The Lead Times Listed Below Are Estimates Based on Product Availability

Total Page:16

File Type:pdf, Size:1020Kb

The Lead Times Listed Below Are Estimates Based on Product Availability

The lead times listed below are estimates based on product availability.

* Please note: For “In Stock” items, your order must be processed and packed before it’s ready to ship. This can take anywhere from 1 – 4 additional days.

Furniture Collection In Stock -OR- Lead Time Made to Order Industrial Furniture Indoor Collections: Downtown Made to Order 3 – 6 Weeks *In Stock items are noted* Industrial Furniture Indoor Collections: SoHo Made to Order 3 – 6 Weeks *In Stock items are noted*

Beech Wood Classics: Traditional Made to Order 2 – 4 Weeks *In Stock items are noted* Beech Wood Classics: Modern Made to Order 2 – 3 Weeks *In Stock items are noted*

Holsag Beech Wood Collection Made to Order 4 – 7 Weeks

Fine Dining Collections: Designer Made to Order 4 – 6 Weeks *In Stock items are noted* Fine Dining Collections: Executive Made to Order 4 – 6 Weeks Fine Dining Collections: Continental Made to Order 4 – 6 Weeks Fine Dining Collections: Unique Made to Order 4 – 6 Weeks Fine Dining Collections: Rattan - Upholstered Made to Order 4 – 6 Weeks

Indoor Table Collections: Table Tops: Wood Made to Order 3 – 5 Weeks *In Stock items are noted* Indoor Table Collections: Table Tops: Stone | Stone Composite Made to Order 3 – 5 Weeks *In Stock items are noted* Indoor Table Collections: Table Tops: Laminate Made to Order 4 – 6 Weeks Indoor Table Collections: Table Tops: Padded Made to Order 4 – 6 Weeks Indoor Table Collections: Table Bases: Classic Made to Order 1 – 3 Weeks *In Stock items are noted* Indoor Table Collections: Table Bases: Promenade Made to Order 1 – 3 Weeks *In Stock items are noted* Indoor Table Collections: Table Bases: Decorative Made to Order 1 – 3 Weeks *In Stock items are noted*

Restaurant Booth Seating Made to Order 3 – 5 Weeks

Emeco Collections Made to Order 3 – 5 Weeks

Metal Frame Collections: Designer Made to Order 4 – 7 Weeks Metal Frame Collections: Traditional Made to Order 4 – 7 Weeks Lodge Style Hickory Collection Made to Order 4 – 7 Weeks

Assisted Living | Hospitality Made to Order 5 – 7 Weeks

Economy Collection Made to Order 1.5 – 3.5 Weeks *In Stock items are noted*

Banquet Furniture Made To Order 4 – 7 Weeks

Indoor Resin In Stock 2 – 3 Weeks

Recommended publications