Cancelation of Tenders

Total Page:16

File Type:pdf, Size:1020Kb

Cancelation of Tenders

FATA Development Authority

CANCELATION OF TENDERS

It is to inform that advertisement “Re-Notice Inviting Tenders” regarding Small Irrigation Schemes in South Waziristan Agency, FR-Tank & FR-D.I.Khan published in the dailies “The News Islamabad, Jang Rawalpindi, Mashriq Peshawar on 27th October, 2017 and also uploaded on the PPRA website is stand cancelled.

The said schemes will be re-advertised later on after clarification.

Project Director, PSU Small Dams, FATA Development Authority, Plot-46, Sector B-2, Phase V, Near RMI, Hayatabad Peshawar Phone # +92-091-9219518-22 FATA Development Authority

NOTICE INVITING RE- TENDERS FATA Development Authority invites sealed bids for the following Small Irrigation Schemes from contractor/firms of repute and relevant experience having registration upto the year 2017-18 with Pakistan Engineering Council (PEC) and FATA Secretariat in the category noted against each at the term & condition listed below. Tender Requir Date/T Time Earne Form S. Estim ed Last ime of Limit/ st Fee N Work Name ated PEC Date/T Openin Comple Mone (Non o. Cost Categ ime of g of tion y Refund ory Submis Bids Period able) sion of (Rs. In Bids (Month Millio (PkR) (PkR) s) ns) C-5 20-11- Contruction of and 2017 20-11- 12 Dangarkai Salerai Weir 44.59 above 2017 at 1 891,9 3,000 at Month 5 with 12.00(N & Irrigation Channel 00 11.00( s CE04, oon) Makin SWA AM) CE09 C-5 20-11- and Construction of 2017 20-11- 06 35.17 above 2017 at 2 Kaniguram Weir And 703,5 3,000 at Month 8 with 12.00(N 60 11.00( s Irrigaion Channel SWA CE04, oon) AM) CE09 C-5 20-11- and Construction of Mantoi 2017 20-11- 12 37.21 above 2017 at 3 Ishangi Weir and 744,3 3,000 at Month 7 with 12.00(N 40 11.00( s Irrigation Channel SWA CE04, oon) AM) CE09 C-5 20-11- Constrcution of La and 2017 20-11- 06 Konrhai Shakir Kot 35.89 above 2017 at 4 717,8 3,000 at Month 4 with 12.00(N Irrigation & Water 80 11.00( s CE04, oon) Supply Scheme SWA AM) CE09 5 Construction of Shakha 34.92 3,000 C-5 20-11- 20-11- 12 Khel Raghzai Weir & 5 698,5 and 2017 2017 at Month 00 above at 12.00(N s Irrigation Channel oon) Janata SWA with 11.00( CE04, AM) CE09

C-4 20-11- Constrcution of Kala and 1, 2017 20-11- 10 Khan Kach Irrigation & 68.89 above 2017 at 6 377,9 3,000 at Month Water Supply Scheme 6 with 12.00(N 20 11.00( s CE04, oon) SWA AM) CE09 C-4 20-11- Contruction of Baz and 2, 2017 20-11- 10 Muhammad Kamrani 104.2 above 2017 at 7 085,1 3,000 at Month Kach Irrigation & Water 56 with 12.00(N 20 11.00( s CE04, oon) Supply Scheme SWA AM) CE09 C-6 20-11- and Construction of Sperkai 2017 20-11- 08 11.11 above 2017 at 8 Karez Irrigation & Water 222,3 3,000 at Month 5 with 12.00(N 00 11.00( s Supply Scheme SWA CE04, oon) AM) CE09 C-5 20-11- Construction of Tanai and 2017 20-11- 08 Soar Pull Irrigation & 48.11 above 2017 at 9 962,2 3,000 at Month Water Supply Scheme 3 with 12.00(N 60 11.00( s CE04, oon) SWA AM) CE09 C-4 20-11- Construction of Mat and 1, 2017 20-11- 08 1 Zali Khel Kach Irrigation 90.51 above 2017 at 810,3 3,000 at Month 0 & Water Supply Scheme 8 with 12.00(N 60 11.00( s CE04, oon) SWA AM) CE09 C-5 20-11- Construction of and 1, 2017 20-11- 08 1 Muhammad Angashai 50.20 above 2017 at 004,1 3,000 at Month 1 Irrigation & Water 7 with 12.00(N 40 11.00( s CE04, oon) Supply Scheme SWA AM) CE09 C-6 21-11- and Constrcution of Sheikh 2017 21-11- 06 1 above 2017 at Bozeed kot Weir & 20.32 406,4 3,000 at Month 2 with 12.00(N 00 11.00( s Irrigation Channel SWA CE04, oon) AM) CE09 1 Construction of Rehamt 39.10 3,000 C-5 21-11- 21-11- 08 3 Ullah Kach Mechan 9 782,1 and 2017 2017 at Month 80 above at 12.00(N s Baba Irrigation & Water oon) Supply Scheme SWA with 11.00( CE04, AM) CE09

