Bid Workup Sheet for Cost Breakdown
Total Page:16
File Type:pdf, Size:1020Kb
Bid Workup Sheet for Cost Breakdown
No Item QTY Unit Item Subtotal Cost Code 1 Sitework 1 l/s $385,000 Site Construction 2 Landscaping 1 l/s $180,000 Site Construction 3 Termite Control 25,000 sf $2,000 Site Construction 4 Building Concrete 1 l/s $130,500 Building Structures 5 Building Sidewalk 1,000 sf $4,000 Building Structures 6 Masonry 1 l/s $1 75,000 Building Structures 7 Stone Veneer 1,050 sf $26,250 Building Structures 8 Foam Insulation 1 l/s $7,500 Building Structures 9 Structural Steel 1 l/s $145,000 Building Structures 10 Aluminum Trellis 1 l/s $30,000 Building Structures 11 Rough Carpentry 1 l/s $40,000 Building Finishes 12 Window Sills 1 l/s $4,500 Building Structures 13 Built-up Roofing 1 l/s $135,000 Building Structures 14 Caulking 1 l/s $5,600 Building Structures 15 H.M. Doors 3 ea $2,325 Building Finishes 16 Wood Doors 2 ea $1,180 Building Finishes 17 Hardware 5 ea $1,750 Building Finishes 18 Glass and Glazing 1 l/s $52,000 Building Finishes 19 Windows 1 l/s $7,560 Building Finishes 20 Stucco 1 l/s $65,000 Building Finishes 21 Drywall 1 l/s $115,000 Building Finishes 22 Acoustical Ceilings 1 l/s $14,530 Building Finishes 23 VCT 1 l/s $1,250 Building Finishes 24 Painting 1 l/s $38,000 Building Finishes 25 Toilet Accessories 1 l/s $8,000 Building Finishes 26 Awnings 1 l/s $10,000 Building Structures 27 Fire Protection 1 l/s $28,000 Building Systems 28 Plumbing 1 l/s $9,000 Building Systems 29 HVAC 1 l/s $74,580 Building Systems 30 Electrical 1 l/s $99,000 Building Systems 31 Site Lighting 1 l/s $13,570 Site Construction