LOGO METHOD STATEMENT GENERAL PLUMBING

Your company details Address Tel: Fax: Mobile: Project/Contract General plumbing including; installation and maintenance of ball valves, soil pipes, Taps, pipe soldering, hot work etc Contractor Site Address Project Start Date Expected Duration Projected Completion Date

Name Title Signature Date Document Author Authorised by

Authorised by

Authorised by (for Client)

Emergency Contact Details

Contact

Tel

Mobile

Data Protection Statement The information and data provided herein shall not be duplicated, disclosed or disseminated by the recipient in whole or in part for any purpose whatsoever without the prior written permission from Company. Disclaimer please read (delete before use)

The details provided in this example method statement are intended as a guide only, the hazards and control procedures listed are not a comprehensive list. You must ensure that you carry out a risk assessment to determine and control the significant hazards that will be present in your particular circumstance. All information and advice is given in good faith. We cannot accept any responsibility for your subsequent acts or omissions. If you have any doubts queries or concerns, you should refer to the relevant regulations and take further professional advice.

Please delete all red text prior to use

Series: Series & Number Issue Date: TBA Revision Number Revision Date Page 1 of 7 Copyright HS Direct Ltd 2006 All rights reserved LOGO METHOD STATEMENT GENERAL PLUMBING

Use this page to highlight the significant hazards your staff and others will be exposed to, also highlight the most important preventative/control measures that must be taken, HAZARDS and CONTROL MEASURES will be taken from your RISK ASSESSMENT. You can also highlight quality and environmental issues. The following are examples; please delete/enter your own Staff Information Sheet The following method statement has been developed to provide a safe system of work and must be adhered to at all times, any significant deviation from this system must first be authorised by your manager or safety representative. Please read the entire sheet before beginning, if you have any questions please contact your manager or safety representative.

The main hazards to your safety and health are; a) Injury from slips trips and falls. b) Injury from Manual Handling. c) Ill health from breathing solder fumes. d) Injury to other contractors during works. e) Injury from machine and tool hazards. f) Fire from hot work. g) Working at height. h) Possible presence of Asbestos.

Main Preventative Measures you must take; a) You must be “competent” to carry out the task. b) Barriers and/or warning signs must be placed around the work area where appropriate. c) Fire extinguishers will be on hand during hot work. d) Protective heat shields must be used. e) Visitors and other members of staff are prohibited from entry unless accompanied by competent person, all visitors issued with personal protective equipment where appropriate. f) You must read and be familiar with the COSHH Safety Data Sheets for solder. g) You must follow all directions given by the project manager or his agents. h) Review the asbestos survey before starting work.

Personal Protective Equipment you must wear; a) Hard Hat. b) Hi Visibility Vest. c) Dust Mask. d) Safety Glasses. e) Overalls. f) Gloves. g) Safety boots.

Environmental Protection Measures you must take; a) You must dispose of waste and spoil to the designated area or skip provided for waste.

Series: Series & Number Issue Date: TBA Revision Number Revision Date Page 2 of 7 Copyright HS Direct Ltd 2006 All rights reserved LOGO METHOD STATEMENT GENERAL PLUMBING

Quality Control a) Adhere strictly to the following procedure to ensure quality of service. b) If in doubt contact your manager for clarification before proceeding.

Add in other relevant sections such as the items listed below. Your risk assessment will tell you which control procedures must be in place (Remove any that do not apply to you) General Precautions To be observed by all staff at all times, any deviation from these control procedures must be authorised by the site foreman or safety representative.

Staff, Training & PPE Plumbing and maintenance work will be carried out by staff from Company, all staff are time served plumbers with relevant experience, and hold the following qualifications; List Qualifications. A site manager will be appointed to each contract he/she will be responsible for quality and safety. Apprentices and young workers will be supervised and are not allowed to carry out tasks or operate machinery for which they have not been trained.

All site workers will wear Safety boots, and protective clothing at all times, other items of PPE such as eye protection, respiratory masks and gloves are available to be worn as and when necessary.

Preparation & Induction A risk assessment will be prepared for all maintenance tasks which will be discussed with members of staff and the building manager, any queries or concerns will be raised with the contract manager who will ensure it is dealt with. Staff will be inducted onto site by the building manager and will follow all safety procedures advised by the client.

