahriach Bahriach list of complaints. 50 Uttar Shri Rajaram, Gram Requested State Government for Investigation is going on at 9. Pradesh Panchayat Atwa, investigation on 14.10.2009 and District Level Work not provided under NREGA Block Amrodha, reminder sent on 05.11.2009, in Gram Panchayat Atwa, Block Distrct Kanpur-Dehat 16.12.09,08.02.10,03.03.10 and Reply is awaited Amrodha, Distrct Kanpur-Dehat 31.03.2010

51 Uttar Shri Kammoda s/o Use of machinery, misappropriation Requested State Government for Reply is awaited 0. Pradesh Shri Khumna, Gram of funds by fraudulent withdrawal investigation on 14.10.2009 and Kururra, Post and of money from the Bank Account reminder sent on Block Mehrauni, of NREGA workers. in Gram 05.11.200916.12.09,08.02.10,03.0 District Lalitpur Sabha Kurrura, Block Mahoni, 3.10 and 31.03.2010 District Lalitpur 51 Uttar Shri Devi Prasad Corruption, fake muster roll & job Requested State Government for Investigation is going on at 1. Pradesh Dubey, gram cards and financial irregularities by investigation on 14.10.2009 and District Level Panchayat Smt. Shyam Kumari, Gram reminder sent on Khamahariya Pradhan, Sh. Suresh Dutt Mishar, 05.11.200916.12.09,08.02.10,03.0 Reply is awaited Damuan, Thana Gram Panchayat Adhikari and the 3.10 Vidhyanachal, Tehsil Junior Engineer under NREGA Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government sadar, District Mirzapur 51 Uttar Shri Govind Singh s/o Discrimination in the issuance of Requested State Government for Investigation is going on at 2. Pradesh Shri Bhagwan Singh, job cards and payment made in fake investigation on 14.10.2009 and District Level Gram Sabha Nahi pond excavation work under reminder sent on Juenia, Block NREGA at Gram Sabha Nahi 05.11.200916.12.09,08.02.10,03.0 Reply is awaited Sarwankheda, District Juenia, Block Sarwankheda, 3.10 and 31.03.2010 Kanpur District Kanpur

51 Uttar Social Audit not being done in Requested State Government for Investigation is going on at 3. Pradesh Shri Awadh Bihari Lucknow. investigation on 14.10.2009 and District Level Lal, Coordinater, reminder sent on NREGA Task Force, 05.11.200916.12.09,08.02.10,03.0 Reply is awaited Lucknow 3.10 and 31.03.2010

51 Uttar NREGA funds not being to Block Requested State Government for According to the Chief 4. Pradesh Madawara in District Lalitpur investigation on 14.10.2009 and Development Officer of Shri Sunil Sighai, reminder sent on Lalitpur the report had not District Lalitpur 05.11.200916.12.09,08.02.10,03.0 been found true. Please dispose 3.10 and 31.03.2010 this matter from the pending list of complaints. 51 Uttar Corruption and Irregularities at Requested State Government for Investigation is going on at 5. Pradesh Gram Kurrahi in Banda investigation on 14.10.2009 and District Level Shri Ishrat Raies. Zila reminder sent on 05.11.2009 Panchayt Member, 16.12.09,08.02.10,03.03.10 and Reply is awaited District Banda 31.03.2010

51 Uttar Shri Raies Ahmed Corruption in purchase of plants Requested State Government for Investigation is going on at 6. Pradesh Khan, Secretary, Uttar and plantation work under NREGA investigation on 14.10.2009 and District Level Pradesh Congress in District Banda reminder sent on Committee, Lucknow 05.11.200916.12.09,08.02.10,03.0 Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government 3.10 and 31.03.2010