C-5 21-11- Construction of Mandi and 2017 21-11- 08 1 Kol Badshah Irrigation & 35.03 above 2017 at 700,6 3,000 at Month 4 with 12.00(N 4 Water Supply Scheme 80 11.00( s CE04, oon) SWA AM) CE09 C-5 21-11- and Constrcution of Gulistan 2017 21-11- 08 1 46.50 above 2017 at Kach Irrigation & Water 930,1 3,000 at Month 6 with 12.00(N 5 20 11.00( s Supply Scheme SWA CE04, oon) AM) CE09 C-5 21-11- Construction of Naziba and 1, 2017 21-11- 08 1 Cheena Irrigation & 57.25 above 2017 at 145,1 3,000 at Month 6 with 12.00(N 6 Water Supply Scheme 20 11.00( s CE04, oon) SWA AM) CE09 C-5 21-11- Construction of and 1, 2017 21-11- 10 1 Maiddaka Kach Danyal 59.02 above 2017 at 180,4 3,000 at Month 3 with 12.00(N 7 Kalai Irrigation & Water 60 11.00( s CE04, oon) Supply Scheme SWA AM) CE09 C-5 21-11- Construction of Lalakhel and 2017 21-11- 10 1 Kach Alamsher 45.63 above 2017 at 912,7 3,000 at Month 7 with 12.00(N 8 Irrigation & Water 40 11.00( s CE04, oon) Supply Scheme SWA AM) CE09 C-5 21-11- Construction of Janat and 2017 21-11- 08 1 Gul Shamshi Khel 27.37 above 2017 at 547,5 3,000 at Month 7 with 12.00(N 9 Irrigation & Water 40 11.00( s CE04, oon) Supply Scheme SWA AM) CE09 C-5 21-11- Construction of Selanar and 2017 21-11- 06 2 Kalai Bar Khandi Khel 26.58 above 2017 at 531,7 3,000 at Month 8 with 12.00(N 0 Irrigation & Water 60 11.00( s CE04, oon) Supply Scheme SWA AM) CE09 C-6 21-11- Construction of Hakeem and 2017 21-11- 06 2 Abad Kach Shakari 17.13 above 2017 at 342,7 3,000 at Month 5 with 12.00(N 1 Weir & Irrigation 00 11.00( s CE04, oon) Channel SWA AM) CE09 C-4 21-11- and Construction of Naghar 2, 2017 21-11- 10 2 117.6 above 2017 at Spin Irrigation & Water 352,3 3,000 at Month 2 19 with 12.00(N 80 11.00( s Supply Scheme SWA CE04, oon) AM) CE09 C-5 22-11- and Construction of Old 2017 22-11- 12 2 48.30 above 2017 at Makin Weir & Irrigation 966,1 3,000 at Month 3 6 with 12.00(N 20 11.00( s Channel SWA CE04, oon) AM) CE09 C-6 22-11- and Construction of Basomir 2017 22-11- 08 2 24.78 above 2017 at kach Irrigation & Water 495,7 3,000 at Month 4 8 with 12.00(N 60 11.00( s Supply Scheme SWA CE04, oon) AM) CE09 C-4 22-11- Construction of and 1, 2017 22-11- 10 2 Khaserai Soza Mashali 92.31 above 2017 at 846,2 3,000 at Month 5 Kach Irrigation & Water 4 with 12.00(N 80 11.00( s CE04, oon) Supply Scheme FR-Tank AM) CE09 C-5 22-11- Construction of Khan and 1, 2017 22-11- 06 2 Kach Khaserai Weir 60.02 above 2017 at 200,5 3,000 at Month 6 Irriigation Channel 8 with 12.00(N 60 11.00( s CE04, oon) Scheme FR-Tank AM) CE09 C-5 22-11- Construction of Zhghal and 2017 22-11- 06 2 Kach Weir Irrigation above 2017 at 39.38 787,6 3,000 at Month 7 Channel & Water with 12.00(N 00 11.00( s CE04, oon) Supply Scheme FR-Tank AM) CE09 C-6 22-11- Construction of and 2017 22-11- 06 2 Haramzai Wamm Weir 22.84 above 2017 at 456,9 3,000 at Month 8 & irrigation Channel FR- 8 with 12.00(N 60 11.00( s CE04, oon) D.I.Khan AM) CE09 C-5 22-11- and Construction of Anizay 2017 22-11- 06 2 41.35 above 2017 at waam Weir Irriigation 827,0 3,000 at Month 9 4 with 12.00(N 80 11.00( s Channel FR-D.I.Khan CE04, oon) AM) CE09 3 Construction of Murdak 20.91 3,000 C-6 22-11- 22-11- 06 0 Waam Weir Irriigation 8 418,3 and 2017 2017 at Month 12.00(N Channel Scheme FR- 60 above at s with 11.00( D.I.Khan CE04, oon) AM) CE09 C-4 22-11- Construction of Yaqoobi and 1, 2017 22-11- 10 3 Parwara Irrigation & 96.58 above 2017 at 931,6 3,000 at Month 4 with 12.00(N 1 Water Supply Scheme 80 11.00( s CE04, oon) FR-D.I.Khan AM) CE09 C-5 Construction of Khawar 22-11- and Tangai Sabir Abad 1, 2017 22-11- 10 3 above 2017 at Irrigation & Water 53.15 063,0 3,000 at Month with 12.00(N 2 00 11.00( s Supply Scheme FR- CE04, oon) AM) D.I.Khan CE09 C-6 22-11- and Construction of Peepal 2017 22-11- 06 3 23.72 above 2017 at Waam Irrigation 474,4 3,000 at Month 1 with 12.00(N 3 20 11.00( s Channel FR-D.I.Khan CE04, oon) AM) CE09 Terms & Conditions 1 Bid Documents including BOQ can be obtained from Office of the undersigned mentioned against each scheme by the owner of the firm/legal representative from the date of publication in the newspaper till 17-11-2017. 2 Cost of tender form/documents as mentioned above are payable through demand draft or pay order (non refundable) in the name of Chief Executive FATA Development Authority. The same is to be furnished alongwith the bid documents. 3 2% Earnest money as mentioned above must be accompanied with the application for issuing of documents in the shape of call deposit in the name of Chief Executive FATA DA from scheduled banks of Pakistan. 4 Copies of the requisite documents alongwith CNIC, enlistment,renewal, income tax and registration of Pakistan Engineering Council etc must be attached with the tender documents . 5 The representatives of the firm should have authority letter dully attested by notery public. 6 The contract shall be awarded to the contractor/bidder whose evaluated bid is the lowest and meets the specifications and quality needs of the procuring entity. In case the contractor quotes bid below 10% of the Engineer's estimate / BoQ, the bid shall stand rejected. The call deposit shall be accepted subject to verification from the issuing bank. 7 Sealed bids sent through registered mail/courier should reach upto 11:00 AM on the dates mentioned above and will be opened at 12:00 Noon on the same date in presence of origional bidders/their legal representatives who choose to attend the opening. The delay in delivery of the tender documents will be the responsibility of the bidder.