Welfare The Client is responsible for providing adequate washing, toilet, drying and refreshment facilities for Company staff and sub-contractors, Company are responsible for ensuring that such welfare facilities are maintained in a clean and wholesome manner. This will be your responsibility when you are the principal contractor, it may be necessary occasionally for your company to identify suitable local amenities.

First Aid It is the responsibility of the company to ensure adequate first aid provision for its staff. Adequate means provision of a trained first aider, suitable first aid equipment and/or the provision of an appointed person at the minimum.

A trained first aider will be a suitable person who has attended an approved course of at least 3 days training repeated every 3 years and attended a refresher course every year in between.

An Appointed Person is a person provided by the employer to take charge of the situation (e.g. to call an ambulance) if a serious injury/illness occurs in the absence of a first aider. The Appointed Person can render emergency first aid if trained to do so. Often principal contractors will ensure sufficient first aid cover for sites under their control

Series: Series & Number Issue Date: TBA Revision Number Revision Date Page 3 of 7 Copyright HS Direct Ltd 2006 All rights reserved LOGO METHOD STATEMENT GENERAL PLUMBING

Access egress The principal contractor is responsible for providing safe access and egress to the site, YOUR COMPANY staff will ensure safe access and egress is maintained for themselves and other contractors in the area they are working in, good standards of housekeeping will be maintained. YOUR COMPANY will be responsible for safe access and egress when you are the principal contractor

Material Handling All materials required for site will be unloaded to a designated unloading and storage area which will be away from the work area as far as is practicable. This area will be kept tidy to minimise trip hazards. Materials, as and when required, will be transferred from the storage area to the work area. All staff will take care when handling materials.

Manual Handling All staff and contractors have been instructed on the potential dangers of manual handling, and have received manual handling training. Staff and contractors will not lift items, tools or equipment beyond their capabilities. Heavy or awkward items will be broken down into smaller units or dual lifted where this is not possible. It is the responsibility of the site foreman to identify and control potentially dangerous manual handling situations as they occur on site on a day to day basis.

Working from Step Ups The majority of tasks that involve working at height will be carried out using the step up, before use the floor area should be clear, free from waste and on level ground. The step up should be checked for any sign of damage before use and if damaged removed from use immediately.

Working from Step Ladders The majority of tasks carried out at height involve working below 2 metres from step ladders; all staff have been made aware of the dangers of working from step ladders and have been instructed on the safe use of ladders. Staff are required to read and understand HSE leaflet INDG402 the Safe use of Ladders & Stepladders. Only competent members of staff will be allowed to work from step ladders and it is the responsibility of the site foreman to ensure conditions are safe before allowing any ladder work to take place. Only short duration work will be performed from ladders. Alternative access methods will be used when longer duration work is required.

Please also see Practical Alternatives to Using Step Ladders Part 1 and Practical Alternatives to Using Step Ladders Part 2

Contractor/Visitor Safety YOUR COMPANY will liaise with other contractor’s staff on a day to day basis and ensure they are aware of the risks present during the works. Staff and contractors will not leave any area of work in a dangerous condition or with risks to themselves, other contractors, tenants, or visitors, all tools and equipment will be cleared to secure storage at the completion of each shift. Scaffold, ladders and any other access to height will be made inaccessible.

Tools and Electrical Equipment Series: Series & Number Issue Date: TBA Revision Number Revision Date Page 4 of 7 Copyright HS Direct Ltd 2006 All rights reserved LOGO METHOD STATEMENT GENERAL PLUMBING

All items of tools and equipment will be visually inspected on a regular basis defective or damaged equipment will be removed from service. Electrical tools will be 110V where possible, sub contractors will not be allowed to bring on to site any damaged or defective tools, the site foreman is responsible for ensuring all tools and equipment brought onto the site is fit for purpose.

Solder Flux Solder flux fumes are potentially dangerous all staff must read and understand the safety data sheet regarding solder flux. (HSE Publication INDG248 Solder Fume and You). It is the responsibility of the site foreman to ensure adequate ventilation where soldering is being carried out. Method Statements

Describe the task or process you are writing about; Task Description This method statement describes the work process for general plumbing and plumbing maintenance work.