51 Uttar Shri Ashok Kumar, Payment made through fake Requested State Government for Investigation is going on at 7. Pradesh Gram Basratpur, Post attendance in muster roll under investigation on 14.10.2009 and District Level Dhavria, Block NREGA in Gram Bisratpur, Block reminder sent on Kopaganj, District Kopaganj,District Mau 05.11.200916.12.09,08.02.10,03.0 Reply is awaited Mau 3.10 and 31.03.2010

51 Uttar Shri Shesh Narayan Underpayment of wages, Requested State Government for According to the Chief 8. Pradesh Ojha, Gram Bairamad duplication of works under investigation on 14.10.2009 and Development Officer of Karari, Post Basuhar, NREGA at Gram Bairamad Karari, reminder sent on Kaushambi; the report was District Kaushambi District Kaushambi 05.11.200916.12.09,08.02.10,03.0 found true. and remedial action 3.10 and 31.03.2010 is being taken Reply is awaited 51 Uttar Shri Denanath Fake muster rolls & job cards, Requested State Government for Investigation is going on at 9. Pradesh Srivastava (President), misappropriation of NREGA fund investigation on 22.10.2009 and District Level Zila Kisan Sangharash of Rs. 3 crore in the pond digging reminder sent on Samity, District work by Shri Suprabhat Singh 05.11.200916.12.09,08.02.10,03.0 Reply is awaited Chandoli, Uttar ( Shayak Abiyanta) and Shri C.B. 3.10 and 31.03.2010 Pradesh Ram (Awar Abiyanta) 52 Uttar Shri Gopal Prashad Manipulation in job card and Requested State Government for Investigation is going on at 0. Pradesh Gupt, Ex President, NREGA funds investigation on 22.10.2009 and District Level District Congress reminder sent on 05.11.2009 Committee, District 16.12.09,08.02.10,03.03.10 and Reply is awaited Sonbhadra, Uttar 31.03.2010 Pradesh 52 Uttar Shri Sunil Jain, Purv Fake payment to 16 labourers in Requested State Government for According to the Chief 1. Pradesh Parshad and Kheragarh Tehsil, Agra by Gram investigation on 22.10.2009 and Development Officer of Agra; Mahamantri, Member Pradhan. reminder sent on the report was found true and Pradesh Karykarene, 05.11.200916.12.09,08.02.10,03.0 remedial action has been taken NREGA Nigrani 3.10 and 31.03.2010 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Samity, Uttar Pradesh Reply is awaited Congress Committee, Lucknow 52 Uttar Shri Nagender Shukla, Corruption, Manipulation in job Requested State Government for According to The Chief 2. Pradesh deputy Chairman & cards, and fake payments under investigation on 22.10.2009 and Development Officer, the Prabhari, Gram and NREGA by Gram Pradhan and reminder sent on complaint has not been found Post Piparpati, District Secretary in Vikas Khand Pathreva, 05.11.200916.12.09,08.02.10,03.0 true. Please dispose this matter Deoria, Uttar Pradesh Gram Panchayat Mundera Jagdish 3.10 and 31.03.2010 from the pending list of District Deoria. complaints. 52 Uttar Smt. Anju Bala, Corruption , fake muster rolls, Requested State Government for Investigation is going on at 3. Pradesh Member, Kshetra repetition of works and misuse of investigation on 27.10.2009 and District Level Panchayat Belhari, NREGA fund by the Block reminder sent on District Ballia, Uttar Pramukh, B.D.O. and other 05.11.2009,16.12.09,08.02.10,03.0 Reply is awaited Pradesh officials under NREGA in District 3.10 and 31.03.2010 Ballia

