Block and Rock Laying

Total Page:16

File Type:pdf, Size:1020Kb

Block and Rock Laying

Block and Rock Laying WVEIS Code 1911

This course will introduce students to the basic fundamentals of block and rock laying. Students will become familiar with basic tools, equipment and techniques used in block and rock laying.

Standard 1: Install a block foundation. (1911.S.1)

Block Foundation Objectives Students will: 1911.1.1 Describe how to locate the corners of a foundation wall on the footing from batter boards. 1911.1.2 Estimate materials needed for a foundation project. 1911.1.3 Lay out, bond, build and waterproof a foundation project. 1911.1.4 Describe and install wire reinforcement and lintels in a block wall.

Standard 2: Lay concrete block to the line. (1911.S.2)

Concrete Block Objectives Students will: 1911.2.1 Define terms associated with laying block. 1911.2.2 Identify methods of putting up a line. 1911.2.3 Lay out a block wall, and lay block to the line using an established level. 1911.2.4 Discuss the importance of having uniform bed joints and head joints.

Standard 3: Lay block leads. (1911.S.3)

Block Leads Objectives Students will: 1911.3.1 Write a paragraph describing the importance and purpose of laying block leads to the correct height, level and plumb. 1911.3.2 Estimate materials and build an outside and inside corner lead seven courses high. 1911.3.3 Build a block partition wall with control joints.

Standard 4: Lay stone. (1911.S.4)

Stone Objectives Students will: 1911.4.1 Define terms associated with cut stone. 1911.4.2 Describe various types of stone, and the procedure for laying out stone. 1911.4.3 Select types of anchors used in setting stone. 1911.4.4 Identify methods of handling stone. 1911.4.5 List factors to consider when setting stone. 1911.4.6 Lay a stone wall.

Recommended publications