8 The bidders are required to send their bids in duplicate in separate envelopes clearly marked as original & duplicate. The original shall be sent to the undersigned and the duplicate to the General Manager (Finance) FATA DA. 9 The contractor/firm both should not only quote above / below on the tender form and BOQ but also the total bid cost should invariably be written in the tender form in words and figures. 1 In case bid become tie, the award of contract shall be decided through a free 0 draw. 1 All taxes including income tax and sale tax will be recoverable as per rules of 1 the government issued from time to time. 1 If any document, submitted alongwith the bidding document, is found 2 fake/bogus, the registration of the contractor/firm shall stand cancelled/blacklisted. 1 Any disfiguring / overwriting, manipulation in the tender shall render the bid 3 liable to rejection. 1 Only the first two figures after the decimal of the rate will be considered in 4 evaluation of the bid. 1 Incomplete / conditional bid will not be acceptable. 5 1 FATA DA may reject all bids or proposals at any stage of the bidding process as 6 per clause-33 of PPRA rules. 1 Pre-bid meeting will be held in the Office of undersigned at 11:00 AM on 13- 7 11-2017. 1 This add is also available on PPRA & FATA-DA website. 8 Note: The venue has been changed from ACO Office at Tank Political Compound to Project Director, PSU Small Dams, FATA Development Authority, 46 , Sector B-2, Phase V, Hayatabad, Near RMI, Peshawar, Phone No. 091-9219519-22 Project Director, PSU Small Dams, FATA Development Authority 46 , Sector B-2, Phase V, Hayatabad, Near RMI, Peshawar, Phone No. 091- 9219519-22

Recommended publications