52 Uttar 55(55)/VIP/MOS/ Corruption and fraudulent Requested State Government for Investigation is going on at 4. Pradesh (RD-PJ)/09 withdrawal of NREGA funds by the investigation on 10.11.2009, District Level Shri Jitin Prasada, Gram Panchayat Adhikari. 16.12.09,08.02.10,03.03.10 and Minister of State of 31.03.2010 Reply is awaited Petroleum and Natural Gas forwarding a letter of Shri Ramendra Shukla, Tehsil Incharge, Nigrani Samiti, Khamria, District Lakhimpur khiri, Uttar Pradesh 52 Uttar 50(55)/VIP/MOS/RD Corruption, Partiality in work Requested State Government for Investigation is going on at 5. Pradesh -PJ/09 provision to job card holders and investigation on 10.11.2009 District Level Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Shri Jitin Prasada misuse of NREGA fund by Gram reminder sent on Minister of State of Pradhan’s son by fake signature of 16.12.09,08.02.10,03.03.10 and Reply is awaited Petrolium and Natural his father 31.03.2010 Gas forwarding a letter of Shri Rajendra Prasad Mishra, Gram Devri, Vikash Khand Behajam, District Lakhimpur Khiri, Uttar Pradesh 52 Uttar Shri Rajendra S/o Shri Embezzlement and corruption Requested State Government for Investigation is going on at 6. Pradesh Hakesh Singh and under NREGA by using fake names investigation on 11.11.2009 District Level Others, Gram Nogava on job cards & fake road reminder sent on Taga, Block- Amroha, construction. 16.12.09,08.02.10,03.03.10 and Reply is awaited Tehsil Dhanora 31.03.2010

52 Uttar Shri Shyam Kumar Corruption of funds by using fake Requested State Government for Investigation is going on at 7. Pradesh Dohare, S/o Shri job cards. investigation on 11.11.2009 District Level Buddhalal Dohare, reminder sent on Gram Panchayat 16.12.09,08.02.10,03.03.10 and Reply is awaited Sanda, Block Umarda, 31.03.2010 District Kannuj 52 Uttar Shri Arshafi Lal and Discrimination in the issuance of Requested State Government for Investigation is going on at 8. Pradesh others, Gram job cards and allotment of work, investigation on 11.11.2009 District Level Panchayat- Gauri, under payment of wages, reminder sent on Block- manipulation in muster roll in Gram 16.12.09,08.02.10,03.03.10 and Reply is awaited Safipur,District- Panchayat- Gauri, Block Safipur, 31.03.2010 Unnao District Unnao 52 Uttar Shri Ramotar Singh Payment of wages not made under Requested State Government for Investigation is going on at 9. Pradesh and others, Gram- NREGA in Gram Ekoda, Tehsil investigation on 11.11.2009 District Level Ekoda, Tehsil- Amroha, Block Joya, District reminder sent on Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Amroha, Block- Joya, Jyotiba Phule Nagar 16.12.09,08.02.10,03.03.10 and Reply is awaited District- Jyotiba Phule 31.03.2010 Nagar 53 Uttar Email dated 10.12.09 Misappropriation of NREGA funds Requested State Government for Reply is awaited 0. Pradesh received from Shri in Gonda district investigation and 31.03.2010 Sanjay Dixit, Member, CEGC 53 Uttar Shoskumar Verma, To investigate irregularity work Forwarded to the State Reply is awaited 1. Pradesh GP Badoba, Vikash under NREGA by Gram Pradhan Government on 07.01.2010 Khand Dhobia, and Other Official reminder sent on District Gonda, dated: 08.02.10,03.03.10 and 31.03.2010 10/12/2009 53 Uttar Shri Ramratan Rajvar, Corruption & irregular work to Forwarded to the State Reply is awaited 2. Pradesh S/o Rambrush Rajvar, NREGA