FAC-003-AB-1 Transmission Vegetation Management Program
Total Page:16
File Type:pdf, Size:1020Kb
FAC-003-AB-1 Transmission Vegetation Management Program Template
Year: 20xx
Rev. #
Date mmm dd, yyyy
Name/Position Signature Date Author Checked Approved FAC-003-AB-1 Transmission Vegetation Management Program
REVISION HISTORY
Rev. # Description Author Date
Page 2 of 7 FAC-003-AB-1 Transmission Vegetation Management Program
1 OBJECTIVE...... 4 2 PRACTICES...... 5 2.1 Clearance...... 5 2.2 Personnel Qualifications...... 5 3 PROCEDURES...... 6 3.1 Mitigation Measures - Clearance 1 Exceptions...... 6 3.2 Communication of Imminent Threats...... 6 4 WORK SPECIFICATIONS...... 7 4.1 Site Work Specification...... 7 4.2 Inspection Schedule...... 7
Page 3 of 7 FAC-003-AB-1 Transmission Vegetation Management Program
1 OBJECTIVE
______
______
______
______
______
Page 4 of 7 FAC-003-AB-1 Transmission Vegetation Management Program
2 PRACTICES
In the completion of this section, please follow the guidelines/examples as set out in Section 2 of the document, “TVMP Requirements”
Note: The following practices are a minimum requirement for TFO’s. Other practices may be added or referenced as necessary.
2.1 Clearance
Table 1: Clearances Clearance 1 distance (m) = estimated Clearance 2 Voltage (kV) annual growth + 1m safety + Flash over distance (m) Deciduous Non Deciduous 1yr 2yrs 3yrs 4yrs 1yr 2yrs 3yrs 4yrs
2.2 Personnel Qualifications
Table 2: Position Requirements Position Position Requirements Acceptable Documentation
Table 3: Individual Qualifications Individual Position Position Applicable Requirements Documentation
2.3 ______
2.4 ______
Page 5 of 7 FAC-003-AB-1 Transmission Vegetation Management Program
3 PROCEDURES
In the completion of this section, please follow the guidelines/examples as set out in Section 3 of the document, “TVMP Requirements”
Note: The following procedures are a minimum requirement for TFO’s. Other procedures may be added or referenced as necessary.
3.1 Mitigation Measures - Clearance 1 Exceptions
3.2 Communication of Imminent Threats
3.3 ______
3.4 ______
Page 6 of 7 FAC-003-AB-1 Transmission Vegetation Management Program
4 Work Specifications
In the completion of this section, please follow the guidelines/examples as set out in Section 4 of the document, “TVMP Requirements”
4.1 Site Work Specification
4.2 Inspection Schedule
As part of the Vegetation Management Plan the TFO shall provide a list of all scheduled patrols for the NERC related lines plus all system critical lines.
Patrols to include but not limited to: Annual Fall Air Patrol (YAP) – off cycle work identified Field Verification of off cycle work identified during YAP, this work may not be included in Vegetation Management Plan Detailed Ground Patrol (DGP) Cyclical Vegetation Management Patrols Detailed Air Patrols (DAP), both cyclical and as required
The following table identifies when each line (or line segment) is planned to be inspected and tracks when the work is actually done.
Line Inspection Type Planned Year Date Complete Applicable Documentation
Page 7 of 7