APPENDIX A: ARCHITECTURAL

Architectural Calculations

155’

19’ 4’ Interstitial Volume 35’ 102’

Existing Building 287.5’ 102’ Volume Changes 287.5’ (287.5’ x 102’ x 35’) + (155’ x 102’ x 19’) = 1,326,765 ft³ total initial volume 287.5’ x 102’ x 4’ = 117,300 ft³ 117,300 ft³ x 2 new spaces = 234,600 ft³ total added interstitial volume 234,600 ft³ / 1,326,765 ft³ = .176 = 17.6% increase in building volume

Surface Area Changes

287.5’ x 4’ = 1150 sf 102’ x 4’ = 408 sf 2(1150 sf + 408 sf ) = 3116 sf 3116 sf x 2 = 6,232 sf total surface area added w/ interstitial spaces

South Elevation East Elevation 1st Floor Interstitial Space 1st Floor Interstitial Space 43’ (precast 1) x 4’ height = 172 sf 63’ (precast 1) x 4’ height = 252 sf 157.5’ (precast 2) x 4’ height = 630 sf 39’ (glazing) x 4’ height = 156 sf 87’ (glazing) x 4’ height = 348 sf 2nd Floor Interstitial Space 2nd Floor Interstitial Space 63’ (precast 1) x 4’ height = 252 sf 130’ (precast 1) x 4’ height = 520 sf 39’ (glazing) x 4’ height =156 sf 157.5’ (precast 2) x 4’ height = 630 sf

North Elevation West Elevation 1st Floor Interstitial Space 1st Floor Interstitial Space 239.5’ (precast 1) x 4’ height = 958 sf 70’ (precast 2) x 4’ height = 280 sf 48’ (precast 2) x 4’ height = 192 sf 32’ (precast 1) x 4’ height = 128 sf 2nd Floor Interstitial Space 2nd Floor Interstitial Space 167’ (precast 2) x 4’ height = 668 sf 70’ (precast 2) x 4’ height = 280 sf 120.5 (precast 1) x 4’ height = 482 sf 32’ (precast 1) x 4’ height = 128 sf

Total additional Precast 1 = 172 + 520 + 252 +252 +958 +482 +128 +128 = 2,892 sf Total additional Precast 2 = 630 + 630 + 192 +668 + 280 + 280 = 2,680 sf Total additional Glazing = 348 + 156 + 156 = 660 sf Existing Section (Left) and Interstitial Section (Right with Added Areas Shaded)

April 15, 2003 Page A- 1 AE Senior Thesis Sandy Vondrak

April 15, 2003 Page A- 2