workers Government on 07.01.2010 Gram Banjha, Post- reminder sent on Jahanagang , District 08.02.10,03.03.10 and 31.03.2010 Ajamgarh, dated: 12/10/2009 53 Uttar Shri Indramani Dube, Corruption, Misuse of NREGA Forwarded to the State Reply is awaited 3. Pradesh Principle Secretary, fund Government on 07.01.2010 District Congress reminder sent on committee, dated: 08.02.10,03.03.10 and 31.03.2010 4/12/2009 53 Uttar Shri Abdul Kadir, Corruption, Misuse of NREGA Forwarded to the State Reply is awaited 4. Pradesh Gram Padri, Nawga, fund Government on 07.01.2010 Sonvadra, dated: reminder sent on 14/12/2009 08.02.10,03.03.10 and 31.03.2010

53 Uttar Shri Prabhudayal, S/o Corruption, Misuse of NREGA Forwarded to the State Reply is awaited 5. Pradesh Banmari Lal Gram fund by Grameen Sahayak & SBI Government on 07.01.2010 Kinharpur, PS. Manager reminder sent on Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Matsena, District 08.02.10,03.03.10 and 31.03.2010 Firozabad, dated: 23/12/2009 53 Shri Brijesh Pandey, To investigate irregularity work Forwarded to the State Reply is awaited 6. State coordinator, UP under NREGA Government on 07.01.2010 Uttar NREGA Nigrani reminder sent on Pradesh Samity, dated: 08.02.10,03.03.10 and 31.03.2010 17/12/2009 53 Uttar Media report of Amar Corruption, Misuse of NREGA Forwarded to the State Reply is awaited 7. Pradesh Ujala, Lucknow, fund Government on 07.01.2010 Tuesday, dated: reminder sent on 16/12/2009, District: 08.02.10,03.03.10 and 31.03.2010 Gonda 53 Uttar Media report of Irregularities work under NREGA Forwarded to the State Reply is awaited 8. Pradesh Awam-A-Hind, JP by Gram Panchayat Government on 07.01.2010 Nagar,Amroha, dated: reminder sent on 25/11/2009 08.02.10,03.03.10 53 Uttar Smt Debanti W/o Shri Issuence of false job cards and late Forwarded to the State Reply is awaited 9. Pradesh Delip, Lalita Devi payment of wages by panchayat Government on 08.01.2010 W/o Shri Ramnath, official/member reminder sent on Sabitri W/o Shri 08.02.10,03.03.10 and 31.03.2010 Harishankar, Gita W/o Shri Bechu, Villege Chandrabar Dugeli, Bikashkhand Rashra, Janpad Balia, dated: 20/11/2009 54 Uttar Shri Devmani Worng distribution of job cards, Forwarded to the State Reply is awaited 0. Pradesh Gupta,NREGA Fake muster rolls, Irregularities and Government on 12.01.2010 monitoring committee, missuse of MGNREGA fund reminder sent on Gram Prabhari, Gram 08.02.10,03.03.10 and 31.03.2010 Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Panchayat Bhattolia, Shetra Panchayat Ghorabal, Janpad Sonbhadra, dated: 13/10/2009 & 12/10/2009 54 Uttar Shri Rajbahadur Corruption, Irregular work and Forwarded to the State Reply is awaited 1. Pradesh Singh, Former District misuse of NREGA fund by Shri Government on 08.01.2010 President Samajbadi Chandravan Singh Patel, VDO reminder sent on Party, Civil line, 08.02.10,03.03.10 and 31.03.2010 Allhabad Road, Karbi,Janpad Chitrakut,dated: 30/11/2009 54 Uttar Shri Rameshwar Recruitment and payment of Gram Forwarded to the State Reply is awaited 2. Pradesh Prasad Roger Sewak by State Government Government on 19.01.2010 Pandey,Chairman, reminder sent on Gram Vikash Adhikari 08.02.10,03.03.10 and 31.03.2010 Sangha, Uttar Pradesh, dated: 20/11/2009 54 Uttar Shri Pankaj Mishra Corruption, Manipulation of job Forwarded to the State Reply is awaited 