Describe in detail the step by step the tasks or process someone must follow in order to complete the task safely. Delete any that do not apply to your situation

Preparation

1) Report to site office and inform site manager of arrival, collect permit to work where required. 2) Attend any induction as required by the principal contractor or building manager. 3) Put on your personal protective equipment. 4) Take tools and equipment to the work area. 5) Cordon off work area if required to do so. 6) Ensure the area to be worked on and the exit points are clear of obstruction and that safe access and egress is maintained. 7) Check any electrical or hand tools for damage or faults, faulty or damaged tools must be removed from service immediately. 8) Do not leave tools and equipment unattended at any time. 9) Ensure the work area is left safe at end of each shift and when unattended.

Maintenance/repair work

1) Liaise with other contractors and facilities manager to isolate water supplies. 2) Isolate Hot & cold water pipes where necessary. 3) Drain down the water system where necessary. 4) When chasing out the walls firstly use the cable/pipe finder to locate any electric cables or pipe work. 5) Mark the wall for the area to be chased out. 6) On plasterboard walls carefully cut out using a knife or saw. 7) On plaster walls chase out using a Kango power chisel or hand bolster.

Series: Series & Number Issue Date: TBA Revision Number Revision Date Page 5 of 7 Copyright HS Direct Ltd 2006 All rights reserved LOGO METHOD STATEMENT GENERAL PLUMBING

8) If necessary remove any skirting boards by driving the bolster chisel behind the board and carefully levering it away from the wall (gloves should always be worn) 9) If necessary to take up any floorboards these should first be checked with the cable/pipe finder to ensure the area below the board is clear. 10)Set the circular saw to 18mm depth and along the length of the board on both sides through the tennon (on some floors it may be necessary to reset the saw to a depth of 22mm and take a second cut 11)Using the bolster chisel lever up the board, remove all nails. 12)When taking up carpet and lifting floorboards attention will be paid to the trip hazard created, do not leave open floorboards and upturned carpets any longer than is necessary, sufficient warning signs must be posted where there is a risk of other contractors entering the site. 13)Carry out replacement of parts or repairs. 14)Ensure waste pipes and other plastic pipe work are connected correctly. 15)Where plastic pipe is connected with solvents, staff will follow all safe use instructions. 16)Where solder work has to be carried out, prepare pipe work for solder joints. 17)Obtain the appropriate hot work permit from the facilities manager. 18)Ensure the correct type of fire extinguisher is on hand during hot work. 19)Protect surrounding area with heat shields. 20)Ensure adequate ventilation for solder work. 21)Connect and solder all necessary joints. 22)Check all joints. 23)Liaise with facilities manager to turn water supplies back on. 24)Carry out further checks for water tightness and quality of finish. 25)Chlorinate the system if required and check for successful completion. 26)Request facilities manager to inspect works. 27)Issue certificate of completion and chlorination to facilities manager. 28)Pack tools and equipment and leave area clean and tidy. 29)Maintain fire watch for 30 minutes where hot work has been carried out. 30)Report to site office and sign off permit to work.

Series: Series & Number Issue Date: TBA Revision Number Revision Date Page 6 of 7 Copyright HS Direct Ltd 2006 All rights reserved LOGO METHOD STATEMENT GENERAL PLUMBING

Do you need Assistance with Health & Safety, Employment Law or Subcontractors?

Our group of companies has 3 “Software as a Service” products offering your business the support it needs to comply with Health, Safety and Employment law.

Safety First Package:

 Online system allowing you to create unlimited Risk Assessments, Method statements and COSHH assessments  Full support from our Safety consultants 7 days a week  Legal Protection Insurance for HSE Prosecutions, Jury Service and other legal expenses  Fax to site service, call us and we can have your documents sent directly to your customer

Workforce Management Package:

 Employment contracts and staff handbooks for your employees  A host of forms and paperwork required for dealing with employment matters  Telephone support from our HR consultants  Free insurance against Employment Tribunal and other related court costs and awards  Manage subcontractors in line with legislation and create a PQQ for them to complete online

Our systems contain many more features. For a demonstration of our systems please visit www.hsdirect.co.uk or www.eldirect.co.uk

or call us now on 0800 849 6728

Series: Series & Number Issue Date: TBA Revision Number Revision Date Page 7 of 7 Copyright HS Direct Ltd 2006 All rights reserved