3. Pradesh S/o Shri Sattyadev cards, and Missuse of MGNREGA Government on 19.01.2010 Mishra, Gram by Gram Pradhan reminder sent on Panchayat Dhouli, 08.02.10,03.03.10 and 31.03.2010 District Balia, dated: 12/01/2010 54 Uttar MGNREGA workers, Corruption, Fake muster rolls, Forwarded to the State Reply is awaited 4. Pradesh Gram Amnabad, Failure to pay minimum wages and Government on 28.01.2010 Basantnagar, misuse of MGNREGA fund. reminder sent on Ramnagar and 08.02.10,03.03.10 and 31.03.2010 Bhabanipur, Thesil Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Bilsi, Janpad Badaun, dated: 01/01/2010 54 Uttar Mr. Surendra Prasad, Regarding forge payment through Forwarded to the State Reply is awaited 5. Pradesh Ballia, Uttar Pradesh fake vouchers Government on and 31.03.2010

54 Uttar Shri Mabashiram, S./o Mis-utilisation of Mahatma Gandhi Forwarded to the State Reply is awaited 6. Pradesh Shri Payrelal, village NREGA fund. Government on 15/02/2010 Tetali Nagla Mahadev, reminder sent on 03.03.10 and Block Tundla, Thana 31.03.2010 and Thesil Tundla, Firozabad, Uttar Pradesh 54 Uttar Smt. Shila W/o Shri Delay Payment of wages under Forwarded to the State Reply is awaited 7. Pradesh Ramesh Chandra, Mahatma Gandhi NREGA Government on 03/03/2010 by Fax Gram Chakoty, Bikash and Post and reminder sent on Khand Kurara, Tehsil 31.03.2010 and district Hamirpur, Uttar Pradesh 54 Uttar Shri Mehabub Ali S/o Misuse of Mahatma gandhi Forwarded to the State Reply is awaited 8. Pradesh Shri Mehmud Ali , NREGA fund by Gram Pradhan Government on 03/03/2010 by Fax Gram Sabha Rasulpur and Secretary and Post and reminder sent on Sikroda, Thana 31.03.2010 Masuree, District Gaziabad, Uttar Pradesh 54 Uttar Shri Birendra Singh, Irregularities work under Mahatma Forwarded to the State Reply is awaited 9. Pradesh Gram sathoy, Block Gandhi NREGA by Gram Pradhan Government on 03/03/2010 by Fax Dibai, District and Post and reminder sent on Bulandshar, Uttar 31.03.2010 Pradesh 55 Uttar Workers, Gram Coruption and Miss-utilisation of Forwarded to the State Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Pradesh panchayat Kundi, Mahatma gandhi NREGA fund by Government on 03/03/2010 by Fax Shetra Panchayat faking muster rolls by Gram and Post and reminder sent on Moop-Nigang, District pradhan 31.03.2010 Jaunpur 55 Uttar Shri Lakhan Singh, Corruption and Mis-utilisation of Forwarded to the State Reply is awaited 1. Pradesh Dr. Ambedkar Jan, Mahatma Gandhi NREGA fund by Government on 16/03/2010 and Mahila, Bikalanga, Gram Pradhan and BDO reminder sent on 31.03.2010 kalyan Samity Daniapur,Dak Sefni, District Rampur, Uttar Pradesh. 55 Uttar Villagers, Gram Misutilisation of Mahatma Gandhi Forwarded to the State Reply is awaited 2. Pradesh Panchayat NREGA fund by faking muster Government on 16/03/2010 and Damodarpur, Amouly, rolls and using poor materials for reminder sent on 31.03.2010 Janpad Fatehpur the construction of road and cannel. 55 Uttar Shri Chandrasen and Corruption and Misuse of fund by Forwarded to the State Reply is awaited 3. Pradesh villagers, Gram Gram Pradhan Secretary & BDO Government on 16/03/2010 and Panchayat Hidelpura, and withdrawl about Rs. 900000 by reminder sent on 31.03.2010 gram Galampura, using fake muster rolls and Block &Tehsil signature. Moumogarh, Janpad Jalaun, Uttar Pradesh 55 Uttar Shri Shivnarayan s/o Issuance of false Job Cards and Forwarded to the State Reply is awaited 4. Pradesh Shri Nandulal Ahrbar delay payment of wages. Government on 16/03/2010 and and villagers, Jaraboli, reminder sent on 31.03.2010 post Marouli, block Baar, Tehsil Mahoroni, District Lalitpur, Uttar Pradesh. 55 Shri Kalyan singh, s/o Corruption, irregular and issuance Forwarded to the State Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Shri Lalit Singh, of false job cards under Mahatma Government on 16/03/2010 and Uttar Block Maau, Janpad Gandhi NREGA. reminder sent on 31.03.2010 Pradesh Chitrakut, Uttar Pradesh. 55 Uttar Shri Emamuddin, s/o Mis-utilisation of Mahatma Gandhi Forwarded to the State Reply is awaited 6. Pradesh Shri Mohd. Ishak, NREGA fund by Secretary and Government on 15/03/2010 and Gram Sabha Meerpur, Gram Pradhan. reminder sent on 31.03.2010 Karba, District Bahraich, Uttar Pradesh 55 Uttar Shri Harendra Pratap Corruption, irregular work and Forwarded to the State Reply is awaited 7. Pradesh Singh, Gram + Post- misuse of fund by faking signature Government on 15/03/2010 and Dendasai, district under Mahatma Gandhi NREGA. reminder sent on 31.03.2010 Fatehpur, Uttar Pradesh 55 Uttar Shri Esrat Raies, Corruption, irregular, fake muster Forwarded to the State Reply is awaited 8. Pradesh Member, Zilla rolls and misuse of fund under Government on 19/03/2010 and Panchayat Banda Mahatma Gandhi NREGA. reminder sent on 31.03.2010 Uttar Pradesh, Gram+Post- Kurehi, District Banda, Awas Allahabad-179, Uttar Pradesh 55 Uttar Dr. Arabind Singh Corruption and misutilisation of Forwarded to the State Reply is awaited 9. Pradesh Kannajiya, Zilla fund for the project of construction Government on 19/03/2010 and Prabhari, NREGA of ''Sauchalay'' under Sanitation reminder sent on 31.03.2010 Nigrani Samity, Programme and Delay Payment of Janpad Hardoi, Uttar wages failure to provide Pradesh. And Shri employment under Mahatma Subash Chandra Gandhi NREGA. Tiwari, NREGA Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Nigrani Samity, Gram Sabha Sokhpur Nagria, Bikash Khand Harpalpur, Hardoi. 56 Uttar Shri Arbind Kumar Failure to provide work and fake Forwarded to the State Reply is awaited 0. Pradesh Dixit s/o Shri Ram muster rolls under Mahatma Government on 29/03/2010 and Manohar Dixit, Gandhi NREGA reminder sent on 31.03.2010 Gram+post- Mobai, Vikash Khand - Vitora, Janpad- Fatehpur, Uttar Pradesh. 56 Uttar Shri Ashok Kumar, Misuse of fund by faking muster Forwarded to the State Reply is awaited 1. Pradesh Satantra Patrakar, rolls and other issue under Government on 29/03/2010 and Sadbhabna Bhawan, Mahatma Gandhi NREGA reminder sent on 31.03.2010 Naugarh, Janpad Chandoli, Uttar Pradesh-232111. 56 Uttarakha Shri Bindu Prasad NREGS workers are not getting wages Requested State Government for Reply is awaited 2. nd Routela,District in time and the execution of the investigation on 30.07.2009 and Cooperative Bank, programme is beset with difficulties. reminders sent on 21.08.2009 Almora. & 05.11.2009 56 Uttarakha Shri Yugal Kishore, Non – issuance of job cards, work not Requested State Government for Reply is awaited 3. nd Gram- Thunar, Post- provided and discrimination against investigation on 31.08.2009 and Bhriguklal, Garhwal people in allotting of work in the reminder sent on 05.11.2009 District. NREGS.

56 Uttarakha All workers of Non- payment of remuneration from Requested State Government for Reply is awaited 4. nd MGNREGA District July, 2009 under MGNREGA investigation on 17.2.2010 Champabat, Uttarakhand. 56 Uttarakha Sh. Sagat Singh Jeena, Alleging manipulation of job cards, Forwarded to the State Reply is awaited Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government nd Member, Common work not provided and Government on 31.3.2010 cause/I.E.S.L. V.P.O misappropriation of mahatma Simalkha, District Gandhi NREGA fund. Nanitel, UA 56 West Bali Tudu, vill.  Failure to provide work on time Forwarded to State Government Reply is awaited 6. Bengal Joypur, district  Favoring or discriminating on 8.5.2008. Reminders sent on Hooghly, (Forwarded against people allocating of job 23.5.08, 29.05.08, 5.06.08 , by Prime Minister’s card under NREGA. 23.1.09 , 27.05.09 21.08.2009 & Office) 05.11.2009 56 West Villager’s of Magra-I Embezzlement of funds Forwarded to State Government Reply is awaited 7. Bengal Gram Panchayat, Workers in worksite are children on 8.5.2008. Reminders sent on block Chinsurah, below 18 years of age in Magra-I 23.5.08, 29.05.08, 5.06.08, 23.1.09 district Hooghly GP , 27.05.09 , 21.08.2009 & 05.11.2009 56 West Article in Statesman NREGS Scam come under Scanner Forwarded to the State On the basis of the enquiry in 8. Bengal August 4, 2008 Government on 4/08/2008 and respect of the complaint reminders sent on 23.1.09 , Programme Officer and Block 27.05.09 , 21.08.2009 & Development Officer, 05.11.2009 Manikchak has lodged a complaint at Manickchak Police Station vide G.D. No. 1474 against paymaster Humayun Kabir. ATR is awaited 56 West Article in The Former CPM Pradhan charged Forwarded to the State Reply is awaited 9. Bengal Statesman with misuse of funds Government on 26/08/2008 and August 25, 2008 reminders sent on 23.1.09 , 27.05.09 , 21.08.2009 & 05.11.2009 57 West Article in The Police Say Poverty led to death in a Forwarded to the State Reply is awaited 0. Bengal Telegraph family Government on 18/08/2008 and Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government August 14, 2008 reminder sent on 23.1.09 , 27.05.09 & 21.08.2009 57 West Article in The Death from hunger Forwarded to the State Reply is awaited 1. Bengal Statesmen Government on 5.1.09 and Dated 30 December reminders sent on 23.1.09 , 2008 27.05.09, 21.08.2009 & 05.11.2009 57 West Article in The Employment hard to come by as Forwarded to the State Reply is awaited 2. Bengal Statesman crores lie unused Government on 13.02.09 and Dated 13th Feb 2009 reminders sent on 27.05.09 , 21.08.2009 & 05.11.2009 57 West Shri Debashish Fraud of Rs. 67,239/- and fake Requested State Government for On the basis of the enquiry the 3. Bengal Mahanta and Smt muster rolls by Pradhan and investigation on 11.05.2009 and Programme Officer, Snamukhi Sunanda Saha, Gram Nirman Sahayak in the construction reminders sent on 27.05.09 , has lodged FIR against Panchayat Member, of kachha Jore Bundh by earth at 21.08.2009 & 05.11.2009 delinquent persons. ATR is Pathar Mora Booth & Tantir Bandh, Baltalardanga, Bara awaited. Post Office Nutan sanko, Ghat Muan, Moutala in Balan Rampur, Gram Gram Panchayat Kochindi under Panchayat Kochdihi, NREGA Block Sonamukhi, District Bankura 57 West Shri. Debashish corruptions in the work of Requested State Government for Allegation was largely been 4. Bengal Mahanta and Sunanda construction of kachha jore Bundh investigation on 11.5.2009 and substantiated in the enquiry. Saha, by earth reminders sent on 21.08.2009 & FIR has been lodged against Gram Panchayat 05.11.2009 delinquent persons, Smt Mala Kochdihi, Mondal, Prodhan, Kochidi Bankura Gram Panchayat, Shri Dilip Kr Mukherjee, supervisor of the said scheme, Rajib Kr. Bid Nierman Sahayak, Kochidi Gram Panchayat at Sonamukhi Sl. No. State Name of the Allegations made Action taken by Ministry Action taken by State complainant Government Police Station vide FIR No. 49/09 dated 24.08.2009. ATR is awaited.